Institutional Repository | Satya Wacana Christian University: Pengakuan Pendapatan pada Perusahaan Jasa Konstruksi ( Studi Kasus pada PT. Rante Mutiara Insani )
Lampiran 1
Contoh Jurnal – jurnal yang terkait dengan Pengakuan Pendapatan
MEMORIAL VOUCHER
PT. RANTE MUTIARA INSANI
MEMORIAL VOUCHER
NO. VOUCHER M-ABC0001
DATE
01.02.12
-
NO.
1
DESCRIPTION
ACCOUNT
AR. PT ABC
AR. PT ABC / PPh 23
DEBET
10.500.000
500.000
Over Bourden
Coal Hauling
Coal Getting
PPN Out
001/INV/RMI-ABC/I/2012
3.000.000
5.000.000
2.000.000
1.000.000
Periode : January-12
TOTAL
PROPOSED BY
KREDIT
CHECKED BY
11.000.000
APPROVED BY
11.000.000
INPUT BY
NO. VOUCHER M-ABC0002
DATE
01.02.12
PT. RANTE MUTIARA INSANI
MEMORIAL VOUCHER
NO.
1
DESCRIPTION
ACCOUNT
AR. PT ABC
AR. PT ABC / PPh 23
DEBET
15.750.000
750.000
Rental Unit Komatsu D85
PPN Out
002/INV/RMI-ABC/I/2012
Periode : January-12
15.000.000
1.500.000
TOTAL
PROPOSED BY
KREDIT
CHECKED BY
16.500.000
APPROVED BY
16.500.000
INPUT BY
NO. VOUCHER M-ABC0003
DATE
01.02.12
PT. RANTE MUTIARA INSANI
MEMORIAL VOUCHER
NO.
1
DESCRIPTION
ACCOUNT
AR. PT ABC
AR. PT ABC / PPh 23
DEBET
21.000.000
1.000.000
Pembuatan Bundwall, Parking Bay
PPN Out
003/INV/RMI-ABC/I/2012
Periode : January-12
20.000.000
2.000.000
TOTAL
PROPOSED BY
KREDIT
CHECKED BY
22.000.000
APPROVED BY
44
INPUT BY
22.000.000
BANK VOUCHER
PT. RANTE MUTIARA INSANI
BANK VOUCHER
NO. VOUCHER
DATE
:
B01-0001
: 15.03.12
-
NO.
1
DESCRIPTION
ACCOUNT
Bank Sendiri Tanjung
AR. PT ABC
001/INV/RMI-ABC/I/2012
002/INV/RMI-ABC/I/2012
003/INV/RMI-ABC/I/2012
TOTAL
DEBET
KREDIT
49.500.000
49.500.000
45
11.000.000
16.500.000
22.000.000
49.500.000
Lampiran 2
Format Laporan Laba Rugi PT. RMI
PT. RANTE MUTIARA INSANI
LABA RUGI
Periode 31 Desember 20X1
Nilai
%
(Bulan Berjalan)
Pendapatan
Jasa Pertambangan
Pendapatan Proyek
Pendapatan Rental
Nilai
(Kumulatif)
Total Pendapatan
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Biaya Operasional Proyek
Biaya Operasional Proyek
Beban Operasional Langsung
Total Biaya Operasional Proyek
Laba / Rugi Operasional
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Biaya Operasional Umum
Beban Usaha
Biaya Operasional Umum
Total Biaya Operasional Umum
Laba / Rugi Operasional
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Pendapatan dan Beban Lain – lain
Pendapatan dan Beban Lain - lain
Pendapatan Bunga
Pendapatan Lain – lain
Laba Selisih Kurs
Rugi Selisih Kurs
Beban Bunga
Biaya Lain – lain
Total Pendapatan dan Beban Lain - lain
xxxx
xxxx
xxxx
(xxxx)
(xxxx)
(xxxx)
xxxx
xxxx
xxxx
xxxx
(xxxx)
(xxxx)
(xxxx)
xxxx
Laba Rugi Sebelum Pajak
xxxx
xxxx
Biaya Pajak
Biaya Pajak
Biaya Pajak (PPH 29)
Total Biaya Pajak
xxxx
xxxx
xxxx
xxxx
Laba Rugi Bersih
xxxx
xxxx
46
%
Lampiran 3
rmi
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
Contoh Matrik Harga Produksi
OB RATES FOR MONTHLY PRODUCTION (US $)
TABEL 1 :
VERTICAL DISTANCE (M)
HORIZONTAL DISTANCE (M)
500
1.000
1.500
2.000
2.500
3.000
3.500
0
1,00
1,10
1,20
1,30
1,40
1,50
1,60
10
1,02
1,12
1,22
1,32
1,42
1,52
1,62
20
1,04
1,14
1,24
1,34
1,44
1,54
1,64
30
1,06
1,16
1,26
1,36
1,46
1,56
1,66
40
1,08
1,18
1,28
1,38
1,48
1,58
1,68
50
1,20
1,30
1,40
1,50
1,60
1,70
60
1,22
1,32
1,42
1,52
1,62
1,72
70
1,34
1,44
1,54
1,64
1,74
80
1,36
1,46
1,56
1,66
1,76
90
1,38
1,48
1,58
1,68
1,78
100
1,40
1,50
1,60
1,70
1,80
47
Lampiran 4
rmi
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
Paringin, 9 Februari 2012
CONTOH
: 001/INV/RMI-ABC/II/12
: 1. Invoice
2. Kwitansi
3. Faktur Pajak
: Permintaan Pembayaran
Overburden, Coal Mining dan Coal Hauling to Kelanis
Nomor
Lampirann
Perihal
Kepada Yth,
PT. ABC Indonesia
Jalan Patimura, Blok 5, Kav 1-2
Salatiga, Indonesia.
