DRPLNJM dan DRPPHLN
BAPPENAS LIST OF PLANNED PRIORITY EXTERNAL LOANS 2018
MINISTRY OF NATIONAL DEVELOPMENT PLANNING/
NATIONAL DEVELOPMENT PLANNING AGENCY
REPUBLIC OF INDONESIA
LIST OF PLANNED PRIORITY
EXTERNAL LOANS 2018
iii
Ministry of National Development Planning/
National Development Planning Agency - 2018 -
Chapter 1
1. Introduction
In accordance with the mandate of Government Regulation Number 10/2011 on Procedure for the Procurement of External Loans and Grants, and on the Decree of the Minister of National Development Planning/Head of the National Development Planning Agency Number 4/2011, on Procedure for Planning, Proposing, Assessing, Monitoring, and Evaluation of Projects Financed by External Loans and Grants, the government issues The List of Planned Priority External Loans or Daftar Rencana Prioritas Pinjaman Luar Negeri (DRPPLN) 2018. DRPPLN 2018 is a list of projects that are ready to be implemented.
The projects listed in DRPPLN 2018 are projects that have been previously listed in the List of Medium-Term Planned External Loans or Daftar Rencana Pinjaman Luar Negeri Jangka Menengah (DRPLN-JM) and its revisions, and have indicative potential lender. In addition, these projects must have been that meet most criteria for project readiness shown by documents Readiness Criteria (RC). Since most of the DRPPLN 2018 projects will start their implementation from 2019. Parallelly, those projects should be included in the External Loan withdrawal plan in 2019.
The DRPPLN 2018 is presented in two chapters. Chapter 1 consists of the recapitulation of the projects by the executing agencies, by the indicative sources of financing, and by the sector allocation. While Chapter 2 consists of the summary of each project information, such as location, scope, outputs and outcomes as well as implementing agencies involved in project implementation (project digest).
2. Recapitulation and List of Projects in the DRPPLN 2018
DRPPLN 2018 consists of 42 projects with a total loan amount of USD 6.5 billion with a local financing of USD 2.9 billion. There are 17 out of those 42 projects that have been listed in the previous DRPPLN which has not signing yet. The recapitulation of proposed projects in the DRPPLN 2018 on the basis of executing agencies is shown in Table 1, while the proportion of infrastructure and non-infrastructure sector allocation is presented in Table 2.
Table 1. The DRPPLN 2018 by Executing Agencies
Amount (USD million)
Number of
No Executing Agency
Projects
Counterpart Loans Funds
Ministries/Agencies
Ministry of Public Works and
19 4,020.8 1,074.3 Housing
2 Ministry of Transportation
3 Ministry of Health
2 263.3 1,754.3 Ministry of National
Development
4 Planning/National
1 150.0 Development Planning Agency
5 Ministry of Defense
6 210.0 Ministry of Agrarian and
1 200.0 Land Agency
6 Spatial Planning/National
Ministry of Research,
7 Technology, and Higher
27.1 Education
8 Ministry of Religious Affairs
9 Ministry of Manpower
3 46.6 0 Indonesian Institute of
The Agency for Meteorology,
20.4 Climatology, and Geophysics
State-Owned Enterprises
PT. SMI/Indonesia
12 Infrastructure Finance
Company PT. PLN/State Electricity
2,897.3 Table 2. Recapitulation of the DRPPLN 2018 by Sector
Amount (USD million) No
Number of
Local Funds
2,897.3 Table 3. Recapitulation of the DRPPLN 2018 by Source of Financing
Total
Diagram B. Proportion of Loan Amount Type of Executing Agency
by Sector
State-Owned
Enterprises
Non-
(SOEs);
Infrastructure
Ministries/
Agencies
Infrastructure
Loan Amount No
Source of Financing
(USD million) Multilateral Agencies
1 World Bank 1,299.6
Bilateral Partners 4,440.8
6 Japan (JICA) 2,562.5
7 RRT 925.0
8 Austria 256.6
9 Korea/KEXIM 377.6
10 France/AFD 319.1
Total
Some figures/ diagrams of the DRPPLN/ Green Book 2018 as follows: Diagram
A. Proportion of Loan Amount by
Table 4. List of DRPPLN 2018
(in US$ 000)
Counterpart No
Project Title
Program Title
Loan
Lender Fund
Ministry of Public Works and Housing
Directorate General of Highways
Development of New Tunnels
Toll Road
Alignment in
0 JICA PayakumbuhPangkalan
Toll Road
Directorate General of Human Settlement
Regency Settlement Infrastructure
Slum Alleviation
0 JICA Development
Program
(RSID) Development of
Sustainable Urban
National Urban
Bank Program (NUDP)
Program
National Urban
Drinking Water
World 4 Water Supply
184,800 Bank Project (NUWSP)
Jakarta Sewerage
Development of
Development
Waste Water
131,240 JICA Project Zone 6
Management
(Phase 1)
Program
Jakarta Sewerage 6 Development
333,000 JICA Project Zone 1
631,000
Sustainable Urban Development in
Sustainable Urban
Indonesia (Eco
Development
District)
7 Program
61,100
23,500 AFD
(in US$ 000)
Counterpart No
Project Title
Program Title
Loan
Lender Fund
Improvement of Solid Waste
Development of
8 Management to
Solid Waste
World
5,000 Support Regional
Bank and Metropolitan
Directorate General of Water Resources
The Urgent Rehabilitation of
Development and
9 Strategic Irrigation
16,000 Korea for Western Region
Management of
Irrigation Program
of Indonesia Engineering Service
Mitigation of
for Coastal and
1,116 Korea River Development
10 Water Hazards
Program
Project Engineering Service
for Dam
Dam Development
Development Project
Urban Flood Control
