Buku Green Book (DRPPLN) 2016 UPDATE v.13 20122016 FINAL

REPUBLIC OF INDONESIA

LIST OF PLANNED PRIORITY
EXTERNAL LOANS
(DRPPLN)
2016

Ministry of National Development Planning/
National Development Planning Agency
- 2016 -

1

Foreword
In the process of preparing development projects to be funded by external
loans, the Ministry of National Development Planning arranges the List of Planned
Priority External Loans or Daftar Rencana Prioritas Pinjaman Luar Negeri (DRPPLN),
containing the list of projects that have met most of the readiness criteria. The DRPPLN
of 2016 published through the Decree of the Minister of National Development
Planning/Head
of

National
Development
Planning
Agency
Number
KEP.25/M.PPN/HK/03/2016. The DRPPLN 2016 consists of 25 projects: 24 projects of
ministries/agencies and 1 project of the local government. The total amount of the
external loans that needed to finance the projects in DRPPLN 2016 is estimated USD $
4.0 billion.
The DRPPLN 2016 will be used as a reference for planning and budgeting of
new external loan projects which will be executed in 2016-2017. With the issuance of the
DRPPLN 2016, the ministries/agencies/local authorities, as executing agencies, are
expected to enhance the readiness of their proposed projects listed in the DRPPLN 2016
and to ensure the activities can be done in a timely manner. In addition, the DRPPLN
2016 is also expected to be used by development partners as a reference in taking followup measures regarding their cooperation plan with the Government of Indonesia.
Ministry for National Development Planning/
Head of the National Development Planning Agency,

Sofyan A. Djalil


i

List of Contents
Foreword ...................................................................................................................... i
List of Contents ......................................................................................................... iii
Chapter 1 ......................................................................................................................v
1.
2.

Introduction ......................................................................................................... v
Recapitulation and List of Projects in the DRPPLN 2016 ............................. vi

Chapter 2 .................................................................................................................... ix
Kementerian Pekerjaan Umum dan Perumahan Rakyat/ Ministry of Public
Works and Housing .................................................................................................. 1
Direktorat Jenderal Bina Marga/ Directorate General of Highways ....................3
1. Engineering Service for National Roads Development Project .....................5
2. Development of Cileunyi - Sumedang - Dawuan Toll Road Phase II...........7
3. Toll Road Development of Manado - Bitung ...................................................9
Direktorat Jenderal Cipta Karya/ Directorate General of Human

Settlements ................................................................................................................11
4. Community Based Water and Sanitation Program (PAMSIMAS) ..............13
5. Engineering Service for Sanitation Improvement Project ............................17
6. Engineering Service for Water Supply Development Project ......................19
7. IKK Water Supply Program and Small Water Treatment Plant for Water
Scarcity Area.......................................................................................................21
8. Small Scale Water Treatment Plants for Emergency Relief ..........................23
9. National Slum Upgrading ................................................................................25
Direktorat Jenderal Sumber Daya Air/ Directorate General of Water
Resources ...................................................................................................................29
10. Engineering Service for Bulk Water and Water Supply Development
Project ..................................................................................................................31
11. Engineering Service for Coastal and River Development Project ...............33
12. Flood Management in Selected River Basins .................................................35
13. Engineering Service for Dam Multipurpose Development Project .............38
14. Engineering Service for Irrigation and Lowland Development Project .....40
15. Integrated Participatory Development and Management of Irrigation
Project - Phase I ..................................................................................................42
16. The Urgent Rehabilitation of Strategic Irrigation for Western Region of
Indonesia .............................................................................................................45

17. Komering Irrigation Project Stage III ..............................................................47
18. Rentang Irrigation Modernization Project ......................................................50

Kementerian Perhubungan/ Ministry of Transportation ................................... 53
19. Procurement of Track Material and Turn Out -Phase II ...............................55
iii

Kementerian Riset, Teknologi, dan Perguruan Tinggi/ Ministry of Research,
Technology, and Higher Education ......................................................................57
20. Development of Four Higher Education Institutions................................... 59
21. University of Gadjah Mada Achieving World Class University with SocioEntrepreneurial Spirit ....................................................................................... 63
22. The Plan of Hasanuddin University Hospital Development ...................... 66

Kementerian Agama/ Ministry of Religious Affairs ..........................................69
23. The Transformation of IAINs Into Modern Islamic Universities (TIMEs) 71
24. The Development and Improvement of Three Islamic Higher Educational
Institutions ......................................................................................................... 74

Pemerintah Daerah Provinsi Aceh/ Local Government of Aceh Province .....77
25. Reengineering and Improving the Hospitals and Referral System in

Selected Aceh Districts ..................................................................................... 79

iv

Chapter 1
1. Introduction
In order to support the achievement of national development priorities as stated in
Medium-Term National Development Plan or Rencana Pembangunan Jangka Menengah
Nasional (RPJMN) of 2015-2019, the Government of Indonesia explores the utilization
of all potential sources of financing, including external loans. The utilization of the
external loans is regulated under the Government Regulation Number 10/2011 on the
Procedure for Procurement of External Loans and Grants.
As mandated in the Government Regulation Number 10/2011, The Ministry of
National Development Planning/National Development Planning Agency
(Bappenas) coordinates the planning process of projects funded by external loans.
During the process, several external loan planning documents are issued, among
others the List of Medium-Term Planned External Loans or Daftar Rencana Pinjaman
Luar Negeri Jangka Menengah (DRPLN-JM)/ Blue Book and the List of Planned Priority
External Loans or Daftar Rencana Prioritas Pinjaman Luar Negeri (DRPPLN)/ Green
Book. The DRPLN-JM/ Blue Book is a document that contains the planned programs

