SUB TOTAL (OPERATING COST)

   OWNING & OPERATING COST

WORK HOURS PER YEAR (G)

  f. Grease kg/jam x Rp/kg Rp/jam

  a. Fuel lt/jam x Rp/lt Rp/jam

  b. Engine Oil lt/jam x Rp/lt Rp/jam

  c. Transmission Oil lt/jam x Rp/lt Rp/jam

  d. Final Drive Oil lt/jam x Rp/lt Rp/jam

  e. Hydraulic Oil lt/jam x Rp/lt Rp/jam

  2.3 Tires (break stone)/(life time) Rp/jam

  2.2 Filters 50% x (b+c+d+e) Rp/jam

  II OPERATING COST

  2.4 Operator Wage Rp/jam

  2.5 Repair Cost (std. Cost)(multiple.fact) (6,00)x(1,1)x(8.500 Rp/jam

  2.6 Special Items (ripper point price) Rp/jam usable hours

  Rp/jam

  III TOTAL (PURE) OWNING & OPERATING COST Rp/jam

  2.1. Pelumas & Bahan Bakar

  (working hours per year) (G) SUB TOTAL (OWNING COST) Rp/jam

  EQUIPMENT EXCAVATOR

  Rp DEPRECIATED VALUE (E)=(C)-(D)

  MODEL

  YEAR MADE ATTACEHMENT STANDARD BUCKET JOB TYPE SOIL LOADING FIELD CONDITION SEDANG PROJECT RUNNING PERIOD EXCHANGE RATE Rp/US $

  Rp BOOK VALUE/DELIVERED PRICE (A)

  Rp TIRE PRICE (B)

  Rp DELIVERED PRICE LESS TIRES (C)=(A)-(B)

  Rp SALVAGE VALUE (D)

  Rp LIFE TIME (hours) (F) hrs

  1.2 Interest, tax, insurance factor (J) 1-((H-1)*(1-I)/(2*H)) (ITI) (annual rates)x(factor)x(delivered price) (0.12)x(J) x(A)

  hrs

  LIFE TIME (years) (H)=(F/G) years

  TRADE-IN VALUE RATE (I)= (D/A)

  DEPRECIATION Rp/year

  I OWNING COST

  1.1 Depreciated cost (depreciated value)/life time (hrs) Rp/jam

SUB TOTAL (OPERATING COST)

  EQUIPMENT BULDOZER

  MODEL

  YEAR MADE ATTACEHMENT STANDARD JOB TYPE COAL PILLING FIELD CONDITION SEDANG PROJECT RUNNING PERIOD EXCHANGE RATE Rp/US $

  Rp BOOK VALUE/DELIVERED PRICE (A)

  Rp TIRE PRICE (B)

  Rp DELIVERED PRICE LESS TIRES (C)=(A)-(B)

  Rp SALVAGE VALUE

  Rp DEPRECIATED VALUE (E)=(C)-(D)

  Rp LIFE TIME (hours) (F) hrs

WORK HOURS PER YEAR (G)

  LIFE TIME (years) (H)=(F/G) years

  f. Grease kg/jam x Rp/kg Rp/jam

  Rp/jam

  TOTAL (PURE) OWNING & OPERATING COST

  III

   SUB TOTAL (OPERATING COST) Rp/jam

  2.6 Special Items (ripper point price) Rp/jam usable hours

  2.5 Repair Cost (std. Cost)(multiple.fact) (5,00)x(1,1)x(8.500 Rp/jam

  (0,5x8.5 Rp/jam

  2.4 Operator Wage

  2.3 Tires (break stone)/(life time) Rp/jam

  2.2 Filters 50% x (b+c+d+e) Rp/jam

  e. Hydraulic Oil lt/jam x Rp/lt Rp/jam

  TRADE-IN VALUE RATE (I)= (D/A)

  d. Final Drive Oil lt/jam x Rp/lt Rp/jam

  c. Transmission Oil lt/jam x Rp/lt Rp/jam

  b. Engine Oil lt/jam x Rp/lt Rp/jam

  a. Fuel lt/jam x Rp/lt Rp/jam

  hrs

  II OPERATING COST

  (working hours per year) (G) SUB TOTAL (OWNING COST) Rp/jam

  1.2 Interest, tax, insurance factor (J) 1-((H-1)*(1-I)/(2*H)) (ITI) (annual rates)x(factor)x(delivered price) (0.12)x(J) x(A)

