PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2015

PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2015

PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE

Table of Content

MAP OF RIAU PRWOVINCE The Development of Dumai Industrial Park.

TABLE OF CONTENTS

14 MESSAGE FROM HEAD OF PROMOTION AND INVESTMENT

1 The Development of Tanjung Buton Industrial Park and Harbour

17 BOARD RIAU PROVINCE

The Development of Kuala Enok Industrial Park

19 MESSAGE FROM GOVERNOR OF RIAU PROVINCE

2 The Development of Tenayan Raya Industrial Park

ENERGY AND MINING SECTOR 22

22 The Development of Railway System in Riau Province

INFRASTRUCTURE SECTOR 4 The Development of Power Plants

24 The Development of Pekanbaru-Dumai Toll Road in Riau Province

4 The Development of Cement Industry in Rokan Hulu

TOURISM SECTOR 26

26 The Development of Downstream Industries (CPO and Rubber)

DOWNSTREAM INDUSTRY SECTOR 8 The Development of North Rupat Island as Tourist Resort

28 in Riau Province

The Development of Jemur Island as Tourist Resort

8 The Development of Pedamaran Island as Tourist Resort

31 INDUSTRIAL PARK SECTOR 11 The Development of Tirta Bono Natural Tourism Spot

PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2015

Message

T form of data on business as well as investment potentials and opportunities in Riau Province has been our

he commitment of Riau Province Government to continually improving the quality of service and for

from Head of

investors and business circle particularly pertaining to provision of adequate informative materials in the

Promotion and

Investment prime motivation in preparing this book titled “Priority Investment Project in Riau Province 2015 “

Riau Province is a region which has variety natural resources such as crude palm oil (CPO), rubber, coconut,

Board – Riau Province

pulp, paper and many other potential commodities. Riau Province has high mobility of public activity and is also an area with new economic growth. The position and strategic location of Riau Province which located in the central area of the busiest international shipping lane of Malacca Straits in Asia Pacific and also share borders with several neighboring countries : Malaysia and Singapore, makes Riau Province able to anticipate a growing and increasing Regional Capital.

The Government of Riau Province always give the best effort in providing many facilities and benefits for the potential investors by providing more accurate information and data’s about potential investment opportunities in Riau which is summarized in this book. It is presented the basic information of some potential investments spread all over regency / municipality region that available for investment and business activities.

As the head of the Investment and Promotion Board of Riau Province, I would like to express that our office is ready for the service and assistance to facilitate any parties interested to undertake business as well as investment activities in Riau, cooperating with us in a mutually beneficial scheme to build the region, under the concept of sustainable development.

We are greatly appreciate to all supportive parties in the set up of this book, “Priority Investment Project in Riau Province 2015 “. We hope our work and creation would be a part of the effort in building up the prosperity of our beloved Riau Province. Warmest Regards,

Drs. Ismaili Fauzi

Head of the Investment and Promotion Board of Riau Province

2 PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2015

Message

iau Province is a regional which has variety natural resources of high economic

from Governor

value such as oil, CPO, rubber, paper, pulp and many other potential commod-

of Riau Province

ities. Riau Province has high mobility of public activity and is also an area with new economic growth. The position and strategic location of Riau Province which located in the central area of the busiest international shipping lane of Malacca Straits in Asia Pa- cific and also shares borders with several neighboring countries : Malaysia and Singapore, makes Riau Province able to anticipate a growing and increasing Regional Capital.

Riau Province contributes to economic activity after global crisis with creating Condu- sive Investment Climate which, hopefully able to support Domestic Investment Activity and Foreign Investment Activity by creating The Formation of Coordinating Team for the strengthening of investment climate in Riau Province, sosializing of Investment Rules, establishing Investors Complaint Board in order to lessen the complications for investors in Riau.

I do hoped this book entitled” Priority Investment Project in Riau Province 2015 “ will serve a sufficient and useful information for the prospective investors. The most important thing is that the Government of Riau Province has been ready and committed to rendering the investors who will do investment activity in Riau Province.

Finally, I warmly invite all interested parties to seize these opportunities and invest in Riau Province. Thank you for all participants who has given the best support in promoting and investment in Riau Province.

Best Regards

Ir Arsyadjuliandi Rachman, MBA

Plt Governor of Riau Province

PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2015

The Development of Railway System PEKANBARU – DUMAI – RANTAU PRAPAT

PROJECT DESCRIPTION

1. LOCATION : RIAU PROVINCE Riau Province is blessed with abundant natural resources, strategic location at the in-

2. PROJECT OWNER : THE GOVERNMENT OF RIAU PROVINCE tersection of the Malacca Straits and new centre of economic growth. The Provincial

3. PROJECT CLASSIFICATION : INFRASTRUCTURE Government of Riau realizes that the development of the Railway system in Riau is very

important, strategic and feasible. This project will be implement through the adoption of a new railway between Dumai – Duri and Rantau Prapat (North Sumatera Province). The development of a new railway system in these areas will bring positive impact to accelerate the realization of Trans Su- matera Railway, the development of the Coal Industry in Central Sumatera and support the regional cooperation, such as : IMS-GT and IMT-GT. In addition, the development of

FOTO/INTERNET

railway is also aim to provide mass transportation is cheap and efficient. The purpose and goals of this project :

1. Making available the railway system in Riau Province and integrating into Sumatera Rail- way.

2. Transporting the regional potentials safety, less expensively, fast, timely and simultane- ously economizing the fuel.

3. Reduce road damage caused by road transport vehicle that exceed the carrying capacity of existing roads in Riau Province.

4. Enhance the smooth transportation flow particularly the goods transportation to the outlet of Dumai harbour. Goods transportation potentials through 2010 estimately as follows :

4 PRIORITY INVESTMENT

PROJECT IN RIAU PROVINCE 2015

FINANCIAL ANALYSIS :

The estimated project costs and project operational revenues is :

l Total Project Cost

: US$ 684,423,754

Role of Regional Administration:

l IRR

l Total Cash Flow

: US$ 9.761.885,700

The Government of Riau Province offers the following

as incentives :

Calculation and projection provided in the previous

1) Land acquisition processing and cost.

sections show that a new railway system for Riau between

2) Local regulation on good/cargo transportation

obligating companies transporting goods/cargoes in l B & C ratio

Dumai and Rantau Prapat is reasonably feasible.

huge/bulky volume to use train. l Cash flow surplus of USD 9.6 bilion after 40 operational

3) Offering land concession within the premise of years.