and projects which are appropriate to be funded by external loans for the mediumterm period, while the DRPPLN/ Green Book is a document that contains the list of
external loans projects which already have a funding source indication and ready to
be negotiated within the yearly effective period.
The formulation of DRPPLN is based on the Decree of Minister for National
Development Planning/Head of National Development Planning Agency Number 4
year 2011 on the Procedures of Planning, Proposing, Assessing, Monitoring and
Evaluating of Projects Financed by External Loans and Grants. Projects that listed in
DRPPLN should have met most of the required readiness criteria through the
assessment of readiness documents submitted by the executing agencies. The
readiness assessment is conducted in order to minimize the barriers that may occur
during the implementation, and to increase the effectiveness and the efficiency of
external loans utilization.
Through the Ministerial Decree Number KEP.25/M.PPN/HK/03/2016, The Ministry of
National Development Planning/National Development Planning Agency (Bappenas)
has issued the DRPPLN 2016. As the DRPLN-JM/ Blue Book of 2015-2019 was
prepared using the program based approach, therefore, the DRPPLN of 2016 also be
presented in program-based approach. It means that the DRPPLN of 2016 may contain
initial proposed projects in the DRPLN-JM or part of program/ project of the DRPLNJM of 2015-2019. As the program based approach applied, the projects which are listed
in the DRPLN-JM of 2015-2019 can be adjusted in terms of locations, scope of projects,
and project cost, as long as the adjustment remains in the corridors of the target

achievement of external loan programs listed in the DRPLN-JM 2015-2019.

v

The DRPPLN 2016 is presented in two chapters. Chapter 1 consists of the
recapitulation of the projects by the executing agencies, by the indicative sources of
financing, and by the sector allocation. While Chapter 2 consists of the summary of
each project information, such as location, scope, outputs and outcomes as well as
stakeholders involved in project implementation (project digest).

2. Recapitulation and List of Projects in the DRPPLN 2016
The DRPPLN 2016 consists of 25 proposed projects, with the total loan amount of USD
4.0 billion, and the counterpart funding of USD 1.2 billion. The recapitulation of
proposed projects in the DRPPLN 2016 on the basis of executing agencies is shown in
Table 1, while the proportion of infrastructure and non-infrastructure sector allocation
is presented in Table 2.
Table 1. The DRPPLN 2016 by Executing Agencies

No


Executing Agency

Number of
Projects

Ministries/Agencies

Amount (USD million)
Loans

Counterpart
Funds

24

3,889.4

1,183.0

1


Ministry of Public Works

18

3,196.4

1,064.9

2

Ministry of Transportation

1

175.1

30.9

3


Ministry of Research,
Technology, and Higher
Education

3

279.7

36.9

4

Ministry of Religious
Affairs

2

238.2


50.3

1

106.8

10.7

Local Government of
Aceh Province

1

106.8

10.7

Total

25

3,996.2

1,193.7

Local Governments
5

vi

The external loan projects, as stated in the DRPPLN 2016, mostly will be used to
financed infrastructure sector, such as construction of dam and irrigation (USD 1.56
million, 39%), slum alleviation program (USD 0.8 million, 19%), water supply and
sanitation (USD 0.4 million, 10%), development of highway and national road (USD
0.3 million, 9%), the provision of railway facilities (USD 0.2 million, 4%), and the
provision of bulk water and flood management (USD 0.1 million, 3%). While for noninfrastructure sector, external financing of the DRPPLN 2016 is utilized to support
higher education development (USD 0.5 million, 13%), and health sector (USD 0.1
million, 3%).
Table 2. Recapitulation of the DRPPLN 2016 by Sector
No

Number of
Projects

Sector

Amount(USD million)
Loans

Counterpart Funds

1

Infrastructure

19

3,371.5

1,095.8

2

Non-Infrastructure

6

624.7

97.9

25

3,996.2

1,193.7

Total

Table 3. Recapitulation of the DRPPLN 2016 by Source of Financing
No

Source of Financing

Multilateral Agencies

Loan Amount
(USD million)
2,434.3

1

ADB

856.9

2

World Bank

733.0

3

IDB

744.4

4

IFAD

100.0

Bilateral Partners

1,561.9

5

China (Exim Bank)

472.6

6

Hungary

36.4

7

Spain

14.8

8

Korea (EDCF)

228.0

9

Japan (JICA)

671.7

10

Germany (KfW)

138.4
Total

3,996.2

vii

Some figures/ diagrams of the DRPPLN/ Green Book 2016 as follows:

Diagram A. Proportion of Loan Amount by Type of Executing Agency

Local Governments
2,7%

Ministries/
Agencies
97,3%

Diagram B. Proportion of Loan Amount by Sector

Non Infrastructure
15,6%

Infrastructure
84,4%

viii

Table 4. List of DRPPLN 2016
(in US$ 000)
No

Project Title

Program Title

Loan

Counterpart
Fund

Lender

Ministry of Public Works
Directorate General of Highways

1

Engineering
Service for
National Roads
Development
Project

2

Development of
Cileunyi –
Sumedang –
Dawuan Toll
Road Phase II

3

Toll Road
Development of
Manado – Bitung

Development
and
Improvement
of National
Roads
Program

Toll Road
Development
Program

45,000

0

ADB

219,399

24,378

China
(Exim
Bank)

78,100

8,678

China
(Exim
Bank)

300,000

769,440

World
Bank

36,443

10,000

Hungary

14,848

153

Spain

25,200

0

ADB

Directorate General of Human Settlement

4

Community
Based Water and
Sanitation
Program
(PAMSIMAS)

5

IKK Water
Supply Program
and Small Water
Treatment Plant
for Water Scarcity
Area

6

Small Scale Water
Treatment Plants
for Emergency
Relief

7

Engineering
Service for
Sanitation
Improvement
Project

Drinking
Water
Development
Program

Development
of Waste
Water
Management
Program

ix

(in US$ 000)
No

8

9

Project Title
Engineering
Service for Water
Supply
Development
Project
National Slum
Upgrading

Program Title
Development
of Waste
Water
Management
Program
Slum
Alleviation
Program

Loan

Counterpart
Fund

Lender

26,380

0

ADB

329,760

6,000

IDB

433,000

7,000

World
Bank

2,000

0

Directorate General of Water Resources

10

11

12

13

14

Engineering
Service for Bulk
Water and Water
Supply
Development
Project
Engineering
Service for
Coastal and River
Development
Project
Flood
Management in
Selected River
Basins
Engineering
Service for Dam
Multipurpose
Development
Project
Engineering
Service for
Irrigation and
Lowland
Development
Project