  1.1 Depreciated cost (depreciated value)/life time (hrs) Rp/jam

  I OWNING COST

  DEPRECIATION Rp/year

  2.1. Pelumas & Bahan Bakar

   OWNING & OPERATING COST

WORK HOURS PER YEAR (G)

  f. Grease kg/jam x Rp/kg Rp/jam

  a. Fuel lt/jam x Rp/lt Rp/jam

  b. Engine Oil lt/jam x Rp/lt Rp/jam

  c. Transmission Oil lt/jam x Rp/lt Rp/jam

  d. Final Drive Oil lt/jam x Rp/lt Rp/jam

  e. Hydraulic Oil lt/jam x Rp/lt Rp/jam

  2.3 Tires (break stone)/(life time) Rp/jam

  2.2 Filters 50% x (b+c+d+e) Rp/jam

  II OPERATING COST

  2.4 Operator Wage Rp/jam

  2.5 Repair Cost (std. Cost)(multiple.fact) (5,00)x(1,1)x(8,500 Rp/jam

  2.6 Special Items (ripper point price) Rp/jam usable hours

  Rp/jam

  III TOTAL (PURE) OWNING & OPERATING COST Rp/jam

  2.1. Pelumas & Bahan Bakar

  (working hours per year) (G) SUB TOTAL (OWNING COST) Rp/jam

  EQUIPMENT EXCAVATOR

  Rp DEPRECIATED VALUE (E)=(C)-(D)

  MODEL

  YEAR MADE ATTACEHMENT STANDARD JOB TYPE COAL LOADING FIELD CONDITION SEDANG PROJECT RUNNING PERIOD EXCHANGE RATE Rp/US $

  Rp BOOK VALUE/DELIVERED PRICE (A)

  Rp TIRE PRICE (B)

  Rp DELIVERED PRICE LESS TIRES (C)=(A)-(B)

  Rp SALVAGE VALUE (D)

  Rp LIFE TIME (hours) (F) hrs

  1.2 Interest, tax, insurance factor (J) 1-((H-1)*(1-I)/(2*H)) (ITI) (annual rates)x(factor)x(delivered price) (0.12)x(J) x(A)

  hrs

  LIFE TIME (years) (H)=(F/G) years

  TRADE-IN VALUE RATE (I)= (D/A)

  DEPRECIATION Rp/year

  I OWNING COST

  1.1 Depreciated cost (depreciated value)/life time (hrs) Rp/jam

SUB TOTAL (OPERATING COST)

  EQUIPMENT DUMP TRUCK

  MODEL

  YEAR MADE ATTACEHMENT STANDARD JOB TYPE COAL HAULING FIELD CONDITION SEDANG PROJECT RUNNING PERIOD EXCHANGE RATE Rp/US $

  Rp BOOK VALUE/DELIVERED PRICE (A)

  Rp TIRE PRICE (B)

  Rp DELIVERED PRICE LESS TIRES (C)=(A)-(B)

  Rp SALVAGE VALUE (D)

  Rp DEPRECIATED VALUE (E)=(C)-(D)

  Rp LIFE TIME (hours) (F) hrs

WORK HOURS PER YEAR (G)

  LIFE TIME (years) (H)=(F/G) years

  e. Hydraulic Oil lt/jam x Rp/lt Rp/jam

  Rp/jam

  TOTAL (PURE) OWNING & OPERATING COST

  III

   SUB TOTAL (OPERATING COST) Rp/jam

  2.6 Special Items (ripper point price) Rp/jam usable hours

  2.5 Repair Cost (std. Cost)(multiple.fact) (0,50)x(1,0)x(8.500 Rp/jam

  2.4 Operator Wage Rp/jam

  2.3 Tires (break stone)/(life time) Rp/jam

  2.2 Filters 50% x (b+c+d+e) Rp/jam

  f. Grease kg/jam x Rp/kg Rp/jam

  d. Final Drive Oil lt/jam x Rp/lt Rp/jam

  TRADE-IN VALUE RATE (I)= (D/A)

  c. Transmission Oil lt/jam x Rp/lt Rp/jam

  b. Engine Oil lt/jam x Rp/lt Rp/jam

  a. Fuel lt/jam x Rp/lt Rp/jam

  2.1. Pelumas & Bahan Bakar

  hrs

  (working hours per year) (G) SUB TOTAL (OWNING COST) Rp/jam

  1.2 Interest, tax, insurance factor (J) 1-((H-1)*(1-I)/(2*H)) (ITI) (annual rates)x(factor)x(delivered price) (0.12)x(J) x(A)

