Penerimaan PAD 2012.

REALISASI PENERIMAAN DAN PENYETORAN
PADA DINAS PEKERJAAN UMUM KABUPATEN BANTUL TAHUN 2012
BULAN : DESEMBER 2012

NO

KODE REKENING

RENCANA PENDAPATAN
SETELAH PERUBAHAN
(RUPIAH)

URAIAN

1.03.01.000.00.0.4.1
1.03.01.000.00.0.4.1.2
1.03.01.000.00.0.4.1.2.01
1 1.03.01.000.00.0.4.1.2.01.02
2 1.03.01.000.00.0.4.1.2.01.07

PENDAPATAN ASLI DAERAH

RETRIBUSI DAERAH:
Retribusi Jasa Umum
Retribusi Pelayanan Persampahan/ Kebersihan
Retribusi Penyedotan kakus

1.03.01.000.00.0.4.1.2.02
3 1.03.01.000.00.0.4.1.2.02.01

Retribusi Jasa Usaha
Retribusi Jasa Usaha Pemakaian Kekayaan Daerah
- Sewa Motor Walls

PENERIMAAN (Rp)

PENYETORAN (Rp)

3,368,698,400
1,519,714,400
209,714,400
199,664,400

10,050,000

S/D BULAN
LALU
3,256,907,194
1,416,662,694
261,935,320
248,992,820
12,942,500

10,000,000

30,760,000

800,000

10,000,000

30,760,000


800,000

3,466,332,659
1,567,361,909
302,030,070
287,245,070
14,785,000
31,560,000
31,560,000

BULAN INI
209,425,465
150,699,215
40,094,750
38,252,250
1,842,500

JUMLAH

S/D BULAN

LALU
3,256,907,194
1,416,662,694
261,935,320
248,992,820
12,942,500

BULAN INI

JUMLAH

PROSENTASE
(%)

209,425,465
150,699,215
40,094,750
38,252,250
1,842,500


3,466,332,659
1,567,361,909
302,030,070
287,245,070
14,785,000

102.90
103.14
144.02
143.86
147.11

30,760,000

800,000

31,560,000

315.60


30,760,000

800,000

31,560,000

315.60

1.03.01.000.00.0.4.1.2.03
4 1.03.01.000.00.0.4.1.2.03.01

Retribusi Perijinan Tertentu
Retribusi IMB

1,300,000,000
1,300,000,000

1,123,967,374
1,123,967,374


109,804,465
109,804,465

1,233,771,839
1,233,771,839

1,123,967,374
1,123,967,374

109,804,465
109,804,465

1,233,771,839
1,233,771,839

94.91
94.91

1.03.01.000.00.0.4.1.4
1.03.01.000.00.0.4.1.4.01

5 1.03.01.000.00.0.4.1.4.01.07
6 1.03.01.000.00.0.4.1.4.01.18

LAIN-LAIN PENDAPATAN ASLI DAERAH YANG SYAH
Hasil Penjualan Aset Daerah yang Tak Terpisahkan
Penjualan Drum Bekas
Penerimaan Lain-lain
- Penerimaan Lain-lain Listrik dan Air
- Sewa tanah, bangunan, peralatan dan bangunan AMP
- Sewa Rusunawa Sewon dan Kasihan
- Sewa GOR Sultan Agung
- Penerimaan Lain-lain IPAL

1,848,984,000
1,848,984,000
3,168,000
1,845,816,000
138,600,000
1,200,000,000
378,900,000

120,000,000
8,316,000

1,840,244,500
1,840,244,500
1,386,000
1,838,858,500
140,296,000
1,200,000,000
382,119,500
112,230,000
4,213,000

58,726,250
58,726,250
2,124,000
56,602,250
14,818,750
37,507,500
3,300,000

976,000

1,898,970,750
1,898,970,750
3,510,000
1,895,460,750
155,114,750
1,200,000,000
419,627,000
115,530,000
5,189,000

1,840,244,500
1,840,244,500
1,386,000
1,838,858,500
140,296,000
1,200,000,000
382,119,500
112,230,000

4,213,000

58,726,250
58,726,250
2,124,000
56,602,250
14,818,750
37,507,500
3,300,000
976,000

1,898,970,750
1,898,970,750
3,510,000
1,895,460,750
155,114,750
1,200,000,000
419,627,000
115,530,000
5,189,000

102.70
102.70
110.80
102.69
111.92
100.00
110.75
96.28 **
62.4 ***

3,368,698,400

3,256,907,194

209,425,465

3,466,332,659

3,256,907,194

209,425,465

3,466,332,659

102.90

1.03.01.000.00.0.4.1.4.1.8.00.10

JUMLAH
Keterangan :
- Pemohon IMB tidak bisa diprediksi
- Ada permohonan IMB yang melanggar garis sempadan
sehingga ijin tidak bisa diterbitkan.
Belum terlaksananya Liga Indonesia.
Tahun 2012 sedang diidentifikasi
Tahun 2012 team menyusun by name dan
pada tahun 2013 baru ditarik retribusi

Mengetahui
Kepala Dinas Pekerjaan Umum Kab. Bantul

Bantul, 28 Desember 2012
Bendahara Penerima

Ir. HERU SUHADI, MT

SUHARTO, SE

NIP. 19581229199303002

NIP. 195910171990031002