Provision and
Management
of Bulk Water
Supply
Program

9,620

ADB

ADB
0

Mitigation of
Water
Hazards
Program

Korea
(EDCF)

10,500

108,700

48,668

1,930

Dam
Development
Program

ADB

ADB
0
Korea
(EDCF)

21,679

Development
and
Management
of Irrigation
Program

38,100

x

0

ADB

(in US$ 000)
No

Project Title

15

Integrated
Participatory
Development and
Management of
Irrigation Project
- Phase I

16

The Urgent
Rehabilitation of
Strategic
Irrigation for
Western Region
of Indonesia

17

18

Program Title

Loan

Counterpart
Fund

600,000

Lender

ADB
70,000

100,000

Development
and
Management
of Irrigation
Program

IFAD

195,778

27,150

Korea
(EDCF)

Komering
Irrigation Project
Stage III

120,000

31,061

Japan
(JICA)

Rentang
Irrigation
Modernization
Projet (RIMP)

480,000

62,361

Japan
(JICA)

175,056

30,892

China
(Exim
Bank)

Ministry of Transportation

19

Procurement of
Track Material
and Turn Out
Phase II

Railway
Development
Program

Ministry of Research, Technology, and Higher Education

20

Development of
Four Higher
Education
Institutions
Project

Improving
Access, Quality,
Relevance, and
Competitiveness
of Higher
Education

176,486

27,360

IDB

21

University of
Gadjah Mada
Achieving World
Class University
with SocioEntrepreneurial
Spirit

Improving
Access, Quality,
Relevance, and
Competitiveness
of Higher
Education

71.649

7.041

Japan
(JICA)

xi

(in US$ 000)
No

22

Project Title

The Plan of
Hasanuddin
University
Hospital
Development

Program Title
Improving
Access,
Quality,
Relevance,
and
Competitiven
ess of Higher
Education

Loan

Counterpart
Fund

Lender

31.566

2.586

Germany
(KfW)

118,201

20,255

IDB

30,000

IDB

106,800

10,700

Germany
(KfW)

3,996,195

1,193,723

Ministry of Religious Affair

23

24

The
Transformation
of IAINs Into
Modern Islamic
Universities
(TIMEs)
The Development
and Improvement
of Three Islamic
Higher
Educational
Institutions

Improving
Access, Quality,
Relevance, and
Competitiveness
of Islamic Higher
Education
120,000

Local Government of Aceh Province

25

Reengineering
and Improving
the Hospitals and
Referral Systems
in Selected Aceh
Districts

Health
Services
Referral
Program

TOTAL

xii

Chapter 2
PROJECT DIGEST

xiii

Kementerian Pekerjaan Umum dan
Perumahan Rakyat/
Ministry of Public Works and Housing

1

Direktorat Jenderal Bina Marga/
Directorate General of Highways

3

GB-16-01-2
1.

Project Title

: Engineering Service for National Roads Development
Project

2.

Program Title

: Development and Improvement of National Roads
Program

3.

Executing Agency

: Ministry of Public Works and Housing

4.

Implementing Agency : Directorate General of Highways, Ministry of Public
Works and Housing

5.

Duration

: 36 Months

6.

Location

: Nationwide

7.

Objectives
To accelerate the road construction projects of Sumatera, Java, Kalimantan, Bali and
Papua.

8.

Scope of Project
Conduct feasibility studies (FS), environmental impact assessments (EIA), land
acquisition and resettlement plan (LARAP), and detailed engineering design (DED)
for preparing the national road constructions, including flyover/ underpass on
national roads in big cities and railway crossings, ring roads (bypass) and other
strategic road constructions in Sumatera, Java, Kalimantan, Sulawesi, Bali and
Papua Island along 1.000 km.

9.

Activities
Activities

Consulting services

Implementation
Location

Project Implementation Unit
Directorate
General
of
Highways, Ministry of Public
Works and Housing

Nationwide

5

GB-16-01-2

10. Funding Source
Funding (US $ 000)

Implementing Agency

Loan

Grant

Local

Total

Directorate
General
of
Highways,
Ministry
of
Public Works and Housing

45,000

0

0

45,000

Total

45,000

0

0

45,000

Source

ADB

11. Disbursement Plan
Disbursement Plan (US $ 000)
1

2nd

st

11,250

Total

3rd
16,875

45,000

16,875

12. Funding Allocation
Activities
a. Preparing FS
documents
b. Preparing EIA and
LARAP documents
c. Preparing DED
documents
Total

Category (US $ 000)
Services

Constructions Goods

11,250
5,625
28,125
45,000

13. Program Reference
BB-ID: BB-1519-R0-03

6

Trainings Other

GB-16-02-1
1.

Project Title

: Development of Cileunyi - Sumedang - Dawuan Toll
Road Phase II

2.

Program Title

: Toll Roads Development Program

3.

Executing Agency

: Ministry of Public Works and Housing

4.

Implementing Agency : Directorate General of Highways, Ministry of Public
Works and Housing

5.

Duration

: 36 months

6.

Location

: West Java Province

7.

Objectives
a. Strengthen the road network in the West Java area to enhance mobility as full
access controlled expressway in order to allow enough capacity for the expected
increase in traffic volume;
b. Improve accessibility and capacity of road networks connecting Bandung and
Cirebon and the proposed new airport and seaport;
c. Promote national and regional development in the corridor-impacted areas and
cities along the road in the eastern part of West Java;
d. Increase productivity of the area and improve access to regional and
international market; and
e. As an alternative of existing national road Cileunyi – Sumedang - Dawuan
which the condition of the traffic is dense and prone to disaster.

8.

Scope of Project
a. Civil works of toll road construction for 10.1 km;
b. Consulting services for detailed engineering design and construction
supervision;
c. Land acquisition.

9.

