Analisa Perencanaan Sistem Pengkondisian Udara Untuk Kapal FPB 28 BC - ITS Repository

TUG AS AKHIR
(KS 1701 )

ANALISAPERENCANAAN
SISTEM PENGKONDISIAN UDARA
UNTUK KAPAL FPB 28 BC

Oisusun oleh :

NAJAMUDDIN
42 00 109 602

JURUSAN TEKNIK SISTEM PERKAPALAN
FAKULTASTEKNOLOGIKELAUTAN
INSTITUT TEKNOLOGl SEPULUH NOPEMBER
_____________,
SURAB!Y~

p~tPV:iTAKN

2004


s
-=-----t
f - & . 1--VZJ 'I

1 1'

J
tZll:..;- -t,__,.:_ A ;_ I -:
·;;;;:i· ?-~or

Tfl . 1'cdi'!MI

,.t~

~- N:A";.

~-1

9'1


JURUSAN TtKNII< SI S1'tM PERKAPALAN
~A

K ULTASE

KN

OLG

IK

ELAUTN

INSTITUT TEKNOLOGI SEPULUH NOPE'-•tBER SURABA VA

LEMBAR PENGESAHAN TUGAS AKHIR
ANA LISA PERENCANAAN SISTEM
PENGKONDISIAN UDARA UNTUK KAPAL FPB 28 BC


Diajukan guna memcnuhi salah satu persyaratan untuk mendapatkan gelar Sarjana Teknik pada
Jurusan Teknik Sistem Pcrkapalan Fakultas Teknologi Kelautan lnstitut Teknologi Sepuluh
Nopember Surahaya

Mt'ngetahui dan disetujui :

Oose n Pembimblng I

l)ose n Peni bimbing II

Jr. Alam Baheramsyah, M.Sc
NIP.

1 3196~

NIP. 130 816 215

,,

I


JURUSAN T£KNIK SISTEM P£RKAPALAN
FAKULTASTEKNOLOOI K ELAUTAN
INSTITUT TEKNOLOOI SEPULUH NOPEMBER SURABA VA

SURAT KEPUTUSAN PENGERJAAN TUGAS AKHIR KS 1701
Sebagai salah satu syarat untuk mendapatkan gelar Sarjana Teknik Sistem Perkapalan Fakultas Teknologe
Kelautan ITS. maka perlu diterbitkan Sural Keputusan Pengerjaan Tugas Akhir yang memberikan tugas kepada
mahasiswa tersebut di bawah untuk mengerjakan Tugas sesuai judul dan lingkup bahasan yang ditentukan
Nama Mabasis10a

: Najamuddin

NRP

: 4200 109 602

Ooseu Pe mbimbing

: I. Jr. Alam Baherams)'ah. M.&


2. lr. Tjoek Soeprajitno
Tanggal Oiberiknn Tugas

: 30 September 2003

Tllngg:el Oisclcsaikan Tu~tns

: 02 Agustus 2004

Judul Tugns Al,hir

: An;l lisn Pcrencanaan Sistem Pengkondisi:en
Udara llntuk Kapal FPR 28 RC

Suraba)a.

1004

Kctua Jurusun Tcknik Sistcm


Surabaya.

2004

Yang menerima tugas

/
NR.P. 4200 109 602

NIP. 131 993 365

'"

'' (J)an rtufianmu tefali memerintalik,an supaya
k,amu Janean menyem6ali sefain CDia d'an
liend'ak,[afi ~mu
6er6uat 6a~
pda i6u 6apaftmu
aenean se6aif&~ny

...
CDan rend'ali~f
tfirimu ter!Uufap mer~
6eraua aenean penuli k,asili sayane aan
ucapf(_anfali :
Wafiai rtufianf(_u, k,asifianifali
mer~
fi..§auanya, se6agaimana mer~
6eraua
te[afi mendUiiftak_u wafJu RJcif ~.
11

';I£ . Israa 23 - 24'

Persem6afiank,u :
Vntu/{)4.yafiarufa dan I6urufa tercinta
Serta Orang yang pafing 'l(usayangi

ABSTRACT


ABSTRACT

The FPB 28 IJC owned by Bea and Cukai where built in 1981
was equipped ventilation system with fan in dueling system to distribute
air in accommodation rooms. Because there are mairy heating source to
increase air temperature in rooms, so it need an air conditioning system
to create a comfortable and a healthy condition for ship crews.
In planning uf the air conditioning system, it search all data
about to count a result of heating source where influence the rooms. The
next action will get a result of power capacities of the system where
needed, and so the practice in use the system between central and split
system of air conditioning.
hom the

SUIIIIIIlll)

ana(v:e where done, can be found a resiilt of

sensrble calor 7,2 kll and latent calor 0. 7 kfV from all the rooms then a
pou er capacrties of system where needed 3, 7 kll'. Also estimatmg tire

cost of system along operated. and so can make sure the system where
used hm·i11g a ci~d'.tg.u ruang kontor dunana terdap:~•"

~

,mg te!ah
d1~ebutkan,

maka d1dalam
pemo~han

dapat

\ang c1bu tuhl..an schtngga darm berja:an dc-ngan raik dan dapat

kebuwhan s.:pcm yang diharapkan

Tt>knik .n:o/:on - I=TK- IT.

P~r!ntula

t~n;

- \"olume mangan (ln'l

P~it.omcrk

Scna h.apasitas ?endingin

J'>lklnnetnk b p~ndm'la

Tekmk Sistem Petkapalan- FTK- ITS

tlll!Uk mcndapatkan e:ambaran yang lebih
udara. Langkah-langkah dalam