Industrial Parks in Riau Province.

4) Compensation project (besides the above incen-

Non operational revenues (e.g. stations and train

tives, the following projects are also offered as

restaurants) are not included. Based on the available

accompanying compensation for the Riau Railway

information, total quantified benefit of passanger and

project) :

freight transports until 2050 are calsulated as :

• Coal Mining Concession, either through joint-ven- l Total Bene

ture with existing concessionaires or tender for new l Total Project Costs

: US$ 721.843.239,14

concession. The coal characteristic is of 5000-7000 l Benefit & Cost Ratio

: US$ 684.423.754

cal. • Cement factory/industry development, relying on

Financial Highlights for Rokan IV Koto-Dumai (230 Km)

limestone deposit available for 250 years. l Total Investment

• Tourist resort development in nothern coast of l Benefit Cost Ratio

: US$ 382.881.360

Rupat Island, located right facing the Malacca l IRR

l Payback Period

: 15 Years

Model of investment

: Build, operate and

transfer (BOT) l Total Investment

Financial Highlights for Cerenti-Kuala Enok (225 Km)

: l Benefit Cost Ratio

: US$ 394.654.304

Status of project

: New project. l IRR

1) Feasibility Study

: Never tendered. l Payback Period

Competent Official : The Government of Riau Province

Head of the Transportation Agency of Riau Province Jl. Jend. Sudirman No. 474 Pekanbaru

Phone : +62-761-33992 Fax : +62-761-33992

PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2015 PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2015

The Development of Pekanbaru-Dumai TOLL ROAD IN RIAU PROVINCE

PROJECT DESCRIPTION

Riau requires the availability of a smooth and fast tranportation facilities to provide easy link between cities and centers of resources and products as well as hinterland areas to centers of distribution in order to support and accomodate

Riau Province has abundant resources that are potentials to be developed for

the fast growing economy and business activities.

business and investment purposes. Riau has a strategic location at the intersec- The axistance of new highway (toll road) to provide better support for the tion of the Malacca Straits and new centre of economic growth.

processing and utilization of Riau rich natural resources is urgenty required . As the result of fast economic growth and business the development, several

Length of road and Regions traversed is 135,4 km: traversing across Pekanbaru cities have grown as new centeres of trade, industry, services and other invest-

Municipality, Siak Regency, Bengkalis Regency and Dumai Municipality. ment activities : Pekanbaru (capital city). Dumai (oil processing and hub port of

Riau mainland), Perawang (wood processing center), Duri(oil mining and process- ing center), Pangkalan Kerinci (CPO, Pulp and Paper processing center).

To accelerate growth, Riau is to be developed into 3 development zones, each with a main port as the center of growth and distribution, Dumai ( the hub-port of Northern Development Zones), Tanjung Buton (central development zone) and Kuala Enok (Southern Development Zone).

1. LOCATION : RIAU PROVINCE

2. PROJECT OWNER : THE GOVERNMENT OF RIAU PROVINCE

3. PROJECT CLASSIFICATION : INFRASTRUCTURE

6 PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2015

PROJECT ANALYSIS :

- Section (RAMP) II : Kandis-Dumai

a. Construction Package : - Section (RAMP) I : Pekanbaru-Kandis = 46.199 Km

= 89.144 Km - Total Length = 135.343 Km

b. Traffic Projection:

YEAR CLASS I

CLASS II-A

CLASS II-B

TOTAL

(Vehicle)

(Vehicle)

(Vehicle)

FINANCIAL ANALYSIS :

• Land Acquisition

: IDR 475 Billion

• Investment Cost

: IDR 8.45 Trillion

• IRR

Estimated Growth in Pekanbaru-Dumai Traffic is 65 % per year

• Concession

: 50 Years

Existing ramp of Pekanbaru-Dumai is 199.65 Km, with the speed 45-55 Km / Hour, driv-

ROLE OF REGIONAL ADMINISTRATION:

ing time 3.5-5 hour. The Government of Riau Province offers the following as incentives :

With the Toll Road Lenght of 135.34 Km, the speed ranging from 90-100 Km and driving time 1.5 hour.

1) Land acquisition is processed and bom by the government of Riau Province and the local government (right of way marking has been

done : payment for land compensation to the land owners is on Class I

c. Toll Tariffs :

going).

2) Facilitation to process permits/licenses by the government of Riau Class II

Rp. 310/Km

Rp. 465/Km

Province.

Class II B

Rp. 620/Km

Model of Cooperation : Build, operate, tranfer (BOT)

Competent Official : The Government of Riau Province.

Head of the Transportation Agency of Riau Province

Jalan Jend.Sudirman No.474 Pekanbaru

Phone : +62-761-33992,

Fax : +62-761-33992

 PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2015  PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2015

The Development of Downstream Industries

(CPO AND RUBBER) IN RIAU PROVINCE

LOCATION : RIAU PROVINCE PROJECT OWNER : THE GOVERNMENT OF RIAU PROVINCE PROJECT CLASSIFICATION : AGRO INDUSTRIES

Project Description Number of Palm

No

Regency/City

Cultivated Land

CPO Production

(Ha)

(Ton/Years) Oil Processing Industry

I tation and agriculture, forestry, mining and energy sectors, Within the

n terms of natural resources potensial , Riau mainland has diverse and

ample commodities with high economic value, primarily within the plan-

2 Rokan Hulu

3 Rokan Hilir

plantation sector, for instance it is identified that there exists oil palm planta- 14

4 Indragiri Hulu

5 Indragiri Hilir

tion measuring 2.258.553 hectares (the largest in Indonesia = 37 %) with CPO

production of 7.047.221 tons ( the largest in Indonesia = 38%). Besides that,

Riau also have rubber area 504.139 hectares and the production 333.070

8 Kuantan Singingi

ton/ years. The area of this plantation is spread out in 12 regencies/cities in 10

10 Kota Dumai

Riau Province.