Activities
Activities
a. Civil works
(Rancakalong –
Sumedang Section)

Implementation
Locations

Project Implementation Units

West Java Province

Directorate General of
Highways, Ministry of Public
Works and Housing

b. Consulting services
c. Land acquisition

7

GB-16-02-1
10. Funding Source
Funding (US $ 000)

Implementing Agency

Loan

Directorate General of
Highways, Ministry of
Public Works and Housing
Total

Grant

Local

Total

219,399

0

24,378

243,777

219,399

0

24,378

243,777

Source
China
(Exim
Bank)

11. Disbursement Plan
Disbursement Plan (US $ 000)
1

2nd

st

38,246

3rd

61,483

Total

4th

77,509

243,777

66,539

12. Funding Allocation
Activities

Category (US $ 000)
Services Constructions

a. Civil works
b. Consulting services

Goods

Other

228,631
2,180

c. Land acquisition

11,826
1,140

d. Miscellaneous
expenses
Total

Trainings

2,180

228,631

13. Program Reference
BB-ID: BB-1519-R0-01

8

11,826

1,140

GB-16-03-1
1.

Project Title

: Toll Road Development of Manado - Bitung

2.

Program Title

: Toll Roads Development Program

3.

Executing Agency

: Ministry of Public Works and Housing

4.

Implementing Agency : Directorate General of Highways, Ministry of Public
Works and Housing

5.

Duration

: 36 months

6.

Location

: North Sulawesi Province

7.

Objectives

8.

a.

Improve accessibility and capacity of road networks to facilitate traffic
movement in the integrated economic development area (KAPET) of Manado Bitung and Bitung Special Economic Zone (SEZ) as well as to support Bitung
International Hub Port;

b.

Increase productivity by reducing of distributional cost and by opening access
to regional and international market;

c.

Improve economic growth by developing road to support regional
development;

d.

Reduce travel time and travel cost along the corridor;

e.

Provide an alternative road to improve safety and comfort for users.

Scope of Project
Civil works of toll road construction for 7 km.

9.

Activities
Activities
Civil works

Implementation Locations
North Sulawesi Province

(Section 1, Segment 2)

9

Project Implementation
Units
Directorate General of
Highways, Ministry of
Public Works and
Housing

GB-16-03-1
10. Funding Source
Implementing Agency
Directorate General of
Highways, Ministry of
Public Works and
Housing
Total

Funding (US $ 000)
Loan

Grant

Local

Total

78,100

0

8,678

86,778

78,100

0

8,678

86,778

Source

China
(Exim Bank)

11. Disbursement Plan
Disbursement Plan (US $ 000)
1

st

2nd

8,670

3rd
31,240

Total

4th

31,240

15,610

86,778

12. Funding Allocation
Activities

Category (US $ 000)
Services

Constructions

Civil works

86,778

Total

86,778

13. Program Reference
BB-ID: BB-1519-R0-01

10

Goods

Trainings

Other

Direktorat Jenderal Cipta Karya/
Directorate General of Human Settlements

11

GB-16-04-1
1.

Project Title

: Community Based Water and Sanitation Program
(PAMSIMAS)

2.

Program Title

: Drinking Water Development Program

3.

Executing Agency

: Ministry of Public Works and Housing

4.

Implementing Agency :

5.

Duration

: 48 months

6.

Location

: Nationwide

7.

Objectives

a. Directorate General of Human Settlements, Ministry
of Public Works and Housing;
b. Directorate General of Regional Development,
Ministry of Home Affairs;
c. Directorate General of Village Government
Development, Ministry of Home Affairs;
d. Directorate General of Community and Village
Empowernment, Ministry of Villages,
Disadvantages Regions and Transmigration;
e. Directorate General of Desease Control and
Environmental Health, Ministry of Health.

To increase the number of under-served and low income rural and peri-urban
populations accessing sustained water supply and sanitation services through
mainstreaming programmatic and scaling-up of a community-based approach on
a national scale in the context of universal access to water and sanitation by 2019.
8.

Scope of Project
a.

Community empowerment and local institutional development;

b.

Improving sanitation and hygiene practices;

c.

Water supply and public sanitation infrastructure;

d.

District and village incentive grants;

e.

Implementation support and project management.

13

GB-16-04-1

9.

Activities
Activities

Implementation
Location

Project Implementation Unit
1. Directorate General of Regional
Development, Ministry of Home
Affairs;

a.

2. Directorate General of Village

Community
empowerment and
local institutional
development

Government Development,
Ministry of Home Affairs
3. Directorate General of Community
and Village Empowernment,
Ministry of Villages, Disadvantages
Regions and Transmigration

b. Improving
sanitation and
hygiene practices

Nationwide

Directorate General of Disease
Control and Environmental Health,
Ministry of Health

c. Water supply and
public sanitation
infrastructure
Directorate General of Human
Settlements, Ministry of Public Works
and Housing

d. District and village
incentive grants
e. Implementation
support and project
management

14

GB-16-04-1

10. Funding Source
Implementing Agency
a. Directorate General
of Human
Settlements, Ministry
of Public Works and
Housing

Funding (US $ 000)
Loan

Grant

182,930

0

b. Directorate General
of Regional
Development,
Ministry of Home
Affairs

35,020

0

c. Directorate General
of Village
Government
Development,
Ministry of Home
Affairs

14,610

0

d. Directorate General
of Community and
Village
Empowernment,
Ministry of Villages,
Disadvantages
Regions and
Transmigration

35,020

0

e. Directorate General
of Disease Control
and Environmental
Health, Ministry of
Health

29,430

0

300,000

0

Total

Local*

Total

769,440

1,069,440

769,440

1,069,440

*) Including parallel financing from local government and community

15

Source

World
Bank

GB-16-04-1

11. Disbursement Plan
Disbursement Plan (US $ 000)
1st

2nd

3rd

131,760

325,110

Total

4th

357,340

1,069,440

255,240

12. Funding Allocation
Activities

Category (US $ 000)
Services

Constructions Goods

a. Community
empowerment and
local institutional
development
b. Improving
sanitation and
hygiene practices

Trainings

158,070

73,390

c. Water supply and
public sanitation
infrastructure

437,500

d. District and village
incentive grants
e. Implementation
support and project
management
Total

Other

302,930

97,550
170,940

437,500

13. Program Reference
BB-ID: BB-1519-R0-04

16

158,070

302,930

GB-16-05-2
1.

