GAMBARAN UMUM PROYEK PENGURUGAN BALEKAMB
GAMBARAN UMUM PROYEK PENGURUGAN
BALEKAMBANG MAJALAYA
OWNER
MAIN KONTRAKTOR
PEMBAYARAN
VOLUME KONTRAK :
:
: PT.
PT.
: PER …………….. M 3. (SKBDN / BANK GARANSI)
144.000 M 3 .
ATAU
HARGA KONTRAK
: Rp.
6,000 DUMP/RITASE
60,000.00
/ M 3 . PADAT VIBRO
RENCANA ANGGARAN PELAKSANAAN ( PER M3. )
BIAYA RITASI DT & QUARRY :
1. SEWA DUMP TRUCK
= Rp.
2. BIAYA BBM DT
= Rp.
3. BIAYA SUPIR DT
= Rp.
4. DEPOSIT TANAH
= Rp.
5. SEWA EXCAVATOR
= Rp.
6. BIAYA BBM ALAT
= Rp.
7. BIAYA OPERATOR ALAT
= Rp.
BIAYA PEMADATAN :
1. SEWA VIBRO & BULDOZER
= Rp.
2. BIAYA BBM ALAT
= Rp.
3. BIAYA OPERATOR ALAT
= Rp.
BIAYA UMUM & ADMIN. :
1. BIAYA KOORDINASI & PENGAMANAN RUTE JALAN
2. BIAYAPERSIAPAN / PENDAHULUAN PROYEK :
= Rp.
3. BIAYA PEGAWAI (KOORDINATOR, CHECKER DLL = Rp.
4. BEBAN KOMPENSASI TERHADAP MASYARAKAT S = Rp.
33,333
2,500
1,531
347
2,000
382
347
5,000
JUMLAH
= Rp.
45,441
PROFIT
= Rp.
14,559
JUMLAH
= Rp.
60,000
CATATAN : PROFIT
Rp
14,559 /M3.
BELUM TERMASUK UNTUK FEE SUKSES PHK MEDIASI
ASUMSI - ASUMSI :
WAKTU PELAKSANAAN :
VOLUME KONTRAK
1. EXCAVATOR (BEKO)
KEMAMPUAN ALAT (EXCAVATOR)
GALI/MUAT PER HARI = 10 JAM
JML PEMAKAIAN ALAT
GALI/MUAT PER HARI = 10 JAM
JML WAKTU PELAKSANAAN
2. DUMP TRUCK :
Kapasitas Dump truk
Frequensi Dump Truk
Jumlah armada
Frequensi tiap 1 DT
:
3
144,000 M .
50
500
10
5,000
M3./JAM
M3.
UNIT
M3.
29 HARI
1 BULAN
24
208
24
9
m3/DT
trip/hari
DT
trip
WAKTU SIKLUS ALAT/DT :
1. EXCAVATOR (BEKO)
Kapasitas Bucket
Kapasitas Produksi Per Jam
Jumlah Jam Kerja
Jumlah Produksi/Alat
Jumlah Pemakaian Alat
Jumlah Produksi Per Hari
1.2
50
10
500
2
1,000
M3.
M3.
Jam
M3.
Unit
M3.
2. DUMP TRUCK :
Jarak Tempuh
Waktu muat dan manouver
Kecepatan (dgn muatan)
Waktu tempuh (dgn muatan)
Waktu bongkar dan manouver
Kecepatan (tanpa muatan)
Waktu tempuh (tanpa muatan)
Jml Waktu Bongkar/Muat/Perjalanan
Jumlah trip tiap jam
Jam kerja per hari
Total trip per hari (real time)
Total daya angkut per hari/DT
Target Volume Angkut per hari
Jumlah Dump Truk yg diperlukan
20
15
20
30
5
30
20
70
0.86
1.17
10
9
km
menit
km/jam
menit
menit
km/jam
menit
menit/trip
trip/jam
jam/trip
jam/hari
trip/hari
206 m3 /hr/DT
3
5,000 m
24 Unit DT
PREDIKSI PELAKSANAAN PEKERJAAN PENGURUGAN :
1
PEKERJAAN PERSIAPAN :
-
2
DIREKSI KEET / SITE OFFICE
MOBILISASI DAN DEMOBILISASI PERLATAN & PERSONIL
PENGUKURAN LEVELING TANAH DASAR
PEMBUATAN JALAN AKSES DARI QUARRY KE JALAN UMUM
PEKERJAAN PEMATANGAN LAHAN SEPANJANG DAERAH TIMBUNAN TANAH :
-
PEMBONGKARAN TERHADAP PENGHALANG YANG MUNGKIN ADA
MEMINDAHKAN DAN MENANGANI AIR YANG ADA AGAR TIDAK TERHENTI
MEMBUANG DAN MENANGANI LOKASI TIMBUNAN TANAH YANG BERLUMPUR
MENGHENTIKAN / MENYUMBAT SUMBER AIR TANAH YANG TIMBUL APABILA ADA
3
PEKERJAAN PEMADATAN TANAH DASAR SEPANJANG LOKASI KERJA
4
PEKERJAAN PENIMBUNAN TANAH DAN PEMADATAN
- SETIAP PENGHAMPARAN 30 CM. ATAU SESUAI KETENTUAN YANG ADA DALAM
SPESIFIKASI YANG DIKELUARKAN PIHAK OWNER DAN ATAU STANDAR PT. ………………………..
