REKAPITULASI RENCANA ANGGARAN BIAYA (1)

REKAPITULASI RENCANA ANGGARAN BIAYA
NAMA PEKERJAAN

: STUDI PENYUSUNAN DED PERLUASAN KANTOR KSOP KELAS II GRESIK

LOKASI

: Jl. YOS SUDARSO No. 36, GRESIK

TAHUN ANGGARAN

: 2017

NO

JUMLAH HARGA

JENIS PEKERJAAN

(Rp)
2


1

A.

3

BANGUNAN KANTOR BARU
I.

PEKERJAAN LANTAI 1

Rp

238,206,317.89

II.

PEKERJAAN LANTAI 2


Rp

98,162,196.86

III.

PEKERJAAN ATAP

Rp

39,931,348.85

Rp

376,299,863.60

JUMLAH - A
B.

PERLUASAN GUDANG ARSIP

I.

PEKERJAAN LANTAI 1

Rp

191,255,903.34

II.

PEKERJAAN LANTAI 2

Rp

127,814,310.72

Rp

319,070,214.06


93,724,096.36

JUMLAH - B
C.

PERLUASAN AREA PELAYANAN
I.

PEKERJAAN PERLUASAN LOKET PELAYANAN

Rp

II.

PEKERJAAN PERLUASAN RUANG TUNGGU DEPAN

Rp

-


III.

PEKERJAAN PENUTUPAN VOID LANTAI 2

Rp

-

JUMLAH - C

Rp

93,724,096.36

SUB TOTAL PEKERJAAN STRUKTUR Rp

789,094,174.02

DIBULATKAN Rp


789,094,100.00

Sidoarjo, Maret 2017

Konsultan Perencana
CV. Matra Cipta

Ir. Kosmas Wahyu Novianto
DIREKTUR

RENCANA ANGGARAN BIAYA
NAMA PEKERJAAN

: STUDI PENYUSUNAN DED PERLUASAN KANTOR KSOP KELAS II GRESIK

LOKASI

: Jl. YOS SUDARSO No. 36, GRESIK

TAHUN ANGGARAN


: 2017

NO

JENIS PEKERJAAN
2

1

A.

VOLUME

SATUAN

3

4


HSPK

JUMLAH

(Rp)

(Rp)

5

6=3x5

BANGUNAN KANTOR BARU

I.

PEKERJAAN LANTAI 1

1


Bor Pondasi Strauss Pile

2

Galian Tanah

3

Urugan Pasir Padat Bawah Pondasi

dia. 30 cm

tb. 5 cm

64.00

m1

67,078.00


4,292,992.00

12.07

m3

106,177.50

1,281,112.23

0.86

m3

295,487.50

254,662.95

4


Urugan Tanah Kembali Pondasi

5

Urugan Sirtu (Perataan site)

6

Pembuangan Tanah

7

Lantai Kerja

tb. 5 cm

8

Pondasi

PC-2

9

Pelapisan Anti Rayap Pondasi

10

Sloof

elv. - 0.70

TB-1

20 x 40 cm

2.63

m3

5,737,106.00

15,106,488.55

11

Kolom

Lantai 1

C-1

30 x 40 cm

4.66

m3

7,483,857.00

34,844,838.19

12

Balok

elv. + 3.95

B-1

30 x 60 cm

5.43

m3

6,369,673.00

34,568,215.37

13

Balok

elv. + 3.95

B-2 K

20 x 45 cm

0.85

m3

9,674,902.00

8,243,016.50

14

Balok

elv. + 3.95

B-3

20 x 40 cm

0.23

m3

8,347,887.00

1,916,674.86

15

Balok

elv. + 3.95

B-4

20 x 35 cm

3.65

m3

7,880,523.00

28,751,300.11

16

Plat Lantai

elv. + 3.95

S-2

Tb. 12 cm

11.11

m3

7,113,771.00

165 x 90 cm

7.31

m3

28,776.00

210,460.76

14.03

m3

288,557.50

4,047,018.94

68.75

m3

37,895.00

2,605,357.04

1.19

m3

1,041,115.90

1,240,031.50

4.75

m3

4,461,540.00

21,201,238.08

13.92

m2

42,721.80

594,687.46

Jumlah - I

79,048,223.35
Rp

238,206,317.89

I.

PEKERJAAN LANTAI 2

1

Kolom

Lantai 2

C-1

30 x 40 cm

1.76

m3

7,483,857.00

13,201,523.75

2

Kolom

Lantai 2

C-2

25 x 35 cm

0.64

m3

8,118,141.00

5,220,979.43

3

Kolom

Lantai 2

C-3

20 x 20 cm

0.44

m3

9,682,342.00

4,269,912.82

4

Balok

elv. + 7.45

B-1

30 x 60 cm

2.90

m3

6,369,673.00

18,459,312.35

5

Balok

elv. + 7.45

B-2 K

20 x 45 cm

0.41

m3

9,674,902.00

4,009,279.39

6

Balok

elv. + 7.45

B-3

20 x 40 cm

0.54

m3

8,347,887.00

4,521,215.60

7

Balok

elv. + 7.45

B-4

20 x 35 cm

2.45

m3

7,880,523.00

19,279,699.52

8

Plat Atap

elv. + 7.45

S-1

Tb. 10 cm

3.63

m3

8,055,248.00

Jumlah - II

29,200,274.00
Rp

98,162,196.86

Rencana Anggaran Biaya Struktur_hal. 1

NO

JENIS PEKERJAAN
2

1

III.

PEKERJAAN ATAP

1

Rangka Atap

2

Double Base Plate

3

Angker

4

Cat Meni

5

Ikatan Angin

dia. 12 mm

6

Plat Sambung Ikatan Angin

tb. 5 mm

7

Baut Tumpuan Ikatan Angin

dia. 8 mm

8

Turnbuckle Ikatan Angin

dia. 12 mm

Profil Double C.125.50.20.2,3 mm

9

Gording
Penyangga Gording

11

Baut Penyangga Gording

12

Cat Meni Gording

13

Sagrod

14

Baut Sagrod

15
16

SATUAN

3

4

HSPK

JUMLAH

(Rp)

(Rp)

5

6=3x5

357.91

kg

32,181.60

11,518,232.31

uk. 20 x 30 cm - tb. 10 mm

75.36

kg

46,424.40

3,498,542.78

dia. 16 mm - P. 40 cm

20.19

kg

23,691.80

478,395.74

4.91

m2

59,026.00

289,841.27

42.12

m1

19,542.60

823,068.33

11.78

kg

46,424.40

546,647.31

24.00

bh

14,375.00

345,000.00

6.00

bh

48,125.00

288,750.00

Profil Double C.125.50.20.2,3 mm

10

VOLUME

Profil C.125.50.20.2.3 mm

308.48

kg

32,181.60

9,927,508.69

L.50.50.5 mm

12.06

kg

46,424.40

560,063.96

dia. 8 mm

64.00

bh

14,375.00

920,000.00

28.01

m2

59,026.00

1,653,306.45

dia. 10 mm

33.85

m1

15,174.50

513,687.17

dia. 10 mm

56.00

bh

15,000.00

840,000.00

Penutup Atap Metalsheet

Tb. 0.4 mm

68.91

m2

55,055.00

3,794,005.22

Papan Lisplank

Tb. 9 mm

17.96

m1

219,120.00

3,934,299.60

Profil C.125.50.20.2.3 mm

Jumlah - III

Rp

39,931,348.85

Rencana Anggaran Biaya Struktur_hal. 2

NO

JENIS PEKERJAAN
2

1

VOLUME

SATUAN

3

4

HSPK

JUMLAH

(Rp)

(Rp)

5

6=3x5

B.

PERLUASAN GUDANG ARSIP

I.