Project Title

: Engineering Service for Sanitation Improvement
Project

2.

Program Title

: Development of Waste Water Management Program

3.

Executing Agency

: Ministry of Public Works and Housing

4.

Implementing Agency : Directorate General of Human Settlements, Ministry of
Public Works and Housing

5.

Duration

: 36 Months

6.

Location

: Cirebon City, Kendari City, Tangerang City, Bekasi City
and Bekasi Regency

7.

Objectives
To accelerate the project preparation for sanitation improvement in selected region;
To improve the quality of project implementation.

8.

9.

Scope of Project
a.

Preparation of feasibility studies (FS), detailed engineering design (DED), and
environmental impact assessment (EIA) document;

b.

Preparation of land acquisition and resettlement plan (LARAP) in Cirebon City,
Kendari City, Tangerang City, Bekasi City and Bekasi Regency;

c.

Supervision activities.

Activities
Activities

Consulting services

1.
2.
3.
4.
5.

Implementation
Location

Project Implementation Unit

Cirebon City
Kendari City
Tangerang City
Bekasi City
Bekasi Regency

Directorate General of Human
Settlements, Ministry of Public
Works and Housing

10. Funding Source
Implementing Agency

Funding (US $ 000)
Loan

Grant

Local

Total

Directorate General of Human
Settlements, Ministry of Public
Works and Housing

25,200

0

0

25,200

Total

25,200

0

0

25,200

17

Source

ADB

GB-16-05-2

11. Disbursement Plan
Disbursement Plan (US $ 000)
1st

2nd
2,520

Total

3rd
2,520

25,200

20,160

12. Funding Allocation
Activities
Consulting services
Total

Category (US $ 000)
Services

Constructions

25,200
25,200

13. Program Reference
BB-ID: BB-1519-R0-05

18

Goods

Trainings

Other

GB-16-06-2
1.

Project Title

: Engineering Service for Water Supply Development
Project

2.

Program Title

: Drinking Water Development Program

3.

Executing Agency

: Ministry of Public Works and Housing

4.

Implementing Agency : Directorate General of Human Settlements, Ministry of
Public Works and Housing

5.

Duration

: 36 Months

6.

Location

: Riau Province, Bengkulu Province, Banten Province,
West Java Province, and DKI Jakarta

7.

Objectives
To accelerate the project preparation for water supply development in selected
region. To improve the quality of project implementation;

8.

9.

Scope of Project
a.

Preparation of feasibility studies (FS), environmental impact assessment (EIA),
and detailed engineering design (DED) document;

b.

Preparation of land acquisition and resettlement plan (LARAP);

c.

Supervision during project implementation.

Activities
Activities

Implementation Location

Project
Implementation
Unit

Consulting services

1. Riau Province (Dumai City,
Rokan Hilir Regency, Bengkalis
Regency)
2. Bengkulu Province (Bengkulu
Tengah Regency, Bengkulu City,
Seluma Regency)
3. Banten Province and DKI Jakarta
Province
4. West Java Province (Sumedang
Regency, Majalengka Regency,
Indramayu Regency, Cirebon
Regency, and Cirebon City)

Directorate
General of
Human
Settlements,
Ministry of
Public Works and
Housing

19

GB-16-06-2

10. Funding Source
Funding (US $ 000)

Implementing Agency

Loan

Directorate General of
Human Settlements ,
Ministry of Public Works
and Housing
Total

Grant

Local

Total

26,380

0

0

26,380

26,380

0

0

26,380

Source

ADB

11. Disbursement Plan
Disbursement Plan (US $ 000)
1st

2nd
7,275

Total

3rd
14,100

26,380

5,000

12. Funding Allocation
Activities
Consulting services
Total

Category (US $ 000)
Services

Constructions

26,380
26,380

13. Program Reference
BB-ID: BB-1519-R0-04

20

Goods

Trainings

Other

GB-16-07-1
1.

Project Title

: IKK Water Supply Program and Small Water
Treatment Plant for Water Scarcity Area

2.

Program Title

: Drinking Water Development Program

3.

Executing Agency

: Ministry of Public Works and Housing

4.

Implementing Agency : Directorate General of Human Settlements, Ministry of
Public Works and Housing

5.

Duration

: 24 months

6.

Location

: Nationwide

7.

Objectives
To increase access to clean water for communities in water scarcity areas.

8.

9.

Scope of Project
a.

Construction of water supply systems for communities in water scarcity areas:

b.

Construction of water treatment plant;

c.

Construction of raw water transmission pipelines;

d.

Construction of distribution pipelines.

Activities
Activities
a.

Construction of water
treatment plant

b.

Construction of raw water
transmission pipeline

c.

Construction of distribution
pipeline

Implementation
Locations

Nationwide

Project Implementation
Units
Directorate General of
Human Settlements,
Ministry of Public
Works and Housing

10. Funding Source
Implementing Agency
Directorate General of
Human Settlements, Ministry
of Public Works and Housing
Total

Funding (US $ 000)
Loan

Grant

36,443
36,443

21

Local

Total

0

10,000

46,443

0

10,000

46,443

Source

Hungary

GB-16-07-1
11. Disbursement Plan
Disbursement Plan (US $ 000)
1

Total*

2nd

st

10,360

26,083

36,443

*) Not including local funding of USD 10.0 million

12. Funding Allocation
Activities

Category (US $ 000)
Services

Constructions

a. Construction of
water treatment
plant
b. Construction of
raw water
transmission
pipeline

46,443

c. Construction of
distribution
pipeline
Total

46,443

13. Program Reference
BB-ID: BB-1519-R0-04

22

Goods

Trainings

Other

GB-16-08-1
1.

Project Title

: Small Scale Water Treatment Plants for Emergency
Relief

2.

Program Title

: Drinking Water Development Program

3.

