Institutional Repository | Satya Wacana Christian University: Pengakuan Pendapatan pada Perusahaan Jasa Konstruksi ( Studi Kasus pada PT. Rante Mutiara Insani )

Lampiran 1

Contoh Jurnal – jurnal yang terkait dengan Pengakuan Pendapatan
MEMORIAL VOUCHER
PT. RANTE MUTIARA INSANI
MEMORIAL VOUCHER

NO. VOUCHER M-ABC0001
DATE
01.02.12
-

NO.

1

DESCRIPTION

ACCOUNT

AR. PT ABC

AR. PT ABC / PPh 23

DEBET

10.500.000
500.000
Over Bourden
Coal Hauling
Coal Getting
PPN Out

001/INV/RMI-ABC/I/2012

3.000.000
5.000.000
2.000.000
1.000.000
Periode : January-12

TOTAL

PROPOSED BY

KREDIT

CHECKED BY

11.000.000
APPROVED BY

11.000.000

INPUT BY

NO. VOUCHER M-ABC0002
DATE
01.02.12

PT. RANTE MUTIARA INSANI
MEMORIAL VOUCHER


NO.

1

DESCRIPTION

ACCOUNT

AR. PT ABC
AR. PT ABC / PPh 23

DEBET

15.750.000
750.000

Rental Unit Komatsu D85
PPN Out
002/INV/RMI-ABC/I/2012
Periode : January-12


15.000.000
1.500.000

TOTAL
PROPOSED BY

KREDIT

CHECKED BY

16.500.000
APPROVED BY

16.500.000

INPUT BY

NO. VOUCHER M-ABC0003
DATE

01.02.12

PT. RANTE MUTIARA INSANI
MEMORIAL VOUCHER

NO.

1

DESCRIPTION

ACCOUNT

AR. PT ABC
AR. PT ABC / PPh 23

DEBET

21.000.000
1.000.000


Pembuatan Bundwall, Parking Bay
PPN Out
003/INV/RMI-ABC/I/2012
Periode : January-12

20.000.000
2.000.000

TOTAL
PROPOSED BY

KREDIT

CHECKED BY

22.000.000
APPROVED BY

44


INPUT BY

22.000.000

BANK VOUCHER
PT. RANTE MUTIARA INSANI
BANK VOUCHER

NO. VOUCHER
DATE

:

B01-0001
: 15.03.12
-

NO.


1

DESCRIPTION

ACCOUNT

Bank Sendiri Tanjung
AR. PT ABC
001/INV/RMI-ABC/I/2012
002/INV/RMI-ABC/I/2012
003/INV/RMI-ABC/I/2012
TOTAL

DEBET

KREDIT

49.500.000

49.500.000


45

11.000.000
16.500.000
22.000.000
49.500.000

Lampiran 2

Format Laporan Laba Rugi PT. RMI
PT. RANTE MUTIARA INSANI
LABA RUGI
Periode 31 Desember 20X1
Nilai

%

(Bulan Berjalan)


Pendapatan
Jasa Pertambangan
Pendapatan Proyek
Pendapatan Rental

Nilai
(Kumulatif)

Total Pendapatan

xxxx
xxxx
xxxx
xxxx

xxxx
xxxx
xxxx
xxxx


Biaya Operasional Proyek
Biaya Operasional Proyek
Beban Operasional Langsung
Total Biaya Operasional Proyek
Laba / Rugi Operasional

xxxx
xxxx
xxxx

xxxx
xxxx
xxxx

Biaya Operasional Umum
Beban Usaha
Biaya Operasional Umum
Total Biaya Operasional Umum
Laba / Rugi Operasional

xxxx
xxxx
xxxx

xxxx
xxxx
xxxx

Pendapatan dan Beban Lain – lain
Pendapatan dan Beban Lain - lain
Pendapatan Bunga
Pendapatan Lain – lain
Laba Selisih Kurs
Rugi Selisih Kurs
Beban Bunga
Biaya Lain – lain
Total Pendapatan dan Beban Lain - lain

xxxx
xxxx
xxxx
(xxxx)
(xxxx)
(xxxx)
xxxx

xxxx
xxxx
xxxx
(xxxx)
(xxxx)
(xxxx)
xxxx

Laba Rugi Sebelum Pajak

xxxx

xxxx

Biaya Pajak
Biaya Pajak
Biaya Pajak (PPH 29)
Total Biaya Pajak

xxxx
xxxx

xxxx
xxxx

Laba Rugi Bersih

xxxx

xxxx

46

%

Lampiran 3
rmi

PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526

Contoh Matrik Harga Produksi
OB RATES FOR MONTHLY PRODUCTION (US $)
TABEL 1 :

