Penerimaan PAD 2011.

REALISASI PENERIMAAN DAN PENYETORAN
PADA DINAS PEKERJAAN UMUM KABUPATEN BANTUL TAHUN 2011
BULAN : NOVEMBER 2011
PENERIMAAN (Rp)
NO

KODE REKENING

URAIAN

TARGET

1 1 03 01 412 01 02 Retribusi sampah perumahan
Sewa Tanah, Bangunan & Peralatan AMP (Operasi
2 1 03 01 412 02 01
AMP)
3 1 03 01 412 02 01 Sewa Motor Walls
4 1 03 01 412 02 01 Sewa Rusunawa
5 1 03 01 412 02 07 Retribusi Penyediaan dan/Penyedotan kakus
6 1 03 01 412 03 01 Retribusi Ijin Mendirikan Bangunan (IMB)
7 1 03 01 414 01 07 Penjualan drum bekas

8 1 03 01 414 01 18 Penerimaan lain-lain
- Sewa GOR Sultan Agung
- Penerimaan uang listrik dan PAM penghuni
Rusunawa
JUMLAH

*

**

Keterangan :
Penyambungan listrik Rusunawa Ngestiharjo
oleh PLN baru dilaksanakan pada akhir bulan
November 2011
Pengadaan aspal disesuaikan kemampuan dana

160,000,000

S/D BULAN
LALU

195,087,915

1,200,000,000

PENYETORAN (Rp)

15,066,275

210,154,190

S/D BULAN
LALU
195,087,915

-

1,200,000,000

1,200,000,000


6,000,000
340,000,000
8,704,000
950,000,000
6,324,000

12,690,000
269,118,300
10,368,000
952,790,444
2,130,000

2,400,000
43,750,000
640,000
188,039,916
1,404,000

20,000,000


29,280,000

117,600,000
2,808,628,000

BULAN INI

JUMLAH

BULAN INI

JUMLAH

PROSENT
ASE (%)

15,066,275

210,154,190


131.35

-

1,200,000,000

1,200,000,000

100.00

15,090,000
312,868,300
11,008,000
1,140,830,360
3,534,000

12,690,000
269,118,300
10,368,000
952,790,444

2,130,000

2,400,000
43,750,000
640,000
188,039,916
1,404,000

15,090,000
312,868,300
11,008,000
1,140,830,360
3,534,000

251.50
92.02
126.47
120.09
55.88


5,000,000

34,280,000

29,280,000

5,000,000

34,280,000

171.40

93,120,600

8,399,900

101,520,500

93,129,600


8,399,900

101,529,500

86.33

1,564,585,259

1,464,700,091

3,029,285,350

1,564,594,259

1,464,700,091

3,029,294,350

107.86


Mengetahui
Kepala Dinas Pekerjaan Umum Kab. Bantul

Bantul, 30 Desember 2011
Bendahara Penerima

Ir. HERU SUHADI, MT

SUHARTO, SE

NIP. 19581228199303002

NIP. 195910171990031002