Penentuan Jumlah Operator Bagian Pengepakan dengan Metode Work Sampling dan Biomekanika (Studi Kasus PT. Florindo Makmur)

DAFTAR PUSTAKA

Ginting, Rosnani. 2009. Perancangan Produk. Yogyakarta: Graha Ilmu
Groover, Mikell P. 2007. Work System and The Methods, Measurement, and
Management of Work. Seventh Edition. United States of America :
Pearson Education, Inc
Iftikar Z. Sutalaksana,. 1979. Teknik Tata Cara Kerja. Bandung: ITB
Ikechukwe.” Establishing Appropriate Labour Output Rate for Increased Site
Work Productivity of Building Projects in Owerri Metropolis”, Imo State,
Nigeria.
Jono,” Pengukuran Beban Tenaga Kerja Dengan Metode Work Sampling”.
Universitas Widya Mataram,Yogyakarta.
Niebel, Benjamin.2007.”Method Standards and Work Design”. (New York : MC
Graw Hill)
Phillips A. Chandler. 2000. “Human Factors Engineering”. Gordon and breach.
New York.
Sane, Shriram.”Work Sampling to improve Labour Utilization of Fabrication
Shop .”

Vishwakarma Institute of Techonology”, Savitribai Phule


University, Pune, India.
Shahu, rashmi.”The NIOSH Lifting Equation for Manual Liftings and Its
Applications”.Departemen of Industrial Engineering, Nagpur, India

Universitas Sumatera Utara

Soleman,Alimah.”Analisis Beban Kerja Ditinjau Dari Faktor Usia Dengan
Pendekatan Recommended Weiht Limit”.Universitas Pattimura, Ambon.
SooWon, Chang.” The Productivity Improvement for Steel Framing Work
Efficiency by Work Sampling and 5-minute Rating Technique”. Korea
Institute of Construction Engineering and Management.
Sukaria Sinulingga,2011,“Metodologi Penelitian”.Edisi 3, USU pres h. 3. Medan.
Tuma Ryad. “Impact Of External And Human Factors On Labor Productivity Of
Construction Projects In Iraq.”Civil Engineering, MIT College, Pune,
India.
Wignjosoebroto, Sritomo.”Ergonomi Studi Gerak Dan Waktu. Surabaya:
PT.Guna Widya, 1995

Universitas Sumatera Utara