ANAO Report No.3 2015–16 Regulation of Great Barrier Reef Marine Park Permits and Approvals 96 submit. Of the 185 recently assessed and current permits examined 101 , the ANAO found that: • deeds and bonds—40 of the 42 deeds required by permit conditions had been appropriately executed by GBRMPA and the permit holder and documentation supporting the lodgement of all 15 bonds either cash deposit or bank guarantee has been retained 102 ; • EMPs—of the 13 EMPs required by permit conditions, GBRMPA documented the receipt of seven with three of the six missing EMPs due for submission between 2007 and 2011. 103 Of the seven EMPs received, there was little or no evidence retained of GBRMPA’s assessment of four EMPs and no documented approval of three EMPs 104 ; and • additional documentation such as sampling and analysis plans, communication strategies, fieldwork summaries, annual reports and compliance certificates for structures—24 permits required permit holders to provide 50 documents to GBRMPA for its assessment andor approval. Evidence retained by GBRMPA indicated that 11 documents relating to eight permits—22 per cent—had been submitted, of which evidence of assessmentapproval was retained in relation to only six documents.

6.11 The post-approval reporting requirements in approved permits were

initially established by GBRMPA to assist with the management of the risks posed to the Marine Park by permitted activities. GBRMPA’s failure to effectively monitor permit holders’ compliance undermines the effectiveness of these requirements as a means of managing risks to the Marine Park. There is considerable scope for GBRMPA to develop new, and enhance existing, guidance materials and support tools to better assist staff to: monitor the 101 Permits examined by the ANAO include 116 permits current as at August 2014 and 79 permit applications assessed during the period July 2012 to June 2014. Ten permits examined by the ANAO were in both samples. 102 One of the missing deeds was superseded when the permit was transferred to a new permit holder. 103 GBRMPA has yet to request updates to the EMPs for a further two permits—some 15 months after the permits were granted—despite having identified gaps in the coverage of the existing plans. GBRMPA extended the timeframe for the submission of the remaining EMP by one year to January 2016 at the request of the permit holder. 104 Two of these EMPs establish reporting requirements for permit holders additional to those contained in the permit conditions. However, documentation has not been retained by GBRMPA to indicate that its monitoring staff were aware of, and permit holders met, these additional reporting requirements.