5
PEKERJAAN COMMISIONING TEST PEMADATAN DENGAN MENGGUNAKAN PERALATAN
SAND CONE DAN ATAU SHEEP FOOT ROLLER SAMPAI DENGAN MEMENUHI TINGKAT
KEPADATAN DAN DAYA DUKUNG YANG DITETAPKAN SESUAI PERATURAN
PERALATAN YANG DIGUNAKAN :
1
2
3
4
5
6
EXCAVATOR
DUMP TRUCK
BULDOZER
COMPACTOR / VIBRO ROLLER
TRUCK TANGKI AIR
PERALATAN PENDUKUNG LAINNYA
BANDUNG, AGUSTUS 2016
ENGINEERING
RENCANA ANGGARAN PENDAPATAN DAN BIAYA OPERASIONAL
BALEKAMBANG-MAJALAYA
I.
PENDAPATAN :
NILAI KONTRAK PENGURUGAN TANAH MERAH : 144.000 M3. x Rp. 60.000 ,-
II.
= Rp.
8,640,000,000
= Rp.
4,800,000,000
= Rp.
-
BIAYA OPERASIONAL (PENGELUARAN PROYEK) :
A.
BIAYA RITASE DUMP TRUCK + TANAH
1
DUMP TRUCK :
SEWA
BBM
SUPIR
2
: Rp. 800.000,- x 6.000 Ritase
4,800,000,000
-
EXCAVATOR :
SEWA
BBM
OPERATOR
3
= Rp.
= Rp.
= Rp.
: 2 UNIT x 500 JAM x Rp. 170.000,- / JAM
: 20 LTR x 500 JAM x 10 UNIT x Rp. 7.000,: Rp. 350.000,-/HARI x 44 HARI x 2 UNIT
= Rp.
= Rp.
= Rp.
-
PEMBELIAN TANAH MERAH :
:
9.200 DUMP (RIT) x Rp. 350.000,-/DUMP
JUMLAH BIAYA RITASE DUMP TRUCK DAN TANAH :
B.
4,800,000,000
= Rp.
360,000,000
= Rp.
220,500,000
SEWA ALAT :
- BULDOZER D6
- COMPACTOR/VIBRO R.
- TRUK TANGKI AIR
2
3
: 2 UNIT x 500 JAM x Rp. 245.000,-/JAM
: 1 UNIT x 500 JAM x Rp. 190.000,-/JAM
: 1 UNIT x Rp. 20.000.000,- x 1 BULAN
= Rp.
= Rp.
= Rp.
245,000,000
95,000,000
20,000,000
BBM ALAT :
- BULDOZER D6
- COMPACTOR/VIBRO R.
- TRUK TANGKI AIR
: 20 LTR x 500 JAM x 2 UNIT x Rp. 7.000,: 15 LTR x 500 JAM x 1 UNIT x Rp. 7.000,: 80 LTR x 50 HARI x 1 UNIT x Rp.7 .000,-
= Rp.
= Rp.
= Rp.
140,000,000
52,500,000
28,000,000
OPERATOR ALAT :
- BULDOZER D6
- COMPACTOR/VIBRO R.
- TRUK TANGKI AIR
: Rp. 250.000,-/HARI x 50 HARI x 2 UNIT
: Rp. 350.000,-/HARI x 50 HARI x 1 UNIT
: Rp. 250.000,-/HARI x 44 HARI x 2 UNIT
= Rp.
= Rp.
= Rp.
25,000,000
12,500,000
12,500,000
JUMLAH BIAYA PEMADATAN :
= Rp.
50,000,000
= Rp.