VERTICAL DISTANCE (M)

HORIZONTAL DISTANCE (M)
500

1.000

1.500

2.000

2.500

3.000

3.500

0

1,00

1,10

1,20

1,30

1,40

1,50

1,60

10

1,02

1,12

1,22

1,32

1,42

1,52

1,62

20

1,04

1,14

1,24

1,34

1,44

1,54

1,64

30

1,06

1,16

1,26

1,36

1,46

1,56

1,66

40

1,08

1,18

1,28

1,38

1,48

1,58

1,68

50

1,20

1,30

1,40

1,50

1,60

1,70

60

1,22

1,32

1,42

1,52

1,62

1,72

70

1,34

1,44

1,54

1,64

1,74

80

1,36

1,46

1,56

1,66

1,76

90

1,38

1,48

1,58

1,68

1,78

100

1,40

1,50

1,60

1,70

1,80

47

Lampiran 4
rmi

PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526

Paringin, 9 Februari 2012

CONTOH
: 001/INV/RMI-ABC/II/12
: 1. Invoice
2. Kwitansi
3. Faktur Pajak
: Permintaan Pembayaran
Overburden, Coal Mining dan Coal Hauling to Kelanis

Nomor
Lampirann

Perihal

Kepada Yth,
PT. ABC Indonesia
Jalan Patimura, Blok 5, Kav 1-2
Salatiga, Indonesia.
Dengan hormat,
Bersama dengan ini kami sampaikan bahwa pekerjaan untuk bulan Januari 2012
telah selesai kami kerjakan.
Maka dengan ini kami mengajukan permintaan pembayaran sebesar :
Terbilang : Dua puluh dua milyar sembilan ratus lima puluh lima juta dua ratus
delapan puluh empat ribu dua ratus tujuh puluh lima rupiah

Mohon supaya ditransfer ke rekening kami A/C No. 031.009.653.0038 pada Bank
Sendiri Cabang Tanjung A/N PT. Rante Mutiara Insani.
Demikian dari kami, atas perhatian dan persetujuan dari Bapak kami ucapkan
terima kasih.

Hormat kami,
PT. Rante Mutiara Insani
Guno Gumilang

Operation Manager

48

Lampiran 5
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526

rmi

Invoice

: 001/INV/RMI-ABC/II/12

CONTOH
PRODUCTION PAYMENT SUMMARY

Period : Januari 2012

No
A
1

Amount IDR

Description
PARINGIN PIT
Overburden

((300,000 BCM x $ 1,00 ) + ( 200,000 BCM x $ 1,50)) x Rp.
2.850.300.000

9.500

2

Coal Mining

11.875.000

1000 TON x $ 1,25 x Rp. 9.500

3

Coal Hauling

((1000 TON x $0 ,50 ) + ( $ 0,40 x 1000 TON x 5.000 KM)) x
19.000.000.500

Rp. 9.500

SUBTOTAL 21.862.175.500
PPN 5% 1.093.108.775
TOTAL 22.955.284.275

Tanjung, 9 Februari 2012
PT. ABC INDONESIA
Approved By,

PT. ABC INDONESIA
Approved By,

PT. RANTE MUTIARA INSANI
Approved By,

SURYONO
General Operation Manager

MUSLIH
Deputy GM. Strategic Planing

GUNO GUMILANG
Operation Manager

49

Lampiran 6
rmi

PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526

KWITANSI

CONTOH

Sudah terima dari

: PT. ABC INDONESIA

Banyaknya uang

: Dua puluh dua milyar sembilan ratus lima puluh lima juta
dua ratus delapan puluh empat ribu dua ratus tujuh puluh
lima rupiah

Untuk pembayaran : Pekerjaan Overburden, Coal Mining, dan Coal Hauling
bulan Februari 2012.

Rp.