11 Kota Pekanbaru

12 Kepulauan Meranti

DISTRIBUTION OF PLANTATION AND CRUMB RUBBER PRODUCTION BY LOCATION IN RIAU PROVINCE

NO. REGENCY/CITY CULTIVATED LAND (Ha) CRUMB RUBBER PRODUCTION (Ton/Years) 1 KAMPAR 101.342 77.513

2 ROKAN HULU

3 ROKAN HILIR

4 INDRAGIRI HULU

5 INDRAGIRI HILIR

5.194 1.327 6 PELALAWAN 27.286 28.473

7 KUANTAN SINGINGI

150.565 55.617 8 SIAK 13.851 10.628 9 BENGKALIS 37.042 33.546

10 KEPULAUAN MERANTI

11 KOTA DUMAI

12 KOTA PEKANBARU

8 PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2015

DEVELOPMENT OF PALM OIL DERIVATIVE INDUSTRIES IN RIAU PROVINCE

NO SUPPLY INDUSTRY CORE INDUSTRY

RELATED INDUSTRY

SUPPORT INDUSTRY

1 CPO and PKO Olein, Stearin and

Industry of packed

Industry of phospat

supply PFAD

cooking oil, salad oil,

acyd, citrate acyd,

mayonaise, margarine,

NaOH, additive, color

CBS, shortening,

industry, lecitine, salt,

vegetable ghee, ice

emulsifier, potasium,

cream, processed food,

sorbate, powdered

pastry, vit. A-vit. E, soap,

milk, machinery and

detergent and animal

equipment, packing.

feed.

2 CPO and PKO Fatty Acyd

Industry of soap chips,

Industry of ZnO

supply

food emulsifier, metalic

catalist, machinery

soap, surfactan, lubricant,

and equipment,

CBS, rubber processing,

packing.

personal care product, glicerol, pharmacy.

3 CPO and PKO Fatty Alcohol

Industry of surfactan,

Industry of methanol,

supply

cosmetic, personal care

hydrogen, Ni catalist,

product.

copper chromite catalist, sulfate acyd, machinery and equipment, packing.

4 CPO and PKO Biodiesel

Industry of surfactan,

Industry of methanol,

supply

transportation service,

NaOH, KOH, H 2 SO 4 ,

power generating,

sodium metilate.

glicerol.

Financial Analysis

The Analysis of Plantation Development Financial

Source: Head of the Estate Agency of Riau Province

Competent Official : The Government of Riau Province

Jl. Cut Nyak Dien No. 6 Pekanbaru Telepon : +62-761-22206 Fax : +62-761-22206

PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2015

Rule of Regional Administration

The Government will provide the following incentive to investors :

1) Facilitation to process permits/licenses by the Park Management.

2) Income Tax Facility for Investment undertakings (Government Regulation No. 52 of 2011).

3) Import Tax redemption for machinery and goods (Minister of Finance Regulation No. 176/PMK.011/2009).

a) Financial Structure : - Joint Venture or BOT Scheme

b) Model of Cooperation : - Investor may lease land for industrial premise from the industrial park. - Investor may take contract with CPO suppliers and crumb rubber suppliers on market price basis.

Status Project

a) Status of Land Lease (land title) : Right to build.

b) Period of Land Lease

: 80 years, through the following phases :

- 30 years. - Extendable 20 years. - Renewable for 30 years after the extended period.

c) Feasibility Study

: Survey.

d) Tender

: Never Tendered.

Process and Procedures Regional Regulation

Investment processes and procedures refer to the applicable Law on Investment, by involving the Central Investment Board ( Investment Coordination Board of the Republic of Indonesia ), Riau Province and Pemerintah Kota ( Municipality ) Dumai.

10 PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2015 PROJECT IN RIAU PROVINCE 2015

The Development of

D umai INDUSTRIAL PARK

Location : Kelurahan (Village) Pelintung, Dumai Municipality Distance : 187 Km from Pekanbaru City. Project Owner : The Administration of Dumai Municipality. Project Classification : Industrial Estate.

Project Description

a) General Description - Hinterlands surrounding the Dumai Industrial Park (KID) is palm oil/CPO and rubber plantation and producing centers as the source of raw materials for the downstream industries. - Strategic location : directly facing the straits of Malacca-one of the busiest sea and trading lanes in the

world and proximity to Singapore-trade and service hub in Southeast Asia. - Rapid growth of the upstream and downstream sectors of the palm oil (CPO) industry in Dumai

Municipality and surrounding area. - Determination of Dumai-Duri-Rupat as an industrial Estate Riau and the Centre of National Strategic

Activities (PKSN).

b) The Proposed Location of Dumai Industrial Park : - Allocated Area

: 5.000 Ha.

- Developed Area

: 400 Ha.

- Ready to develop Area

: 600 Ha.

PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2015

- Existing Facilities

nantie) permit. • Port 

Services :

- Land utilization certificate is re • Warehouse 

: 50,000 DWT

a. Special Port

: 8,400 m2

- ISPS Codeing

quired.

- Recommendation letter from • Clean Water 

• Electricity

: 55 MW

- 24 hours service

village/sub district heads. • Terminal 

: 750 m3/jam

- Pilot and tug boat facilities

- May be developed as bonded area. • Waste Treatment Plant 

: 210,000 m

- Tarrif cheaper than PT. Pelindo

: 150 m3/jam

(state port authority)

- Park management will facilitate

prospective investor/tenant for - Park Management

• Access road - Service excellence

: PT. Kawasan Industri Dumai (KID)

• Discharge Hopper

permits/licenses processing.

e. Location

• LOA 425 M

- Within the Dumai special • PT. KID has complete building and factories, among others : Harbour, Ware 

c) Facilities of Dumai Industrial Park :

• Draft 14.5 LWS

economic cluster. housing, Fertilizer, PKS and Refinery as well as Biodiesel Plants.

• Conveyor

- Custom and fiscal facilitation. • PT. Kawasan Industri Dumai manages a 1000 ha Special Harbour that can be 

• Grab Sheel

- Industrial Park is considered as moored by ships weighing 50,000 DWT, with piping and conveyor system and

• Mobile Crane

vital object which is given priority bulking terminal for palm oil. This industry has begun its operation since 2000

• Special loading/unloading service

for high security level by the and has continued to expand its business into various activities to date.

with tarrif cheaper than PT. Pelindo

b. Land Plotting

National Police and Armed Forces.