System
Mitigation of
12,460 JICA Selected Cities
12 Improvement in
Water Hazards
Program
Phase II Strategic Irrigation
Modernization and
World 13 Urgent
Development and
78,000 Bank/ Rehabilitation
Management of
AIIB Project (SIMURP)
Irrigation Program
Provision and
Karian DamSerpong
Management of
14 Water
124,643 KEXIM Conveyance System
Bulk Water Supply
Program
Pelosika Multipurpose Dam Construction
Dam Development
52,940 RRT (in US$ 000)
Counterpart No
Project Title
Program Title
Loan
Lender Fund
Jenelata Dam 16 Construction
41,470 RRT Project
Lompatan Harimau Dam Construction 17 Project (Rokan Kiri
35,290 RRT Dam Construction Project)
Riam Kiwa Multipurpose Dam
18 Construction
33,530 RRT Project
Regional Infrastructure Development Agency
Integrated
Infrastructure for
Infrastructure
World 19 Development for
Tourism
Bank National Tourism
Development
Program
Strategic Areas
Ministry of Transportation
Construction of
Railway
Jakarta Mass Rapid
0 JICA Transit Project
Phase II
(in US$ 000)
Ministry of Health
Basic Health Care
Indonesia
Program
Supporting Primary World 21 and Refferal Health
1,744,628 Bank Care Reform (I-
Referral Program
Improvement of Facilities and
Program for
Infrastructure for
Human Resources
9,681 IDB Teaching
and
Development in
Learning Activities
Health Sector
in Health Sector
Counterpart No
Project Title
Program Title
Loan
Lender Fund
Ministry of National Development Planning/National Development Planning Agency
Human Resources Development for Bureaucratic
Human Resources
Reform/
Development for
World 23
Bank Management of
Strengthening
Bureaucracy
Reform Program
Apparatus Talents (SMART)
Ministry of Defense
Upgrading Medical Equipments for
Military Hospitals
Naval Hospital
0 Austria Wahyu Slamet
Bitung-North Sulawesi
Upgrading Medical Equipments and 25 Supporting
Facilities for Army Hospital Pelamonia
Procurement of Medical 26 Equipments for
Army Hospital Putri Hijau
Upgrading Medical Equipments and 27 Supporting
Facilities for Army Hospital Udayana
Upgrading Medical Equipments for Air 28 Force Hospital
Dody Sarjoto - Makassar
(in US$ 000)
Counterpart No
Project Title
Program Title
Loan
Lender Fund
Upgrading Medical Equipments for
Army Hospital of Gatot Subroto
Ministry of Agrarian and Spatial Planning/National Land Agency
Implementation of
Program to
World 30 Accelerate Agrarian
Geospatial
Bank Reform
Information
Program
Ministry of Research, Technology, and Higher Education
(in US$ 000) The Advanced
Improving Access,
Knowledge and
Quality, Relevance,
Skills for
and
21,281 ADB Sustainable
Competitiveness of
Development
Higher Education
Project (AKSI)
Program
Development and Upgrading of the
Improving Access,
5,614 SFD State University of
Quality, Relevance,
Jakarta - Phase 2
and Competitiveness of
Establishment of
Higher Education
33 University of
182 SFD Bengkulu's Hospital
Program
Ministry of Religious Affair
The
Improving Access,
Development of
Quality, Relevance,
UIN Maulana
and Competitiveness
9,350 SFD Malik lbrahim
of Islamic Higher
Malang Phase II
Education Program
East Java Project
Ministry of Manpower
Maritime 35 Vocational Training
Center in Serang
Improving Labour
Austria Maritime
Competitiveness
Program
36 Vocational Training
Center in Medan
Counterpart No
Project Title
Program Title
Loan
Lender Fund
Maritime
Improving Labour
37 Vocational Training
0 Austria Center in Makassar
Indonesian Institute of Sciences
Procurement of
Marine Research
38 Multi Purposes
2,950 AFD Research Vessels
The Agency for Meteorology, Climatology, and Geophysics
Program for
Strengthening
13,169 France Climate and
Development and
Guidance of
39 Weather Service
Meteorology,
Capacity Phase II
Climatology, and
PT. SMI/Indonesia Infrastructure Finance Company
Increasing PT Indonesia Infrastructure
Infrastructure
Finance Financing
Development
40 Capacity in
Infrastructure Development in Indonesia
PT. PLN/State Electricity Company
Hululais
Electricity
Geothermal Power
Infrastructure
0 JICA Plant 1 & 2 (2x55
Additional Loan for
8,986 JICA Hydroelectric
Development
Power (87 MW)
Program
TOTAL
Kementerian Pekerjaan Umum dan Perumahan Rakyat/Ministry of Public Works and Housing
Direktorat Jenderal Bina Marga/ Directorate General of Highways
GB-18-01-0
1. Project Title : Development of New Tunnels Alignment in Payakumbuh-Pangkalan Toll Road Section II Phase I
2. Program Title : Toll Road Development Program
3. Executing Agency
: Ministry of Public Works and Housing
4. Implementing Agency
: Directorate General of Highways, Ministry of Public Works and Housing
: West Sumatera Province
7. Objectives
a. To improve the connectivity between Padang and Pekanbaru by reducing travel time between the two cities.
b. To improve regional road network capacity especially in the Northern Sumatra region.
c. To increase productivity made possible by the repression of distributional cost and by opening access to regional and international market.
d. To improve economic growth by developing road to support regional development.
e. To provide alternative road corridor with better safety requirement and comfort for users.
8. Scope of Project
a. Tunnel and toll road construction at Section-II Phase I at Payakumbuh-Pangkalan segment.
b. Consulting services for construction supervision.