  1.1 Depreciated cost (depreciated value)/life time (hrs) Rp/jam

  I OWNING COST

  DEPRECIATION Rp/year

  II OPERATING COST

   OWNING & OPERATING COST

WORK HOURS PER YEAR (G)

  f. Grease kg/jam x Rp/kg Rp/jam

  a. Fuel lt/jam x Rp/lt Rp/jam

  b. Engine Oil lt/jam x Rp/lt Rp/jam

  c. Transmission Oil lt/jam x Rp/lt Rp/jam

  d. Final Drive Oil lt/jam x Rp/lt Rp/jam

  e. Hydraulic Oil lt/jam x Rp/lt Rp/jam

  2.3 Tires (break stone)/(life time) Rp/jam

  2.2 Filters 50% x (b+c+d+e) Rp/jam

  II OPERATING COST

  2.4 Operator Wage Rp/jam

  2.5 Repair Cost (std. Cost)(multiple.fact) (5,00)x(1,1)x(8.500 Rp/jam

  2.6 Special Items (ripper point price) Rp/jam usable hours

  Rp/jam

  III TOTAL (PURE) OWNING & OPERATING COST Rp/jam

  2.1. Pelumas & Bahan Bakar

  (working hours per year) (G) SUB TOTAL (OWNING COST) Rp/jam

  EQUIPMENT BULDOZER

  Rp DEPRECIATED VALUE (E)=(C)-(D)

  MODEL

  YEAR MADE ATTACEHMENT STANDARD JOB TYPE SOIL SPREADING FIELD CONDITION SEDANG PROJECT RUNNING PERIOD EXCHANGE RATE Rp/US $

  Rp BOOK VALUE/DELIVERED PRICE (A)

  Rp TIRE PRICE (B)

  Rp DELIVERED PRICE LESS TIRES (C)=(A)-(B)

  Rp SALVAGE VALUE (D)

  Rp LIFE TIME (hours) (F) hrs

  1.2 Interest, tax, insurance factor (J) 1-((H-1)*(1-I)/(2*H)) (ITI) (annual rates)x(factor)x(delivered price) (0.12)x(J) x(A)

  hrs

  LIFE TIME (years) (H)=(F/G) years

  TRADE-IN VALUE RATE (I)= (D/A)

  DEPRECIATION Rp/year

  I OWNING COST

  1.1 Depreciated cost (depreciated value)/life time (hrs) Rp/jam

SUB TOTAL (OPERATING COST)

  EQUIPMENT MOTOR GRADER

  MODEL

  YEAR MADE ATTACEHMENT STANDARD JOB TYPE ROAD MAINTENANCE FIELD CONDITION SEDANG PROJECT RUNNING PERIOD EXCHANGE RATE Rp/US $

  Rp BOOK VALUE/DELIVERED PRICE (A)

  Rp TIRE PRICE (B)

  Rp DELIVERED PRICE LESS TIRES (C)=(A)-(B)

  Rp SALVAGE VALUE (D)

  Rp DEPRECIATED VALUE (E)=(C)-(D)

  Rp LIFE TIME (hours) (F) hrs

WORK HOURS PER YEAR (G)