630,500,000
= Rp.
288,000,000
BIAYA KOORDINASI & PENGAMANAN RUTE JALAN
KOORDINASI & PENGAMANAN RUTE JALAN : 144.000 M3. x Rp. 2.000,-/M3.
D.
-
= Rp.
BIAYA PEMADATAN :
1
C.
= Rp.
BIAYA PERSIAPAN / PENDAHULUAN PROYEK :
1
2
3
4
5
6
BIAYA
BIAYA
BIAYA
BIAYA
BIAYA
BIAYA
PEMBUATAN DIREKSI KIT / SITE OFFICE
MOBILISASI DAN DEMOBILISASI PERALATAN & PERSONIL
PENGUKURAN LEVELING TANAH DASAR
BIKIN JALAN AKSES DARI QUARRY KE JALAN UMUM
PEMATANGAN LAHAN SEPANJANG LOKASI KERJA
OVERHEAD PROYEK, BIAYA COMMISIONING TEST PEMADATAN DAN BIAYA TAK TERDUGA LAINNYA
JUMLAH BIAYA PERSIAPAN / PENDAHULUAN PROYEK :
REKAPITULASI :
PENDAPATAN :
= Rp.
8,640,000,000
=
=
=
=
=
=
4,800,000,000
630,500,000
288,000,000
55,000,000
50,000,000
720,000,000
BIAYA OPERASIONAL (PENGELUARAN PROYEK) :
A.
B.
C.
D.
E.
F.
JUMLAH BIAYA RITASE DUMP TRUCK DAN QUARRY
JUMLAH BIAYA PEMADATAN
JUMLAH BIAYA KOORDINASI & PENGAMANAN RUTE JALAN
JUMLAH BIAYA PERSIAPAN / PENDAHULUAN PROYEK :
BIAYA PEGAWAI (KOORDINATOR, CHECKER DLL)
JUMLAH BEBAN KOMPENSASI TERHADAP MASYARAKAT SEKITAR
KEUNTUNGAN KOTOR PROYEK :
NOTE : BELUM TERMASUK FEE SUKSES UNTUK PIHAK MEDIASI.-
BANDUNG, AGUSTUS 2016
ENGINEERING
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
= Rp.
6,543,500,000
= Rp.
2,096,500,000
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
55,000,000
-
= Rp.
55,000,000
BALEKAMBANG MAJALAYA
OWNER
MAIN KONTRAKTOR
PEMBAYARAN
VOLUME KONTRAK :
:
: PT.
PT.
: PER …………….. M 3. (SKBDN / BANK GARANSI)
144.000 M 3 .
ATAU
HARGA KONTRAK
: Rp.
6,000 DUMP/RITASE
60,000.00
/ M 3 . PADAT VIBRO
RENCANA ANGGARAN PELAKSANAAN ( PER M3. )
BIAYA RITASI DT & QUARRY :
1. SEWA DUMP TRUCK
= Rp.
2. BIAYA BBM DT
= Rp.
3. BIAYA SUPIR DT
= Rp.
4. DEPOSIT TANAH
= Rp.
5. SEWA EXCAVATOR
= Rp.
6. BIAYA BBM ALAT
= Rp.
7. BIAYA OPERATOR ALAT
= Rp.
BIAYA PEMADATAN :
1. SEWA VIBRO & BULDOZER
= Rp.
2. BIAYA BBM ALAT
= Rp.
3. BIAYA OPERATOR ALAT
= Rp.
BIAYA UMUM & ADMIN. :
1. BIAYA KOORDINASI & PENGAMANAN RUTE JALAN
2. BIAYAPERSIAPAN / PENDAHULUAN PROYEK :
= Rp.
3. BIAYA PEGAWAI (KOORDINATOR, CHECKER DLL = Rp.
4. BEBAN KOMPENSASI TERHADAP MASYARAKAT S = Rp.
33,333
2,500
1,531
347
2,000
382
347
5,000
JUMLAH
= Rp.
45,441
PROFIT
= Rp.
14,559
JUMLAH
= Rp.
60,000
CATATAN : PROFIT
Rp
14,559 /M3.
BELUM TERMASUK UNTUK FEE SUKSES PHK MEDIASI
ASUMSI - ASUMSI :
WAKTU PELAKSANAAN :
VOLUME KONTRAK
1. EXCAVATOR (BEKO)
KEMAMPUAN ALAT (EXCAVATOR)
GALI/MUAT PER HARI = 10 JAM
JML PEMAKAIAN ALAT
GALI/MUAT PER HARI = 10 JAM
JML WAKTU PELAKSANAAN
2. DUMP TRUCK :
Kapasitas Dump truk
Frequensi Dump Truk
Jumlah armada
Frequensi tiap 1 DT
:
3
144,000 M .