PEKERJAAN LANTAI 1

1

Bor Pondasi Strauss Pile

2

Galian Tanah

3

Urugan Pasir Padat Bawah Pondasi

4

Urugan Tanah Kembali Pondasi

5

Urugan Sirtu (Perataan site)

6

Urugan Pasir Padat

7

Pembuangan Tanah

8

Lantai Kerja

tb. 5 cm

9

Pondasi

PC-1

90 x 90 cm

10

Pondasi

PC-1 A

70 x 90 cm

11

Pelapisan Anti Rayap Pondasi

12

Sloof

elv. - 0.70

TB-2

20 x 30 cm

1.59

m3

5,493,653.00

8,759,629.71

13

Kolom Pedestal

Lantai 1

C-2

25 x 35 cm

1.83

m3

8,118,141.00

14,846,050.35

14

Kolom

Lantai 1

C-4

WF.200.100.5,5.8 mm

663.07

kg

32,181.60

21,338,621.33

15

Balok

elv. + 3.83

B-5

WF.200.100.5,5.8 mm

946.79

kg

32,181.60

30,469,056.16

16

Balok

elv. + 3.83

B-6

Double C.125.50.20.2,3

267.56

kg

32,181.60

8,610,372.12

17

Plat Stiffener & Voute

tb. 5 mm

160.99

kg

32,181.60

5,180,767.75

18

Double Base Plate

uk. 25 x 30 cm - tb. 10 mm

129.53

kg

46,424.40

6,013,120.41

19

End Plate

uk. 10 x 39 cm - tb. 10 mm

119.40

kg

46,424.40

5,543,003.72

20

End Plate

uk. 11 x 17.4 cm - tb. 5 mm

1.50

kg

46,424.40

69,752.20

21

End Plate

uk. L.10.5 x 17.4 cm - tb. 5 mm

2.85

kg

46,424.40

132,529.17

22

Angker

dia. 16 mm - P. 40 cm

41.65

kg

23,691.80

986,691.22

23

Angker Chemical

dia. 16 mm - P. 40 cm

90.00

titik

128,518.50

11,566,665.00

24

Baut HTB

dia. 12 mm

238.00

bh

15,000.00

3,570,000.00

25

Shear Connector

dia. 16 mm

221.00

bh

23,702.80

5,238,318.80

26

Cat Meni

Rangka Profil Baja

27

Plat Lantai

elv. + 3.95

dia. 30 cm

tb. 5 cm

tb. 10 cm

S-4

Tb. 12 cm

44.00

m1

67,078.00

2,951,432.00

9.60

m3

106,177.50

1,019,580.06

2.71

m3

295,487.50

800,032.41

6.18

m3

28,776.00

177,910.50

16.74

m3

288,557.50

4,829,586.88

4.78

m3

295,487.50

1,413,021.23

47.42

m3

37,895.00

1,796,980.90

0.95

m3

1,041,115.90

990,777.95

2.92

m3

4,472,171.00

13,040,850.64

0.50

m3

3,954,679.00

1,993,158.22

10.49

m2

42,721.80

448,151.68

79.58

m2

59,026.00

4,697,267.36

4.54

m3

7,661,478.00

34,772,575.59

Jumlah - I

Rp

191,255,903.34

Rencana Anggaran Biaya Struktur_hal. 3

NO

JENIS PEKERJAAN
2

1

VOLUME

SATUAN

3

4

II.

PEKERJAAN LANTAI 2

1

Kolom

Lantai 2

C-4

WF.200.100.5,5.8 mm

Balok

elv. + 6.70

B-5

WF.200.100.5,5.8 mm

946.79

Balok

elv. + 6.70

B-6

Double C.125.50.20.2,3

267.56

695.87

kg

HSPK
(Rp)

(Rp)

5

6=3x5

32,181.60

22,394,242.17

kg

32,181.60

30,469,056.16

kg

32,181.60

8,610,372.12

Plat Stiffener & Voute

tb. 5 mm

164.27

kg

32,181.60

5,286,329.83

End Plate

uk. 10 x 39 cm - tb. 10 mm

119.40

kg

46,424.40

5,543,003.72

End Plate

uk. 11 x 17.4 cm - tb. 5 mm

1.50

kg

46,424.40

69,752.20

End Plate

uk. L.10.5 x 17.4 cm - tb. 5 mm

2.85

kg

46,424.40

132,529.17

Angker

dia. 16 mm - P. 40 cm

41.65

kg

23,691.80

986,691.22

Angker Chemical

dia. 16 mm - P. 40 cm

90.00

titik

128,518.50

11,566,665.00

Baut HTB

dia. 12 mm

238.00

bh

15,000.00

3,570,000.00

dia. 16 mm

221.00

bh

23,702.80

5,238,318.80

80.92

m2

59,026.00

4,776,159.50

m3

8,085,982.00

Shear Connector
Cat Meni

Rangka Profil Baja

Plat Atap

elv. + 6.80

S-3

Tb. 10 cm

3.61

Jumlah - II

C.
I.

JUMLAH

29,171,190.81
Rp

127,814,310.72

PERLUASAN AREA PELAYANAN
PEKERJAAN PERLUASAN LOKET PELAYANAN
Bor Pondasi Strauss Pile

dia. 30 cm

24.00

Galian Tanah

m1

67,078.00

1,609,872.00

5.46

m3

106,177.50

579,550.77

0.39

m3

295,487.50

115,204.67

Urugan Tanah Kembali Pondasi

3.51

m3

28,776.00

101,128.07

Urugan Sirtu (Perataan site)

5.51

m3

288,557.50

1,590,673.22

Urugan Pasir Padat Bawah Pondasi

Urugan Pasir Padat

tb. 5 cm

tb. 10 cm

Pembuangan Tanah

1.58

m3

295,487.50

465,392.81

25.94

m3

37,895.00

983,147.88

Lantai Kerja

tb. 5 cm

0.52

m3

1,041,115.90

541,255.33

Pondasi

PC-1

90 x 90 cm

1.94

m3

4,472,171.00

8,693,900.42

5.94

m2

42,721.80

253,767.49

0.78

m3

5,493,653.00

4,285,049.34

1.00

m3

8,118,141.00

8,097,845.65

361.67

kg

32,181.60

11,639,248.00

Pelapisan Anti Rayap Pondasi
Sloof

elv. - 0.70

TB-2

20 x 30 cm

Kolom Pedestal

Lantai 1

C-2

25 x 35 cm

Kolom

Lantai 1

C-4

WF.200.100.5,5.8 mm

Balok

elv. + 3.83

B-5

WF.200.100.5,5.8 mm

423.87

kg

32,181.60

13,640,814.79

Balok

elv. + 3.83

B-6

Double C.125.50.20.2,3

154.38

kg

32,181.60

4,968,108.52
2,528,006.28

Plat Stiffener & Voute

tb. 5 mm

78.55

kg

32,181.60

Double Base Plate

uk. 25 x 30 cm - tb. 10 mm

70.65

kg

46,424.40

3,279,883.86

End Plate

uk. 10 x 39 cm - tb. 10 mm

61.23

kg

46,424.40

2,842,566.01

Angker

dia. 16 mm - P. 40 cm

22.72

kg

23,691.80

538,195.21

Angker Chemical

dia. 16 mm - P. 40 cm

60.00

titik

128,518.50

7,711,110.00

Baut HTB

dia. 12 mm

120.00

bh

15,000.00

1,800,000.00

Shear Connector

dia. 16 mm

115.00

bh

23,702.80

2,725,822.00

40.08

m2

59,026.00

2,365,564.46

1.53

m3

8,085,982.00

12,367,989.57

Cat Meni

Rangka Profil Baja

Plat Atap

elv. + 3.95

S-3

Tb. 10 cm

Jumlah - I

Rp

93,724,096.36

Rencana Anggaran Biaya Struktur_hal. 4

ANALISA HARGA SATUAN PEKERJAAN BETON BERTULANG
NAMA PEKERJAAN

: STUDI PENYUSUNAN DED PERLUASAN KANTOR KSOP KELAS II GRESIK

LOKASI

: Jl. YOS SUDARSO No. 36, GRESIK

TAHUN ANGGARAN

: 2017

NO.

URAI AN

SAT.

VOLUME

1

2

3

4

1

1 m3 - Pekerjaan Pondasi

Strauss Pile

HARGA SAT.
(Rp.)

(Rp.)

5

6=4x5

dia. 30 cm

Campuran beton K-300

m3

1.0000

Bekisting Poer

m2

-

Pembongkaran Bekisting

m2

Besi BJTP-24

kg

22.2788

Besi BJTD-39

kg

88.4433

Besi Wiremesh BJTD-50

kg

1,370,290.90

1 m3 - Pekerjaan Pondasi

PC-1

-

9,487.50

-

291,482.82

13,660.90

1,208,215.53

15,103.00

Rp

2,869,989.00

90 x 90 cm

Campuran beton K-300

m3

1.0000

1,370,290.90

1,370,290.90

Bekisting Poer

m2

6.9444

158,436.30

1,100,252.08

Pembongkaran Bekisting

m2

6.9444

9,487.50

65,885.42

Besi BJTP-24

kg

-

13,083.40

Besi BJTD-39

kg

Besi Wiremesh BJTD-50

kg

141.6995

1 m3 - Pekerjaan Pondasi

PC-1 A

-

13,660.90

-

1,935,742.86

15,103.00

Rp

4,472,171.00

70 x 90 cm

Campuran beton K-300

m3

1.0000

1,370,290.90

1,370,290.90

Bekisting Poer

m2

7.5794

158,436.30

1,200,846.56

Pembongkaran Bekisting

m2

7.5794

9,487.50

71,909.23

Besi BJTP-24

kg

-

13,083.40

Besi BJTD-39

kg

Besi Wiremesh BJTD-50

kg

96.0136

1 m3 - Pekerjaan Pilecap

PC-2

-

13,660.90

-

1,311,632.49

15,103.00

Jumlah HSPK

4

-

13,083.40

Jumlah HSPK

3

1,370,290.90

158,436.30

Jumlah HSPK

2

HSPK

Rp

3,954,679.00

165 x 90 cm

Campuran beton K-300

m3

1.0000

1,370,290.90

1,370,290.90

Bekisting Poer

m2

5.9343

158,436.30

940,215.42

Pembongkaran Bekisting

m2

5.9343

9,487.50

56,302.08

Besi BJTP-24

kg

-

13,083.40

Besi BJTD-39

kg

Besi Wiremesh BJTD-50

kg

153.3377
Jumlah HSPK

-

13,660.90

2,094,731.65

15,103.00

Rp

4,461,540.00

Analisa Beton Bertulang_hal. 1

NO.

