Index of /intel-research/silicon
I DF M a nufa c t uring
U pda t e
Brian L. Harrison
Corporate Vice President
General Manager
Fab/Sort Manufacturing
September 16, 2003
I nt e l’s M a nufa c t uring
Le a de rship
Scale
y Scale:
– Leading edge capacity, investment, & people
Agility
y Agility:
– Customer Responsiveness
Operational
Excellence
y Operational Excellence:
– Disciplined execution & continuous improvement
2
Scale
I nt e l’s M a nufa c t uring
Le a de rship
y Scale:
– Leading edge capacity, investment capability & people
3
Scale
I nt e l’s 3 0 0 m m Fa b Sit e s
Ireland
Fab 24
Oregon
D1C/D1D
New Mexico
Fab 11X
90nm
65nm
Dev
–Arizona Fab 12 announced as next
300mm fab for 65nm
4
Scale
I nt e l’s 3 0 0 m m fa bs
• D1C (OR)
• 130nm production running (yields > 200mm)
• 90nm process validated and shipping pre-production samples
• Fab 11X (NM)
• 130nm production running (yields > 200mm)
• 90nm tools & process in checkout (on track); production in Q4
• Fab 24 (IR)
• 90nm facility ready; installing tools (on track); production in
2004
• D1D (OR)
• 65nm facility and tools online; development underway (for
production in 2005)
• Fab 24 (IR) & Fab 12C (Arizona) are next in line for 65nm
production (specific schedule TBD)
5
I nt e l’s M a nufa c t uring
Le a de rship
Agility
y Scale:
– Leading edge capacity, investment capability & people
y Agility:
– Customer Responsiveness
6
N e w T e c hnology Ra m p Le a de rship
Agility
1 3 0 nm M a nufa c t uring Ca pa c it y
wspw
1 3 0 nm
Proc e ss
(3 0 0 m m )
Done
Done
F11X
1 3 0 nm
Proc e ss
Done Done
Done
Done Done
D2 F22
F20
F17 D1C
Other. 2
Other. 1
D2
Other. 3
0
Q1
Q2
Q3
2001
Q4
Q1
Q2
Q3
2002
Q4
Q1
Q2
Q3
Q4
2003
Intel estimates and public information
7
Agility
9 0 nm c a pa c it y ra m p
Ramping 90nm faster with only Three 300mm fabs!
Intel 0.13um
F24
(200mm
Equivalent)
WSPW
Intel 90nm
F11X
D1C
F11X
D1C
Q
Q+1
Q+2
Q+3
Q+4
Q+5
Q+6
Q+7
(Quarter in Ramp)
**Source: Intel Estimates
8
I nt e l’s M a nufa c t uring
Le a de rship
Operational
Excellence
y Scale:
– Leading edge capacity, investment capability & people
y Agility:
– Customer Responsiveness
y Operational Excellence:
– Disciplined execution & continuous improvement
9
Log (Die Yield)
Operational
Excellence
I nt e l Y ie ld M a t c hing T hrough
Copy Ex a c t ly
0.5 µm
(3 fabs)
0.25 µ m
(3 fabs)
0.35 µm
(3 fabs)
180 nm
130 nm
(5 fabs)
(4 fabs)
Month
10
Y ie ld T re nd
0.18µm
200mm
0.13µm
200mm
0.13µm
300mm
90nm
300mm
Defect
Density
(log scale)
1997
1998
1999
2000
2001
2002
2003
2004
90 nm defect reduction trend - our fastest ever
90 nm yields are now at HVM levels
11
Operational
Excellence
Copy Ex a c t ly! M e t hod
Product:
• Matching At All Levels
• Same Physical Inputs
• Statistically Matched
Responses (Outputs)
• Keeping Matched
•
•
•
•
Coordinated Changes
Audits
Process Control System
Joint Fab Mgmt Structure
-Yield
-Reliability
Module:
-CD’s
-Visual
-SEM
-Electrical
Equipment/Process:
-Etch/Dep Rates
-Particles
-Thicknesses
-Film Comp
Physical Inputs:
-Recipes
-Facilities
-Chemicals
-Gases
-Clean room
-Equipment
Better
Better Quality
Quality and
and Faster
Faster Improvements
Improvements
12
Sum m a ry
y Intel’s manufacturing leadership (through scale,
agility, and operational excellence) will enable a
rapid transition to our 90nm products
y 300mm capacity is coming on-line rapidly to support
Intel’s microprocessor roadmap
y Intel’s 90nm technology ramp is underway and on
track
13
14
Fa b1 1 X 9 0 nm St a t us
Inline Monitors
Monitor 4
Monitor 3
Monitor 2
Full Loop
Short route 1
Short route 2
D1C Mean
D1C Mean + 1.5s
Monitor 1
Scale
–All in-line monitors in Fab 11X looking