Tanjung, 9 Februari 2012
PT. Rante Mutiara Insani

22.955.284.275

Guno Gumilang
Operation Manager

50

Lampiran 7
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
2023747

rmi

Invoice

: 001/INV/RMI-ABC/II/12

CONTOH
MINING SUMMARY SHEET

Period : Januari 2012

No
A.
1

Quantity
This Month
Year to Date

Description
PARINGIN PIT
Overburden Removal (BCM)

30,000

150,000

200,000

500,000

Paringin Mine
Transport Distance (m)

1,500

Vertical Distance (m)

45,00
2

3

1,000

Coal Mining(Ton)

Transport Distance (m)

3,000

Vertical Distance (m)

55,00

Coal Hauling(Ton)

1,000

Paringin Mine

1,000
Transport Distance (km)

PT. ABC INDONESIA
Checked By,

45,000

3,000

5,000

PT. RANTE MUTIARA INSANI
Checked By,

MUSLIH
Deputy GM. Strategic Planing

GUNO GUMILANG
Operation Manager

Date :

Date :

51

Lampiran 8
REKAPITULASI BIAYA PEKERJAAN
MINE INFRASTRUCTURE DEPARTMENT
Uraian Pekerjaan

: Capex

CONTOH

Cost Code

: 178.20.15

Periode

: 26 Januari s/d 25 Februari 2012

Nama Kontraktor

: PT. Rante Mutiara Insani

No.
1

Uraian Pekerjaan

Volume

Satuan

Harga Satuan
(Rp)

Jumlah Biaya
(Rp)

Haul Road Wara to North Tutupan
Compactor C150
Excavator CAT 330

150

jam

100.000

50

jam

50.000

2.500.000
17.500.000

Sub Total I
2

15.000.000

Haul Road HW Construction
Compactor C150

55

jam

100.000

Dump Truck CWB 340

35

jam

25.000

5.500.000
875.000
6.375.000

Sub Total II
3

Public Road Highwall Relocation
Compactor C150

25

jam

100.000

2.500.000

Backhoe JCB/MF 02

45

jam

35.000

1.575.000

Sub Total III

4.075.000

SUB TOTAL

27.950.000

PPn 5%

1.397.500

TOTAL

29.347.500

Supplied by,

Approved by,

PT. Rante Mutiara Insani

PT. ABC Indonesia

Guno Gumilang

Hendra

Operation Manager

Mine Civilwork Superintendent

52

Keterangan

Lampiran 9
Monthly Equipment Time Sheet
Periode : 01 – 31 Januari 2012

PT. Rante Mutiara Insani
Job Site
: PT. ABC Indonesia
Unit Produksi : Kobelco SK 330
Contract No
: 001/ABC/K/MAT/I/2012

Salatiga, 1 Februari 2012
Dibuat Oleh,
PT. Rante Mutiara Insani

Guno Gumilang
Operation Manager

CONTOH

Equipment No : XE 100 S
Serial No
:-

Disetujui Oleh,
PT. ABC Indonesia

Disetujui Oleh,
PT. ABC Indonesia

Putra
Coal Transport Section Head

Atma
Enginering Manager

53

Lampiran 10
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
2023747

rmi

CONTOH
BERITA ACARA PRODUKSI
No: 001/BAP/RMI-ABC/I/12
Period

: Januari 2012

Contact No : 001/ABC/K/MAT/I/2012
No
1

Total
WH

Description

Price/WH
(USD)

50,00
20,00
Sub Total
PPN 10%
Grand Total

Excavator Kobelco EX 100 s

Ammount
(USD)
1,000
1,000
100
1,100

Salatiga, 1 Februari 2012
PT. ABC INDONESIA
Approved By,

PT. RANTE MUTIARA INSANI
Prepared By,

SAPTO
Production Manager

GUNO GUMILANG
Operation Manager

54

Lampiran 11

CONTOH

55

Lampiran 12
BERITA ACARA JOINT SURVEY
PT. ABC INDONESIA
DENGAN
PT. RANTE MUTIARA INSANI
PROGRESS : JANUARI 2012

CONTOH
Pada hari ini, Senin tanggal 1 bulan Februari tahun 2012. Telah dilaksanakan
penandatanganan berita acara joint survey over burden removal dengan penjelasan
sebagai berikut :
-

-

Berdasarkan

: Perjanjian jasa penambangan batubara tanggal
1 januari 2008 antara PT. ABC Indonesia
dengan PT. Rante Mutiara Insani
Progress pekerjaan
: Januari 2012
Pelaksanaan joint survey : 31 Januari 2012
Volume OB removal
: 100,000.00
bcm
Jarak angkut OB
: 1000
m
Volume coal getting
: 10,000
ton
Jarak angkut batubara
: 8.000
km

Terlampir peta progress dan data pendukung lainnya.
Demikian berita acara ini dibuat dengan sesungguhnya untuk dapat dipergunakan
sebagaimana perlunya.

