2. Chapter 3: Premises and Equipment

 Premises and equipment must be located , designed , constructed , adapted and maintained to suit the operations to be carried out.  The layout and design must aim to minimize the risk of errors and permit effective cleaning and maintenance in order to avoid cross-contamination, build up of dustdirt and any adverse effect on the quality of products. Itʼs about design + engineering Hi gh l e gu la te d Pharmaceutical industry provides unique challenges No o e t a s e PICS does not specify criteria or numerical for premises and equipment W ith h a d so ft te hs Your ingenuity will be everything provided to you by Fithrul farmarind.wordpress.com Cop ight© CM Plus Co po atio . All ights ese ed ®  PRINCIPLE Premises and equipment must be located, designed, constructed, adapted and maintained to suit the operations to be carried out. Their layout and design must aim to minimize the risk of errors and permit effective cleaning and maintenance in order to avoid cross-contamination , build up of dust or dirt and, in general, any adverse effect on the quality of products. Premises should be carefully maintained, ensuring that repair and maintenance operations do not present any hazard to the quality of products. They should be cleaned and, where applicable, disinfected according to detailed written procedures. .

2. Chapter 3: Premises and Equipment

 General provided to you by Fithrul farmarind.wordpress.com Cop ight© CM Plus Co po atio . All ights ese ed ®

2. Chapter 3: Premises and Equipment

A typical flowchart in facility project case: Feasi ilit Co eptual de elop e t P oje t pla i g Basi desig + DQ Detailed desig + Spe ifi atio Supplie sele tio Co st u tio + i stallatio IQOPPQ P odu tio + ai te a e Expertise involved in all phases from design concept to production … provided to you by Fithrul farmarind.wordpress.com Cop ight© CM Plus Co po atio . All ights ese ed ® Risk Co t ol De easi g Risk Risk A epta e Fish Bo e, FMEA et . UR 6 ISP I ia PUR P odu t Qualit CQA CPP,GMP GUR P odu t Capa it Et . Co eptual Desig Risk Assess e t Spe if Risk Risk A al sis SIA Risk Assess. Desig Co ept Desig data et . URS PUR P odu t Qualit CQA CPP,GMP GUR P odu t Capa it Et . C iti al Aspe ts Fa ilit S ste Spe ifi atio Basi Desig Detail Desig DQ VMP Co st u tio Co issio i g IQ,OQ PQPPQ Risk Re ie Mo ito i g Self I spe tio Co e ial P odu tio Mai te a e P og a w w R M T a ta ilit Mat i Qualifi atio Co issio i g