Dengan hormat,
Bersama dengan ini kami sampaikan bahwa pekerjaan untuk bulan Januari 2012
telah selesai kami kerjakan.
Maka dengan ini kami mengajukan permintaan pembayaran sebesar :
Terbilang : Dua puluh dua milyar sembilan ratus lima puluh lima juta dua ratus
delapan puluh empat ribu dua ratus tujuh puluh lima rupiah
Mohon supaya ditransfer ke rekening kami A/C No. 031.009.653.0038 pada Bank
Sendiri Cabang Tanjung A/N PT. Rante Mutiara Insani.
Demikian dari kami, atas perhatian dan persetujuan dari Bapak kami ucapkan
terima kasih.
Hormat kami,
PT. Rante Mutiara Insani
Guno Gumilang
Operation Manager
48
Lampiran 5
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
rmi
Invoice
: 001/INV/RMI-ABC/II/12
CONTOH
PRODUCTION PAYMENT SUMMARY
Period : Januari 2012
No
A
1
Amount IDR
Description
PARINGIN PIT
Overburden
((300,000 BCM x $ 1,00 ) + ( 200,000 BCM x $ 1,50)) x Rp.
2.850.300.000
9.500
2
Coal Mining
11.875.000
1000 TON x $ 1,25 x Rp. 9.500
3
Coal Hauling
((1000 TON x $0 ,50 ) + ( $ 0,40 x 1000 TON x 5.000 KM)) x
19.000.000.500
Rp. 9.500
SUBTOTAL 21.862.175.500
PPN 5% 1.093.108.775
TOTAL 22.955.284.275
Tanjung, 9 Februari 2012
PT. ABC INDONESIA
Approved By,
PT. ABC INDONESIA
Approved By,
PT. RANTE MUTIARA INSANI
Approved By,
SURYONO
General Operation Manager
MUSLIH
Deputy GM. Strategic Planing
GUNO GUMILANG
Operation Manager
49
Lampiran 6
rmi
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
KWITANSI
CONTOH
Sudah terima dari
: PT. ABC INDONESIA
Banyaknya uang
: Dua puluh dua milyar sembilan ratus lima puluh lima juta
dua ratus delapan puluh empat ribu dua ratus tujuh puluh
lima rupiah
Untuk pembayaran : Pekerjaan Overburden, Coal Mining, dan Coal Hauling
bulan Februari 2012.
Rp.
Tanjung, 9 Februari 2012
PT. Rante Mutiara Insani
22.955.284.275
Guno Gumilang
Operation Manager
50
Lampiran 7
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
2023747
rmi
Invoice
: 001/INV/RMI-ABC/II/12
CONTOH
MINING SUMMARY SHEET
Period : Januari 2012
No
A.
1
Quantity
This Month
Year to Date
Description
PARINGIN PIT
Overburden Removal (BCM)
30,000
150,000
200,000
500,000
Paringin Mine
Transport Distance (m)
1,500
Vertical Distance (m)
45,00
2
3
1,000
Coal Mining(Ton)
Transport Distance (m)
3,000
Vertical Distance (m)
55,00
Coal Hauling(Ton)
1,000
Paringin Mine
1,000
Transport Distance (km)
PT. ABC INDONESIA
Checked By,
45,000
3,000
5,000
PT. RANTE MUTIARA INSANI
Checked By,
MUSLIH
Deputy GM. Strategic Planing
GUNO GUMILANG
Operation Manager
Date :
Date :
51
Lampiran 8
REKAPITULASI BIAYA PEKERJAAN
MINE INFRASTRUCTURE DEPARTMENT
Uraian Pekerjaan
: Capex
CONTOH
Cost Code
: 178.20.15
Periode
: 26 Januari s/d 25 Februari 2012
Nama Kontraktor
: PT. Rante Mutiara Insani
No.