PT. Rante Mutiara Insani

PT. ABC Indonesia

Muchlis Abduloh
Deputy Operation Manager

Susilo Husodo
Prod. Eng. Section Head

Mengetahui,

Sandoro Adi Prakoso
Operation Manager
56

Lampiran 13
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526

rmi

Invoice

: 001/INV/RMI/ABC/MINING/I/2012

SARAN
PRODUCTION PAYMENT SUMMARY

Period : Januari 2012

No

Job Description

Volume

Unit

Rate

Total

1

Over Burden

100

Ton

(Rp)
100.000

(Rp)
10.000.000

2

Coal Mining

500

Ton

150.000

75.000.000

3

Coal Hauling

100

Ton

50.000

5.000.000

Transportation

5000

Ton/Km

10.000

50.000.000

Sudirman PIT

(100 Ton x 50Km )

140.000.000
7.000.000
147.000.000

SUBTOTAL
PPN 5%
GRAND TOTAL

Tanjung, 9 Februari 2012
PT. ABC INDONESIA
Approved By,

PT. ABC INDONESIA
Approved By,

PT. RANTE MUTIARA INSANI
Approved By,

SURYONO
General Operation Manager

MUSLIH
Deputy GM. Strategic Planing

GUNO GUMILANG
Operation Manager

57

Lampiran 14
rmi

Invoice

PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526

: 001/INV/RMI/ABC/CONST/I/2012

SARAN
Working Summary Sheet
Period : Januari 2012

No

Job Description

Volume

Unit

1

Perbaikan jalan

Rate

Total

20

Km

(Rp)
100.000

5000

M3

50.000

Sudirman PIT

(Rp)
2.000.000

250.000.000

menuju lokasi
tambang Sudirman
PIT

2

Pembuatan Kolam
Penampungan air

252.000.000
12.600.000
264.600.000

SUBTOTAL
PPN 5%
GRAND TOTAL

Tanjung, 9 Februari 2012
PT. ABC INDONESIA
Supplied By,

PT. RANTE MUTIARA INSANI
Approved By,

SURYONO
Mine Civilwork Superintenden

GUNO GUMILANG
Operation Manager

58

Lampiran 15
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
2023747

rmi

SARAN
PRODUCTION SUMMARY

No: 001/BAP/RMI/ABC/RENT/I/2012

Working Period

: Januari 2012

Contract Number

:-

Invoice Number

: 001/INV/RMI/ABC/RENT/I/2012

No
1

Total
WH

Unit Used

Price/WH
(Rp)

50,00
100.000
Sub Total
PPN 10%
Grand Total

Excavator Kobelco EX 100 s

Total
(Rp)
5.000.000
5.000.000
500.000
5.500.000

Salatiga, 1 Februari 2012
PT. ABC INDONESIA
Approved By,

PT. RANTE MUTIARA INSANI
Prepared By,

SAPTO
Production Manager

GUNO GUMILANG
Operation Manager

59

Lampiran 16

60

Lampiran 17

DAFTAR RIWAYAT HIDUP
Nama Lengkap

:

Mahatma Hendranata Saputra

Jenis Kelamin

:

Laki-laki

Tempat/Tanggal Lahir :

Boyolali, 19 Januari 1990

Agama

:

Kristen

Alamat Domisili

:

Jalan Perintis Kemerdekaan, Bangunharjo,
RT 07 RW II, Bangunharjo, Pulisen,
Boyolali

Status

:

Belum Kawin

Telp.

:

085643747539

Email

:

mahatma_hs@yahoo.com

Nama Ayah

:

Hendratmoko

Nama Ibu

:

Sri Rahayuningsih

Nama Orang Tua

INFORMASI PENDIDIKAN
Pendidikan

Kota

Tahun Lulus

SD Pulisen

Boyolali

2002

SMP

SMP Negeri 1

Boyolali

2005

SMA

SMA Negeri 1

Boyolali

2008

IPS

Universitas Kristen
Satya Wacana

Salatiga

2012

Akuntansi

SD

S1

Nama Institusi

Jurusan

PENGALAMAN PRIBADI
Pengalaman
Sertifikasi

Keterangan
1. Brevet Pajak A & B Fakultas
Ekonomika dan Bisnis UKSW.