Executing Agency

: Ministry of Public Works and Housing

4.

Implementing Agency : Directorate General of Human Settlements, Ministry of
Public Works and Housing

5.

Duration

: 24 months

6.

Location

: Medan, Bekasi, Surabaya, and Makassar City

7.

Objectives
a. To provide small scale water treatment plants that can be effectively used in
case of emergency;
b. To overcome the difficulties to get save drinking water in emergency situations.

8.

Scope of Project
a. Infrastructure, including land acquisition and storage construction, access road
to small scale water treatment plant storage location/ location open storage
(LOS), electricity, communication, and fencing storage;
b. Procurement and installment of mobile water treatment plant for emergency
relief;
c. Emergency Module Units (EMUs) training program, consists of:
i. EMUs Management and Training through knowledge and capacity
building programs in management, planning, and coordination to provide
training for new staff;
ii. EMUs Operation and Maintenance for Technicians through capacity
building for technical staff to Emergency Module Units operational,
maintenance and sustainability.

9.

Activities
Activities
a.
b.

Infrastructure works
Procurement and
installment of mobile
water treatment plant

Implementation
Locations
 Medan (North
Sumatera)
 Bekasi (West Java)
 Surabaya (East Java)
 Makassar (South
Sulawesi)

23

Project Implementation
Unit
Directorate General of
Human Settlements,
Ministry of Public
Works and Housing

GB-16-08-1
10. Funding Source
Implementing Agency
Directorate General of
Human Settlements,
Ministry of Public Works
and Housing
Total

Funding (US $ 000)
Loan

Grant

Local

Total

14,848

0

153

15,001

14,848

0

153

15,001

Source

Spain

11. Disbursement Plan
Disbursement Plan (US $ 000)
1st

Total*

2nd
12,478

14,848

2,370

*) Not including local funding of USD 0.15 million

12. Funding Allocation
Activities

Category (US $ 000)*
Services

Constructions

a. Infrastructure works
b. Procurement and
instalment of mobile
water treatment
plant
Total

Goods

5,817

133

8,898

133

5,817

*) Not including local funding of USD 0.15 million

13. Program Reference
BB-ID: BB-1519-R0-04

24

8,898

Trainings Other

GB-16-09-1
1.

Project Title

: National Slum Upgrading

2.

Program Title

: Slum Alleviation Program

3.

Executing Agency

: Ministry of Public Works and Housing

4.

Implementing Agency :

a. Directorate General of Human Settlements,
Ministry of Public Works and Housing
b. Ministry of National Development Planning/
National Development Planning Agency

5.

Duration

: 60 months

6.

Location

: Nationwide

7.

Objectives
a. To improve community access to appropriate infrastructure and services in
order to alleviate slums, based on the 8 slum indicators, such as building
standards, access roads, availability of clean water supply, drainage
connectivity, sewerage management, waste management, fire safety, public
space;
b. To promote collaboration with stakeholders through empowerment of local
governments;
c. To improve community welfare by promoting sustainable livelihoods.

8.

Scope of Project
a. Slum alleviation activities (50 cities, 1,412 villages), in community level and
local government;
b. Slum prevention activities (153 cities, 4,732 villages) through collaboration at
community level and local government;
c. Sustainable livelihood to support slum alleviation and prevention.

25

GB-16-09-1
9.

Activities
Activities

Implementation
Locations

Project Implementation
Units
Ministry of National
Development Planning/
National Development
Planning Agency

a. Institutional and Policy
Development
b. Integrated Planning Support
and Capacity Building for
Local Government and
Communities
c. Urban Infrastructure and
Services Investment Support
d. Block Investments for Slum
Alleviation and Prevention

Nationwide

e. Building Community
Institutions and Local
Government

Directorate General of
Human Settlements,
Ministry of Public Works
and Housing

f. Knowledge Generation and
Review
g. Support to Project
Management Unit
h. Technical Assistance and
Implementation Support

Directorate General of
Human Settlements,
Ministry of Public Works
and Housing

i. Contingency for Disaster
Response

26

GB-16-09-1
10. Funding Source
Implementing Agency
a. Directorate General
of Human
Settlements, Ministry
of Public Works and
Housing
b. Ministry of National
Development
Planning/ National
Development
Planning Agency
Total
*) Not

Funding (US $ 000)
Loan

Source

Grant

Local

Total*

329,760

0

6,000

335,760

IDB

431,000

0

7,000

440,000

World
Bank

2,000

0

0

762,760

0

13,000

775,760

including the parallel financing from Central Government & Local Government, which

amounts US$ 1,31 billion.

11. Disbursement Plan
Disbursement Plan (US $ 000)
Source
IDB
World
Bank
Total
*) Not

1

st

2nd

3rd

5,650 107,240 108,400

4th

5th

Total*

6th

64,600

49,870

92,200 113,600 103,200

71,800

52,000

440,000

12,850 199,440 222,000 167,800 121,670

52,000

775,760

7,200

-

335,760

including the parallel financing from Central Government & Local Government, which

amounts US$ 1,31 billion.

27

GB-16-09-1
12. Funding Allocation
Activities

Category (US $ 000)*
Services

Constructions

a. Institutional and
Policy Development
b. Integrated Planning
Support and Capacity
Building for Local
Government and
Communities

2,000
89,000

c. Urban Infrastructure
and Services
Investment Support

310,000

d. Block Investments for
Slum Alleviation and
Prevention

233,540

e. Building Community
Institutions and Local
Government

78,730

f. Knowledge
Generation and
Review

4,610

g. Support to Project
Management Unit

35,080

h. Technical Assistance
and Implementation
Support

39,000

i.

Contingency for
Disaster Response

j.

Contingency
Total

Goods Trainings Other

0
12,700
241,810

543,540

6,610 12,700

including the parallel financing from Central Government & Local Government, which
amounts US$ 28,9 million for IDB Project
*)

13. Program Reference
BB-ID: BB-1519-R0-07

28

Direktorat Jenderal Sumber Daya Air/
Directorate General of Water Resources

29

GB-16-10-2
1.