1
Uraian Pekerjaan
Volume
Satuan
Harga Satuan
(Rp)
Jumlah Biaya
(Rp)
Haul Road Wara to North Tutupan
Compactor C150
Excavator CAT 330
150
jam
100.000
50
jam
50.000
2.500.000
17.500.000
Sub Total I
2
15.000.000
Haul Road HW Construction
Compactor C150
55
jam
100.000
Dump Truck CWB 340
35
jam
25.000
5.500.000
875.000
6.375.000
Sub Total II
3
Public Road Highwall Relocation
Compactor C150
25
jam
100.000
2.500.000
Backhoe JCB/MF 02
45
jam
35.000
1.575.000
Sub Total III
4.075.000
SUB TOTAL
27.950.000
PPn 5%
1.397.500
TOTAL
29.347.500
Supplied by,
Approved by,
PT. Rante Mutiara Insani
PT. ABC Indonesia
Guno Gumilang
Hendra
Operation Manager
Mine Civilwork Superintendent
52
Keterangan
Lampiran 9
Monthly Equipment Time Sheet
Periode : 01 – 31 Januari 2012
PT. Rante Mutiara Insani
Job Site
: PT. ABC Indonesia
Unit Produksi : Kobelco SK 330
Contract No
: 001/ABC/K/MAT/I/2012
Salatiga, 1 Februari 2012
Dibuat Oleh,
PT. Rante Mutiara Insani
Guno Gumilang
Operation Manager
CONTOH
Equipment No : XE 100 S
Serial No
:-
Disetujui Oleh,
PT. ABC Indonesia
Disetujui Oleh,
PT. ABC Indonesia
Putra
Coal Transport Section Head
Atma
Enginering Manager
53
Lampiran 10
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
2023747
rmi
CONTOH
BERITA ACARA PRODUKSI
No: 001/BAP/RMI-ABC/I/12
Period
: Januari 2012
Contact No : 001/ABC/K/MAT/I/2012
No
1
Total
WH
Description
Price/WH
(USD)
50,00
20,00
Sub Total
PPN 10%
Grand Total
Excavator Kobelco EX 100 s
Ammount
(USD)
1,000
1,000
100
1,100
Salatiga, 1 Februari 2012
PT. ABC INDONESIA
Approved By,
PT. RANTE MUTIARA INSANI
Prepared By,
SAPTO
Production Manager
GUNO GUMILANG
Operation Manager
54
Lampiran 11
CONTOH
55
Lampiran 12
BERITA ACARA JOINT SURVEY
PT. ABC INDONESIA
DENGAN
PT. RANTE MUTIARA INSANI
PROGRESS : JANUARI 2012
CONTOH
Pada hari ini, Senin tanggal 1 bulan Februari tahun 2012. Telah dilaksanakan
penandatanganan berita acara joint survey over burden removal dengan penjelasan
sebagai berikut :
-
-
Berdasarkan
: Perjanjian jasa penambangan batubara tanggal
1 januari 2008 antara PT. ABC Indonesia
dengan PT. Rante Mutiara Insani
Progress pekerjaan
: Januari 2012
Pelaksanaan joint survey : 31 Januari 2012
Volume OB removal
: 100,000.00
bcm
Jarak angkut OB
: 1000
m
Volume coal getting
: 10,000
ton
Jarak angkut batubara
: 8.000
km
Terlampir peta progress dan data pendukung lainnya.
Demikian berita acara ini dibuat dengan sesungguhnya untuk dapat dipergunakan
sebagaimana perlunya.
PT. Rante Mutiara Insani
PT. ABC Indonesia
Muchlis Abduloh
Deputy Operation Manager
Susilo Husodo
Prod. Eng. Section Head
Mengetahui,
Sandoro Adi Prakoso
Operation Manager
56
Lampiran 13
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
rmi
Invoice
: 001/INV/RMI/ABC/MINING/I/2012
SARAN
PRODUCTION PAYMENT SUMMARY
Period : Januari 2012
No
Job Description
Volume
Unit
Rate
Total
1
Over Burden
100
Ton
(Rp)
100.000
(Rp)
10.000.000
2
Coal Mining
500
Ton
150.000
75.000.000
3
Coal Hauling
100
Ton
50.000
5.000.000
Transportation
5000
Ton/Km
10.000
50.000.000
Sudirman PIT
(100 Ton x 50Km )
140.000.000
7.000.000
147.000.000
SUBTOTAL
PPN 5%
GRAND TOTAL
Tanjung, 9 Februari 2012
PT. ABC INDONESIA
Approved By,
PT. ABC INDONESIA
Approved By,
PT. RANTE MUTIARA INSANI
Approved By,
SURYONO
General Operation Manager
MUSLIH
Deputy GM. Strategic Planing
GUNO GUMILANG
Operation Manager
57
Lampiran 14
rmi
Invoice
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
: 001/INV/RMI/ABC/CONST/I/2012
SARAN
Working Summary Sheet
Period : Januari 2012
No
Job Description
Volume
Unit
1
Perbaikan jalan
Rate
Total
20
Km
(Rp)
100.000
5000
M3
50.000
Sudirman PIT
(Rp)
2.000.000
250.000.000
menuju lokasi
tambang Sudirman
