PENGUMUMAN BTA SIMATAN

LAMPIRAN PENGUMUMAN PEMENANG
: 050/07/403.501/PP-BTA.SMT/VIII/2012

Tanggal

: 2 AGUSTUS 2012

Nama Paket

: PEMBANGUNAN BTA SIMATAN KAPASITAS 50 M3

KOREKSI ARITMATIK

EVALUASI TEKNIS

EVALUASI KEWAJARAN
HARGA

EVALUASI KUALIFIKASI

PEMBUKTIAN KUALIFIKASI


HASIL EVALUASI AKHIR

1

HARGA PENAWARAN HARGA TERKOREKSI

MS/TMS

MS/TMS

MS/TMS

MS/TMS

MS/TMS

MS/TMS

MS


MS

MS

TMS

NAMA PENAWAR

CV. LESTARI

#REF!

EVALUASI ADMINISTRASI

No

HPS =

174.482.000,00


141.357.000,00

TMS

2

CV. UNGGUL

151.080.000,00

151.109.000,00

TMS

TMS

3

CV. MULYA BERSAMA


151.365.000,00

151.393.000,00

TMS

TMS

4

CV. KARYA ANUGRAH

193.172.000,00

160.048.000,00

MS

TMS


5

CV. LUMINTU JAYA

166.777.000,00

166.798.000,00

MS

MS

TMS
MS

TMS

6


CV. BRANTAS RAYA

173.547.000,00

169.895.000,00

MS

TMS

7

CV. RAHAYU MULYA

181.131.000,00

176.578.000,00

MS


MS

MS

MS

8

CV. PURI MAS

180.908.000,00

180.949.000,00

MS

MS

MS


TMS

MS

Pakta integritas tidak ada

TMS
MS
TMS

Pakta integritas tidak ada

TMS

Jangka waktu penawaran di
bwh 45 hari

189.532.000,00

189.558.000,00


TMS

10

CV. AWAN INDAH

205.466.000,00

205.504.000,00

MS

MS

MS

MS

MS


MS

11

CV. TRI KUSUMATIKA

205.970.000,00

206.010.000,00

MS

MS

MS

MS

MS


MS

12

CV. TAMAN SARI

209.333.000,00

209.374.000,00

MS

MS

MS

MS

MS

MS

ELMY KURNIARTO WIDODO, ST,MT
Ketua

Alat tidak sesuai

Metode pelaksanaan tdk memenuhi
substansif & tdk menggambarkan
penguasaan pnyelesaian pekerjaan

CV. KURNIAWAN

PDAM KAB. MAGETAN TAHUN 2012

Pakta integritas tidak ada
Jangka waktu penawaran di
bwh 45 hari
Jangka waktu penawaran di
bwh 45 hari

TMS

9

PANITIA PENGADAAN BARANG/JASA

KETERANGAN

Nomor