Project Title

: Engineering Service for Bulk Water and Water Supply
Development Project

2.

Program Title

: Provision and Management of Bulk Water Supply
Program

3.

Executing Agency

: Ministry of Public Works and Housing

4.

Implementing Agency : Directorate General of Water Resources, Ministry of
Public Works and Housing

5.

Duration

: 36 months

6.

Location

: Java Island, Nusa Tenggara Islands, Maluku Island,
Bangka Belitung Islands, and archipelago region in
Southern and Northern Sulawesi

7.

Objectives

8.

a.

To accelerate the project preparation for bulk water and water supply
development.

b.

To identify and evaluate the water demand and water use in Java, Nusa
Tenggara, and archipelago region;

c.

To identify existing condition of water supply;

d.

To identify the potential of surface water and underground water;

Scope of Project
a.

Conduct research, analysis, mapping area, and rehabilitation system of water
supply;

b.

Prepare basic design of water supply system, budget analysis, estimated
construction cost, and financial analysis;

c.

Identification and preparation of conservation area, and analyze the maximum
supporting capacity of raw and underground water;

d.

Strengthen the capabilities of human resources of bulk water and water supply’s
stakeholders.

31

GB-16-10-2

9.

Activities
Activities

Implementation Location

Project Implementation
Unit

Consulting services

Java Island, Nusa Tenggara
Islands, Maluku Island, Bangka
Belitung
Islands,
and
archipelago region in Southern
and Northern Sulawesi

Directorate General of
Water Resources,
Ministry of Public
Works and Housing

10. Funding Source
Funding (US $ 000)

Implementing Agency

Loan

Grant

Local

Directorate General of Water
Resources, Ministry of
Public Works and Housing

2,000

0

0

2,000

Total

2,000

0

0

2,000

Source

Total

ADB

11. Disbursement Plan
Disbursement Plan (US $ 000)
1

2nd

st

500

Total

3rd
850

2,000

650

12. Funding Allocation
Activities
Consulting services
Total

Category (US $ 000)
Services

Constructions Goods

2,000
2,000

13. Program Reference
BB-ID: BB-1519-R0-09

32

Trainings

Other

GB-16-11-2
1.

Project Title

: Engineering Service for Coastal and River
Development Project

2.

Program Title

: Mitigation of Water Hazard Program

3.

Executing Agency

: Ministry of Public Works and Housing

4.

Implementing Agency : Directorate General of Water Resources, Ministry of
Public Works and Housing

5.

Duration

: 36 months

6.

Location

: Nationwide

7.

Objectives

8.

9.

a.

To accelerate the project preparation of coastal and river development;

b.

To identify the constrains during river and coastal development and
rehabilitation planning;

c.

To improve the planning process of river and coastal development and
rehabilitation;

d.

To strengthen the capability of river and coastal human resources;

e.

To compose river and coastal development and rehabilitation
document/standard from project preparation to operation maintenance.

Scope of Project
a.

Analyze river and coastal master plan and feasibility studies;

b.

Prepare complete detailed designs, land acquisitions, resettlement plans,
environmental impact assessments (EIAs), constructions, operation and
maintenance documents for river and coastal development and rehabilitation;

c.

Prepare procurement scheme that will be done during river and coastal
development and rehabilitation projects;

d.

Implement technical and financial analysis for every river and coastal
development and rehabilitation projects;

e.

Strengthen the capabilities of human resources of river and coastal’s
stakeholders.

Activities
Activities
Consulting services

Implementation Location

Project Implementation Unit
Directorate General of Water
Resources, Ministry of Public
Works and Housing

Nationwide

33

GB-16-11-2

10. Funding Source
Implementing Agency

Funding (US $ 000)
Grant

Local

Directorate General of
9,620
Water Resources,
Ministry of Public Works
10,500
and Housing

0

0

9,620

ADB

0

0

10,500

Korea
(EDCF)

0

0

20,120

Total

20,120

Total

Source

Loan

11. Disbursement Plan
Disbursement Plan (US $ 000)
1

2nd

st

6,124

Total

3rd
11,110

2,886

20,120

12. Funding Allocation
Activities
Consulting services
Total

Category (US $ 000)
Services

Constructions Goods

20,120
20,120

13. Program Reference
BB-ID: BB-1519-R0-11

34

Trainings

Other

GB-16-12-1
1.

Project Title

: Flood Management in Selected River Basins

2.

Program Title

: Mitigation of Water Hazards Program

3.

Executing Agency

: Ministry of Public Works and Housing

4.

Implementing Agency

: a. Directorate General of Water Resources, Ministry
of Public Works and Housing
b. Directorate General of Agriculture Infrastructure
and Facilities, Ministry of Agriculture
c. Directorate General of Regional Development,
Ministry of Home Affairs
d. Ministry of National Development Planning/
National Development Planning Agency

5.

Duration

: 72 months

6.

Location

: Maluku and Banten Province

7.

Objectives
To better manage and mitigate flood risks in selected rivers and reducing its negative
impacts to economic and social sector, though implementation of process-oriented
integrated flood risk management.

8.

Scope of Project
a. Strengthening watershed conservation activities;
b. Providing public information on flood risks for flood plan management;
c. Improving conveyance of the river for reduction of flood peak;
d. Strengthening community’s preparedness for emergency flood management;
and
e. Improving the capacity of the government in the flood subsector.

35

GB-16-12-1
9.