PIT
2
Pembuatan Kolam
Penampungan air
252.000.000
12.600.000
264.600.000
SUBTOTAL
PPN 5%
GRAND TOTAL
Tanjung, 9 Februari 2012
PT. ABC INDONESIA
Supplied By,
PT. RANTE MUTIARA INSANI
Approved By,
SURYONO
Mine Civilwork Superintenden
GUNO GUMILANG
Operation Manager
58
Lampiran 15
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
2023747
rmi
SARAN
PRODUCTION SUMMARY
No: 001/BAP/RMI/ABC/RENT/I/2012
Working Period
: Januari 2012
Contract Number
:-
Invoice Number
: 001/INV/RMI/ABC/RENT/I/2012
No
1
Total
WH
Unit Used
Price/WH
(Rp)
50,00
100.000
Sub Total
PPN 10%
Grand Total
Excavator Kobelco EX 100 s
Total
(Rp)
5.000.000
5.000.000
500.000
5.500.000
Salatiga, 1 Februari 2012
PT. ABC INDONESIA
Approved By,
PT. RANTE MUTIARA INSANI
Prepared By,
SAPTO
Production Manager
GUNO GUMILANG
Operation Manager
59
Lampiran 16
60
Lampiran 17
DAFTAR RIWAYAT HIDUP
Nama Lengkap
:
Mahatma Hendranata Saputra
Jenis Kelamin
:
Laki-laki
Tempat/Tanggal Lahir :
Boyolali, 19 Januari 1990
Agama
:
Kristen
Alamat Domisili
:
Jalan Perintis Kemerdekaan, Bangunharjo,
RT 07 RW II, Bangunharjo, Pulisen,
Boyolali
Status
:
Belum Kawin
Telp.
:
085643747539
Email
:
mahatma_hs@yahoo.com
Nama Ayah
:
Hendratmoko
Nama Ibu
:
Sri Rahayuningsih
Nama Orang Tua
INFORMASI PENDIDIKAN
Pendidikan
Kota
Tahun Lulus
SD Pulisen
Boyolali
2002
SMP
SMP Negeri 1
Boyolali
2005
SMA
SMA Negeri 1
Boyolali
2008
IPS
Universitas Kristen
Satya Wacana
Salatiga
2012
Akuntansi
SD
S1
Nama Institusi
Jurusan
PENGALAMAN PRIBADI
Pengalaman
Sertifikasi
Keterangan
1. Brevet Pajak A & B Fakultas
Ekonomika dan Bisnis UKSW.
61
Tahun
2012
Pengalaman Organisasi
1. Divisi
Eksternal
Himpunan 2009
Mahasiswa Program Studi Kelompok
Studi Akuntansi – Senat Mahasiswa
Fakultas Ekonomika dan Bisnis
2. Divisi Internal Himpunan Mahasiswa 2010
Program
Studi
–
Akuntansi
Kelompok
Senat
Studi
Mahasiswa
Fakultas Ekonomika dan Bisnis.
Pengalaman Kerja
1. Asisten Dosen Aplikasi Spreadsheet 2011
Fakultas
Ekonomika
dan
Bisnis
UKSW
2. Asisten Dosen Aplikasi Spreadsheet 2012
dan Pengantar Akuntansi Fakultas
Ekonomika dan Bisnis UKSW
Kepanitiaan
1. Panitia Accounting Fair “Globalisasi
2009
Akuntansi dan Penguatan Usaha
Kecil Menengah di Indonesia”
2. Panitia Seminar Nasional “Kode Etik
2009
Profesi Akuntan Publik”
3. Sekretaris National Seminar on
2010
Accounting “Peran Akuntansi Dalam
Pemberantasan Korupsi”
4. Ketua National Seminar on
2011
Accounting “ Penyusunan Laporan
Keuangan Berbasis SAK 2010”
5. Ketua National Seminar on
2011
Accounting “ Penyusunan Laporan
Keuangan Berbasis SAK ETAP”
6. Panitia Makrab Ekonomi, “Economic
Goes To The World”.
62
2011
Seminar dan Pelatihan
1. Golden 2008 ( Program Pengenalan
2008
Fakultas )
2. Talk Show Fakultas Ekonomika dan
2008
Bisnis
3. Latihan Kepemimpinan Pra Dasar
2008
Mahasiswa
4. Seminar Kerohanian “Keluargaku,
2009
Penting nggak sih?”
5. Accounting Weekend Fellowship
2009
2008 ( Pengenalan Program Studi dan
Keakraban Mahasiswa Program
Studi)
6. Kegiatan Pelestarian Budaya Melalui
2010
“NOANCEP”
7. Kuliah Umum “Asuransi Sebagai
2010
Pilihan Investasi”
8. Kegiatan Basic Leadership Training
2010
“Prepare Future Leaders In Creative
and Innovative”
9. Seminar Nasional Kewirausahaan
2011
“Great Man Have a Great Mind”
10. Sosialisasi Undang – Undang No. 21
2012
Tahun 2011 Tentang Otoritas Jasa
Keuangan
Keterampilan
Penunjang
1. Konser Kursus Ke – 13 Fakultas Seni
2010
Pertunjukan UKSW
2. Konser Kursus Fakultas Seni
Pertunjukan UKSW “Brighten Your
Day With Music”
63
2012
Contoh Jurnal – jurnal yang terkait dengan Pengakuan Pendapatan
MEMORIAL VOUCHER
PT. RANTE MUTIARA INSANI
MEMORIAL VOUCHER
NO. VOUCHER M-ABC0001
DATE
01.02.12
-
NO.
