Analisis Kausalitas BI Rate dan Jumlah Uang Beredar di Indonesia

LAMPIRAN 1
BULANAN
JANUARI 2010
FEBRUARI 2010
MARET 2010
APRIL 2010
MEI 2010
JUNI 2010
JULI 2010
AGUSTUS 2010
SEPTEMBER 2010
OKTOBER 2010
NOVEMBER 2010
DESEMBER 2010
JANUARI 2011
FEBRUARI 2011
MARET 2011
APRIL 2011
MEI 2011
JUNI 2011
JULI 2011

AGUSTUS 2011
SEPTEMBER 2011
OKTOBER 2011
NOVEMBER 2011
DESEMBER 2011
JANUARI 2012
FEBRUARI 2012
MARET 2012
APRIL 2012
MEI 2012
JUNI 2012
JULI 2012
AGUSTUS 2012
SEPTEMBER 2012
OKTOBER 2012
NOVEMBER 2012
DESEMBER 2012

BI RATE (%)
6.50%

6.50%
6.50%
6.50%
6.50%
6.50%
6.50%
6.50%
6.50%
6.50%
6.50%
6.50%
6.50%
6.75%
6.75%
6.75%
6.75%
6.75%
6.75%
6.75%
6.75%

6.50%
6.00%
6.00%
6.50%
5.75%
5.75%
5.75%
5.75%
5.75%
5.75%
5.75%
5.75%
5.75%
5.75%
5.75%

M1 ( Miliar Rp)
496527
490084
494461

494718
514005
545405
539746
555495
549941
555549
571337
605411
604169
585890
580601
584634
611791
636206
639688
662806
656096
665000
667587

722991
696281
683208
714215
720876
749403
779367
771739
772378
795460
774923
801345
841652

M2 (Miliar Rp)
2073859.77
2066480.99
2112082.7
2116023.54
2143234.05

2231144.33
2217588.81
2236459.45
2274954.57
2308845.97
2347806.86
2471205.79
2436678.95
2420191.14
2451356.92
2434478.39
2475285.98
2522783.81
2564556.13
2621345.74
2643331.45
2677786.93
2729538.27
2877219.57
2857126.93

2852004.94
2914194.47
2929610.37
2994474.39
3052786.1
3057335.75
3091568.49
3128179.27
3164443.15
3207908.29
3307507.55

57
Universitas Sumatera Utara

LAMPIRAN 2
Null Hypothesis: BI_RATE has a unit root
Exogenous: Constant
Lag Length: 0 (Automatic based on AIC, MAXLAG=8)


Augmented Dickey-Fuller test statistic
Test critical values: 1% level
5% level
10% level

t-Statistic

Prob.*

-1.047167
-3.632900
-2.948404
-2.612874

0.7252

*MacKinnon (1996) one-sided p-values.

Augmented Dickey-Fuller Test Equation
Dependent Variable: D(BI_RATE)

Method: Least Squares
Date: 06/04/14 Time: 22:08
Sample (adjusted): 2010M02 2012M12
Included observations: 35 after adjustments
Variable

Coefficient

BI_RATE(-1)
C

-0.083388
0.005051

R-squared
Adjusted R-squared

0.032160
0.002832


S.E. of regression

0.001854

Sum squared resid

0.000113

Log likelihood
F-statistic
Prob(F-statistic)

171.5398
1.096559
0.302632

Std. Error

t-Statistic


0.079632 -1.047167
0.005038 1.002606

Prob.
0.3026
0.3233

0.000214
0.001856
Akaike info criterion 9.687991
Schwarz criterion
9.599114
Hannan-Quinn criter. 9.657310
Durbin-Watson stat
2.331647
Mean dependent var
S.D. dependent var

58
Universitas Sumatera Utara