  LIFE TIME (years) (H)=(F/G) years

  e. Hydraulic Oil lt/jam x Rp/lt Rp/jam

  Rp/jam

  TOTAL (PURE) OWNING & OPERATING COST

  III

   SUB TOTAL (OPERATING COST) Rp/jam

  2.6 Special Items (ripper point price) Rp/jam usable hours

  2.5 Repair Cost (std. Cost)(multiple.fact) (5,00)x(1,1)x(8.500 Rp/jam

  2.4 Operator Wage Rp/jam

  2.3 Tires (break stone)/(life time) Rp/jam

  2.2 Filters 50% x (b+c+d+e) Rp/jam

  f. Grease kg/jam x Rp/kg Rp/jam

  d. Final Drive Oil lt/jam x Rp/lt Rp/jam

  TRADE-IN VALUE RATE (I)= (D/A)

  c. Transmission Oil lt/jam x Rp/lt Rp/jam

  b. Engine Oil lt/jam x Rp/lt Rp/jam

  a. Fuel lt/jam x Rp/lt Rp/jam

  2.1. Pelumas & Bahan Bakar

  hrs

  (working hours per year) (G) SUB TOTAL (OWNING COST) Rp/jam

  1.2 Interest, tax, insurance factor (J) 1-((H-1)*(1-I)/(2*H)) (ITI) (annual rates)x(factor)x(delivered price) (0.12)x(J) x(A)

  1.1 Depreciated cost (depreciated value)/life time (hrs) Rp/jam

  I OWNING COST

  DEPRECIATION Rp/year

  II OPERATING COST

   OWNING & OPERATING COST

WORK HOURS PER YEAR (G)

  f. Grease kg/jam x Rp/kg Rp/jam

  a. Fuel lt/jam x Rp/lt Rp/jam

  b. Engine Oil lt/jam x Rp/lt Rp/jam

  c. Transmission Oil lt/jam x Rp/lt Rp/jam

  d. Final Drive Oil lt/jam x Rp/lt Rp/jam

  e. Hydraulic Oil lt/jam x Rp/lt Rp/jam

  2.3 Tires (break stone)/(life time) Rp/jam

  2.2 Filters 50% x (b+c+d+e) Rp/jam

  II OPERATING COST

  2.4 Operator Wage Rp/jam

  2.5 Repair Cost (std. Cost)(multiple.fact) (5,00)x(1,1)x(8.500 Rp/jam

  2.6 Special Items (ripper point price) Rp/jam usable hours

  Rp/jam

  III TOTAL (PURE) OWNING & OPERATING COST Rp/jam

  2.1. Pelumas & Bahan Bakar

  (working hours per year) (G) SUB TOTAL (OWNING COST) Rp/jam

  EQUIPMENT BULDOZER

  Rp DEPRECIATED VALUE (E)=(C)-(D)

  MODEL

  YEAR MADE ATTACEHMENT STANDARD JOB TYPE SOIL RIPPING & DOZING FIELD CONDITION SEDANG PROJECT RUNNING PERIOD EXCHANGE RATE Rp/US $

  Rp BOOK VALUE/DELIVERED PRICE (A)

  Rp TIRE PRICE (B)

  Rp DELIVERED PRICE LESS TIRES (C)=(A)-(B)

  Rp SALVAGE VALUE (D)

  Rp LIFE TIME (hours) (F) hrs

  1.2 Interest, tax, insurance factor (J) 1-((H-1)*(1-I)/(2*H)) (ITI) (annual rates)x(factor)x(delivered price) (0.12)x(J) x(A)

  hrs

  LIFE TIME (years) (H)=(F/G) years

  TRADE-IN VALUE RATE (I)= (D/A)

  DEPRECIATION Rp/year

  I OWNING COST

  1.1 Depreciated cost (depreciated value)/life time (hrs) Rp/jam

SUB TOTAL (OPERATING COST)

  EQUIPMENT KOMATSU

  MODEL

  YEAR MADE ATTACEHMENT STANDARD JOB TYPE COMPACTING FIELD CONDITION SEDANG PROJECT RUNNING PERIOD EXCHANGE RATE Rp/US $

  Rp BOOK VALUE/DELIVERED PRICE (A)

  Rp TIRE PRICE (B)

  Rp DELIVERED PRICE LESS TIRES (C)=(A)-(B)

  Rp SALVAGE VALUE (D)

  Rp DEPRECIATED VALUE (E)=(C)-(D)

  Rp LIFE TIME (hours) (F) hrs

WORK HOURS PER YEAR (G)