URAI AN

SAT.

VOLUME

1

2

3

4

5

1 m3 - Pekerjaan Sloof

TB-1

HARGA SAT.
(Rp.)

(Rp.)

5

6=4x5

20 x 40 cm

Campuran beton K-300

m3

1.0000

1,370,290.90

1,370,290.90

Bekisting Sloof

m2

12.5000

164,395.00

2,054,937.50

Pembongkaran Bekisting

m2

12.5000

9,487.50

118,593.75

Besi BJTP-24

kg

44.0384

13,083.40

576,171.96

Besi BJTD-39

kg

118.3752

13,660.90

1,617,111.92

Besi Wiremesh BJTD-50

kg

-

15,103.00

Jumlah HSPK

6

1 m3 - Pekerjaan Sloof

TB-2

20 x 30 cm
m3

1.0000

1,370,290.90

1,370,290.90

Bekisting Sloof

m2

13.3333

164,395.00

2,191,933.33

Pembongkaran Bekisting

m2

13.3333

9,487.50

126,500.00

Besi BJTP-24

kg

29.1616

13,083.40

381,533.39

Besi BJTD-39

kg

104.1948

13,660.90

1,423,395.39

Besi Wiremesh BJTD-50

kg

-

15,103.00

1 m3 - Pekerjaan Kolom

C-1

Rp

5,493,653.00

30 x 40 cm

Campuran beton K-300

m3

1.0000

1,370,290.90

1,370,290.90

Bekisting Kolom

m2

11.6667

305,209.30

3,560,775.17

Pembongkaran Bekisting

m2

11.6667

9,487.50

110,687.50

Besi BJTP-24

kg

49.3230

13,083.40

645,312.60

Besi BJTD-39

kg

131.5280

13,660.90

1,796,791.03

Besi Wiremesh BJTD-50

kg

-

15,103.00

1 m3 - Pekerjaan Kolom

C-2

Rp

7,483,857.00

25 x 35 cm

Campuran beton K-300

m3

1.0000

1,370,290.90

1,370,290.90

Bekisting Kolom

m2

13.7143

305,209.30

4,185,727.54

Pembongkaran Bekisting

m2

13.7143

9,487.50

130,114.29

Besi BJTP-24

kg

35.2104

13,083.40

460,672.07

Besi BJTD-39

kg

144.3050

13,660.90

1,971,336.44

Besi Wiremesh BJTD-50

kg

-

15,103.00

Jumlah HSPK

9

5,737,106.00

Campuran beton K-300

Jumlah HSPK

8

Rp

Jumlah HSPK

7

HSPK

1 m3 - Pekerjaan Kolom

C-3

Rp

8,118,141.00

20 x 20 cm

Campuran beton K-300

m3

1.0000

1,370,290.90

1,370,290.90

Bekisting Kolom

m2

20.0000

305,209.30

6,104,186.00

Pembongkaran Bekisting

m2

20.0000

9,487.50

189,750.00

Besi BJTP-24

kg

45.4561

13,083.40

594,720.09

Besi BJTD-39

kg

104.1948

13,660.90

1,423,395.39

Besi Wiremesh BJTD-50

kg

Jumlah HSPK

15,103.00

Rp

9,682,342.00

Analisa Beton Bertulang_hal. 2

NO.

URAI AN

SAT.

VOLUME

1

2

3

4

10

1 m3 - Pekerjaan Balok

B-1

HARGA SAT.
(Rp.)

(Rp.)

5

6=4x5

30 x 60 cm

Campuran beton K-300

m3

1.0000

1,370,290.90

1,370,290.90

Bekisting Balok

m2

8.3333

373,257.50

3,110,479.17

Pembongkaran Bekisting

m2

8.3333

9,487.50

79,062.50

Besi BJTP-24

kg

43.8427

13,083.40

573,611.20

Besi BJTD-39

kg

90.4940

13,660.90

1,236,229.66

Besi Wiremesh BJTD-50

kg

-

15,103.00

Jumlah HSPK

11

1 m3 - Pekerjaan Balok

B-2 K

20 x 45 cm
m3

1.0000

1,370,290.90

1,370,290.90

Bekisting Balok

m2

12.5000

373,257.50

4,665,718.75

Pembongkaran Bekisting

m2

12.5000

9,487.50

118,593.75

Besi BJTP-24

kg

77.0672

13,083.40

1,008,300.94

Besi BJTD-39

kg

183.8823

13,660.90

2,511,998.08

Besi Wiremesh BJTD-50

kg

-

15,103.00

1 m3 - Pekerjaan Balok

B-3

Rp

9,674,902.00

20 x 40 cm

Campuran beton K-300

m3

1.0000

1,370,290.90

1,370,290.90

Bekisting Balok

m2

12.5000

373,257.50

4,665,718.75

Pembongkaran Bekisting

m2

12.5000

9,487.50

118,593.75

Besi BJTP-24

kg

44.0384

13,083.40

576,171.96

Besi BJTD-39

kg

118.3752

13,660.90

1,617,111.92

Besi Wiremesh BJTD-50

kg

-

15,103.00

1 m3 - Pekerjaan Balok

B-4

Rp

8,347,887.00

20 x35 cm

Campuran beton K-300

m3

1.0000

1,370,290.90

1,370,290.90

Bekisting Balok

m2

12.8571

373,257.50

4,799,025.00

Pembongkaran Bekisting

m2

12.8571

9,487.50

121,982.14

Besi BJTP-24

kg

28.2168

13,083.40

369,171.49

Besi BJTD-39

kg

89.3099

13,660.90

1,220,053.19

Besi Wiremesh BJTD-50

kg

-

15,103.00

Jumlah HSPK

14

6,369,673.00

Campuran beton K-300

Jumlah HSPK

13

Rp

Jumlah HSPK

12

HSPK

1 m3 - Pekerjaan Plat

S-1

Rp

7,880,523.00

Tb. 10 cm

Campuran beton K-300

m3

1.0000

1,370,290.90

1,370,290.90

Bekisting Plat

m2

11.4331

468,270.00

5,353,768.75

Pembongkaran Bekisting

m2

11.4331

9,487.50

108,471.35

Besi BJTP-24

kg

93.4556

13,083.40

1,222,717.45

Besi BJTD-39

kg

Besi Wiremesh BJTD-50

kg

-

13,660.90

-

15,103.00

Jumlah HSPK

Rp

8,055,248.00

Analisa Beton Bertulang_hal. 3

NO.

URAI AN

SAT.

VOLUME

1

2

3

4

15

1 m3 - Pekerjaan Plat

S-2

HARGA SAT.
(Rp.)

(Rp.)

5

6=4x5

Tb. 12 cm

Campuran beton K-300

m3

1.0000

1,370,290.90

1,370,290.90

Bekisting Plat

m2

9.4762

468,270.00

4,437,415.71

Pembongkaran Bekisting

m2

9.4762

9,487.50

89,905.36

Besi BJTP-24

kg

92.9543

13,083.40

1,216,158.76

Besi BJTD-39

kg

-

13,660.90

-

Besi Wiremesh BJTD-50

kg

-

15,103.00

-

Jumlah HSPK

16

1 m3 - Pekerjaan Plat

S-3

Rp

7,113,771.00

Tb. 10 cm

Campuran beton K-300

m3

1.0000

1,370,290.90

1,370,290.90

Bekisting Plat Metaldeck

m2

14.9763

402,950.90

6,034,719.81

Pembongkaran Bekisting

m2

7.4882

9,487.50

71,043.90

Besi BJTP-24

kg

-

13,083.40

-

Besi BJTD-39

kg

-

13,660.90

-

Besi Wiremesh BJTD-50

kg

40.3845

15,103.00

Jumlah HSPK

17

HSPK

1 m3 - Pekerjaan Plat

S-4

609,927.08
Rp

8,085,982.00

Tb. 12 cm

Campuran beton K-300

m3

1.0000

1,370,290.90

1,370,290.90

Bekisting Plat Metaldeck

m2

12.3295

402,950.90

4,968,183.10

Pembongkaran Bekisting

m2

6.1647

9,487.50

58,488.07

Besi BJTP-24

kg

-

13,083.40

Besi BJTD-39

kg

-

13,660.90

Besi Wiremesh BJTD-50

kg

83.7262
Jumlah HSPK

-

15,103.00

1,264,516.32
Rp

7,661,478.00

Analisa Beton Bertulang_hal. 4

ANALISA HARGA SATUAN DASAR PEKERJAAN
NAMA PEKERJAAN

: STUDI PENYUSUNAN DED PERLUASAN KANTOR KSOP KELAS II GRESIK

LOKASI

: Jl. YOS SUDARSO No. 36, GRESIK

TAHUN ANGGARAN

: 2017

NO.