- Right to build (HGB) certificate and

f. Social and Workforce

- Minimizing social cost as social Facilities in Dumai Industrial Park :

Facilities in Dumai Industrial Park :

directly processed for tranfer of

ownership (BNN) to the tenant

security aspect is handled by the

park management. 1 Road within park complex

No. Type of Infrastructure

- Minimizing the required number of man power for security as the 2 Sea Port/Harbor

Capacity

- Price : USD 45/m2 (Negotiable)

- Size is subject to the need

- Clear and clean status

Designes for vessel up to 50.000 DWT

c. Main and access road in good condition

premise is monitored by the park

3 Power Plant

55 MW (Upgrade 100 MW)

d. Permits/Licenses

security.

- The park management is liabel to 5 Clean Water Installation

4 Palm Oil Bulking Terminal

210.000 MT

No requirement for :

give facilitation to the investor/ 6 Waste Treatment Installation 150 MT/Hour

750 m3/Hour

- Location permit.

tenant should any problem occur 7 Cargo

- Nuisance (HO = Hindering Ordi

Liquid, solid and container

in industrial relation.

12 PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2015

The Roles of Regional Administration

has been controlled by the

Project Value: PT. KID controls 1000 hectares of the

a. Legality

Municipal Administration of Dumai,

- Decision of Governor of Riau

USD 223.927.801 Team of the Development of

Number KPTS 412/IX/2003 on For

land. BPI has made a Masterplan of

mation of Coordinating Executive

land extending to 2000 hectares in

Authority of Signing : Mayor of

b. Tender: Never tendered Dumai

Dumai Industrial and Harbour.

- Municipal Regulation of Dumai

Contact Person :

Number 27 of 2005 on Amande

Process and Procedures :

Any investors intending to receive a tax Integrated Service Board of Dumai

The Head of Investment and

ment to Municipal Regulation

facility in importing capital goods or raw Municipality.

Number 11 of 2002 on Municipal

materials shall arrange SPPM through In- Phone:

Spatial Lay Out Plan of Dumai.

vestment Coordination Board in Jakarta, Fax:

+62-765-31222

b. Incentive

+62-765-31222

- Facilitation to process permits/

while those not requiring a tax facility

licenses by the Park Management.

can arrange their licensing through the

The Head of Municipal

- Income Tax Facility for Investment

Municipal Administration of Dumai.

Development Agency of Dumai.

undertakings (Government

a. Region Regulations :

- Regional Regulation no.27 of 2005 Phone: +62-765-439212

Regulation No.52 of 201).

on revision of Municipal Spatial Lay Fax: +62-765-439212

- Import Tax redemption for

machinery and goods

Out Plan of Dumai.

(Minister of Finance Regulation

- Policy of provincial administration

No.176/PMK.011/2009.

on program of Reliable Areas in Dumai-Duri-Rupat.

c. Financial Structure: Joint Venture

- Policy of Central Government on

and BOT

PKN (Centre of National Activities)

d. Model of Investment: Private

and International Harbour.

parties/State-owned Companies/

- Decision of Governor of Riau

Regional Administration-owned

number KPTS.412/IX/2013, on

Companies/Municipal Administra

Formation of Coordinating

tion of Dumai.

Executive Team of Development of Industrial and Harbour Estates

Status of Project

Dumai.

a. Feasibility Study: The 300 hectares

- Municipal Regulation of Dumai

out of the reserved land extending

Number 27 of 2005 on Amend

to approximately 5,084 hectares

ment to municipal regulation

has pursuant to Municipal Regula

Num ber 11 of 2002 on Municipal

tion of Dumai Number 25 of 2005

Spatial Lay Out Plan of Dumai.

PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2015 PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2015

Location : Village (Desa) Sungai Rawa, Sub-district (Kecamatan) Sungai Apit, Regency (Kabupaten) Siak-Riau Province Distance : +- 167 Km from Pekanbaru City. +- 149 Km from Perawang. Project Owner : PT. Kawasan Industri Tanjung Buton (District Administration-Owned Company of Siak).

Project Classification The Development Of Tanjung Buton : Industrial Estate and Harbour

Project Description

service hub in Southeast Asia.

a. General Description :

- Anticipation in the change of

transportation function to that INDUSTRIAL PARK in Riau are centered on the sale of of conservation.

- Resource potentials in Riau are

funcition of the Siak River from a

considerable. Economic activities

small, value-added raw materials.

c. The total area of Tanjung Buton is

- Threat to the sustainable

5.192.292 Ha which the certified

area offered for port area is 300 Ha AND HARBOUR anticipate an increase in demand. and industrial premise is 233,21

economic activities due to excess

area (land use right) is 600 Ha : the

exploitation of raw materials to

- Efforts to enhance the added

Ha (land price USD 10.000/Ha).

value of the natural resources

d. Types of Industries which are devel

include optimizing the role in

oped in Tanjung Buton :

secondary sectors (industrial).

- Plantation Industry (Agro Base

- Long-term efforts to support the

Industry) : Industry which

subtitute economic activity which

developed potential plantation

is not based on unrenewable

substance such as crude palm oil

natural resources.

(CPO), coconut and rubber.

- Due to the limitation of the Siak

- Wood Cultivation Industry : It is

river in accommodating industries

included sawed wood, glaze

along it, there is, thus a need

wood, vaneer, chips, blockboard,

to change its roles and functions

dowels and fancy wood.

in the future.

- Wood Base Industry : this industry

- Improvement of service and

included industry pulp and wood

economic activities and the

cultivation.

necessity to optimize the develop

- Metal Industry : Electronics

ment of natural resources.

industry and tools which utilized

b. Reasons of Determination :

industry from Batam to supply

- Hinterlands surrounding the

Riau Province and Sumatera

Tanjung Buton Industry Park

Island.

(KITB) are palm plantation estates

- Food industry, Fishery Industry

and CPO and also Rubber produc

and Petro chemical industry.

ing centers as the source of raw

e. The Planning of harbour facilities in

materials for the downstream

Tanjung Buton :

industries.