1
DESCRIPTION
ACCOUNT
AR. PT ABC
AR. PT ABC / PPh 23
DEBET
10.500.000
500.000
Over Bourden
Coal Hauling
Coal Getting
PPN Out
001/INV/RMI-ABC/I/2012
3.000.000
5.000.000
2.000.000
1.000.000
Periode : January-12
TOTAL
PROPOSED BY
KREDIT
CHECKED BY
11.000.000
APPROVED BY
11.000.000
INPUT BY
NO. VOUCHER M-ABC0002
DATE
01.02.12
PT. RANTE MUTIARA INSANI
MEMORIAL VOUCHER
NO.
1
DESCRIPTION
ACCOUNT
AR. PT ABC
AR. PT ABC / PPh 23
DEBET
15.750.000
750.000
Rental Unit Komatsu D85
PPN Out
002/INV/RMI-ABC/I/2012
Periode : January-12
15.000.000
1.500.000
TOTAL
PROPOSED BY
KREDIT
CHECKED BY
16.500.000
APPROVED BY
16.500.000
INPUT BY
NO. VOUCHER M-ABC0003
DATE
01.02.12
PT. RANTE MUTIARA INSANI
MEMORIAL VOUCHER
NO.
1
DESCRIPTION
ACCOUNT
AR. PT ABC
AR. PT ABC / PPh 23
DEBET
21.000.000
1.000.000
Pembuatan Bundwall, Parking Bay
PPN Out
003/INV/RMI-ABC/I/2012
Periode : January-12
20.000.000
2.000.000
TOTAL
PROPOSED BY
KREDIT
CHECKED BY
22.000.000
APPROVED BY
44
INPUT BY
22.000.000
BANK VOUCHER
PT. RANTE MUTIARA INSANI
BANK VOUCHER
NO. VOUCHER
DATE
:
B01-0001
: 15.03.12
-
NO.
1
DESCRIPTION
ACCOUNT
Bank Sendiri Tanjung
AR. PT ABC
001/INV/RMI-ABC/I/2012
002/INV/RMI-ABC/I/2012
003/INV/RMI-ABC/I/2012
TOTAL
DEBET
KREDIT
49.500.000
49.500.000
45
11.000.000
16.500.000
22.000.000
49.500.000
Lampiran 2
Format Laporan Laba Rugi PT. RMI
PT. RANTE MUTIARA INSANI
LABA RUGI
Periode 31 Desember 20X1
Nilai
%
(Bulan Berjalan)
Pendapatan
Jasa Pertambangan
Pendapatan Proyek
Pendapatan Rental
Nilai
(Kumulatif)
Total Pendapatan
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Biaya Operasional Proyek
Biaya Operasional Proyek
Beban Operasional Langsung
Total Biaya Operasional Proyek
Laba / Rugi Operasional
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Biaya Operasional Umum
Beban Usaha
Biaya Operasional Umum
Total Biaya Operasional Umum
Laba / Rugi Operasional
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Pendapatan dan Beban Lain – lain
Pendapatan dan Beban Lain - lain
Pendapatan Bunga
Pendapatan Lain – lain
Laba Selisih Kurs
Rugi Selisih Kurs
Beban Bunga
Biaya Lain – lain
Total Pendapatan dan Beban Lain - lain
xxxx
xxxx
xxxx
(xxxx)
(xxxx)
(xxxx)
xxxx
xxxx
xxxx
xxxx
(xxxx)
(xxxx)
(xxxx)
xxxx
Laba Rugi Sebelum Pajak
xxxx
xxxx
Biaya Pajak
Biaya Pajak
Biaya Pajak (PPH 29)
Total Biaya Pajak
xxxx
xxxx
xxxx
xxxx
Laba Rugi Bersih
xxxx
xxxx
46
%
Lampiran 3
rmi
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
Contoh Matrik Harga Produksi
OB RATES FOR MONTHLY PRODUCTION (US $)
TABEL 1 :
VERTICAL DISTANCE (M)
HORIZONTAL DISTANCE (M)
500
1.000
1.500
2.000
2.500
3.000
3.500
0
1,00
1,10
1,20
1,30
1,40
1,50
1,60
10
1,02
1,12
1,22
1,32
1,42
1,52
1,62
20
1,04
1,14
1,24
1,34
1,44
1,54
1,64
30
1,06
1,16
1,26
1,36
1,46
1,56
1,66
40
1,08
1,18
1,28
1,38
1,48
1,58
1,68
50
1,20
1,30
1,40
1,50
1,60
1,70
60
1,22
1,32
1,42
1,52
1,62
1,72
70
1,34
1,44
1,54
1,64
1,74
80
1,36
1,46
1,56
1,66
1,76
90
1,38
1,48
1,58
1,68
1,78
100
1,40
1,50
1,60
1,70
1,80
47
Lampiran 4
rmi
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
Paringin, 9 Februari 2012
CONTOH
: 001/INV/RMI-ABC/II/12
: 1. Invoice
2. Kwitansi
3. Faktur Pajak
: Permintaan Pembayaran
Overburden, Coal Mining dan Coal Hauling to Kelanis
Nomor
Lampirann
Perihal
Kepada Yth,
PT. ABC Indonesia
Jalan Patimura, Blok 5, Kav 1-2
Salatiga, Indonesia.