9. Activities
Implementation
Activities Project Implementation Units
Locations
a. Civil works Directorate General of
West Sumatera
Highways, Ministry of Public
b. Consulting services Works and Housing
GB-18-01-0
10. Funding Source
Funding (US $ 000)
Implementing Agency Source
Total Directorate General of
0 0 427,000 JICA Public Works and Housing
Highways, Ministry of
11. Disbursement Plan
Disbursement Plan (US $ 000)
12. Funding Allocation
Category (US $ 000) Activities Services Constructions Goods Trainings
Other
a. Civil works
b. Consulting services
Total
13. Program Reference BB-ID: BB-1519-R0-01
Direktorat Jenderal Cipta Karya/ Directorate General of Human Settlements
GB-18-02-1
1. Project Title : Regency Settlement Infrastructure Development (RSID)
2. Program Title : Slum Alleviation Program
3. Executing Agency
: Ministry of Public Works and Housing
4. Implementing Agency
: Directorate General of Human Settlements, Ministry of Public Works and Housing
To fulfill the minimum service standard of settlement in peri-urban area in order to prevent slum in peri-urban area.
8. Scope of Project
a. Capacity building: - Planning, implementing and controlling of peri-urban area development - Policy development and policy coordination - Managing capital investment in developing peri-urban area - Providing sustainable basic infrastructure services
b. Detail Spatial Plan and Infrastructure Masterplan: - Facilitating local government to formulate detail spatial plan and infrastructure
masterplan - Synchronizing infrastructure masterplan with detail spatial plan
c. Infrastructure development: - Formulating detail engineering design - Constructing new infrastructure or developing existing infrastructure services
based on infrastructure masterplan - Supervising infrastructure development
d. Technical assistance: - Providing technical assistance services on capacity building and project
management
GB-18-02-1
9. Activities
Implementation Project Implementation Activities
Locations
Units
a. Capacity building
b. Detail spatial plan and Directorate General of infrastructure masterplan
Human Settlements,
Nationwide
Ministry of Public Works
c. Infrastructure development and Housing
d. Technical assistance
10. Funding Source
Funding (US $ 000)
Implementing Agency Source
Total Directorate General of
Human Settlements, Ministry 201,000
0 0 201,000 JICA of Public Works and Housing
11. Disbursement Plan
Disbursement Plan (US $ 000)
Total
1 st
2 nd
3 rd
4 th
5 th
3,521
24,334
28,041
80,142
64,962
201,000
GB-18-02-1
12. Funding Allocation
Category (US $ 000) Activities Services Constructions Goods Trainings
Other
a. Capacity building 4,482
b. Detail spatial plan and infrastructure master
plan
c. Infrastructure
development
d. Technical assistance
e. Others 6,533
13. Program Reference
BB-ID: BB-1519-R0-
07 GB-18-03-1
1. Project Title
Development
of
National Urban Development Program (NUDP)
2. Program Title
Sustainable Urban Development Program
3. Executing Agency
: Ministry Public Works and Housing
4. Implementing Agency
: a. Ministry Public Works and Housing
b. M inistryo
ation
al
ev
elopm
ent P l
anni anni
al
ev
elopm
ent P l
annin
en
cy ( cy (
gr
ari
an
an
ati
al P l
Land Agency
d. M inistryo
H om
airs
5. Duration : 30 months
6. Location : 40 selected cities
7. Objectives
a. To develop cities according to their function in the national
urban area.
b. To develop each city according to their character and become
habitable, green, and smart city.
c. To develop cities to
have management and financing capabilities
in
infrastructure development involving private and government investments
8. Scope of Project
a. National urban institutional and policy development
b. Integrated planning
for
urban developments
c. City financial management c. City financial management
d. Project implementation support
GB-18-03-1
9. Activities
Implementation
Activities Project Implementation Units
policy, institution and
of National finance - National city policy - National urban development Development
Ministry
Planning/National strategy Development
Jakarta City
Planning - City institution and city
Agency
coaching system - Financial city policy coaching system - Financial city policy
b. Ministry of Agrarian and Spatial Planning/ National
2. Information and Land Agency planning system
c. Ministry of National - Guidance
of Development making
Planning/National Regency/City Spatial Plan Selected cities
Development Planning (RTRWK) and Detailed
Agency Spatial Plan (RDTR)
d. Ministry of Home Affairs - Planning maps of 40 selected
(further coordination with cities
Ministry of Trade, Ministry of Commerce and Investment, Ministry of Finance, Geospatial Information Agency)
3. Facilitating urban development - Guidance
of making Government Plan (RKP) and
Ministry Public Works and Housing
Provision
Housing (coordination with Development Plan (RP3)
Jakarta City
Ministry of Finance) - Regulation about city road,
drinking water,
city
transport, and integrated city infrastructure
Implementation
Activities Project Implementation Units
Locations Locations
4. Preparation urban development plan
b. Ministry of - Urban baseline National
Development - Urban development strategy Planning/National
Selected cities
- Development scenario and Development
Planning investment
Agency
c. Local Government
10. Funding Source
Funding (US $ 000)
Implementing Agency Source
a. Ministry Public Works and
29,000 Housing
b. Ministry of National Development Planning/National
4,210 Development Planning Agency
World (Bappenas)
Bank
c. Ministry of Agrarian and Spatial Planning/ National
13,400 Land Agency
d. Ministry of Home Affairs
Total
GB-18-03-1
11. Disbursement Plan
Disbursement Plan (US $ 000)
12. Funding Allocation
Category (US $ 000) Activities
Services Constructions Goods Trainings Other
a. National urban institutional and policy
development
b. Integrated planning for
urban developments
c. City financial management capacity
development
d. Implementation support
13. Program Reference
BB-ID: BB-1519-R1-30
GB-18-04-1
1. Project Title
National Urban Water Supply Project
2. Program Title
Drinking
Water
Development Program
3. Executing
Agency
: Ministry Public Works and Housing
4. Implementing Agency
: a. Directorate General of Human Settlements, Ministry Public Works and Housing
b. D ir
ctor
at
en
er
alo
gio
ent , M inistryo
H om
airs
c. L o c. L o
5. Duration : 48 Months
6. Location :
Nationwide (40 selected cities)
7. Objectives
a. To improve services coverage and capacity of operation
on
Drinking Water Supply
System (SPAM) in urban areas.
b. To improve operational performance
of
selected District Owned
Water Supply Operators (PDAMs)/Local Governments.
c. To strengthen the urban
water supply
policy framework
at
central and local government level.