- Container Terminal.

- Strategic location : directly facing

- CPO Terminal.

the straits of Malacca-one of

- Fuel Terminal.

the busiestsea and trading lanes

- Multipurpose Terminal.

in the world and prox

- Warehouse.

imity to Singapore trade and

- Navigation Facility.

14 PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2015

Competent Official Project Value :

Director of PT. Kawasan Industri

ITEM

VOLUME

INVESTMENT COST

DONE BY

Tanjung Buton : Ir. H. Syarifuddin, MT

INVESTOR/KITB Person in charge : Ir. H. Syarifuddin, MT.

ARTERY ROAD

21 KM

384 MILYAR RUPIAH BILLION RUPIAH

INVESTOR/KITB Director of PT. Kawasan Industri

COLLECTOR

4,6 KM

36,8 MILYAR RUPIAH BILLION RUPIAH

INVESTOR/KITB Tanjung Buton.

LOCAL

9,3 KM

37,2 MILYAR RUPIAH BILLION RUPIAH

INVESTOR/KITB Mobile

DRAINACE

LS

150,6 MILYAR RUPIAH BILLION RUPIAH

INVESTOR/KITB E-mail

: +62-812-754-1229

LAND CLEARING PEMATANGAN

515 HA

309 JUTA DOLLAR US MILLION DOLLAR

: Syarif_hadi2000@yahoo.com

LAHAN

US

INVESTOR/KITB Company Secretary of PT. Kawasan

Mohd. Soeharto

WATER SUPPLY

120 LITER/DETIK SECOND

180 MILYAR RUPIAH BILLION RUPIAH

INVESTOR/KITB Industri Tanjung Buton.

POWER PLANT

40MEGAWATT

MILLION DOLLAR US 48 JUTA DOLLAR US

THE CENTRAL GOVERMENT PEMERINTAH PUSAT Mobile

PORT OFFICE

LS

: +62-812-7884-36904

Email INVESTOR/KITB : harto_padang@yahoo.com Office Address : Sudirman Square Complex

HOUSING

43.000 PERSON

1,806 TRILYUN RUPIAH BILLION RUPIAH

Blok A-1 3rd Floor

1. CRUDE OIL, PIPELINE AND JETTY LOGISTICS

Jl. Sudirman Pekanbaru Phone : +62-761-37377

Fax : +62-761-37847

ITEM

CAPACITY

INVESTMENT VALUE

BY

E-mail : tanjungbuton@yahoo.com

TANK STORAGE

600.000 BAREL

30 MILLION DOLLAR US

15 MILLION DOLLAR US

10 MILLION DOLLAR US

INVESTOR

POWER PLANT

1x2 MEGAWATT

3 MILLION DOLLAR US

INVESTOR

2. CPO LOGISTIC

ITEM

CAPACITY

INVESTMENT VALUE

BY

TANK STORAGE

PIPELINE LS

1 INVESTOR

HEATER LS

250 INVESTOR

CHARGING STATION STASIUN PENGISIAN

3. OIL FUEL AND PIPELINE LOGISTIC

ITEM

CAPACITY

INVESTMENT VALUE

BY

TANK STORAGE

2 MILLION DOLLARS US

1 MILLION DOLLARS US

INVESTOR

CHARGING STATION STASIUN PENGISIAN

LS

200 THOUSAND DOLLARS US

INVESTMENT VALUE

2,3 BILLION RUPIAH

INVESTOR

PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2015

Role of Regional Administration - Study of Ship’s Channel on Selat

by The Regency of Siak General

Employment Service in 2010. Industrial Estate Tanjung Buton has

a. Legality :

Panjang Strait by the Regency of

Siak Development Agency in 2002.

been legalized through District

- FS and Master plan of Standard

Processes and Procedures

Regulation of Siak No. 8 of 2004.

Water in Buton Industrial Estate

Investment processes and procedures

refer to the applicable Law on Invest- Joint Venture, Build, Operate and

b. Financial Structure :

by the Regency of Siak

ment, by involving the Central Invest- Transfer scheme (BOT).

Development Agency in 2002.

- Site plan of Buton Industrial Estate

ment Agency (Investment Coordination

Board of the Republic of Indonesia, The District Administration of Siak

c. Security Guarantee :

by the Regency of Siak

Province and Districts/Municipalities). guarantees the security of the

Development Agency in 2004.

a. Regional Regulations investors in the Tanjung Buton

- Environmental Impact Statement

- District Regulation of Siak No.7 Industrial Estate and Harbor.

of Buton Industrial Estate by the

District Environmental Impact

of 2004 on Formation of

Control Agency of Siak in 2004.

Regional Administration Owned

Company PT. Kawasan Industri Domestic Investment and Foreign

Model of Investment

- Feasibility Study and Basic Design

Tanjung Buton. Investment pursuant to the applicable

access road to Buton Industrial

- District Regulation of Siak No.8 provisions.

Estate (Pekanbaru-Buton) and Bu

ton-Teluk Mesjid) by the Regency

of 2004 on Industrial Estate

of Siak Development Agency in

Tanjung Buton.

Status of Project

b. Licensing

- Site Permit - Master Plan of Tanjung Buton

a. Feasibility Study :

- Preparation of DED of Harbour

- Building Permit Industrial Estate and Harbour by

Affair (Revision) by PT. KITB in

- HO Permit the Regency of Siak Develop

- Recommendation on ment Agency (BAPPEDA) in 2001.

- Preparation of Environmental

Environmental Impact - Feasibility Study of Buton Harbour

Impact Assessment of Phase I

Assessments by the Regency of Siak

Harbor by PT. KITB in 2007.

- The Planning (DED) National

- Etc

Development Agency in 2002.

Strategic Road Pekanbaru-Buton

16 PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2015 PROJECT IN RIAU PROVINCE 2015

The Development of

KUALA ENOK INDUSTRIAL PARK Project Value:

USD 75.930.715.00 Competent Official

: Mayor of Indragiri Hilir.

Person in charge: Ir

H. SARIPEK, MP

Head of Investment, Promotion and Licensing Board of Indragiri Hilir Regency.