Dengan hormat,
Bersama dengan ini kami sampaikan bahwa pekerjaan untuk bulan Januari 2012
telah selesai kami kerjakan.
Maka dengan ini kami mengajukan permintaan pembayaran sebesar :
Terbilang : Dua puluh dua milyar sembilan ratus lima puluh lima juta dua ratus
delapan puluh empat ribu dua ratus tujuh puluh lima rupiah
Mohon supaya ditransfer ke rekening kami A/C No. 031.009.653.0038 pada Bank
Sendiri Cabang Tanjung A/N PT. Rante Mutiara Insani.
Demikian dari kami, atas perhatian dan persetujuan dari Bapak kami ucapkan
terima kasih.
Hormat kami,
PT. Rante Mutiara Insani
Guno Gumilang
Operation Manager
48
Lampiran 5
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
rmi
Invoice
: 001/INV/RMI-ABC/II/12
CONTOH
PRODUCTION PAYMENT SUMMARY
Period : Januari 2012
No
A
1
Amount IDR
Description
PARINGIN PIT
Overburden
((300,000 BCM x $ 1,00 ) + ( 200,000 BCM x $ 1,50)) x Rp.
2.850.300.000
9.500
2
Coal Mining
11.875.000
1000 TON x $ 1,25 x Rp. 9.500
3
Coal Hauling
((1000 TON x $0 ,50 ) + ( $ 0,40 x 1000 TON x 5.000 KM)) x
19.000.000.500
Rp. 9.500
SUBTOTAL 21.862.175.500
PPN 5% 1.093.108.775
TOTAL 22.955.284.275
Tanjung, 9 Februari 2012
PT. ABC INDONESIA
Approved By,
PT. ABC INDONESIA
Approved By,
PT. RANTE MUTIARA INSANI
Approved By,
SURYONO
General Operation Manager
MUSLIH
Deputy GM. Strategic Planing
GUNO GUMILANG
Operation Manager
49
Lampiran 6
rmi
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
KWITANSI
CONTOH
Sudah terima dari
: PT. ABC INDONESIA
Banyaknya uang
: Dua puluh dua milyar sembilan ratus lima puluh lima juta
dua ratus delapan puluh empat ribu dua ratus tujuh puluh
lima rupiah
Untuk pembayaran : Pekerjaan Overburden, Coal Mining, dan Coal Hauling
bulan Februari 2012.
Rp.
Tanjung, 9 Februari 2012
PT. Rante Mutiara Insani
22.955.284.275
Guno Gumilang
Operation Manager
50
Lampiran 7
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
2023747
rmi
Invoice
: 001/INV/RMI-ABC/II/12
CONTOH
MINING SUMMARY SHEET
Period : Januari 2012
No
A.
1
Quantity
This Month
Year to Date
Description
PARINGIN PIT
Overburden Removal (BCM)
30,000
150,000
200,000
500,000
Paringin Mine
Transport Distance (m)
1,500
Vertical Distance (m)
45,00
2
3
1,000
Coal Mining(Ton)
Transport Distance (m)
3,000
Vertical Distance (m)
55,00
Coal Hauling(Ton)
1,000
Paringin Mine
1,000
Transport Distance (km)
PT. ABC INDONESIA
Checked By,
45,000
3,000
5,000
PT. RANTE MUTIARA INSANI
Checked By,
MUSLIH
Deputy GM. Strategic Planing
GUNO GUMILANG
Operation Manager
Date :
Date :
51
Lampiran 8
REKAPITULASI BIAYA PEKERJAAN
MINE INFRASTRUCTURE DEPARTMENT
Uraian Pekerjaan
: Capex
CONTOH
Cost Code
: 178.20.15
Periode
: 26 Januari s/d 25 Februari 2012
Nama Kontraktor
: PT. Rante Mutiara Insani
No.