  LIFE TIME (years) (H)=(F/G) years

  f. Grease kg/jam x Rp/kg Rp/jam

  Rp/jam

  TOTAL (PURE) OWNING & OPERATING COST

  III

   SUB TOTAL (OPERATING COST) Rp/jam

  2.6 Special Items (ripper point price) Rp/jam usable hours

  2.5 Repair Cost (std. Cost)(multiple.fact) (5,00)x(1,1)x(8.500 Rp/jam

  (1,5x8.50 Rp/jam

  2.4 Operator Wage

  2.3 Tires (break stone)/(life time) Rp/jam

  2.2 Filters 50% x (b+c+d+e) Rp/jam

  e. Hydraulic Oil lt/jam x Rp/lt Rp/jam

  TRADE-IN VALUE RATE (I)= (D/A)

  d. Final Drive Oil lt/jam x Rp/lt Rp/jam

  c. Transmission Oil lt/jam x Rp/lt Rp/jam

  b. Engine Oil lt/jam x Rp/lt Rp/jam

  a. Fuel lt/jam x Rp/lt Rp/jam

  hrs

  II OPERATING COST

  (working hours per year) (G) SUB TOTAL (OWNING COST) Rp/jam

  1.2 Interest, tax, insurance factor (J) 1-((H-1)*(1-I)/(2*H)) (ITI) (annual rates)x(factor)x(delivered price) (0.12)x(J) x(A)

  1.1 Depreciated cost (depreciated value)/life time (hrs) Rp/jam

  I OWNING COST

  DEPRECIATION Rp/year

  2.1. Pelumas & Bahan Bakar

   OWNING & OPERATING COST

WORK HOURS PER YEAR (G)

  f. Grease kg/jam x Rp/kg Rp/jam

  a. Fuel lt/jam x Rp/lt Rp/jam

  b. Engine Oil lt/jam x Rp/lt Rp/jam

  c. Transmission Oil lt/jam x Rp/lt Rp/jam

  d. Final Drive Oil lt/jam x Rp/lt Rp/jam

  e. Hydraulic Oil lt/jam x Rp/lt Rp/jam

  2.3 Tires (break stone)/(life time) Rp/jam

  2.2 Filters 50% x (b+c+d+e) Rp/jam

  II OPERATING COST

  2.4 Operator Wage Rp/jam

  2.5 Repair Cost (std. Cost)(multiple.fact) (5,00)x(1,1)x(8.50 Rp/jam

  2.6 Special Items (ripper point price) Rp/jam usable hours

  Rp/jam

  III TOTAL (PURE) OWNING & OPERATING COST Rp/jam

  2.1. Pelumas & Bahan Bakar

  (working hours per year) (G) SUB TOTAL (OWNING COST) Rp/jam

  EQUIPMENT BULDOZER

  Rp DEPRECIATED VALUE (E)=(C)-(D)

  MODEL

  YEAR MADE ATTACEHMENT STANDARD JOB TYPE COAL RIPPING & DOZING FIELD CONDITION SEDANG PROJECT RUNNING PERIOD EXCHANGE RATE Rp/US $

  Rp BOOK VALUE/DELIVERED PRICE (A)

  Rp TIRE PRICE (B)

  Rp DELIVERED PRICE LESS TIRES (C)=(A)-(B)

  Rp SALVAGE VALUE (D)

  Rp LIFE TIME (hours) (F) hrs

  1.2 Interest, tax, insurance factor (J) 1-((H-1)*(1-I)/(2*H)) (ITI) (annual rates)x(factor)x(delivered price) (0.12)x(J) x(A)

  hrs

  LIFE TIME (years) (H)=(F/G) years

  TRADE-IN VALUE RATE (I)= (D/A)

  DEPRECIATION Rp/year

  I OWNING COST

  1.1 Depreciated cost (depreciated value)/life time (hrs) Rp/jam

SUB TOTAL (OPERATING COST)

  EQUIPMENT TRUK AIR

MODEL CKA-12

  YEAR MADE 1998 ATTACEHMENT STANDARD JOB TYPE FIELD CONDITION SEDANG PROJECT RUNNING PERIOD EXCHANGE RATE Rp/US $

  Rp BOOK VALUE/DELIVERED PRICE (A)

  Rp TIRE PRICE (B)

  Rp DELIVERED PRICE LESS TIRES (C)=(A)-(B)

  Rp SALVAGE VALUE (D)

  Rp DEPRECIATED VALUE (E)=(C)-(D)