61

Tahun
2012

Pengalaman Organisasi

1. Divisi

Eksternal

Himpunan 2009

Mahasiswa Program Studi Kelompok
Studi Akuntansi – Senat Mahasiswa
Fakultas Ekonomika dan Bisnis
2. Divisi Internal Himpunan Mahasiswa 2010
Program

Studi


Akuntansi

Kelompok
Senat

Studi

Mahasiswa

Fakultas Ekonomika dan Bisnis.
Pengalaman Kerja

1. Asisten Dosen Aplikasi Spreadsheet 2011
Fakultas

Ekonomika

dan

Bisnis

UKSW
2. Asisten Dosen Aplikasi Spreadsheet 2012
dan Pengantar Akuntansi Fakultas
Ekonomika dan Bisnis UKSW
Kepanitiaan

1. Panitia Accounting Fair “Globalisasi

2009

Akuntansi dan Penguatan Usaha
Kecil Menengah di Indonesia”
2. Panitia Seminar Nasional “Kode Etik

2009

Profesi Akuntan Publik”
3. Sekretaris National Seminar on

2010

Accounting “Peran Akuntansi Dalam

Pemberantasan Korupsi”
4. Ketua National Seminar on

2011

Accounting “ Penyusunan Laporan

Keuangan Berbasis SAK 2010”
5. Ketua National Seminar on

2011

Accounting “ Penyusunan Laporan

Keuangan Berbasis SAK ETAP”
6. Panitia Makrab Ekonomi, “Economic
Goes To The World”.
62

2011

Seminar dan Pelatihan

1. Golden 2008 ( Program Pengenalan

2008

Fakultas )
2. Talk Show Fakultas Ekonomika dan

2008

Bisnis
3. Latihan Kepemimpinan Pra Dasar

2008

Mahasiswa
4. Seminar Kerohanian “Keluargaku,

2009

Penting nggak sih?”
5. Accounting Weekend Fellowship

2009

2008 ( Pengenalan Program Studi dan
Keakraban Mahasiswa Program
Studi)
6. Kegiatan Pelestarian Budaya Melalui

2010

“NOANCEP”
7. Kuliah Umum “Asuransi Sebagai

2010

Pilihan Investasi”
8. Kegiatan Basic Leadership Training

2010

“Prepare Future Leaders In Creative
and Innovative”
9. Seminar Nasional Kewirausahaan

2011

“Great Man Have a Great Mind”
10. Sosialisasi Undang – Undang No. 21

2012

Tahun 2011 Tentang Otoritas Jasa
Keuangan
Keterampilan
Penunjang

1. Konser Kursus Ke – 13 Fakultas Seni

2010

Pertunjukan UKSW
2. Konser Kursus Fakultas Seni
Pertunjukan UKSW “Brighten Your
Day With Music”

63

2012

Dokumen yang terkait

Pengakuan dan Pengukuran Pendapatan pada Perusahaan Jasa Konstruksi PT. Nindya Karya (Persero) Cabang IV Medan

0 18 89

Institutional Repository | Satya Wacana Christian University: Manajemen Risiko pada Perusahaan Ekstraksi Bahan Alam: studi kasus pada PT Garda Aroma

0 0 13

Institutional Repository | Satya Wacana Christian University: Perancangan Sistem Informasi Persediaan Perusahaan Konstruksi : Studi Kasus PT. Mitra Andalan Konstruksi

0 0 1

Institutional Repository | Satya Wacana Christian University: Perancangan Sistem Informasi Persediaan pada Perusahaan Distributor (Studi Kasus: PT Aneka Raya)

0 0 1

Institutional Repository | Satya Wacana Christian University: Perusahaan Apparel dan Masyarakat Ekonomi Asean (Studi Kasus Pada PT. Jaya Abadi)

0 0 15

Institutional Repository | Satya Wacana Christian University: Perusahaan Apparel dan Masyarakat Ekonomi Asean (Studi Kasus Pada PT. Jaya Abadi)

0 0 2

Institutional Repository | Satya Wacana Christian University: Identifikasi Sistem Pengendalian Internal Siklus Pendapatan Studi Kasus Pada Pt. Arta Boga Cemerlang Salatiga

0 0 13

Institutional Repository | Satya Wacana Christian University: Pengakuan Pendapatan pada Perusahaan Jasa Konstruksi ( Studi Kasus pada PT. Rante Mutiara Insani )

0 0 11

Institutional Repository | Satya Wacana Christian University: Analisis Penerapan Akuntansi Kontrak Konstruksi (Studi Kasus pada PT. Modern Surya Jaya)

0 0 10

BAB 2 LANDASAN TEORI - Studi kasus mengenai rework pada perusahaan jasa konstruksi di Surakarta

0 2 21