healthy: Technology is ready
15
U pda t e
Brian L. Harrison
Corporate Vice President
General Manager
Fab/Sort Manufacturing
September 16, 2003
I nt e l’s M a nufa c t uring
Le a de rship
Scale
y Scale:
– Leading edge capacity, investment, & people
Agility
y Agility:
– Customer Responsiveness
Operational
Excellence
y Operational Excellence:
– Disciplined execution & continuous improvement
2
Scale
I nt e l’s M a nufa c t uring
Le a de rship
y Scale:
– Leading edge capacity, investment capability & people
3
Scale
I nt e l’s 3 0 0 m m Fa b Sit e s
Ireland
Fab 24
Oregon
D1C/D1D
New Mexico
Fab 11X
90nm
65nm
Dev
–Arizona Fab 12 announced as next
300mm fab for 65nm
4
Scale
I nt e l’s 3 0 0 m m fa bs
• D1C (OR)
• 130nm production running (yields > 200mm)
• 90nm process validated and shipping pre-production samples
• Fab 11X (NM)
• 130nm production running (yields > 200mm)
• 90nm tools & process in checkout (on track); production in Q4
• Fab 24 (IR)
• 90nm facility ready; installing tools (on track); production in
2004
• D1D (OR)
• 65nm facility and tools online; development underway (for
production in 2005)
• Fab 24 (IR) & Fab 12C (Arizona) are next in line for 65nm
production (specific schedule TBD)
5
I nt e l’s M a nufa c t uring
Le a de rship
Agility
y Scale:
– Leading edge capacity, investment capability & people
y Agility:
– Customer Responsiveness
6
N e w T e c hnology Ra m p Le a de rship
Agility
1 3 0 nm M a nufa c t uring Ca pa c it y
wspw
1 3 0 nm
Proc e ss
(3 0 0 m m )
Done
Done
F11X
1 3 0 nm
Proc e ss
Done Done
Done
Done Done
D2 F22
F20
F17 D1C
Other. 2
Other. 1
D2
Other. 3
0
Q1
Q2
Q3
2001
Q4
Q1
Q2
Q3
2002
Q4
Q1
Q2
Q3
Q4
2003
Intel estimates and public information
7
Agility
9 0 nm c a pa c it y ra m p
Ramping 90nm faster with only Three 300mm fabs!
Intel 0.13um
F24
(200mm
Equivalent)
WSPW
Intel 90nm
F11X
D1C
F11X
D1C
Q
Q+1
Q+2
Q+3
Q+4
Q+5
Q+6
Q+7
(Quarter in Ramp)
**Source: Intel Estimates
8
I nt e l’s M a nufa c t uring
Le a de rship
Operational
Excellence
y Scale:
– Leading edge capacity, investment capability & people
y Agility:
– Customer Responsiveness
y Operational Excellence:
– Disciplined execution & continuous improvement
9
Log (Die Yield)
Operational
Excellence
I nt e l Y ie ld M a t c hing T hrough
Copy Ex a c t ly
0.5 µm
(3 fabs)
0.25 µ m
(3 fabs)
0.35 µm
(3 fabs)
180 nm
130 nm
(5 fabs)
(4 fabs)
Month
10
Y ie ld T re nd
0.18µm
200mm
0.13µm
200mm
0.13µm
300mm
90nm
300mm
Defect
Density
(log scale)
1997
1998
1999
2000
2001
2002
2003
2004
90 nm defect reduction trend - our fastest ever
90 nm yields are now at HVM levels
11
Operational
Excellence
Copy Ex a c t ly! M e t hod
Product:
• Matching At All Levels
• Same Physical Inputs
• Statistically Matched
Responses (Outputs)
• Keeping Matched
•
•
•
•
Coordinated Changes
Audits
Process Control System
Joint Fab Mgmt Structure
-Yield
-Reliability
Module:
-CD’s
-Visual
-SEM
-Electrical
Equipment/Process:
-Etch/Dep Rates
-Particles
-Thicknesses
-Film Comp
Physical Inputs:
-Recipes
-Facilities
-Chemicals
-Gases
-Clean room
-Equipment
Better
Better Quality
Quality and
and Faster
Faster Improvements
Improvements
12
Sum m a ry
y Intel’s manufacturing leadership (through scale,
agility, and operational excellence) will enable a
rapid transition to our 90nm products
y 300mm capacity is coming on-line rapidly to support
Intel’s microprocessor roadmap
y Intel’s 90nm technology ramp is underway and on
track
13
14
Fa b1 1 X 9 0 nm St a t us
Inline Monitors
Monitor 4
Monitor 3
Monitor 2
Full Loop
Short route 1
Short route 2
D1C Mean
D1C Mean + 1.5s
Monitor 1
Scale
–All in-line monitors in Fab 11X looking
healthy: Technology is ready
15