Phone: +62768- 21215 Faximile: +62768- 21215

- Other project was the developing - Kuala Enok Industrial Park is

a. General Description :

being prepared for the industrial

develop downstream industry of

road network in 65.5 km which Located in The Sub District of

park.

CPO, fish processing industries

connecting Sungai Akar to Bagan Jaya. Tanah Merah, Indragiri Hilir

b. Purpose of the Project :

and other industries of agricultural

- Developing Rumbai Jaya bridge in Regency, about 6.5 hours by car

- Relocating industries scattered

commodities.

the length of 580 meters and 70.68 from Pekanbaru “The Capital City

around of Indragiri Hilir Regency.

c. Existing Condition :

km road network which passed by of The Province”.

- Supporting the Economic Growth

- Kuala Enok Industrial Estate has

Kuala Enok Industrial Estate. - The area directly faces Malacca

of the region.

been complete with Ocean Port in

- Developing Indragiri Hilir Regency

the area of 150 hectares.

Strait, Natuna Sea and Ocean Port

“Kuala Enok” as the south Gate

- The project which has being de

Project Value:

of Kuala Enok.

way of Riau Province.

veloped was 71 km of road

USD 75.930.715.00

- There are 880 hectares of land for

- The area is highly prospective to

connecting Bagan Jaya to Kuala Enok.

Location : Kecamatan (Sub District) Tanah Merah, Kabupaten (Regency) Indragiri Hilir, Riau Province. Distance : 211 Km from Pekanbaru City (6.5 hours). Project Owner : The Regency Administration of Indragiri Hilir. Project Classification : Industrial Estate.

PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2015

Role of Regional

- Legality

eign Investment (PMA) pursuant to the

ment Agency (Investment Coordination

Administration

Kuala Enok Industrial Estate has been

applicable provision.

Board of the Republic of Indonesia,

Province and Districts/Municipalities). giri Hilir has allocated 150 hectares of

1. The District Administration of Indra

legalized through District Regulation

Status of Project

of Indragiri Hilir No.2 of 2004.

a. Feasibility Study

a. Regional Regulations

land for the developing of the Harbor

District Regulation of Indragiri Hilir of Kuala Enok Industrial Estate.

- Financial Structure

DED of Kuala Enok Industrial Estate

Joint Venture, Build, Operate and

by PT. Kita Abadi and The Industrial

No.2 of 2004 on Planning of Indragiri

Hilir Development 2004-2014. Estate was in the phase of infrastruc

2. Road to the Kuala Enok Industrial

Transfer Scheme (BOT).

and Trade Office, Riau Province in

- Security Guarantee

b. Licensing :

ture development.

The Government of Indragiri Hilir

b. Tender

- Site Permit.

- Building Permit. progress are the development of the

3. Some project which is still in the

Regency guarantees the security

Never Tendered.

- HO Permit. highway construction from Bagan

starting from the implementation

- Recommendation on Environt Jaya to the Kuala Enok Industrial

until to the post of the project.

Processes and Procedures

-mental Impact Assessment. Estate and the highway from Sungai

Investment processes and procedures

Model of Investment

refer to the applicable Law on Invest-

- Etc.

Akar to Bagan Jaya.

Domestic Investment (PMDN and For-

ment, by involving the Central Invest-

18 PRIORITY INVESTMENT

18 PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2014 PROJECT IN RIAU PROVINCE 2015 18 PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2014 PROJECT IN RIAU PROVINCE 2015

The Development of Tenayan Raya

Industrial Park

b. Type of Industries which are Location:

Project Description

in 2005 while mid-scale industries

a. General Description :

had also increased from 15 units

developed in Tenayan Raya Estate :

- Food and Beverage Industry. Raya-Pekanbaru Municipality.

Sub-district (Kecamatan) Tenayan

- The development of the Tenayan

in 1999 to 16 units in 2005 and

Industrial Estate (KIT) is the im

small scale industries including

- Textile Industry.

Distance:

plementation of the Municipal

cottage industries had decreased

- Wood Industry.

- Chemical Industry. Municipality (15 Minutes)

14 Km from Pekanbaru

Spatial Lay-out Plan of Pekanbaru

from 220 units in 1999 to 116

in 2006.

units in 2005.

- Mineral Industry.

- Warehouse. Municipal Administration of

Project Owner: - KIT will become a place of reloca

- The development of an

- General Facility. Pekanbaru.

tion for the existing industrial ac

Industrial Estate in Tenayan,

tivities spread at various place in

Pekanbaru can expectedly stimu

- Offices and Commercial.

- Worker Mess. Industrial Estate

Project Classification: Pekanbaru Municipality.

late the development in industrial

- Large scale industries in the

estate while simultaneously

- Metal Industry.

last seven years had increased

opening up new work opportunity.

from 11 units in 1999 to 18 units

PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2015

Project Value : IDR 868.012.850.000

THE PLANNING VALUE OF DEVELOPMENT TENAYAN RAYA INDUSTRIAL PARK

No.

Kind of Projects Jenis Pekerjaan

Total Area / Unit

Anggaran Biaya (Rp) Budget Forecasting

1 Maturation of the land

61.2 Ha

2 Small Warehousing + Garden (@15 m x 30

20 Unit

m)

3 Medium Warehousing + Garden

4 Large Warehousing + Garden

5 Timber Industry (Molding)

6 Rubber Industry

7 Chemical Industry

8 Derivatives Industry Rubber ( tire)

9 Metal Industry

10 Food Industry

11 Industrial Textil (garment)

12 Support

13 Complement

14 Infrastructure

GRAND TOTAL

20 PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2015

Role of Regional Administration

Model of Investment

The Municipal Administration of Pe-

Domestic investment (PMDN) and for-

kanbaru facilitates the arrangement of

eign investment (PMA) pursuant to the

project administration and licensing.

applicable provisions.

a. Legality

Status of Project

- “Industrial Estate” , pursuant

a. Feasibility Study: New Project

to Presidential Decree No.14 of

b. Tender: New (never tendered)

1996 dated June 4, 1996 and Decree of the Minister of Indus

Process and Procedures

try and Trade No. 50/MPP/

a. Regional Regulation:

Kep/2/1997 dated February 20,

Investment processes and

procedures refer to the applicable

- Decision of Mayor of Pekanbaru

Law on Investment, by involving the

Number 650/13-WK/1999

Central Investment Board (Invest

stipulates that Estate allocated

ment Coordination Board of the

for Tenayan Industrial Estate

Republic of Indonesia), the relevant

extends to 1,550 Ha.