1
Uraian Pekerjaan
Volume
Satuan
Harga Satuan
(Rp)
Jumlah Biaya
(Rp)
Haul Road Wara to North Tutupan
Compactor C150
Excavator CAT 330
150
jam
100.000
50
jam
50.000
2.500.000
17.500.000
Sub Total I
2
15.000.000
Haul Road HW Construction
Compactor C150
55
jam
100.000
Dump Truck CWB 340
35
jam
25.000
5.500.000
875.000
6.375.000
Sub Total II
3
Public Road Highwall Relocation
Compactor C150
25
jam
100.000
2.500.000
Backhoe JCB/MF 02
45
jam
35.000
1.575.000
Sub Total III
4.075.000
SUB TOTAL
27.950.000
PPn 5%
1.397.500
TOTAL
29.347.500
Supplied by,
Approved by,
PT. Rante Mutiara Insani
PT. ABC Indonesia
Guno Gumilang
Hendra
Operation Manager
Mine Civilwork Superintendent
52
Keterangan
Lampiran 9
Monthly Equipment Time Sheet
Periode : 01 – 31 Januari 2012
PT. Rante Mutiara Insani
Job Site
: PT. ABC Indonesia
Unit Produksi : Kobelco SK 330
Contract No
: 001/ABC/K/MAT/I/2012
Salatiga, 1 Februari 2012
Dibuat Oleh,
PT. Rante Mutiara Insani
Guno Gumilang
Operation Manager
CONTOH
Equipment No : XE 100 S
Serial No
:-
Disetujui Oleh,
PT. ABC Indonesia
Disetujui Oleh,
PT. ABC Indonesia
Putra
Coal Transport Section Head
Atma
Enginering Manager
53
Lampiran 10
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
2023747
rmi
CONTOH
BERITA ACARA PRODUKSI
No: 001/BAP/RMI-ABC/I/12
Period
: Januari 2012
Contact No : 001/ABC/K/MAT/I/2012
No
1
Total
WH
Description
Price/WH
(USD)
50,00
20,00
Sub Total
PPN 10%
Grand Total
Excavator Kobelco EX 100 s
Ammount
(USD)
1,000
1,000
100
1,100
Salatiga, 1 Februari 2012
PT. ABC INDONESIA
Approved By,
PT. RANTE MUTIARA INSANI
Prepared By,
SAPTO
Production Manager
GUNO GUMILANG
Operation Manager
54
Lampiran 11
CONTOH
55
Lampiran 12
BERITA ACARA JOINT SURVEY
PT. ABC INDONESIA
DENGAN
PT. RANTE MUTIARA INSANI
PROGRESS : JANUARI 2012
CONTOH
Pada hari ini, Senin tanggal 1 bulan Februari tahun 2012. Telah dilaksanakan
penandatanganan berita acara joint survey over burden removal dengan penjelasan
sebagai berikut :
-
-
Berdasarkan
: Perjanjian jasa penambangan batubara tanggal
1 januari 2008 antara PT. ABC Indonesia
dengan PT. Rante Mutiara Insani
Progress pekerjaan
: Januari 2012
Pelaksanaan joint survey : 31 Januari 2012
Volume OB removal
: 100,000.00
bcm
Jarak angkut OB
: 1000
m
Volume coal getting
: 10,000
ton
Jarak angkut batubara
: 8.000
km
Terlampir peta progress dan data pendukung lainnya.
Demikian berita acara ini dibuat dengan sesungguhnya untuk dapat dipergunakan
sebagaimana perlunya.
PT. Rante Mutiara Insani
PT. ABC Indonesia
Muchlis Abduloh
Deputy Operation Manager
Susilo Husodo
Prod. Eng. Section Head
Mengetahui,
Sandoro Adi Prakoso
Operation Manager
56
Lampiran 13
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
rmi
Invoice
: 001/INV/RMI/ABC/MINING/I/2012
SARAN
PRODUCTION PAYMENT SUMMARY
Period : Januari 2012
No
Job Description
Volume
Unit
Rate
Total
1
Over Burden
100
Ton
(Rp)
100.000
(Rp)
10.000.000
2
Coal Mining
500
Ton
150.000
75.000.000
3
Coal Hauling
100
Ton
50.000
5.000.000
Transportation
5000
Ton/Km
10.000
50.000.000
Sudirman PIT
(100 Ton x 50Km )
140.000.000
7.000.000
147.000.000
SUBTOTAL
PPN 5%
GRAND TOTAL
Tanjung, 9 Februari 2012
PT. ABC INDONESIA
Approved By,
PT. ABC INDONESIA
Approved By,
PT. RANTE MUTIARA INSANI
Approved By,
SURYONO
General Operation Manager
MUSLIH
Deputy GM. Strategic Planing
GUNO GUMILANG
Operation Manager
57
Lampiran 14
rmi
Invoice
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
: 001/INV/RMI/ABC/CONST/I/2012
SARAN
Working Summary Sheet
Period : Januari 2012
No
Job Description
Volume
Unit
1
Perbaikan jalan
Rate
Total
20
Km
(Rp)
100.000
5000
M3
50.000
Sudirman PIT
(Rp)
2.000.000
250.000.000
menuju lokasi
tambang Sudirman
PIT
2
Pembuatan Kolam
Penampungan air
252.000.000
12.600.000
264.600.000
SUBTOTAL
PPN 5%
GRAND TOTAL
Tanjung, 9 Februari 2012
PT. ABC INDONESIA
Supplied By,
PT. RANTE MUTIARA INSANI
Approved By,
SURYONO
Mine Civilwork Superintenden
GUNO GUMILANG
Operation Manager
58
Lampiran 15
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
2023747
rmi
SARAN
PRODUCTION SUMMARY
No: 001/BAP/RMI/ABC/RENT/I/2012
Working Period
: Januari 2012
Contract Number
:-
Invoice Number
: 001/INV/RMI/ABC/RENT/I/2012
No
1
Total
WH
Unit Used
Price/WH
(Rp)
50,00
100.000
Sub Total
PPN 10%
Grand Total
Excavator Kobelco EX 100 s
Total
(Rp)
5.000.000
5.000.000
500.000
5.500.000
Salatiga, 1 Februari 2012
PT. ABC INDONESIA
Approved By,
PT. RANTE MUTIARA INSANI
Prepared By,
SAPTO
Production Manager
GUNO GUMILANG
Operation Manager
59
Lampiran 16
60
Lampiran 17
DAFTAR RIWAYAT HIDUP
Nama Lengkap
:
Mahatma Hendranata Saputra
Jenis Kelamin
:
Laki-laki
Tempat/Tanggal Lahir :
Boyolali, 19 Januari 1990
Agama
:
Kristen
Alamat Domisili
:
Jalan Perintis Kemerdekaan, Bangunharjo,
RT 07 RW II, Bangunharjo, Pulisen,
Boyolali
Status
:
Belum Kawin
Telp.