8. Scope of Project
a. Investment support for urban drinking
water supply infrastructure through
giving seed
grant, matching
grant and performance based grant.
b. Technical assistance
and
capacity building for District Owned Water
Supply Operators (PDAMs)/Local Governments Supply Operators (PDAMs)/Local Governments
c. Advisory and policy development support for central government
in order
to strengthen
the policies of urban water
supply investment,
as well as service deliver framework and roadmap.
d. Project management and implementation support.
GB-18-04-1
9. Activities
Implementation
Activities Project Implementation Unit
Location
a. Investment support for urban water supply infrastructure
a. Directorate General of Human Settlements, Ministry Public
b. Technical assistance and Works and Housing capacity building
b. Directorate General of Regional
Nationwide
Development, Ministry of development support
c. Advisory
and
policy
Home Affairs
c. Local Governments (to be
d. Program management and
selected)
implementation support
10. Funding Source
Funding (US $ 000)
Implementing Agency Source
Total Directorate General of Human
Settlements, Ministry Public
96,500
Works and Housing Local Governments
284,800 World Bank Directorate General of Regional
0 184,800
Development, Ministry of Home
11. Disbursement Plan
Disbursement Plan (US $ 000)
*) Not included local fund
GB-18-04-1
12. Funding Allocation
Category (US $ 000) Activities Services Constructions Goods Trainings Other
a. Investment support for urban water supply
infrastructure
b. Technical assistance and
3,500 capacity building
c. Advisory
development support
d. Program management and
implementation support
13. Program Reference
BB-ID: BB-1519-R0-04
GB-18-05-0
1. Project
Title
Jakarta Sewerage Development Project Zone 6 (Phase I)
2. Program Title
Development of Waste Water
Management Program
3. Executing Agency
: Ministry of Public Works and Housing
4. Implementing Agency
: Directorate General of Human
Settlements,
Ministry of Public Works and Housing
5. Duration : 84 Months
6. Location :
DKI
Jakarta Province
7. Objectives
The objective
of
Jakarta Sewerage Development Zone 6 is to improve quality of sanitation condition in DKI Jakarta by constructing sewerage system, which consists of construction of sewer network and wastewater treatment plan (WWTP) in Zone
6 area (Gambir, Tanah Abang, Cengkareng, Grogol, Petamburan, Kebon
Jeruk, Kalideres, Palmerah, Kembangan, Tambora, Kebayoran Lama, Penjaringan). The expected outputs and outcomes of this project are:
a. Improvement of coverage of off-site wastewater system in DKI Jakarta..
b. Improvement of quality
of
environmental condition
to
prevent waterborne disease caused by heavily polluted surface
and ground water in DKI Jakarta.
c. Availability
of
adequate sewerage system in DKI Jakarta, especially in Zone
8. Scope of Project
a. Construction
of
WWTP
b. Construction
of
sewer network
c. Engineering services
9. Activities
Project Activities
Implementation
Locations
Implementation Units
a. Consulting services Directorate General of
b. Environmental impact assessment DKI Jakarta Province Human Settlements,
preparation Ministry of Public preparation Ministry of Public
GB-18-05-0
10. Funding Source
Funding (US $ 000)
Implementing Agency Source
Total Directorate General of Human
Settlements, Ministry of Public 281,640
412,880 JICA
Works and Housing
11. Disbursement Plan*
Disbursement Plan (US $ 000)
*) Not included local fund
12. Funding Allocation*
Category (US $ 000) Activities
Services Constructions
Goods Trainings Other
a. Consulting Services
assessment preparation
c. Construction works including WWTP, trunk sewer, service
250,200 pipe, lateral pipe,
and persil pipe, and pumping station
Total 31,440 250,200
*) Not included local fund
13. Program Reference
BB-ID: BB-1519-R0-08
GB-18-06-0
1. Project Title Jakarta Sewerage Development Project Zone 1
2. Program Title :
Development of Waste Water
Management Program
3. Executing Agency
: Ministry of Public Works and Housing
4. Implementing Agency
: Directorate General of Human
Settlements, Ministry of Public Works and Housing
5. Duration : 96 Months
6. Location :
DKI
Jakarta Province
7. Objectives
The objective
of
Jakarta Sewerage Development Zone 6 is to improve quality of sanitation condition in DKI Jakarta by constructing sewerage system, which consists of construction of sewer network and wastewater treatment plan (WWTP) in Zone
1 area (Penjaringan, Pademangan, Taman Sari, Tambora, Sawah Besar, Gambir, Tanah Abang, and Menteng). The expected outputs and outcomes of this project are:
a. Improvement
of
coverage of off-site wastewater system in DKI Jakarta.
b. Improvement
environmental condition to prevent waterborne disease caused by heavily polluted
surface surface
c. Availability
of
adequate sewerage system
in
DKI
Jakarta, especially in Zone 1.
8. Scope of Project
a. Construction
of
WWTP
b. Construction
of
sewer network
9. Activities
Project Implementation Activities
a. Consulting services
b. Environmental impact assessment preparation
c. Construction works including Directorate General of WWTP, trunk sewer, service pipe,
Human Settlements, lateral pipe, and interceptor
DKI Jakarta
Ministry of Public facilities, piping facilities (house
Province
Works and Housing connection, service pipe, lateral
pipe, persil pipe), and sewer network (service pipe, lateral pipe, and persil pipe)
GB-18-06-0
10. Funding Source
Funding (US $ 000)
Implementing Agency Source
Total Directorate General of
Human Settlements,
964,000 JICA Ministry of Public Works
and Housing
11. Disbursement Plan
Disbursement Plan (US $ 000)
12. Funding Allocation
Category (US $ 000)
Activities
Services Constructions
Goods
Trainings Other
a. Construction
b. Construction of trunk sewer, service pipe,
lateral pipe, and interceptor facilities
c. Development of piping facilities
(house connection,
service
pipe, lateral pipe, and persil pipe)
d. Consulting services
e. Others 70,000
13. Program Reference
BB-ID: BB-1519-R0-08
GB-18-07-0
1. Project Title Sustainable Urban Development
in
Indonesia (Eco
D istri
ct )
2. Program Title :
Sustainable Urban Development Program
3. Executing Agency
: Ministry of Public Works and Housing
4. Implementing Agency
: Directorate General of Human Settlements, Ministry of Public Works and Housing
5. Duration : 48 Months
6. Location :
Yogyakarta City, Semarang City, and Wonosobo District
7. Objectives
To increase
the
capacity of
local
government and the availability
of
infrastructure access in support of the realization
of
competitive sustainable cities in urban strategic areas that meet the eight attributes of Green City.