Activities
Activities
a. Construction
Works
b. Consulting
Services

Implementation
Locations

Project Implementation Unit

Maluku and
Banten
Province

a. Directorate General of Water
Resources, Ministry of Public Works
and Housing
b. Directorate General of Agriculture
Infrastructure and Facilities, Ministry
of Agriculture
c. Directorate General of Regional
Development, Ministry of Home
Affairs
d. Ministry of National Development
Planning/ National Development
Planning Agency

10. Funding Source
Implementing Agency

Funding (US $ 000)
Loan

Grant

Local

Total

a. Directorate General of Water
Resources, Ministry of
Public Works and Housing

87,286

0

39,080

126,366

b. Directorate General of
Agriculture Infrastructure
and Facilities, Ministry of
Agriculture

11,240

0

5,032

16,272

c. Directorate General of
Regional Development,
Ministry of Home Affairs

9,011

0

4,035

13,046

d. Ministry of National
Development Planning/
National Development
Planning Agency

1,163

0

521

1,684

48,668

157,368

Total

Source

ADB

108,700

36

GB-16-12-1
11. Disbursement Plan
Disbursement Plan (US $ 000)
1

2

st

13,544

nd

27,613

3rd

4th

31,566

36,286

5th

Total

6th

28,854

19,505

157,368

12. Funding Allocation
Activities

Category (US $ 000)
Services Constructions Goods Trainings Other

a. Construction works
b. Consulting services

85,652
12,302

c. Vehicle and
equipment

1,956

d. Workshop, training,
and socialization

6,050

e. Land acquisition

17,163

f. Contingencies

11,430

g. Others

22,815

Total

12,302

85,652

13. Program Reference
BB-ID: BB-1519-R0-11

37

1,956

6,050

51,408

GB-16-13-2
1.

Project Title

: Engineering Service for Dam Multipurpose
Development Project

2.

Program Title

: Dam Development Program

3.

Executing Agency

: Ministry of Public Works and Housing

4.

Implementing Agency : Directorate General of Water Resources, Ministry of
Public Works and Housing

5.

Duration

: 36 months

6.

Location

: Nationwide

7.

Objectives
a.

8.

9.

To accelerate the project preparation for dam development including
recommendations for design approval from the Commission of Dams Safety
and Certificate of Design Approval for dam constructions;

b.

To prepare technical details of dam construction;

c.

To do preparation plans of goods and services procurement.

Scope of Project
a.

Conducting the analysis in term of operation, maintenance, facility construction
and procurement plans;

b.

Conducting the analysis in term of detailed design, land acquisition,
resettlement plan and environmental impact assessment;

c.

Review of dam design;

d.

Certification of design;

e.

Procurement document preparation.

Activities
Activities

Consulting services

Implementation
Location

Project Implementation Unit
Directorate General of Water
Resources, Ministry of Public Works
and Housing

Nationwide

38

GB-16-13-2
10. Funding Source
Funding (US $ 000)

Implementing Agency
Directorate General of Water
Resources, Ministry of Public
Works and Housing
Total

Local

Source

Loan

Grant

Total

1,930

0

0

1,930

ADB

21,679

0

0

21,679

Korea
(EDCF)

23,609

0

0

23,609

11. Disbursement Plan
Disbursement Plan (US $ 000)
1st

2nd
7,662

Total

3th
8,360

7,588

23,609

12. Funding Allocation
Activities
Consulting services
Total

Category (US $ 000)
Services

Constructions Goods

23,609
23,609

13. Program Reference
BB-ID: BB-1519-R0-10

39

Trainings

Other

GB-16-14-2
1.

Project Title

: Engineering Service for Irrigation and Lowland
Development Project

2.

Program Title

: Development and Management of Irrigation Program

3.

Executing Agency

: Ministry of Public Works and Housing

4.

Implementing Agency : Directorate General of Water Resources, Ministry of
Public Works and Housing

5.

Duration

: 48 months

6.

Location

: Nationwide

7.

Objectives

8.

a.

To accelerate the project preparation of irrigation and lowland development;

b.

To identify the constraints during irrigation and lowland development and
rehabilitation planning;

c.

To improve the planning process of irrigation and lowland development and
rehabilitation;

d.

To assess the benefit of the project in order to increase agricultural production
and farmer’s income;

e.

To strengthen the capability of irrigation and lowland human resources;

f.

To create irrigation and lowland development and rehabilitation document
standard from project preparation to operation maintenance.

Scope of Project
a.

Analyze irrigation and lowland master plan and feasibility studies (FS);

b.

Prepare complete detailed designs, land acquisitions, resettlement plans,
environmental impact assessments (EIAs), constructions, operation and
maintenance documents for irrigation and lowland development and
rehabilitation;

c.

Prepare procurement scheme that will be done during irrigation and lowland
development and rehabilitation projects;

d.

Implement technical and financial analysis for every irrigation and lowland
development and rehabilitation projects;

e.

Strengthen the capabilities of human resources of irrigation and lowland’s
stakeholders.

40

GB-16-14-2

9.

Activities
Activities

Implementation Location Project Implementation Unit

Consulting services

Directorate General of
Water Resources, Ministry
of Public Works and
Housing

Nationwide

10. Funding Source
Implementing Agency
Directorate General of Water
Resources, Ministry of Public
Works and Housing
Total

Funding (US $ 000)
Loan

Grant

Local

Total

38,100

0

0

38,100

38,100

0

0

38,100

Source

ADB

11. Disbursement Plan
Disbursement Plan (US $ 000)
1st

2nd

6,350

3rd

12,700

Total

4th

12,700

6,350

38,100

12. Funding Allocation
Activities
Consulting services
Total

Category (US $ 000)
Services

Constructions

38,100
38,100

13. Program Reference
BB-ID: BB-1519-R0-08

41

Goods

Trainings

Other

GB-16-15-0
1. Project Title

: Integrated Participatory Development and
Management of Irrigation Project - Phase I

2. Program Title

: Development and Management of Irrigation Program

3. Executing Agency

: Ministry of Public Works and Housing

4. Implementing Agency :

a. Directorate General of Water Resource, Ministry of
Public Works and Housing
b. The Agency for Agricultural Extension and Human
Resources Development, Ministry of Agriculture
c. Ministry of Home Affairs
d. Ministry of National Development Planning/
National Development Planning Agency
e. Local Government

5. Duration

: 60 months

6. Location

: Nationwide

7.

Objectives
Increase rice production, to accelerate poverty alleviation in agriculture on western
and eastern region of Indonesia through the establishment of sustainable irrigated
agriculture development in the participative manner emphasizing the
empowerment of the beneficiary farmers and water user's association (WUAs).

8.

Scope of Project
a.

Supporting the integrated development of irrigation facilitie