50
500
10
5,000
M3./JAM
M3.
UNIT
M3.
29 HARI
1 BULAN
24
208
24
9
m3/DT
trip/hari
DT
trip
WAKTU SIKLUS ALAT/DT :
1. EXCAVATOR (BEKO)
Kapasitas Bucket
Kapasitas Produksi Per Jam
Jumlah Jam Kerja
Jumlah Produksi/Alat
Jumlah Pemakaian Alat
Jumlah Produksi Per Hari
1.2
50
10
500
2
1,000
M3.
M3.
Jam
M3.
Unit
M3.
2. DUMP TRUCK :
Jarak Tempuh
Waktu muat dan manouver
Kecepatan (dgn muatan)
Waktu tempuh (dgn muatan)
Waktu bongkar dan manouver
Kecepatan (tanpa muatan)
Waktu tempuh (tanpa muatan)
Jml Waktu Bongkar/Muat/Perjalanan
Jumlah trip tiap jam
Jam kerja per hari
Total trip per hari (real time)
Total daya angkut per hari/DT
Target Volume Angkut per hari
Jumlah Dump Truk yg diperlukan
20
15
20
30
5
30
20
70
0.86
1.17
10
9
km
menit
km/jam
menit
menit
km/jam
menit
menit/trip
trip/jam
jam/trip
jam/hari
trip/hari
206 m3 /hr/DT
3
5,000 m
24 Unit DT
PREDIKSI PELAKSANAAN PEKERJAAN PENGURUGAN :
1
PEKERJAAN PERSIAPAN :
-
2
DIREKSI KEET / SITE OFFICE
MOBILISASI DAN DEMOBILISASI PERLATAN & PERSONIL
PENGUKURAN LEVELING TANAH DASAR
PEMBUATAN JALAN AKSES DARI QUARRY KE JALAN UMUM
PEKERJAAN PEMATANGAN LAHAN SEPANJANG DAERAH TIMBUNAN TANAH :
-
PEMBONGKARAN TERHADAP PENGHALANG YANG MUNGKIN ADA
MEMINDAHKAN DAN MENANGANI AIR YANG ADA AGAR TIDAK TERHENTI
MEMBUANG DAN MENANGANI LOKASI TIMBUNAN TANAH YANG BERLUMPUR
MENGHENTIKAN / MENYUMBAT SUMBER AIR TANAH YANG TIMBUL APABILA ADA
3
PEKERJAAN PEMADATAN TANAH DASAR SEPANJANG LOKASI KERJA
4
PEKERJAAN PENIMBUNAN TANAH DAN PEMADATAN
- SETIAP PENGHAMPARAN 30 CM. ATAU SESUAI KETENTUAN YANG ADA DALAM
SPESIFIKASI YANG DIKELUARKAN PIHAK OWNER DAN ATAU STANDAR PT. ………………………..
5
PEKERJAAN COMMISIONING TEST PEMADATAN DENGAN MENGGUNAKAN PERALATAN
SAND CONE DAN ATAU SHEEP FOOT ROLLER SAMPAI DENGAN MEMENUHI TINGKAT
KEPADATAN DAN DAYA DUKUNG YANG DITETAPKAN SESUAI PERATURAN
PERALATAN YANG DIGUNAKAN :
1
2
3
4
5
6
EXCAVATOR
DUMP TRUCK
BULDOZER
COMPACTOR / VIBRO ROLLER
TRUCK TANGKI AIR
PERALATAN PENDUKUNG LAINNYA
BANDUNG, AGUSTUS 2016
ENGINEERING
RENCANA ANGGARAN PENDAPATAN DAN BIAYA OPERASIONAL
BALEKAMBANG-MAJALAYA
I.
PENDAPATAN :
NILAI KONTRAK PENGURUGAN TANAH MERAH : 144.000 M3. x Rp. 60.000 ,-
II.
= Rp.
8,640,000,000
= Rp.
4,800,000,000
= Rp.
-
BIAYA OPERASIONAL (PENGELUARAN PROYEK) :
A.
BIAYA RITASE DUMP TRUCK + TANAH
1
DUMP TRUCK :
SEWA
BBM
SUPIR
2
: Rp. 800.000,- x 6.000 Ritase
4,800,000,000
-
EXCAVATOR :
SEWA
BBM
OPERATOR
3
= Rp.