8. Scope of Project
a. Establishment of urban
working group in each district/city.
b. Capacity building and institutionalizatio n
of
all
stakeholders in the form of training, socialization, workshops, and stakeholder forums.
c. Preparation
DED documents in 3 districts/cities locations, namely: Semarang
City,
Yogyakarta City, and
Wonosobo District.
d. Physical implementation in
3 (three) regencies/cities locations, namely: Semarang
City, Yogyakarta City and
Wonosobo District.
e. Assistance and construction works
by Consultant Advisory at the central level as well as contractors in each selected city.
f. Technical assistance
and monitoring evaluation by the center
through PMU and Central Satker as well as by
each district/city through Provincial Satker for
physical works.
g. Preparation of feasibility study (FS), RTBL and g. Preparation of feasibility study (FS), RTBL and
for
prospective new locations
districts/cities, namely: Bandung City, Purbalingga District,
and
Singkawang City.
GB-18-07-0
9. Activities
Implementation
Activities Project Implementation Units
Locations
a. Capacity and institutional improvement
b. Stimulant physical
Directorate General of Human implementation
Yogyakarta City,
Semarang City, and Settlements, Ministry of Public
c. Technical assistance Wonosobo District Works and Housing
d. Support project implementation
10. Funding Source
Implementing Agency
Funding (US $ 000)
Source
Total Directorate General of
Human Settlements,
84,600 AFD Ministry of Public Works
61,100
0 23,500
and Housing
11. Disbursement Plan*
Disbursement Plan (US $ 000) Total
*) Not included local fund
GB-18-07-0
12. Funding Allocation*
Category (US $ 000)
Activities Services Constructions Goods Trainings
Other
a. Capacity and institutional
2,450 improvement
b. Stimulant physical
implementation
c. Technical assistance
d. Support project implementation
*) Not included local fund
13. Program Reference BB-ID: BB-1519-R1-30 GB-18-08-0
1. Project Title : Improvement of Solid Waste Management to Support Regional and Metropolitan Cities
2. Program Title
: Development of Solid Waste Management Program
3. Executing Agency
: Ministry of Public Works and Housing
4. Implementing Agency : Directorate General of Human Settlements, Ministry of Public Works and Housing
5. Duration : 72 Months
6. Location : Nationwide (30 selected cities/districts)
7. Objectives
To improve the solid waste management and services at national level and in selected cities/districts.
8. Scope of Project 8. Scope of Project
b. Integrated planning and capacity building to local government and communities
c. Improved solid waste infrastructure in selected cities/districts.
d. Support the implementation of project and technical assistance.
9. Activities
Implementation
Activities Project Implementation Units
Locations
a. Directorate General of regulatory framework
a. Develop
policy
and
Human Settlements, Ministry of Public Works
b. Capacity building and
and Housing planning facilitation to
Nationwide
b. Ministry of Environment local government
and Forestry
c. Ministry of Home Affairs
c. Project management
d. Directorate General of
d. Solid waste infrastructure Human Settlements,
Selected cities
development Ministry of Public Works and Housing
GB-18-08-0
10. Funding Source
Funding (US $ 000)
Implementing Agency Source
Loan
Grant
Local
Total
Directorate General of Human
Settlements,
Ministry of Public Works and Housing
105,000 World Bank Ministry of Environment
and Forestry Ministry of Home Affairs
11. Disbursement Plan*
Disbursement Plan (US $ 000)
*) Not included local fund
12. Funding Allocation*
Category (US $ 000) Activities
Services Constructions
Goods
Trainings Other
a. Develop policy and regulatory
3,000 framework
b. Capacity building and
planning
facilitation to local government
c. Solid waste infrastructure
development
d. Project 13,000 management
Total
*) Not included local fund
13. Program Reference BB-ID: BB-1519-R0-06-02-0
Direktorat Jenderal Sumber Daya Air/ Directorate General of Water Resources
GB-18-09-3
1. Project Title : The Urgent Rehabilitation of Strategic Irrigation for Western Region of Indonesia
2. Program Title
: Development and Management of Irrigation Program
3. Executing Agency
: Ministry of Public Works and Housing
4. Implementing Agency : Directorate General of Water Resources, Ministry of Public Works and Housing
5. Duration : 72 months
6. Location : Lampung and Banten Province
7. Objectives
To increase agricultural production and contribute to self-sufficiency in the agricultural society in Indonesia by constructing new development irrigation system.
8. Scope of Project
a. Rehabilitation and modernization of irrigation facilities.
b. Improvement of irrigation and drainage canals.
c. Capacity building on operation and maintenance.
9. Activities
Implementation
Activities Project Implementation Units
Locations
a. Construction works Directorate General of Water Lampung and Banten Resources, Ministry of Public
b. Consulting services
Province
Works and Housing
c. Land acquisition
10. Funding Source
Funding (US $ 000)
Implementing Agency Source
Total Directorate General of
Water Resources, Ministry
114,000 of Public Works and
Korea Housing
(EDCF)
Total
GB-18-09-3
11. Disbursement Plan
Disbursement Plan (US $ 000)
12. Funding Allocation
Category (US $ 000) Activities Services Constructions Goods Trainings
Other
a. Construction works
b. Consulting services
c. Land acquisition 5,478
d. Contingency 10,222
e. Others 8,866
13. Program Reference BB-ID: BB-1519-R0-08 GB-18-10-2
1. Project Title : Engineering Service for Coastal and River Development
Project
2. Program Title
: Mitigation of Water Hazard Program
3. Executing Agency
: Ministry of Public Works and Housing
4. Implementing Agency : Directorate General of Water Resources, Ministry of Public Works and Housing
5. Duration : 36 months
6. Location : Nationwide
7. Objectives
To ensure the high priority of coastal and river projects are implemented efficiency by advancing preparatory activities in a systematic manner through engineering services.
