Rencana Induk Investasi Air Limbah
Rencana Induk Investasi Air Limbah Paket I: Bogor
Rekaman Penerbitan dan Revisi
Rencana Induk Investasi
Air Limbah Paket I: Bogor
277184BA01
MMI
MMI
12
A
/home/kominfo3/123/1-daftar_isi.doc
29 March 2011
Draft Master Plan
Maret 2011
Indonesia Infrastructure Initiatives
E-Trade Building, Jl. KH Wahid Hasyim No. 55, Menteng, Jakarta
Revision
Date
Originator
Checker
0
30.3.2011
FB/JS/PA
SI
This document is issued for the party which commissioned it
and for specific purposes connected with the above-captioned
project only. It should not be relied upon by any other party or
used for any other purpose.
Approver
Description
EMS
For Issue
We accept no responsibility for the consequences of this
document being relied upon by any other party, or being used
for any other purpose, or containing any error or omission which
is due to an error or omission in data supplied to us by other
parties
This document contains confidential information and proprietary
intellectual property. It should not be shown to other parties
without consent from us and from the party which
commissioned it.
Mott MacDonald, S Widjojo Centre, 3rd Floor, Jalan Jenderal Sudirman Kav.71, Jakarta, 12190, Indonesia
Mott
S Widjojo
Centre,
3rd Floor,
Jalan Jenderal Sudirman Kav.71, Jakarta, 12190, Indonesia
T +62MacDonald,
21 252 6588
F +62 21
252 6592,
W www.mottmac.com
T +62 21 252 6588 F +62 21 252 6592, W www.mottmac.com
Rencana Induk Investasi Air Limbah Paket I: Bogor
Revision
Date
Originator
Checker
Approver
Description
Mott MacDonald, S Widjojo Centre, 3rd Floor, Jalan Jenderal Sudirman Kav.71, Jakarta, 12190, Indonesia
T +62 21 252 6588 F +62 21 252 6592, W www.mottmac.com
Rencana Induk Investasi Air Limbah Paket I: Bogor
Daftar Isi
Bab
Judul
Halaman
Tables
Figures
277184BA01/MMI/MMI/12/A 29 March 2011
P:\Jakarta\MIN\Project\277184BA01 - IndII Wastewater MP\Deliverables\03. Draft Master Plan\Bogor\DMP Bogor
1.04.11_Bahasa.doc
3
Rekaman Penerbitan dan Revisi
Rencana Induk Investasi
Air Limbah Paket I: Bogor
277184BA01
MMI
MMI
12
A
/home/kominfo3/123/1-daftar_isi.doc
29 March 2011
Draft Master Plan
Maret 2011
Indonesia Infrastructure Initiatives
E-Trade Building, Jl. KH Wahid Hasyim No. 55, Menteng, Jakarta
Revision
Date
Originator
Checker
0
30.3.2011
FB/JS/PA
SI
This document is issued for the party which commissioned it
and for specific purposes connected with the above-captioned
project only. It should not be relied upon by any other party or
used for any other purpose.
Approver
Description
EMS
For Issue
We accept no responsibility for the consequences of this
document being relied upon by any other party, or being used
for any other purpose, or containing any error or omission which
is due to an error or omission in data supplied to us by other
parties
This document contains confidential information and proprietary
intellectual property. It should not be shown to other parties
without consent from us and from the party which
commissioned it.
Mott MacDonald, S Widjojo Centre, 3rd Floor, Jalan Jenderal Sudirman Kav.71, Jakarta, 12190, Indonesia
Mott
S Widjojo
Centre,
3rd Floor,
Jalan Jenderal Sudirman Kav.71, Jakarta, 12190, Indonesia
T +62MacDonald,
21 252 6588
F +62 21
252 6592,
W www.mottmac.com
T +62 21 252 6588 F +62 21 252 6592, W www.mottmac.com
Rencana Induk Investasi Air Limbah Paket I: Bogor
Revision
Date
Originator
Checker
Approver
Description
Mott MacDonald, S Widjojo Centre, 3rd Floor, Jalan Jenderal Sudirman Kav.71, Jakarta, 12190, Indonesia
T +62 21 252 6588 F +62 21 252 6592, W www.mottmac.com
Rencana Induk Investasi Air Limbah Paket I: Bogor
Daftar Isi
Bab
Judul
Halaman
Tables
Figures
277184BA01/MMI/MMI/12/A 29 March 2011
P:\Jakarta\MIN\Project\277184BA01 - IndII Wastewater MP\Deliverables\03. Draft Master Plan\Bogor\DMP Bogor
1.04.11_Bahasa.doc
3