= Rp.
= Rp.
: 2 UNIT x 500 JAM x Rp. 170.000,- / JAM
: 20 LTR x 500 JAM x 10 UNIT x Rp. 7.000,: Rp. 350.000,-/HARI x 44 HARI x 2 UNIT
= Rp.
= Rp.
= Rp.
-
PEMBELIAN TANAH MERAH :
:
9.200 DUMP (RIT) x Rp. 350.000,-/DUMP
JUMLAH BIAYA RITASE DUMP TRUCK DAN TANAH :
B.
4,800,000,000
= Rp.
360,000,000
= Rp.
220,500,000
SEWA ALAT :
- BULDOZER D6
- COMPACTOR/VIBRO R.
- TRUK TANGKI AIR
2
3
: 2 UNIT x 500 JAM x Rp. 245.000,-/JAM
: 1 UNIT x 500 JAM x Rp. 190.000,-/JAM
: 1 UNIT x Rp. 20.000.000,- x 1 BULAN
= Rp.
= Rp.
= Rp.
245,000,000
95,000,000
20,000,000
BBM ALAT :
- BULDOZER D6
- COMPACTOR/VIBRO R.
- TRUK TANGKI AIR
: 20 LTR x 500 JAM x 2 UNIT x Rp. 7.000,: 15 LTR x 500 JAM x 1 UNIT x Rp. 7.000,: 80 LTR x 50 HARI x 1 UNIT x Rp.7 .000,-
= Rp.
= Rp.
= Rp.
140,000,000
52,500,000
28,000,000
OPERATOR ALAT :
- BULDOZER D6
- COMPACTOR/VIBRO R.
- TRUK TANGKI AIR
: Rp. 250.000,-/HARI x 50 HARI x 2 UNIT
: Rp. 350.000,-/HARI x 50 HARI x 1 UNIT
: Rp. 250.000,-/HARI x 44 HARI x 2 UNIT
= Rp.
= Rp.
= Rp.
25,000,000
12,500,000
12,500,000
JUMLAH BIAYA PEMADATAN :
= Rp.
50,000,000
= Rp.
630,500,000
= Rp.
288,000,000
BIAYA KOORDINASI & PENGAMANAN RUTE JALAN
KOORDINASI & PENGAMANAN RUTE JALAN : 144.000 M3. x Rp. 2.000,-/M3.
D.
-
= Rp.
BIAYA PEMADATAN :
1
C.
= Rp.
BIAYA PERSIAPAN / PENDAHULUAN PROYEK :
1
2
3
4
5
6
BIAYA
BIAYA
BIAYA
BIAYA
BIAYA
BIAYA
PEMBUATAN DIREKSI KIT / SITE OFFICE
MOBILISASI DAN DEMOBILISASI PERALATAN & PERSONIL
PENGUKURAN LEVELING TANAH DASAR
BIKIN JALAN AKSES DARI QUARRY KE JALAN UMUM
PEMATANGAN LAHAN SEPANJANG LOKASI KERJA
OVERHEAD PROYEK, BIAYA COMMISIONING TEST PEMADATAN DAN BIAYA TAK TERDUGA LAINNYA
JUMLAH BIAYA PERSIAPAN / PENDAHULUAN PROYEK :
REKAPITULASI :
PENDAPATAN :
= Rp.
8,640,000,000
=
=
=
=
=
=
4,800,000,000
630,500,000
288,000,000
55,000,000
50,000,000
720,000,000
BIAYA OPERASIONAL (PENGELUARAN PROYEK) :
A.
B.
C.
D.
E.
F.
JUMLAH BIAYA RITASE DUMP TRUCK DAN QUARRY
JUMLAH BIAYA PEMADATAN
JUMLAH BIAYA KOORDINASI & PENGAMANAN RUTE JALAN
JUMLAH BIAYA PERSIAPAN / PENDAHULUAN PROYEK :
BIAYA PEGAWAI (KOORDINATOR, CHECKER DLL)
JUMLAH BEBAN KOMPENSASI TERHADAP MASYARAKAT SEKITAR
KEUNTUNGAN KOTOR PROYEK :
NOTE : BELUM TERMASUK FEE SUKSES UNTUK PIHAK MEDIASI.-
BANDUNG, AGUSTUS 2016
ENGINEERING
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
= Rp.
6,543,500,000
= Rp.
2,096,500,000
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
55,000,000
-
= Rp.
55,000,000