Perencanaan Jadwal Perawatan Mesin dengan Pendekatan Reliability Centered Maintenancae pada PT. Neo National

DAFTAR PUSTAKA

Afefy, Islam H. 2010. Reliability-Centered Maintenance Methodology and
Application: A Case Study. Scientific Research Engineering, 2010,2, 863873. (Diakses pada November 2010)
Corder, A. (1992). Teknik Manajemen Pemeliharaan. Jakarta: Erlangga.
Kister, T.C. and Hawkins, B. (2006). Maintenance Planning and Scheduling
Handbook. USA: Elsevier.
Lee, JaeHoon. et.al. 2013. Development of Computerized Facility Maintenance
Management System Based on Reliability Centered Maintenance and
Automated Data Gathering. International Journal of Control and
Automation Vol. 6, No. 1. (Diakses pada tanggal 1 Februari 2013)
Manzini, R. et al. (2010). Maintenance for Industrial Systems. London: Springer.
Palit, Herry Christian dan Winny Sutanto. 2012. Perancangan RCM untuk
Mengurangi Downtime Mesin pada Perusahaan Manufaktur Aluminium.
Prosiding Seminar Nasional Manajemen Teknologi XV Program Studi
MMT-ITS. (Diakses pada tanggal 4 Februari 2012)
Prayuda, Yoga. dkk. 2014. Implementasi Studi Preventive Maintenance Fasilitas
Produksi pada Pabrik Teh Hitam dengan Metode RCM di PTPN VI Kebun
Kayu Aro. E-Jurnal Teknik Industri FT USU Vol. 3, No. 2. (Diakses pada
September 2014)
Sinulingga, S. (2011). Metode Penelitian. Medan: USU Press.


Universitas Sumatera Utara

Smith, A.M. and Hinchcliffe, G.R. (2004). RCM-Gateway to World Class
Maintenance. USA: Elsevier.
Stapelberg, Rudolph Frederick. (2009). Handbook of Reliability, Availability,
Maintainability and Safety in Engineering Design. Spain: Springer.
Wahyudi, Didik. dkk. 2010. Analisis Perawatan Unit Pembangkitan Gresik Unit
III dengan Metode Reliability Centered Maintenance.Seminar Nasional VI
SDM Teknologi Nuklir, ISSN 1978-0176. (Diakses pada tanggal 18
November 2010)

Universitas Sumatera Utara