Provinces and Districts/Municipalities.

b. Financial Structure

b. Licensing

- Cooperation with BOT system

- Site Permit

and shareholding between the

- Building Permit

Municipal Administration and

- HO Permit

Investor.

- Recommendation on

c. Security Guarantee

Environmental Impact

- The Municipal Administration

Assessment

of Pekanbaru guarantees the

- Etc

security, starting from the imple mentation of activity to post project.

Competent Official : Mayor of Pekanbaru Person in charge : MUSA

Head of Integrated Service and Investment Board of Pekanbaru Municipality

Phone : +62761-28262 , Facsimile: +62761-42003 Website : www.pekanbaru.go.id/www.investasi.pekanbaru.go.id

PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2015 PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2015

The Development

of Power Plants - Hydrology and Hydrogeology c. Technical Analysis :

Project Description

dium granule, friction 20-40 feet/day,

absorption characteristic 30-60 feet/day

Indragiri river stems from Ombilin

- Based on the stone condition and

a. General Description :

(900-1800 cm/day), medium permeabil- river springing from lake Singkarak (West

hydrolic slope, the Lubuk Ambacang area

Sumatera). 60% of land area along the In- is geologically feasible as the site for The planned location of Hydropower

- Geography ity.

dragiri/Kuantan river is convered by for- the development of hydropower plant Plant Lubuk Ambacang is situated up-

project, but further detailed study is re- stream of Sungai Indragiri/Sungai Kuan- mal fracture and shifting fracture), caus- will provide water all year long for the

Location is at the fracture zone, (nor- est, functioning as catchments are which

quired.

tan river basin (DAS), in the village of

- Rock formation consists of lime- Lubuk Ambacang, sub district Kuantan

ing the split structure and rock porosity

Indragiri/Kuantan River.

stone, silt and dominant quartz charac- Hulu, Regency of Kuantan Singingi.

dominant. This also causes the ground

Rainfall rate in Lubuk Ambacang area

water flowing permanently into the split

is averagely 2,291 mm/year, surface wa- terized by semi tight water, hard rock and

low permeability, the dam site is highly The planned location of Hydropower

- Topography and fracture (steady flow all year long

ter permeability of stone 30-60 feet/day,

specification rate of ground water per- suited and has less permeability risk. Plant Lubuk Ambacang is a flat wavy and

keeps the water volume sustained.

- The potential of Indragiri/Kuantan hilly area with the elevation of 6-200,

Reservoir area comprises permocar- meability 4.482 m3/S/100 Km2 and run

bon rocks in Kuantan formation consist- off value of surface water in Lubuk Amb- River as energy source is high and has height 50-300 meter above sea level,

comparative value for investment. having elevation advantage against cur- and siltstone, all peeland off at the up

ing of 3 groups : i.e. quartz, limestone

acang area 1,303 mm/year.

- The high surface run off (1,303 rent gravitation of artesian water (hy- stream area of the planned dam site as

Indragiri river basin (DAS) has the to-

mm/year), the development of Hydro- draulic slope), making water current/ well as the youngest stone layer com- planned location of Hydropower Plant

tal catchment area of 91,3 Km2 while the

power Plant will have considerable im- movement to the dam faster.

posed of limestone and silt. The most

(PLTA) development in Lubuk Ambacang

pact to reduce the strong run off which is

vurnerable to cause erotion and flood. Litology in the form of sandstone,

- Geology dominant stone is of quartzite type.

has the catchment area of 7,453 Km2

- With the generated electricity of limestone and quartz with compact me-

(considered high).

b. Existing Condition :

135 MW, the installed electric capacity

22 PRIORITY INVESTMENT

22 PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2014 PROJECT IN RIAU PROVINCE 2015 22 PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2014 PROJECT IN RIAU PROVINCE 2015

Joint Venture

crisis in Riau Province.

Model of Investment

Project Value

Domestic investment (PMDN) and for-

a. The project will cost USD

eign investment (PMA) pursuant to the

343,330,272,78. This covers all

applicable provision.

project costs, including construction cost to funded cash (20%), long term

Status of Project

loan (60%) and short term loan

a. Feasibility Study: New Project

b. Tender: Never Tendered

b. Cost breakdown:

- Cash: USD 68,666,054.46.

Process and Procedures

- Long term Loan: USD

Regional Regulation : Investment pro-

cesses and procedures refer to the ap-

- Short term Loan: USD

plicable Law on Investment, by involving

the Central Investment Board (Invest-

c. IRR: 11.24 %

ment Coordination Board of the Republic

d. Payback Periods: 12 year

of Indonesia), Riau Province and The Re-

Competent Official: Governor of

gency of Kuantan Singingi.

Riau.

Role of Regional Administration

1. Land acquisition.

2. Arrangement and facilitation of permit and licenses.

3. Condusive climate for investment.

a. Legality

- Law No. 15 of 1985 concerning Electricity. - Government Regulation No.3 of 2005 concerning Electricity. - Government Regulation No. 25 of 1995 concerning Support Businesses on Electricity. - Government Regulation No.3 of 2005 concerning the change of Government Regulation No. 10 of 1989 concerning the Provision and Utilization of Electricity.

Head of the Mining and Energy Agency

- Ministerial Regulation of Mineral

and Energy Sources No.0010 of

of Riau Province.

2005 concerning the Licensing

Phone : +62-761-26991

Procedure on Electricity of Cross

Fax : +62-761-26993

Provincial Borders or interconnection with National Transmission Networks.

b. Financial Structure PRIORITY INVESTMENT

PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2014 PROJECT IN RIAU PROVINCE 2015 23

The Development of Cement

Industry in Rokan Hulu

Location : Kecamatan (Sub district) Rokan IV Koto, Kabupaten (Regency) Rokan Hulu, Riau Province. Distance : 183 Km from Pekanbaru City. Project Owner : The Government of Riau Province and Regency Administration of Rokan Hulu.