URAI AN
2

1

A
1

SAT.
3

INDEKS
4

HARGA SAT.

JUMLAH

(Rp.)

(Rp.)

5

6=4x5

1 m1 - Pengukuran dan pemasangan bouwplank

b. Tenaga

:

:

Kayu Hutan Balok Meranti

m3

0.0120

6,225,000.00

Paku

kg

0.0200

26,000.00

Kayu Hutan Papan Meranti

m3

0.0070

6,500,000.00

Pekerja

OH

0.1000

100,000.00

10,000.00

Tukang Kayu

OH

0.1000

125,000.00

12,500.00
1,300.00

Kepala Tukang

OH

0.0100

130,000.00

Mandor

OH

0.0045

145,000.00

74,700.00
520.00
45,500.00 Rp

24,452.50

Rp

159,690.30

Rp

18,975.00

Rp

86,487.50

Rp

106,177.50

1,015.00 Rp

23,615.00

1 m2 - Pembersihan
a. Tenaga

:

Pekerja

OH

0.1000

100,000.00

10,000.00

Mandor

OH

0.0500

145,000.00

7,250.00

Jumlah HSPK + 10%

1 m3 - Galian tanah biasa, sedalam 1 meter
a. Tenaga

:

Pekerja

OH

0.7500

100,000.00

75,000.00

Mandor

OH

0.0250

145,000.00

3,625.00

Jumlah HSPK + 10%

4

1 m3 - Galian tanah biasa, sedalam 2 meter
a. Tenaga

:

Pekerja

OH

0.9000

100,000.00

90,000.00

Mandor

OH

0.0450

145,000.00

6,525.00

Jumlah HSPK + 10%

5

120,720.00

652.50 Rp

Jumlah HSPK + 10%

3

7

PEKERJAAN TANAH

a. Bahan

2

HSPK

1 m3 - Galian tanah dengan alat berat
a. Tenaga

:

b. Sewa Alat

:

Pekerja

OH

0.2260

100,000.00

22,600.00

Mandor

OH

0.0070

145,000.00

Sewa Excavator 0.9 m3

jam

0.0670

307,500.00

20,602.50

Sewa Dump Truck 8 - 10 m3 10 T

jam

0.0700

430,000.00

30,100.00 Rp

Jumlah HSPK + 10%

Rp

50,702.50
81,749.80

Analisa HSP_hal. 1

NO.

URAI AN
2

1

6

SAT.
3

INDEKS
4

HARGA SAT.

JUMLAH

(Rp.)

(Rp.)

5

6=4x5

:

Pasir urug

m3

1.2000

200,000.00

b. Tenaga

:

Pekerja

OH

0.2500

100,000.00

Mandor

OH

0.0250

145,000.00

240,000.00 Rp

3,625.00 Rp
Rp

295,487.50

:

Tanah urug

m3

1.2000

194,750.00

b. Tenaga

:

Pekerja

OH

0.2500

100,000.00

233,700.00 Rp

233,700.00

Mandor

OH

0.0250

145,000.00

25,000.00
3,625.00 Rp

288,557.50

Rp

28,776.00

233,700.00 Rp

233,700.00

1 m3 - Urugan tanah kembali
:

Pekerja

OH

0.2500

100,000.00

25,000.00

Mandor

OH

0.0080

145,000.00

1,160.00

1 m3 - Urugan Sirtu dengan alat berat
a. Bahan

:

Sirtu

m3

1.2000

194,750.00

b. Tenaga

:

Pekerja

OH

0.2500

100,000.00

Mandor

OH

0.0250

145,000.00

3,625.00 Rp

Sewa Stamper

jam

0.0080

60,000.00

480.00 Rp

480.00

Rp

289,085.50

51,480.00

c. Sewa Alat

:

25,000.00

Jumlah HSPK + 10%

28,625.00

1 m1 - Pembuatan Lubang Strauss Pile
a. Tenaga

b. Sewa Alat

:

:

Pekerja

OH

0.4800

100,000.00

Mandor

OH

0.0240

145,000.00

48,000.00
3,480.00 Rp

Sewa Alat Bantu Strouss

bh

0.4000

100,000.00

9,500.00 Rp

Jumlah HSPK + 10%

11

28,625.00

Rp

Jumlah HSPK + 10%

10

28,625.00

1 m3 - Urugan tanah Sirtu
a. Bahan

a. Tenaga

9

240,000.00

25,000.00

Jumlah HSPK + 10%

8

7

1 m3 - Urugan pasir (padat)
a. Bahan

Jumlah HSPK + 10%

7

HSPK

9,500.00

Rp

67,078.00

Rp

37,895.00

1 m3 - Pembuangan tanah
a. Tenaga

:

Pekerja

OH

0.3300

100,000.00

33,000.00

Mandor

OH

0.0100

145,000.00

1,450.00

Jumlah HSPK + 10%

Analisa HSP_hal. 2

NO.

URAI AN
2

1

B

PEKERJAAN BETON BERTULANG

1

1 m3 - Pondasi Bata Rollag
a. Bahan

b. Tenaga

:

:

SAT.
3

INDEKS
4

HARGA SAT.

JUMLAH

(Rp.)

(Rp.)

5

6=4x5

Batu Bata Merah

bh

755.0000

750.00

566,250.00

Semen / PC (50 kg)

zak

0.5310

60,000.00

31,860.00

m3

0.0930

240,000.00

22,320.00 Rp

Pekerja

OH

0.6000

100,000.00

60,000.00

Tukang batu

OH

0.2000

125,000.00

25,000.00

Kepala tukang

OH

0.0200

130,000.00

2,600.00

Mandor

OH

0.0300

145,000.00

4,350.00 Rp

b. Tenaga

91,950.00

Rp

783,618.00

:

:

Semen / PC (50 kg)

zak

4.9400

60,000.00

107,500.00 Rp

731,419.00

296,400.00

Pasir beton

m3

0.5431

240,000.00

130,344.00

Koral beton

m3

0.5258

375,000.00

197,175.00

Air

ltr

215.0000

500.00

Pekerja

OH

1.6500

100,000.00

165,000.00

Tukang batu

OH

0.2750

125,000.00

34,375.00

Kepala tukang

OH

0.0280

130,000.00

3,640.00

Mandor

OH

0.0830

145,000.00

12,035.00 Rp

Jumlah HSPK + 10%

215,050.00

Rp

1,041,115.90

107,500.00 Rp

817,144.00

1 m3 - Campuran beton K-175
a. Bahan

b. Tenaga

:

:

Semen / PC (50 kg)

zak

6.5200

60,000.00

391,200.00

Pasir beton

m3

0.4806

240,000.00

115,344.00

Koral beton

m3

0.5416

375,000.00

203,100.00

Air

ltr

215.0000

500.00

Pekerja

OH

1.6500

100,000.00

165,000.00

Tukang batu

OH

0.2750

125,000.00

34,375.00

Kepala tukang

OH

0.0280

130,000.00

Mandor

OH

0.0830

145,000.00

3,640.00
12,035.00 Rp

Jumlah HSPK + 10%

4

620,430.00

1 m3 - Campuran beton K-100
a. Bahan

3

7

Pasir pasang

Jumlah HSPK + 10%

2

HSPK

215,050.00

Rp

1,135,413.40

107,500.00 Rp

992,350.00

1 m3 - Campuran beton K-250
a. Bahan

b. Tenaga

:

:

Semen / PC (50 kg)

zak

9.6000

60,000.00

576,000.00

Pasir beton

m3

0.4325

240,000.00

103,800.00

Koral beton

m3

0.5468

375,000.00

205,050.00

Air

ltr

215.0000

500.00

Pekerja

OH

1.6500

100,000.00

165,000.00

Tukang batu

OH

0.2750

125,000.00

34,375.00

Kepala tukang

OH

0.0280

130,000.00

Mandor

OH

0.0830

145,000.00

3,640.00
12,035.00 Rp

Jumlah HSPK + 10%

Rp

215,050.00
1,328,140.00

Analisa HSP_hal. 3

NO.