:
085643747539
:
mahatma_hs@yahoo.com
Nama Ayah
:
Hendratmoko
Nama Ibu
:
Sri Rahayuningsih
Nama Orang Tua
INFORMASI PENDIDIKAN
Pendidikan
Kota
Tahun Lulus
SD Pulisen
Boyolali
2002
SMP
SMP Negeri 1
Boyolali
2005
SMA
SMA Negeri 1
Boyolali
2008
IPS
Universitas Kristen
Satya Wacana
Salatiga
2012
Akuntansi
SD
S1
Nama Institusi
Jurusan
PENGALAMAN PRIBADI
Pengalaman
Sertifikasi
Keterangan
1. Brevet Pajak A & B Fakultas
Ekonomika dan Bisnis UKSW.
61
Tahun
2012
Pengalaman Organisasi
1. Divisi
Eksternal
Himpunan 2009
Mahasiswa Program Studi Kelompok
Studi Akuntansi – Senat Mahasiswa
Fakultas Ekonomika dan Bisnis
2. Divisi Internal Himpunan Mahasiswa 2010
Program
Studi
–
Akuntansi
Kelompok
Senat
Studi
Mahasiswa
Fakultas Ekonomika dan Bisnis.
Pengalaman Kerja
1. Asisten Dosen Aplikasi Spreadsheet 2011
Fakultas
Ekonomika
dan
Bisnis
UKSW
2. Asisten Dosen Aplikasi Spreadsheet 2012
dan Pengantar Akuntansi Fakultas
Ekonomika dan Bisnis UKSW
Kepanitiaan
1. Panitia Accounting Fair “Globalisasi
2009
Akuntansi dan Penguatan Usaha
Kecil Menengah di Indonesia”
2. Panitia Seminar Nasional “Kode Etik
2009
Profesi Akuntan Publik”
3. Sekretaris National Seminar on
2010
Accounting “Peran Akuntansi Dalam
Pemberantasan Korupsi”
4. Ketua National Seminar on
2011
Accounting “ Penyusunan Laporan
Keuangan Berbasis SAK 2010”
5. Ketua National Seminar on
2011
Accounting “ Penyusunan Laporan
Keuangan Berbasis SAK ETAP”
6. Panitia Makrab Ekonomi, “Economic
Goes To The World”.
62
2011
Seminar dan Pelatihan
1. Golden 2008 ( Program Pengenalan
2008
Fakultas )
2. Talk Show Fakultas Ekonomika dan
2008
Bisnis
3. Latihan Kepemimpinan Pra Dasar
2008
Mahasiswa
4. Seminar Kerohanian “Keluargaku,
2009
Penting nggak sih?”
5. Accounting Weekend Fellowship
2009
2008 ( Pengenalan Program Studi dan
Keakraban Mahasiswa Program
Studi)
6. Kegiatan Pelestarian Budaya Melalui
2010
“NOANCEP”
7. Kuliah Umum “Asuransi Sebagai
2010
Pilihan Investasi”
8. Kegiatan Basic Leadership Training
2010
“Prepare Future Leaders In Creative
and Innovative”
9. Seminar Nasional Kewirausahaan
2011
“Great Man Have a Great Mind”
10. Sosialisasi Undang – Undang No. 21
2012
Tahun 2011 Tentang Otoritas Jasa
Keuangan
Keterampilan
Penunjang
1. Konser Kursus Ke – 13 Fakultas Seni
2010
Pertunjukan UKSW
2. Konser Kursus Fakultas Seni
Pertunjukan UKSW “Brighten Your
Day With Music”
63
2012