8. Scope of Project
a. Compose the documents regarding project preparations, consist of; (i) master plan, (ii) feasibility study, (iii) detail design, (iv) environmental and social impact assessment, and (v) land acquisition and resettlement action plan.
b. Strengthen the capabilities of human resources of river and coastal s stakeholder.
9. Activities
Activities
Implementation Location
Project Implementation Unit Directorate General of Water
Consulting services
Nationwide
Resources, Ministry of Public Works and Housing
10. Funding Source
Funding (US $ 000)
Implementing Agency Source
Directorate General of Water Resources,
11,210 Korea (EDCF) Ministry of Public
Works and Housing
Total
GB-18-10-2
11. Disbursement Plan
Disbursement Plan (US $ 000)
12. Funding Allocation
Category (US $ 000) Activities Services Constructions Goods Trainings Other
a. Consulting services
9,842
b. Others 1,368
13. Program Reference BB-ID: BB-1519-R0-11
GB-18-11-2
1. Project Title : Engineering Service for Dam Multipurpose Development
Project
2. Program Title
: Dam Development Program
3. Executing Agency
: Ministry of Public Works and Housing
4. Implementing Agency : Directorate General of Water Resources, Ministry of Public Works and Housing
5. Duration : 36 months
6. Location : Nationwide
7. Objectives
To ensure that high priority of dam development projects are implemented efficiently by advancing preparatory activities in a systematic manner through engineering services.
8. Scope of Project
a. Compose the documents regarding project preparations, consist of; (i) master plan, (ii) feasibility study, (iii) detail design, (iv) environmental and social impact assessment, and (v) land acquisition and resettlement action plan.
b. Strengthen the capabilities of human resources of river and dam s stakeholder.
9. Activities
Implementation
Activities Project Implementation Unit
Location
Directorate General of Water Consulting services
Nationwide
Resources, Ministry of Public Works and Housing
10. Funding Source
Funding (US $ 000)
Implementing Agency Source
Loan
Grant
Local
Total
Directorate General of Water Korea Resources, Ministry of Public
0 1,279 22,890 (EDCF) Works and Housing
GB-18-11-2
11. Disbursement Plan
Disbursement Plan (US $ 000)
12. Funding Allocation
Category (US $ 000) Activities Services Constructions Goods Trainings Other
a. Consulting services
b. Others 2,823
13. Program Reference BB-ID: BB-1519-R0-10 GB-18-12-0
1. Project Title Urban Flood Control System Improvement in Selected
Cities Phase II
2. Program Title
Mitigation of Water Hazards Program
3. Executing Agency
Ministry of Public Works and Housing
4. Implementing Agency : Directorate General of Water Resources, Ministry of Public Works and Housing
5. Duration : 82 months
6. Location : Riau, West Sumatera, Jambi, and West Nusa Tenggara
Province
7. Objectives
Increasing readiness to manage and reduce the risk of flood or flood mitigation through integrated flood management approaches in the selected river basin.
8. Scope of Project
a. River improvement infrastructures and facilities.
b. Construction of pumping station.
c. Increasing the capacity of retention pond.
d. River and drainage normalization.
e. Non-structural approach.
9. Activities
Implementation
Activities Project Implementation Units
Locations
a. Civil works
Riau, West Sumatera, Jambi, Directorate General of Water
and West Nusa
Resources, Ministry of Public
b. Consulting services Tenggara Province Works and Housing
10. Funding Source
Funding (US $ 000)
Implementing Agency Source
Total Directorate
Water Resources, Ministry
79,310 JICA of Public Works and
GB-18-12-0
11. Disbursement Plan
Disbursement Plan (US $ 000)
12. Funding Allocation
Category (US $ 000) Activities
Services Constructions
Goods
Trainings Other
a. Civil works
b. Consulting services
c. Land acquisition 698
d. Others 22,439
Total
13. Program Reference BB-ID: BB-1519-R0-11 GB-18-13-0
1. Project Title Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
2. Program Title
Development and Management of Irrigation Program
3. Executing Agency
Ministry of Public Works and Housing
4. Implementing Agency : Directorate General of Water Resources, Ministry of Public Works and Housing
5. Duration : 72 months
6. Location : Nationwide
7. Objectives
a. To ensure water availability and water security for all agricultural water users within the irrigation systems.
b. To improve irrigation services and strengthen management of irrigation schemes in selected areas. This objective will be achieved through revitalization and modernization of water resources and irrigation systems, institutional strengthening and improved management, operation and maintenance of these systems.
8. Scope of Project
a. Urgent rehabilitation of irrigation and drainage system.
b. Strategic modernization of irrigation and drainage system.
c. Project management and consulting services.