  Rp LIFE TIME (hours) (F) hrs

WORK HOURS PER YEAR (G)

  TRADE-IN VALUE RATE (I)= (D/A)

  f. Grease kg/jam x Rp/kg Rp/jam

  hrs

  Rp/jam

  TOTAL (PURE) OWNING & OPERATING COST

  III

   SUB TOTAL (OPERATING COST) Rp/jam

  2.6 Special Items (ripper point price) Rp/jam usable hours

  2.5 Repair Cost (std. Cost)(multiple.fact) (0.5)x(1,0)x(8.500 Rp/jam

  2.4 Operator Wage Rp/jam

  2.3 Tires (break stone)/(life time) Rp/jam

  2.2 Filters 50% x (b+c+d+e) Rp/jam

  e. Hydraulic Oil lt/jam x Rp/lt Rp/jam

  DEPRECIATION Rp/year

  d. Final Drive Oil lt/jam x Rp/lt Rp/jam

  c. Transmission Oil lt/jam x Rp/lt Rp/jam

  b. Engine Oil lt/jam x Rp/lt Rp/jam

  a. Fuel lt/jam x Rp/lt Rp/jam

  LIFE TIME (years) (H)=(F/G) years

  II OPERATING COST

  (working hours per year) (G) SUB TOTAL (OWNING COST) Rp/jam

  1.2 Interest, tax, insurance factor (J) 1-((H-1)*(1-I)/(2*H)) #DIV/0! (ITI) (annual rates)x(factor)x(delivered price) (0.12)x(J) x(A)

  1.1 Depreciated cost (depreciated value)/life time (hrs) Rp/jam

  I OWNING COST

  2.1. Pelumas & Bahan Bakar

   OWNING & OPERATING COST

WORK HOURS PER YEAR (G)

  f. Grease kg/jam x Rp/kg Rp/jam

  a. Fuel lt/jam x Rp/lt Rp/jam

  b. Engine Oil lt/jam x Rp/lt Rp/jam

  c. Transmission Oil lt/jam x Rp/lt Rp/jam

  d. Final Drive Oil lt/jam x Rp/lt Rp/jam

  e. Hydraulic Oil lt/jam x Rp/lt Rp/jam

  2.3 Tires (break stone)/(life time) Rp/jam

  2.2 Filters 50% x (b+c+d+e) Rp/jam

  II OPERATING COST

  2.4 Operator Wage Rp/jam

  2.5 Repair Cost (std. Cost)(multiple.fact) (4,00)x(1,1)x(8.500 Rp/jam

  2.6 Special Items (ripper point price) Rp/jam usable hours

  Rp/jam

  III TOTAL (PURE) OWNING & OPERATING COST Rp/jam

  2.1. Pelumas & Bahan Bakar

  (working hours per year) (G) SUB TOTAL (OWNING COST) Rp/jam

  EQUIPMENT WHEEL LOADER

  Rp DEPRECIATED VALUE (E)=(C)-(D)

  MODEL

  YEAR MADE ATTACEHMENT STANDARD JOB TYPE COAL LOADING FROM STOCKPILE FIELD CONDITION SEDANG PROJECT RUNNING PERIOD EXCHANGE RATE Rp/US $

  Rp BOOK VALUE/DELIVERED PRICE (A)

  Rp TIRE PRICE (B)

  Rp DELIVERED PRICE LESS TIRES (C)=(A)-(B)

  Rp SALVAGE VALUE (D)

  Rp LIFE TIME (hours) (F) hrs

  1.2 Interest, tax, insurance factor (J) 1-((H-1)*(1-I)/(2*H)) (ITI) (annual rates)x(factor)x(delivered price) (0.12)x(J) x(A)

  hrs

  LIFE TIME (years) (H)=(F/G) years

  TRADE-IN VALUE RATE (I)= (D/A)

  DEPRECIATION Rp/year

  I OWNING COST

  1.1 Depreciated cost (depreciated value)/life time (hrs) Rp/jam

SUB TOTAL (OPERATING COST)

  EQUIPMENT EXCAVATOR

  MODEL

  YEAR MADE ATTACEHMENT STANDARD JOB TYPE LAND CLEARING FIELD CONDITION SEDANG PROJECT RUNNING PERIOD EXCHANGE RATE Rp/US $