URAI AN
2

1

5

SAT.
3

INDEKS
4

HARGA SAT.

JUMLAH

(Rp.)

(Rp.)

5

6=4x5

b. Tenaga

:

:

Semen / PC (50 kg)

zak

10.3250

60,000.00

619,500.00

Pasir beton

m3

0.4256

240,000.00

102,144.00

Koral beton

m3

0.5374

375,000.00

201,525.00

Air

ltr

215.0000

500.00

Pekerja

OH

1.6500

100,000.00

165,000.00

Tukang batu

OH

0.2750

125,000.00

34,375.00

Kepala tukang

OH

0.0280

130,000.00

Mandor

OH

0.0830

145,000.00

107,500.00 Rp

215,050.00

Rp

1,370,290.90

1,500,000.00 Rp

1,500,000.00

1 m3 - Campuran beton K-250 (Ready Mix)
a. Bahan

:

Beton Ready Mix K-250

m3

1.0000

1,500,000.00

b. Tenaga

:

Pekerja

OH

0.6885

100,000.00

68,850.00

Tukang batu

OH

0.1377

125,000.00

17,212.50

Mandor

OH

0.0688

145,000.00

Sewa alat concrete vibrator

bh

0.4819

26,500.00

Sewa Alat bantu ( 1 set @ 3 alat )

jam

2.5000

b. Sewa Alat

:

950.00

9,976.00 Rp

96,038.50

12,770.35
2,375.00 Rp

Jumlah HSPK + 10%

15,145.35

Rp

1,755,642.90

1,500,000.00 Rp

1,500,000.00

1 m3 - Campuran beton K-300 (Ready Mix)
a. Bahan

:

Beton Ready Mix K-300

m3

1.0000

1,500,000.00

b. Tenaga

:

Pekerja

OH

0.6885

100,000.00

68,850.00
17,212.50

b. Sewa Alat

:

Tukang batu

OH

0.1377

125,000.00

Mandor

OH

0.0688

145,000.00

Sewa alat concrete vibrator

bh

0.4819

26,500.00

Sewa Alat bantu ( 1 set @ 3 alat )

jam

2.5000

950.00

9,976.00 Rp

96,038.50

12,770.35
2,375.00 Rp

Jumlah HSPK + 10%

8

1,030,669.00

3,640.00
12,035.00 Rp

Jumlah HSPK + 10%

7

7

1 m3 - Campuran beton K-300
a. Bahan

6

HSPK

15,145.35

Rp

1,755,642.90

195.00 Rp

10,170.00

1 kg - Pembesian Beton, Besi BJTP-24
a. Bahan

:

b. Tenaga

:

Besi beton polos / Besi BJTP-24

kg

1.0500

9,500.00

9,975.00

Bendrat

kg

0.0150

13,000.00

Pekerja

OH

0.0070

100,000.00

700.00

Tukang besi

OH

0.0070

125,000.00

875.00

Kepala tukang

OH

0.0007

130,000.00

91.00

Mandor

OH

0.0004

145,000.00

58.00 Rp

1,724.00

Rp

13,083.40

Jumlah HSPK + 10%

Analisa HSP_hal. 4

NO.

URAI AN
2

1

9

SAT.
3

INDEKS
4

HARGA SAT.

JUMLAH

(Rp.)

(Rp.)

5

6=4x5

:

b. Tenaga

:

Besi beton ulir / Besi BJTD-39

kg

1.0500

10,000.00

10,500.00

Bendrat

kg

0.0150

13,000.00

Pekerja

OH

0.0070

100,000.00

700.00

195.00 Rp

Tukang besi

OH

0.0070

125,000.00

875.00

Kepala tukang

OH

0.0007

130,000.00

91.00

Mandor

OH

0.0004

145,000.00

58.00 Rp

1,724.00

Rp

13,660.90

650.00 Rp

12,005.63

a. Bahan

:

Wiremesh
Bendrat

kg

0.0500

13,000.00

b. Tenaga

:

Pekerja

OH

0.0070

100,000.00

700.00

Tukang besi

OH

0.0070

125,000.00

875.00

Kepala tukang

OH

0.0007

130,000.00

91.00

Mandor

OH

0.0004

145,000.00

58.00 Rp

1,724.00

Rp

15,103.00

1,250.00 Rp

52,383.33

kg

1.0200

11,132.97

11,355.63

1 m2 - Bekisting poer (3x Pakai)
a. Bahan

b. Tenaga

:

:

Kayu acuan (meranti)

m3

0.0133

3,250,000.00

43,333.33

Paku

kg

0.3000

26,000.00

7,800.00

Minyak bekisting

ltr

0.1000

12,500.00

Pekerja

OH

0.5200

100,000.00

52,000.00

Tukang kayu

OH

0.2600

125,000.00

32,500.00

Kepala tukang

OH

0.0260

130,000.00

3,380.00

Mandor

OH

0.0260

145,000.00

3,770.00 Rp

Jumlah HSPK + 10%

12

10,695.00

1 kg - Pembesian Wiremesh BJTD-50

Jumlah HSPK + 10%

11

7

1 kg - Pembesian Beton, Besi BJTD-39
a. Bahan

Jumlah HSPK + 10%

10

HSPK

91,650.00

Rp

158,436.30

1,250.00 Rp

57,800.00

1 m2 - Bekisting sloof (3x Pakai)
a. Bahan

b. Tenaga

:

:

Kayu acuan (meranti)

m3

0.0150

3,250,000.00

48,750.00

Paku

kg

0.3000

26,000.00

7,800.00

Minyak bekisting

ltr

0.1000

12,500.00

Pekerja

OH

0.5200

100,000.00

52,000.00

Tukang kayu

OH

0.2600

125,000.00

32,500.00

Kepala tukang

OH

0.0260

130,000.00

3,380.00

Mandor

OH

0.0260

145,000.00

3,770.00 Rp

Jumlah HSPK + 10%

Rp

91,650.00
164,395.00

Analisa HSP_hal. 5

NO.

URAI AN
2

1

13

SAT.
3

INDEKS
4

HARGA SAT.

JUMLAH

(Rp.)

(Rp.)

5

6=4x5

b. Tenaga

:

:

Kayu acuan (meranti)

m3

0.0200

3,250,000.00

Kayu balok meranti
Paku
Plywood
Minyak bekisting

65,000.00

m3

0.0075

6,225,000.00

46,687.50

kg

0.4000

26,000.00

10,400.00

lbr

0.1750

170,000.00

29,750.00

ltr

0.2000

12,500.00

2,500.00

Dolken kayu gelam

btg

1.0000

6,800.00

Pekerja

OH

0.6600

100,000.00

66,000.00

Tukang kayu

OH

0.3300

125,000.00

41,250.00

6,800.00 Rp

Kepala tukang

OH

0.0330

130,000.00

4,290.00

Mandor

OH

0.0330

145,000.00

4,785.00 Rp

Jumlah HSPK + 10%

161,137.50

116,325.00

Rp

305,209.30

9,066.67 Rp

223,000.00

1 m2 - Bekisting balok (1,5x Pakai)
a. Bahan

b. Tenaga

:

:

Kayu acuan (meranti)

m3

0.0267

3,250,000.00

Kayu balok meranti
Paku
Plywood
Minyak bekisting

86,666.67

m3

0.0120

6,225,000.00

74,700.00

kg

0.4000

26,000.00

10,400.00

lbr

0.2333

170,000.00

39,666.67

ltr

0.2000

12,500.00

2,500.00

Dolken kayu gelam

btg

1.3333

6,800.00

Pekerja

OH

0.6600

100,000.00

66,000.00

Tukang kayu

OH

0.3300

125,000.00

41,250.00

Kepala tukang

OH

0.0330

130,000.00

4,290.00

Mandor

OH

0.0330

145,000.00

4,785.00 Rp

Jumlah HSPK + 10%

15

7

1 m2 - Bekisting kolom (2x Pakai)
a. Bahan

14

HSPK

116,325.00

Rp

373,257.50

13,600.00 Rp

309,375.00

1 m2 - Bekisting plat lantai
a. Bahan

b. Tenaga

:

:

Kayu acuan (meranti)

m3

0.0400

3,250,000.00

130,000.00

Kayu balok meranti

m3

0.0150

6,225,000.00

93,375.00

Paku

kg

0.4000

26,000.00

10,400.00

Plywood

lbr

0.3500

170,000.00

59,500.00

Minyak bekisting

ltr

0.2000

12,500.00

Dolken kayu gelam

btg

2.0000

6,800.00

Pekerja

OH

0.6600

100,000.00

66,000.00

Tukang kayu

OH

0.3300

125,000.00

41,250.00

Kepala tukang

OH

0.0330

130,000.00

4,290.00

Mandor

OH

0.0330

145,000.00

4,785.00 Rp

2,500.00

Jumlah HSPK + 10%

Rp

116,325.00
468,270.00

Analisa HSP_hal. 6

NO.