9. Activities
Implementation
Activities Project Implementation Units
Locations Locations
a. Directorate General of Water infrastructure
Resources, Ministry of Public improvements
Works and Housing
b. Strategic infrastructure
b. Ministry of Agriculture
Nationwide
modernization in irrigation
c. Ministry of Internal Affairs system
d. Regional Planning
c. Project management and
and
consulting services Development Agencies
GB-18-13-0
10. Funding Source
Funding (US $ 000)
Implementing Agency Source
Total Directorate
Water Resources, Ministry World
578,000 of Public Works and
Bank/AIIB Housing
11. Disbursement Plan
Disbursement Plan (US $ 000)
Total
1 st
2 nd
3 rd
4 th
5 th
6 th
12. Funding Allocation
Category (US $ 000) Activities
Services Constructions Goods
Trainings Other
a. Urgent rehabilitation and infrastructure
improvements
b. Strategic infrastructure modernization in
irrigation system
c. Project management and consulting
services
d. Others 52,545
13. Program Reference BB-ID: BB-1519-R0-08
GB-18-14-0
1. Project Title Karian Dam-Serpong Water Conveyance System
2. Program Title
Provision and Management of Bulk Water Supply Program
3. Executing AgencyMinistry of Public Works and Housing
4. Implementing Agency Directorate General of Water Resources, Ministry of Public Works and Housing
5. Duration : 60 months
6. Location : Banten and DKI Jakarta Province
7. Objectives
a. To supply raw water to Tangerang, South Tangerang, and DKI Jakarta areas.
b. To improve sanitation environment and living standards in Banten and DKI Jakarta Province.
8. Scope of Project
a. Construction of booster pump station.
b. Construction of water conveyance from Karian Dam to Serpong.
c. Consulting supervision.
9. Activities
Implementation
Activities Project Implementation Units
Locations
a. Construction works Directorate General of Water Banten and DKI Resources, Ministry of Public
b. Construction services Works and Housing
Jakarta Province
10. Funding Source
Funding (US $ 000)
Implementing Agency Source
Disbursement Plan
Total Directorate
Water Resources, Ministry
247,881 KEXIM of Public Works and
GB-18-14-0
Disbursement Plan (US $ 000)
12. Funding Allocation
Category (US $ 000) Activities
Services Constructions Goods
Trainings Other
a. Construction cost
b. Consulting services
c. Project management
d. Others 159,974
13. Program Reference BB-ID: BB-1519-R0-09 GB-18-15-0
1. Project Title
Pelosika Multipurpose Dam Construction Project
2. Program Title
Dam Development Program
3. Executing Agency
Ministry of Public Works and Housing
4. Implementing Agency Directorate General of Water Resources, Ministry of Public Works and Housing
5. Duration : 72 months
6. Location : South East Sulawesi Province
7. Objectives
To control flooding, intensification and extensification of potential irrigation areas downstream of dams, hydroelectric power plant, and raw water supply in Southeast Sulawesi Province
8. Scope of Project
a. Civil work including (i) access road; (ii) base camp, pool of heavy vehicle; (iii) diversion channel; (iv) cofferdam; (v) spillway; (vi) main dam; (vii) intake; (viii) electrical mechanical; (ix) dam instrumentation; and (x) power outlet. b. Consulting services.
9. Activities
Implementation
Activities Project Implementation Units
Locations
a. Civil work Directorate General of Water South East Sulawesi Resources, Ministry of Public
b. Consulting services
Province
Works and Housing
10. Funding Source
Funding (US $ 000)
Implementing Agency Source
Disbursement Plan
Total Directorate
Water Resources, Ministry
352,940 RRT of Public Works and
GB-18-15-0
Disbursement Plan (US $ 000)
12. Funding Allocation
Category (US $ 000) Activities
Services Constructions Goods
Trainings Other
a. Civil work
b. Consulting services
c. Others 52,940
13. Program Reference BB-ID: BB-1519-R0-10 GB-18-16-0
1. Project Title
Jenelata Dam Construction Project
2. Program Title
Dam Development Program
3. Executing AgencyMinistry of Public Works and Housing
4. Implementing Agency Directorate General of Water Resources, Ministry of Public Works and Housing
5. Duration : 72 months
6. Location : South Sulawesi Province
7. Objectives
To support the increase of irrigated agricultural production, raw water, clean water, hydroelectric power plant, flood control, and tourism in Gowa Regency and Makassar City Southeast Sulawesi Province
8. Scope of Project
a. Civil work including (i) access road; (ii) base camp, pool of heavy vehicle; (iii) diversion channel; (iv) cofferdam; (v) spillway; (vi) main dam; (vii) intake; (viii) electrical mechanical; (ix) dam instrumentation; and (x) power outlet.
b. Consulting services.
9. Activities
Implementation
Activities Project Implementation Units
Locations
a. Civil work Directorate General of Water
South Sulawesi
Resources, Ministry of Public
b. Consulting services
Province
Works and Housing
10. Funding Source
Funding (US $ 000)
Implementing Agency Source
Loan
Grant
Local
Total
Disbursement Plan
Directorate General
of
Water Resources, Ministry
276,470 RRT of Public Works and
GB-18-16-0
11.
Disbursement Plan (US $ 000)
12. Funding Allocation
Category (US $ 000) Activities
Services Constructions Goods
Trainings Other
a. Civil work
211,500
b. Consulting services
23,500
c. Others 41,470
13. Program Reference
BB-ID: BB-1519-R0-10
GB-18-17-0
1. Project Title Lompatan Harimau Dam Construction Project (Rokan Kiri Dam Construction Project)
2. Program Title
Dam Development Program
3. Executing Agency
Ministry of Public Works and Housing
4. Implementing Agency : Directorate General of Water Resources, Ministry of Public Works and Housing
5. Duration : 72 months
6. Location : Riau Province
7. Objectives
To support the increase of irrigated agricultural production, raw water, hydroelectric power plant, and flood control in Rokan Regency-Riau Province.
8. Scope of Project
a. Civil work including (i) access road; (ii) base camp, pool of heavy vehicle; (iii) diversion channel; (iv) cofferdam; (v) spillway; (vi) main dam; (vii) intake; (viii) electrical mechanical; (ix) dam instrumentation; and (x) power outlet.
b. Consulting services.