  Rp BOOK VALUE/DELIVERED PRICE (A)

  Rp TIRE PRICE (B)

  Rp DELIVERED PRICE LESS TIRES (C)=(A)-(B)

  Rp SALVAGE VALUE (D)

  Rp DEPRECIATED VALUE (E)=(C)-(D)

  Rp LIFE TIME (hours) (F) hrs

WORK HOURS PER YEAR (G)

  LIFE TIME (years) (H)=(F/G) years

  e. Hydraulic Oil lt/jam x Rp/lt Rp/jam

  Rp/jam

  TOTAL (PURE) OWNING & OPERATING COST

  III

   SUB TOTAL (OPERATING COST) Rp/jam

  2.6 Special Items (ripper point price) Rp/jam usable hours

  2.5 Repair Cost (std. Cost)(multiple.fact) (3,00)x(1,1)x(8.500 Rp/jam

  2.4 Operator Wage Rp/jam

  2.3 Tires (break stone)/(life time) Rp/jam

  2.2 Filters 50% x (b+c+d+e) Rp/jam

  f. Grease kg/jam x Rp/kg Rp/jam

  d. Final Drive Oil lt/jam x Rp/lt Rp/jam

  TRADE-IN VALUE RATE (I)= (D/A)

  c. Transmission Oil lt/jam x Rp/lt Rp/jam

  b. Engine Oil lt/jam x Rp/lt Rp/jam

  a. Fuel lt/jam x Rp/lt Rp/jam

  2.1. Pelumas & Bahan Bakar

  hrs

  (working hours per year) (G) SUB TOTAL (OWNING COST) Rp/jam

  1.2 Interest, tax, insurance factor (J) 1-((H-1)*(1-I)/(2*H)) (ITI) (annual rates)x(factor)x(delivered price) (0.12)x(J) x(A)

  1.1 Depreciated cost (depreciated value)/life time (hrs) Rp/jam

  I OWNING COST

  DEPRECIATION Rp/year

  II OPERATING COST

   OWNING & OPERATING COST

WORK HOURS PER YEAR (G)

  f. Grease kg/jam x Rp/kg Rp/jam

  a. Fuel lt/jam x Rp/lt Rp/jam

  b. Engine Oil lt/jam x Rp/lt Rp/jam

  c. Transmission Oil lt/jam x Rp/lt Rp/jam

  d. Final Drive Oil lt/jam x Rp/lt Rp/jam

  e. Hydraulic Oil lt/jam x Rp/lt Rp/jam

  2.3 Tires (break stone)/(life time) Rp/jam

  2.2 Filters 50% x (b+c+d+e) Rp/jam

  II OPERATING COST

  2.4 Operator Wage Rp/jam

  2.5 Repair Cost (std. Cost)(multiple.fact) (5,00)x(1,1)x(8.500 Rp/jam

  2.6 Special Items (ripper point price) Rp/jam usable hours

  Rp/jam

  III TOTAL (PURE) OWNING & OPERATING COST Rp/jam

  2.1. Pelumas & Bahan Bakar

  (working hours per year) (G) SUB TOTAL (OWNING COST) Rp/jam

  EQUIPMENT BULDOZER

  Rp DEPRECIATED VALUE (E)=(C)-(D)

  MODEL

  YEAR MADE ATTACEHMENT STANDARD JOB TYPE LAND CLEARING FIELD CONDITION SEDANG PROJECT RUNNING PERIOD EXCHANGE RATE Rp/US $

  Rp BOOK VALUE/DELIVERED PRICE (A)

  Rp TIRE PRICE (B)

  Rp DELIVERED PRICE LESS TIRES (C)=(A)-(B)

  Rp SALVAGE VALUE (D)

  Rp LIFE TIME (hours) (F) hrs

  1.2 Interest, tax, insurance factor (J) 1-((H-1)*(1-I)/(2*H)) (ITI) (annual rates)x(factor)x(delivered price) (0.12)x(J) x(A)

  hrs

  LIFE TIME (years) (H)=(F/G) years

  TRADE-IN VALUE RATE (I)= (D/A)

  DEPRECIATION Rp/year

  I OWNING COST

  1.1 Depreciated cost (depreciated value)/life time (hrs) Rp/jam