Project Classification : Energy.

Project Description

limestone and 440,000,000 m3

b. Deposit Condition

a. General Description

of quartz sand.

1. The Limestone deposit is

- Riau Province has abundant

- The deposit of limestone in the

found in the region of Suaman

potential mining resources such

sub district of Rokan IV Koto Ro

river, in the hilly region at the

as crude oil, natural gas, coal,

kan Hulu is the largest potential

altitude of about 200 m above

limestone, quartz sand,

in Riau Province and is suitable

the sea level and in the region

bauxites, gold and other. In

to be developed as raw material

al of Kijang river, Cipang Kiri

Rokan Hulu Regency is found

for cement industry. Riau’s

Hulu District of Rokan IV Koto, in the

huge limestone and quartz

growing economy and fast

area at the altitude of about

sand deposit with potential

development needs sufficient

300-500 m above the sea level.

resources of about 175,000,000

supply of cement to cater to

2. The spread of limestone

m3 or 420,000,000 tons of

community needs, industrial

reaches an area of 1x7 km with

and business activities.

the total reserve of 175,000,000

general used as raw material for cement industry.

m3 or 420,000,000 tons (estimated). Physiographically,

LIMESTONE CHARACTERISTIC

this region is part of the foot of

East Bukit Barisan.

No.

Suaman River, Pawan

Kijang River, Cipang Kiri Hulu

3. Mountain range with the

1. CaCO 3 89,27 ~ 90,92

altitude in the range of 150 and

500 m above the sea level.

2. SiO 2 0,24 ~ 0,26

4. At present, the limestone

3. Al 2 O 3 0,99 ~ 1,74

potential in the region of Kijang

River, Cipang Kiri Hulu-District of Rokan IV Koto, is not at all

4. Fe 2 O 3 0,90 ~ 1,12

utilized. Based on the results of

analysis and intial characterization, the calcium

dolomite found in the region

of Kijang River District of Rokan

IV Koto, can be in general used

as raw material for cement

24 PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2015

5. Quartz sand potential is widely

Model of Investment

found in the regions of Pasir Pangara-

Competent Official

ian Kaiti Pawan River Bungo, District Regent of Rokan Hulu

Domestic investment (PMDN) and For-

of Rambah, at a distance of 8 km from Head of the Mining and Energy

eign investment (PMA) pursuant to the

Pasir Pangaraian and the region of Ko- Agency of Riau Province taranah, District of Tandun. Outcrops of

applicable provision.

Status of Project Phone : +62-761-26991

quartz sand are found in the steep hills Fax : +62-761-26993

a. Feasibility Study: New Project

at the altitude in the range of 150-200 m

b. Tender : Never Tendered

above the sea level. The total reserves of quartz sand stone are 345,000,000

Process/Procedures

m3 and 100,000,000 m3 in the region of

Regional Regulation

Pawan, Kabun-Kotaranah subdistrict.

Investment processes and procedures

Raw Materials Reserve

refer to the applicable Law on Invest-

• Limestone: 175.000.000

ment, by involving the Central Invest-

m3/420.000.000 ton

ment Board (Investment Coordination

• Quartz sand: 345.000.000

Board of the Republic of Indonesia), Riau

m3/100.000.000 ton

Province and The Regency of Rokan Hulu.

Investment Analysis

• Investment Cost: IDR 1.500.000.000.000,- USD 157,894,736.842 (USD 1 = Rp 9.500)

• Financial Analysis Project is feasible for produc tion up to 4000 ton/day or 22.800.000 sack/year (contain

50 kg), selling price Rp 37.000/ sack.

Market Opportunity

• National and local demand for cement production tends to increase.

• The consumption demand for cements in Riau Province is estimated more than 1.000.000 ton/year cements.

Role of Regional Administration

1. Land acquisition

2. Arrangement and facilitation of permit and licenses

3. Condusive climate for investment

Financial Structure

Joint Venture

PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2015 PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2015

Location:

Subdistrict (Kecamatan) North

THE DEVELOPMENT OF NORTH RUPAT ISLAND Rupat, Regency (Kabupaten)

Bengkalis.

Project Classification:

Distance As Tourist - Some activities which can be Resort with Tanjung Medan (the capital

Tourism Sector. Project Owner: The Government of Bengkalis Regency.

l 210 Km or 5,5 hours from

done such as sun burning, surfing,

city of North Rupat Subdistrict).

Pekanbaru City

scuba diving, fishing and

By length of 60 Km, this street

l 2,0 hours from capital city of

swimming.

is main access to Pantai Pasir

Bengkalis

Panjang which will be finished in

l 1,5 hours from capital city of

Project Value: Not yet analized

Dumai

a. Legality:

l 30 mile or 45 minutes from

Role of Regional

- Law No.10 of 1990 on

Portdickson (Malaysia)

Administration

Conservancy Natural Resources

Bengkalis Regency gives some easiness

and Ecosystem.

Project Description

to the investors in some factors

- Indonesian Republic Law No.27

- Rupat is one of thousands of

1. Provide supporting facilitates and

of 2007 on Investment Sector.

islands which spread around Riau

infrastructures.

- Law No.10 of 2009 on Tourism

Province. Rupat Island is very

2. Give an easiness in license.

Sector.

captivating with its white sand

3. The Government of Bengkalis

- Law No.32 of 2004 on Regional

and its wide to 1,524.85 Km2

Regency provide the area around

Administration (Regional

thereby making it a world class

2 ha for the project of North

Autonomy).

resort.

Rupat Island Development as

b. Financial Structure

- The white sands in Rupat island

tourist resort.

Operational Cooperation or Joint

spread around 17 Km from Teluk

4. Join with the Government of Riau

Venture.

Rhu village, Tanjung Punak (North

Province, the Government of

c. Security Guarantee

Rupat) to Cingam river (Rupat). Its

Bengkalis Regency construct axis

The Municipal Administration of

wide is around 30 meter when fall

street between Batu Panjang (the

Bengkalis guarantees the security,

or 7 meter when tide.

capital city of Rupat Subdistrict)

starting from the implementation

26 PRIORITY INVESTMENT PROJECT IN RIAU PROVINCE 2015