9. Activities
Implementation
Activities Project Implementation Units
Locations
a. Civil work Directorate General of Water
Riau Province
Resources, Ministry of Public
b. Consulting services Works and Housing
10. Funding Source
Funding (US $ 000)
Implementing Agency Source
Total Directorate
Water Resources, Ministry
235,290 RRT of Public Works and
GB-18-17-0
Disbursement Plan (US $ 000)
12. Funding Allocation
Category (US $ 000) Activities
Services Constructions Goods
Trainings Other
a. Civil work
b. Consulting services
c. Others 35,290
13. Program Reference BB-ID: BB-1519-R0-10 GB-18-18-0
1. Project Title Riam Kiwa Multipurpose Dam Construction Project
2. Program Title
: Dam Development Program
Disbursement Plan
3. Executing Agency
: Ministry of Public Works and Housing
4. Implementing Agency : Directorate General of Water Resources, Ministry of Public Works and Housing
5. Duration : 72 months
6. Location : South Kalimantan Province
7. Objectives
To support the increase in irrigated agricultural production, raw water, water supply, hydroelectric power, and flood control. Therefore Riam Kiwa Multipurpose Dam Construction Project may be judged as a strategic project that is expected to be priority project in the national and regional scale at this time.
8. Scope of Project
a. Civil work including (i) access road; (ii) base camp, pool of heavy vehicle; (iii) diversion channel; (iv) cofferdam; (v) spillway; (vi) main dam; (vii) intake; (viii) electrical mechanical; (ix) dam instrumentation; and (x) power outlet. b. Consulting services.
9. Activities
Implementation
Activities Project Implementation Units
Locations
a. Civil work Directorate General of Water South Kalimantan Resources, Ministry of Public
b. Consulting services
Province
Works and Housing
10. Funding Source
Funding (US $ 000)
Implementing Agency Source
Total Directorate
Water Resources, Ministry
223,530 RRT of Public Works and
GB-18-18-0
Disbursement Plan (US $ 000)
12. Funding Allocation
Category (US $ 000) Activities
Services Constructions Goods
Trainings Other
a. Civil work
b. Consulting services
c. Others 33,530
13. Program Reference BB-ID: BB-1519-R0-10
Disbursement Plan
Badan Pengembangan Infrastruktur Wilayah/ Regional Infrastructure Development Agency
GB-18-19-0
1. Project Title : Integrated Infrastructure Development for National Tourism Strategic Areas
2. Program Title
: Infrastructure for Tourism Development Program
3. Executing Agency
: Ministry of Public Works and Housing
4. Implementing Agency : Regional Infrastructure Development Agency, Ministry of Public Works and Housing
5. Duration : 72 months
6. Location : North Sumatera, Central Java, West Nusa Tenggara Province, and National Level
7. Objectives
a. To improve the quality of and access to tourism-relevant basic infrastructure and services.
b. To strengthen local economy linkages to tourism.
c. To attract private investment in selected tourism destinations in Indonesia
8. Scope of Project
a. Formulating the integrated master plan for 3 destinations (Toba Lake, Borobudur, and Mandalika).
b. Increase institutional capacity to facilitate integrated and sustainable tourism development for: (i) Integrated Tourism Master Plans (ITMPs), downstream sectoral master plans and studies, and institutional development and capacity building for integrated tourism destination planning; (ii) Program Management Support (PMS) consultant; and (iii) Supporting natural, cultural and social asset monitoring and preservation.
c. Improve tourism-relevant road quality and basic services accessibility including (i) roads and bridges; (ii) pedestrian, non-motorized traffic facilities, parks and greenery, and subnational facilities for public transport; (iii) water supply, sanitation, wastewater management and solid waste management; and (iv) feasibility studies and detailed engineering designs and provision of management and supervision consultants services.
d. Promote local participation in the tourism economy includes (i) developing competency-based standards, qualification frameworks and related curriculum packages; (ii) training of trainers, teachers and assessors; (iii) provision of technical assistance for Technical, Vocational Education, and Training (TVET) institutions; (iv) certification of trainees and tourism professionals; and (v) holding bi-annual tourism skill development forums in each of the selected destinations.
GB-18-19-0
e. Enhance the enabling environment for private investment and business entry in tourism by designing and implementation of (i) a licensing simplification program; and (ii) destination-specific investment promotion strategies and the institutional capabilities to proactively attract, facilitate, retain, and expand private investment.
9. Activities
Implementation
Activities Project Implementation Units
Locations Locations
institutional
capacity to
a. Directorate General of integrated and sustainable
facilitate
Highways, Ministry of Public tourism development
Works and Housing
b. Directorate General of Human
b. Improve tourism-relevant North Sumatera, Settlements, Ministry of Public road quality and basic
Works and Housing services accessibility
Central Java,
West Nusa
c. Regional
Infrastructure
c. Promote local participation Tenggara Province, Development Agency, in the tourism economy
and
Ministry of Public Works and
National Level
Housing
d. Deputy
for Institutional
d. Enhance the enabling Development and Tourism environment for private
Ministry of investment and business
Industry,
Tourism
entry in tourism
10. Funding Source
Funding (US $ 000)
Implementing Agency Source
Total Regional
Infrastructure Development Agency,
0 0 300,000 World Bank Ministry of Public Works
and Housing
*) Including portions to develop FS/DED USD 4 Million
GB-18-19-0
11. Disbursement Plan
Disbursement Plan (US $ 000)
12. Funding Allocation
Category (US $ 000) Activities
Services Constructions Goods
Trainings Other
a. Increase institutional capacity to facilitate integrated
and
22,000
sustainable tourism development
b. Improve tourism- relevant road quality
239,600
and basic services accessibility
c. Promote
local
participation in the
37,100
tourism economy
d. Enhance the enabling environment
for
private investment
1,300
and business entry in tourism
13. Program Reference
BB-ID: BB-1519-R1-31
Kementerian Perhubungan/ Ministry of Transportation
GB-18-20-1
1. Project Title : Construction of Jakarta Mass Rapid Transit (MRT) North-South Line Project (Phase 2)
2. Program Title
: Railway Development Program
3. Executing Agency
: Ministry of Transportation
4. Implementing Agency : a. Ministry of Transportation
b. Local Government of DKI Jakarta
5. Duration : 72 months