URAI AN
2

1

16

SAT.
3

INDEKS
4

HARGA SAT.

JUMLAH

(Rp.)

(Rp.)

5

6=4x5

b. Tenaga

:

:

Plat galvanis tb. 0.75 mm

m2

1.0300

150,000.00

154,500.00

Kayu acuan (meranti)

m3

0.0400

3,250,000.00

130,000.00

Kayu balok meranti

m3

0.0038

6,225,000.00

23,343.75

Paku

kg

0.1000

26,000.00

2,600.00

Plywood

lbr

0.0900

170,000.00

15,300.00

Minyak bekisting

ltr

0.0500

12,500.00

Dolken kayu gelam

btg

1.5000

6,800.00

Pekerja

OH

0.1700

100,000.00

17,000.00

Tukang kayu

OH

0.0800

125,000.00

10,000.00

Kepala tukang

OH

0.0100

130,000.00

1,300.00

Mandor

OH

0.0100

145,000.00

1,450.00 Rp

625.00
10,200.00 Rp

Jumlah HSPK + 10%

336,568.75

29,750.00

Rp

402,950.90

20,400.00 Rp

314,800.00

1 m2 - Bekisting plat dinding
a. Bahan

b. Tenaga

:

:

Kayu acuan (meranti)

m3

0.0300

3,250,000.00

97,500.00

Kayu balok meranti

m3

0.0200

6,225,000.00

124,500.00

Paku

kg

0.4000

26,000.00

10,400.00

Plywood

lbr

0.3500

170,000.00

59,500.00

Minyak bekisting

ltr

0.2000

12,500.00

Dolken kayu gelam

btg

3.0000

6,800.00

Pekerja

OH

0.6600

100,000.00

66,000.00

Tukang kayu

OH

0.3300

125,000.00

41,250.00

2,500.00

Kepala tukang

OH

0.0330

130,000.00

4,290.00

Mandor

OH

0.0330

145,000.00

4,785.00 Rp

Jumlah HSPK + 10%

18

7

1 m2 - Bekisting plat lantai metaldeck
a. Bahan

17

HSPK

116,325.00

Rp

474,237.50

13,600.00 Rp

276,250.00

1 m2 - Bekisting tangga
a. Bahan

b. Tenaga

:

:

Kayu acuan (meranti)

m3

0.0300

3,250,000.00

Kayu balok meranti
Paku
Plywood
Minyak bekisting

97,500.00

m3

0.0150

6,225,000.00

93,375.00

kg

0.4000

26,000.00

10,400.00

lbr

0.3500

170,000.00

59,500.00

ltr

0.1500

12,500.00

Dolken kayu gelam

btg

2.0000

6,800.00

Pekerja

OH

0.6600

100,000.00

66,000.00

Tukang kayu

OH

0.3300

125,000.00

41,250.00

1,875.00

Kepala tukang

OH

0.0330

130,000.00

4,290.00

Mandor

OH

0.0330

145,000.00

4,785.00 Rp

Jumlah HSPK + 10%

Rp

116,325.00
431,832.50

Analisa HSP_hal. 7

NO.

URAI AN
2

1

19

SAT.
3

INDEKS
4

HARGA SAT.

JUMLAH

(Rp.)

(Rp.)

5

6=4x5

7

1 m2 - Pembongkaran cetakan
a. Tenaga

:

Pekerja

OH

0.0500

100,000.00

5,000.00

Mandor

OH

0.0250

145,000.00

3,625.00 Rp

Jumlah HSPK + 10%

20

HSPK

8,625.00

Rp

9,487.50

1,150,800.00

1 m3 - Pondasi Batu Belah, Campuran 1 PC : 3 PP
a. Bahan

b. Tenaga

:

:

Batu Belah 15 cm / 20 cm

m3

1.2000

660,000.00

792,000.00

Semen / PC (40 kg)

kg

202.0000

1,200.00

242,400.00

Pasir pasang

m3

0.4850

240,000.00

116,400.00 Rp

Pekerja

OH

1.5000

100,000.00

150,000.00

Tukang batu

OH

0.7500

125,000.00

93,750.00

Kepala tukang

OH

0.0750

130,000.00

Mandor

OH

0.0750

145,000.00

9,750.00
10,875.00 Rp

Jumlah HSPK + 10%

Rp

264,375.00
1,556,692.50

Analisa HSP_hal. 8

NO.

URAI AN
2

1

C
1

SAT.
3

INDEKS
4

HARGA SAT.

JUMLAH

(Rp.)

(Rp.)

5

6=4x5

1 kg - Besi profil kuda - kuda baja

b. Tenaga

:

:

Besi baja profil WF

kg

1.150

10,500.00

Elektrode baja

kg

0.040

61,656.25

12,075.00

Pekerja

OH

0.060

100,000.00

6,000.00

Tukang las

OH

0.060

125,000.00

7,500.00

2,466.25 Rp

OH

0.006

130,000.00

780.00

Mandor

OH

0.003

145,000.00

435.00 Rp

14,715.00

Rp

32,181.60

2,466.25 Rp

14,541.25

1 kg - Besi baja profil gording atap
a. Bahan

b. Tenaga

:

:

Besi baja profil kanal C

kg

1.150

10,500.00

Elektrode baja

kg

0.040

61,656.25

12,075.00

Pekerja

OH

0.060

100,000.00

6,000.00

Tukang las

OH

0.060

125,000.00

7,500.00

Kepala tukang

OH

0.006

130,000.00

780.00

Mandor

OH

0.003

145,000.00

435.00 Rp

14,715.00

Rp

32,181.60

10,500.00

12,075.00
15,414.06 Rp

27,489.06

Jumlah HSPK + 10%

1 kg - Besi baja siku
a. Bahan

:

b. Tenaga

:

Besi baja siku 70.70.7

kg

1.150

Elektrode baja

kg

0.250

61,656.25

Pekerja

OH

0.060

100,000.00

6,000.00

Tukang las

OH

0.060

125,000.00

7,500.00

Kepala tukang

OH

0.006

130,000.00

780.00

Mandor

OH

0.003

145,000.00

435.00 Rp

14,715.00

Rp

46,424.40

27,489.06

Jumlah HSPK + 10%

4

14,541.25

Kepala tukang

Jumlah HSPK + 10%

3

7

PEKERJAAN BESI & BAJA

a. Bahan

2

HSPK

1 kg - Besi plat landasan / simpul
a. Bahan

b. Tenaga

:

:

Besi plat landasan / simpul

kg

1.150

10,500.00

12,075.00

Elektrode baja

kg

0.250

61,656.25

15,414.06 Rp

Pekerja

OH

0.060

100,000.00

6,000.00

Tukang las

OH

0.060

125,000.00

7,500.00

Kepala tukang

OH

0.006

130,000.00

780.00

Mandor

OH

0.003

145,000.00

435.00 Rp

14,715.00

Rp

46,424.40

Jumlah HSPK + 10%

Analisa HSP_hal. 9

NO.

URAI AN
2

1

5

SAT.
3

INDEKS
4

HARGA SAT.

JUMLAH

(Rp.)

(Rp.)

