Analisis Tingkat Produktivitas Tenaga Kerja Di Kota Binjai

Lampiran 1
Perkembangan Produktivitas Tenaga Kerja

Tahun

PDRB atas harga
konstan (Juta)

UMR/UMP
(RP)

Jumlah tenaga
kerja (jiwa)

1994
1995
1996
1997
1998
1999
2000

2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012

1.001.103.000
1.010.113.000
1.004.304.000
1.101.451.000
1.101.304.000
1.112.411.000
1.112.563.000

1.156.611.000
1.233.404.000
1.345.309.000
1.455.203.000
1.531.966.000
1.613.444.000
1.705.073.000
1.796.236.000
1.905.182.000
2.020.895.000
2.147.820.000
2.284.050.000

650.404
668.097
769.644
710.850
810.000
988.000
710.000

830.000
934.000
888.000
800.200
825.000
830.000
770.000
825.000
925.000
980.000
1.170.000
1.201.000

109.080
120.500
123.400
125.201
126.449
140.032
142.040

150.050
150.080
160.000
198.300
200.400
210.000
210.010
210.280
221.000
221.300
233.045
254.000

Produktivitas
tenaga kerja
(Ribu)
9177,69527
8382,680498
8138,606159
8797,461682

8709,471803
7943,977091
7832,744297
7708,17061
8218,310235
8408,18125
7338,391326
7644,540918
7683,066667
8119,008619
8542,115275
8620,733032
9131,924989
9216,33161
8992,322835

Tingkat
Pendidikan
80,23
83,14

84,02
87,28
87,2
92,17
97,2
98,39
98,45
98,66
98,75
98,33
98,11
98,31
98,28
99,18
99,19
99,22
99,2

Universitas Sumatera Utara


Lampiran 2
Hasil Pengolahan Data Eviews 4.1
Dependent Variable: Y
Method: Least Squares
Date: 27/06/14 Time: 06:33
Sample: 1994 2012
Included observations: 19
Variable

Coefficient

Std. Error

t-Statistic

Prob.

C
X1
X2


11390.41
0.002660
-56.33470

1640.041
0.000900
20.63658

6.945196
2.955881
-2.729846

0.0000
0.0093
0.0148

R-squared
Adjusted R-squared
S.E. of regression

Sum squared resid
Log likelihood
F-statistic
Prob(F-statistic)

0.392681
0.316766
470.3828
3540159.
-142.2446
5.172641
0.018507

Mean dependent var
S.D. dependent var
Akaike info criterion
Schwarz criterion
Hannan-Quinn criter.
Durbin-Watson stat


8347.670
569.0712
15.28891
15.43803
15.31415
1.542098

Universitas Sumatera Utara

Lampiran 3
Uji Multikolinearitas
Obs
1994
1995
1996
1997
1998
1999
2000
2001

2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012

X1
650404
668097
769644
710850
810000
988000
710000
830000
934000
888000
800200
825000
830000
770000
825000
925000
980000
1170000
1201000

X2
80.23
83.14
84.02
87.28
87.2
92.17
97.2
98.39
98.45
98.66
98.75
98.33
98.11
98.31
98.28
99.18
99.19
99.22
99.2

Y
9.177.695
8.382.680
8.138.606
8.797.462
8.709.472
7.943.977
7.832.744
7.708.171
8.218.310
8.408.181
7.338.391
7.644.541
7.683.067
8.119.009
8.542.115
8.620.733
9.131.925
9.216.332
8.992.323

Universitas Sumatera Utara

LAMPIRAN 4
Uji Normalitas
Dependent Variable: Y
Method: Least Squares
Date: 01/07/14 Time: 21:01
Sample: 1994 2012
Included observations: 19
Variable

Coefficient

Std. Error

t-Statistic

Prob.

C
X1

7270.857
0.001256

754.2851
0.000868

9.639401
1.448187

0.0000
0.1658

R-squared
Adjusted R-squared
S.E. of regression
Sum squared resid
Log likelihood
F-statistic
Prob(F-statistic)

0.109819
0.057456
552.4812
5189002.
-145.8772
2.097246
0.165757

Mean dependent var
S.D. dependent var
Akaike info criterion
Schwarz criterion
Hannan-Quinn criter.
Durbin-Watson stat

8347.670
569.0712
15.56602
15.66543
15.58284
0.843878

Dependent Variable: Y
Method: Least Squares
Date: 01/07/14 Time: 21:03
Sample: 1994 2012
Included observations: 19
Variable

Coefficient

Std. Error

t-Statistic

Prob.

C
X2

10376.81
-21.47469

1934.635
20.42810

5.363705
-1.051233

0.0001
0.3079

R-squared
Adjusted R-squared
S.E. of regression
Sum squared resid
Log likelihood
F-statistic
Prob(F-statistic)

0.061038
0.005804
567.4172
5473359.
-146.3840
1.105090
0.307866

Mean dependent var
S.D. dependent var
Akaike info criterion
Schwarz criterion
Hannan-Quinn criter.
Durbin-Watson stat

8347.670
569.0712
15.61937
15.71878
15.63619
0.694360

Universitas Sumatera Utara