5

6=4x5

:

Besi beton

kg

0.670

9,500.00

b. Tenaga

:

Pekerja

OH

0.030

100,000.00

3,000.00

Tukang besi

OH

0.030

125,000.00

3,750.00

6,365.00 Rp

OH

0.003

130,000.00

390.00

Mandor

OH

0.002

145,000.00

290.00 Rp

7,430.00

Rp

15,174.50

6,365.00 Rp

6,365.00

1 m1 - Trackstank / Ikatan batang tarik
a. Bahan

:

Besi beton

kg

0.670

9,500.00

b. Tenaga

:

Pekerja

OH

0.030

100,000.00

3,000.00

Tukang besi

OH

0.030

125,000.00

3,750.00

Kepala tukang

OH

0.003

130,000.00

390.00

Mandor

OH

0.002

145,000.00

290.00 Rp

7,430.00

Rp

15,174.50

10,336.00 Rp

10,336.00

1 m1 - Ikatan angin
a. Bahan

:

Besi beton

kg

1.088

9,500.00

b. Tenaga

:

Pekerja

OH

0.030

100,000.00

3,000.00

Tukang besi

OH

0.030

125,000.00

3,750.00

Kepala tukang

OH

0.003

130,000.00

390.00

Mandor

OH

0.002

145,000.00

290.00 Rp

7,430.00

Rp

19,542.60

3,657.50 Rp

14,107.50

Jumlah HSPK + 10%

8

1 kg - Pemasangan angkur
a. Bahan

b. Tenaga

:

:

Besi beton

kg

1.100

9,500.00

Fitting + Material bantu

kg

0.350

10,450.00

10,450.00

Pekerja

OH

0.030

100,000.00

3,000.00

Tukang besi

OH

0.030

125,000.00

3,750.00

Kepala tukang

OH

0.003

130,000.00

390.00

Mandor

OH

0.002

145,000.00

290.00 Rp

7,430.00

Rp

23,691.80

Rp

18,975.00

Rp

23,702.80

Jumlah HSPK + 10%

9

1 bh - Pemasangan shear connector Ø 13 mm
a. Bahan

:

Shear connector Ø13 mm

b. Tenaga

:

Pengelasan dengan las listrik

bh

1.100

1,015.90

1,117.49

cm1

4.084

3,950.10

16,132.49

Jumlah HSPK + 10%

10

6,365.00

Kepala tukang

Jumlah HSPK + 10%

7

7

1 m1 - Sagrod / Ikatan gording
a. Bahan

Jumlah HSPK + 10%

6

HSPK

1 bh - Pemasangan shear connector Ø 16 mm
a. Bahan

:

Shear connector Ø16 mm

b. Tenaga

:

Pengelasan dengan las listrik

bh

1.100

cm1

5.027

1,538.88

1,692.77

3,950.10

19,855.37

Jumlah HSPK + 10%

Analisa HSP_hal. 10

NO.

URAI AN
2

1

11

SAT.
3

INDEKS
4

HARGA SAT.

JUMLAH

(Rp.)

(Rp.)

5

6=4x5

:

Shear connector Ø19 mm

b. Tenaga

:

Pengelasan dengan las listrik

bh

1.100

cm1

5.969

2,170.06

2,387.06

3,950.10

23,578.25
Rp

28,561.50

Rp

29,456.90

9,874.25 Rp

53,675.91

1 bh - Pemasangan shear connector Ø 22 mm
a. Bahan

:

Shear connector Ø22 mm

b. Tenaga

:

Pengelasan dengan las listrik

bh

1.100

2,909.44

3,200.38

cm1

5.969

3,950.10

23,578.25

Jumlah HSPK + 10%

13

1 titik - Pemasangan chemical anchor dia. 13 mm, P. 40 cm
a. Bahan

b. Tenaga

c. Sewa Alat

:

:

:

Chemical anchor

liter

0.053

825,000.00

Angkur besi

kg

0.417

23,691.80

43,801.66

Tukang besi

OH

0.050

125,000.00

6,250.00

Mandor

OH

0.010

145,000.00

1,450.00 Rp

Sewa alat bantu chemical anchor

jam

0.250

30,000.00

7,500.00 Rp

Jumlah HSPK + 10%

14

b. Tenaga

c. Sewa Alat

7,500.00

Rp

75,763.60

:

:

:

Chemical anchor

liter

0.101

825,000.00

Angkur besi

kg

0.789

23,691.80

18,696.81 Rp

101,634.86

82,938.05

Tukang besi

OH

0.050

125,000.00

6,250.00

Mandor

OH

0.010

145,000.00

1,450.00 Rp

Sewa alat bantu chemical anchor

jam

0.250

30,000.00

7,500.00 Rp

Jumlah HSPK + 10%

7,700.00
7,500.00

Rp

128,518.50

31,638.51 Rp

171,985.24

1 titik - Pemasangan chemical anchor dia. 19 mm, P. 60 cm
a. Bahan

b. Tenaga

c. Sewa Alat

:

:

:

Chemical anchor

liter

0.170

825,000.00

Angkur besi

kg

1.335

23,691.80

140,346.72

Tukang besi

OH

0.050

125,000.00

6,250.00

Mandor

OH

0.010

145,000.00

1,450.00 Rp

Sewa alat bantu chemical anchor

jam

0.250

30,000.00

7,500.00 Rp

Jumlah HSPK + 10%

16

7,700.00

1 titik - Pemasangan chemical anchor dia. 16 mm, P. 50 cm
a. Bahan

15

7

1 bh - Pemasangan shear connector Ø 19 mm
a. Bahan

Jumlah HSPK + 10%

12

HSPK

7,700.00
7,500.00

Rp

205,903.50

49,488.12 Rp

269,014.77

1 titik - Pemasangan chemical anchor dia. 22 mm, P. 70 cm
a. Bahan

:

Angkur besi

kg

2.089

23,691.80

b. Tenaga

:

Tukang besi

OH

0.050

125,000.00

Mandor

OH

0.010

145,000.00

1,450.00 Rp

7,700.00

c. Sewa Alat

:

Sewa alat bantu chemical anchor

jam

0.250

30,000.00

7,500.00 Rp

7,500.00

Chemical anchor

liter

0.266

825,000.00

219,526.64

6,250.00

Jumlah HSPK + 10%

Rp

312,636.50

Analisa HSP_hal. 11

NO.

URAI AN
2

1

17

SAT.
3

INDEKS
4

HARGA SAT.

JUMLAH

(Rp.)

(Rp.)

5

6=4x5

:

Jarum keras / Turnbuckle

bh

1.000

43,750.00

43,750.00

Jumlah HSPK + 10%

Rp

48,125.00

180.00 Rp

2,886.25

1 cm1 - Pengelasan dengan las listrik
a. Bahan

b. Tenaga

:

:

Electrode las

kg

0.040

61,656.25

2,466.25

Solar

ltr

0.030

8,000.00

Minyak pelumas las

ltr

0.004

45,000.00

Pekerja

OH

0.0040

100,000.00

400.00

Tukang besi

OH

0.0020

125,000.00

250.00

Kepala tukang

OH

0.0002

130,000.00

26.00

Mandor

OH

0.0002

145,000.00

29.00 Rp

705.00

Rp

3,950.10

379,500.00 Rp

379,500.00

240.00

Jumlah HSPK + 10%

19

1 m2 - Pemasangan rangka atap baja ringan
a. Bahan

:

Rangka baja ringan + asesoris

kg

1.100

345,000.00

b. Tenaga

:

Pekerja

OH

0.400

100,000.00

40,000.00

Tukang besi

OH

0.100

125,000.00

12,500.00

Kepala tukang

OH

0.010

130,000.00

1,300.00

Mandor

OH

0.005

145,000.00

725.00 Rp

54,525.00

Rp

477,427.50

75,625.00 Rp

178,750.00

Jumlah HSPK + 10%

20

7

1 bh - Pemasangan jarum keras / Turnbuckle
a. Bahan

18

HSPK

1 m2 - Pemasangan usuk + reng baja ringan
a. Bahan

b. Tenaga

:

:

Usuk baja ringan uk. 40x40 mm

m2

1.100

93,750.00

Reng baja ringan profile Ω - 40 mm

m2

1.100

68,750.00

103,125.00

Pekerja

OH

0.200

100,000.00

20,000.00

Tukang besi

OH

0.050

125,000.00

6,250.00

Kepala tukang

OH

0.005

130,000.00

650.00

Mandor

OH

0.003

145,000.00

362.50 Rp

27,262.50

Rp

226,614.30

Jumlah HSPK + 10%

Analisa HSP_hal. 12

NO.

URAI AN
2

1

21

SAT.
3

INDEKS
4

HARGA SAT.

JUMLAH

(Rp.)

(Rp.)

5

6=4x5

HSPK
7

1 m2 - Pemasangan Penutup Atap Metalsheet
a. Bahan

:

Genteng Metal Tb. 0.4 mm
Paku

kg

0.033

10,500.00

b. Tenaga

:

Pekerja

OH

0.200

100,000.00

20,000.00

Tukang kayu

OH

0.200

125,000.00

25,000.00

Kepala tukang

OH

0.025

130,000.00

3,250.00

Mandor

OH

0.010

145,000.00

1,450.00 Rp

lbr

3.320

-

349.65 Rp

Jumlah HSPK + 10%

22

49,700.00

Rp

55,055.00

349.65 Rp

349.65

1 m1 - Pemasangan Bubungan Atap Metalsheet
a. Bahan

:

b. Tenaga

:

Nok Genteng Metal Tb. 0.4 mm

bh

3.077

-

-

Paku

kg

0.033

10,500.00

Pekerja

OH

0.400

100,000.00

40,000.00

Tukang batu

OH

0.200

125,000.00

25,000.00

Kepala tukang

OH

0.020

130,000.00

2,600.00

Mandor

OH

0.002

145,000.00

290.00 Rp

67,890.00

Rp

75,064.00

160,875.00

Jumlah HSPK + 10%

25

349.65

1 m1 - Pemasangan Lisplank
a. Bahan

b. Tenaga

:

:

Woodplank 1.2 x 20 x 400 cm

m1

1.100

77,500.00

85,250.00

Rangka galvalume

kg

1.100

68,750.00

75,625.00 Rp

Pekerja

OH

0.100

100,000.00

10,000.00

Tukang kayu

OH

0.200

125,000.00

25,000.00
2,600.00

Kepala tukang

OH

0.020

130,000.00

Mandor

OH

0.005

145,000.00
Jumlah HSPK + 10%

725.00 Rp

38,325.00

Rp

219,120.00

Analisa HSP_hal. 13

NO.

URAI AN
2

1

26

SAT.
3

INDEKS
4

HARGA SAT.

JUMLAH

(Rp.)

(Rp.)

5

6=4x5

:

Woodplank 1.2 x 20 x 400 cm
Rangka galvalume

kg

1.100

68,750.00

b. Tenaga

:

Pekerja

OH

0.100

100,000.00

10,000.00

Tukang kayu

OH

0.200

125,000.00

25,000.00

Kepala tukang

OH

0.020

130,000.00

2,600.00

Mandor

OH

0.005

145,000.00

m1

1.100

77,500.00

85,250.00
75,625.00 Rp

b. Tenaga

725.00 Rp

38,325.00

Rp

219,120.00

:

:

15,000.00 Rp

305,272.81

Plat seng

lbr

0.500

40,000.00

20,000.00

Paku

kg

0.015

26,000.00

390.00

Hollow besi 30/30

kg

7.050

38,281.25

269,882.81

Meni besi

kg

0.250

60,000.00

Pekerja

OH

0.150

100,000.00

15,000.00

Tukang kayu

OH

0.400

125,000.00

50,000.00

Kepala tukang

OH

0.025

130,000.00

3,250.00

Mandor

OH

0.013

145,000.00

1,885.00 Rp

Jumlah HSPK + 10%

1

70,135.00

Rp

412,948.80

9,600.00 Rp

79,344.00

PEKERJAAN PASANGAN BATA
1 m2 - Bata Merah, 1 PC : 3 PP (tebal 1/2 BT)
a. Bahan

b. Tenaga

:

:

Bata merah 5 x 11 x 22 cm

Bh

70.0000

750.00

52,500.00

Semen portland

Kg

Pasir pasang



14.3700

1,200.00

17,244.00

0.0400

240,000.00

Pekerja
Tukang batu

OH

0.3000

100,000.00

30,000.00

OH

0.1000

125,000.00

12,500.00

Kepala tukang

OH

0.0100

130,000.00

1,300.00

Mandor

OH

0.0150

145,000.00

2,175.00 Rp

Jumlah HSPK + 10%

2

160,875.00

1 m1 - Pemasangan Talang Seng Datar
a. Bahan

D

7

1 m1 - Pemasangan Papan Ruiter
a. Bahan

Jumlah HSPK + 10%

27

HSPK

45,975.00

Rp

137,850.90

74,916.00

1 m2 - Bata Merah, 1 PC : 5 PP (tebal 1/2 BT)
a. Bahan

b. Tenaga

:

:

Bata merah 5 x 11 x 22 cm

Bh

70.0000

750.00

52,500.00

Semen portland

Kg

9.6800

1,200.00

11,616.00

Pasir pasang



0.0450

240,000.00

10,800.00 Rp

Pekerja

OH

0.3000

100,000.00

30,000.00

Tukang batu

OH

0.1000

125,000.00

12,500.00

Kepala tukang

OH

0.0100

130,000.00

1,300.00

Mandor

OH

0.0150

145,000.00

2,175.00 Rp

Jumlah HSPK + 10%

Rp

45,975.00
132,980.10

Analisa HSP_hal. 14

NO.

URAI AN
2

1

E

PEKERJAAN PLESTERAN, ACIAN, & BENANGAN

1

1 m2 - Plesteran, 1 PC : 3 PP (t= 15 mm)
a. Bahan

b. Tenaga

:

:

SAT.
3

INDEKS
4

HARGA SAT.

JUMLAH

(Rp.)

(Rp.)

5

6=4x5

Semen / PC (40 kg)

zak

0.1940

48,000.00

Pasir pasang

m3

0.0230

240,000.00

Pekerja

OH

0.3000

100,000.00

30,000.00

Tukang batu

OH

0.1500

125,000.00

18,750.00

5,520.00 Rp

Kepala tukang

OH

0.0150

130,000.00

1,950.00

Mandor

OH

0.0150

145,000.00

2,175.00 Rp

b. Tenaga

52,875.00

Rp

74,477.70

:

6,240.00 Rp

12,480.00

:

Semen / PC (40 kg)

zak

0.1300

48,000.00

Pasir pasang

m3

0.0260

240,000.00

6,240.00

Pekerja

OH

0.3000

100,000.00

30,000.00

Tukang batu

OH

0.1500

125,000.00

18,750.00

Kepala tukang

OH

0.0150

130,000.00

1,950.00

Mandor

OH

0.0150

145,000.00

2,175.00 Rp

Jumlah HSPK + 10%

52,875.00

Rp

71,890.50

3,888.00 Rp

3,888.00

1 m2 - Acian
a. Bahan

:

Semen / PC (40 kg)

zak

0.0810

48,000.00

b. Tenaga

:

Pekerja

OH

0.2000

100,000.00

20,000.00

Tukang batu

OH

0.1000

125,000.00

12,500.00

Kepala tukang

OH

0.0100

130,000.00

1,300.00

Mandor

OH

0.0100

145,000.00

1,450.00 Rp

Jumlah HSPK + 10%

4

14,832.00

1 m2 - Plesteran, 1 PC : 5 PP (t= 15 mm)
a. Bahan

3

7

9,312.00

Jumlah HSPK + 10%

2

HSPK

35,250.00

Rp

43,051.80

3,744.00

1 m1 - Benangan atau Tali Air, 1 PC : 2 PP
a. Bahan

:

b. Tenaga

:

Semen / PC (40 kg)

zak

0.0130

48,000.00

624.00

Pasir pasang

m3

0.0130

240,000.00

3,120.00 Rp

Pekerja

OH

0.0750

100,000.00

7,500.00

Tukang batu

OH

0.0500

125,000.00

6,250.00

Kepala tukang

OH

0.0050

130,000.00

650.00

Mandor

OH

0.0040

145,000.00

580.00 Rp

14,980.00

Rp

20,596.40

Jumlah HSPK + 10%

Analisa HSP_hal. 15

NO.

URAI AN
2

1

5

SAT.
3

INDEKS
4

HARGA SAT.

JUMLAH

(Rp.)

(Rp.)

5

6=4x5

1

:

b. Tenaga

:

Waterprofing

Kg

0.3500

50,000.00

17,500.00

Serat Fiber

m2

1.0000

5,625.00

Pekerja

OH

0.0500

100,000.00

5,000.00

5,625.00 Rp

23,125.00

Tukang Cat

OH

0.0750

125,000.00

9,375.00

Kepala tukang

OH

0.0075

130,000.00

975.00

Mandor

OH

0.0025

145,000.00

362.50 Rp

15,712.50

Rp

42,721.80

2,800.00 Rp

16,800.00

PEKERJAAN PENGECATAN
1 m2 - Meni besi
a. Bahan

b. Tenaga

:

:

Cat meni besi

kg

0.200

60,000.00

12,000.00

Kuas cat uk. 4"

bh

0.200

10,000.00

2,000.00

Minyak cat / Thinner A

ltr

0.100

28,000.00

Pekerja

OH

0.150

100,000.00

15,000.00

Tukang cat

OH

0.150

125,000.00

18,750.00

Kepala tukang

OH

0.015

130,000.00

1,950.00

Mandor

OH

0.008

145,000.00

1,160.00 Rp

Jumlah HSPK + 10%

2

7

1 m2 - Pelapisan Waterprofing
a. Bahan

Jumlah HSPK + 10%

F

HSPK

36,860.00

Rp

59,026.00

100.00 Rp

5,600.00

1 m2 - Cat besi
a. Bahan

b. Tenaga

:

:

Cat besi

kg

0.100

55,000.00

kuas

bh

0.010

10,000.00

5,500.00

Pekerja

OH

0.020

100,000.00

2,000.00

Tukang cat

OH

0.200

125,000.00

25,000.00

Kepala tukang

OH

0.020

130,000.00

2,600.00

Mandor

OH

0.010

145,000.00

1,450.00 Rp

Jumlah HSPK + 10%

Rp

31,050.00
40,315.00

Analisa HSP_hal. 16