C. 2. Summary Of The Findings by Criteria
1 COMMITMENT TO TRANSPARENCY
1.1 Palm oil growers and millers provide adequate information to other
stakeholders on environmental, social and legal issues relevant to RSPO Criteria, in appropriate languages forms to allow for effective participation in
decision making.
Company has in place a SOP on Information Request and Response SOPSPOSMARTLH- 01. There is list of information that can be accessed by relevant stakeholders. Any request for
information outside the list will require Top management consideration and approval. A list of stakeholder has been available in each unit that consist of Customarycommunity leaders,
Muspida and village chief, Company’s trade union, Contractors and suppliers. Confidential documents are documents outside the list of information for Stakeholders.
Sampling I is conducted on a Letter no 95SIP-SMREPIV2013 dated 16 April 2013 in the form of application for assistance to build a mosque. Company has responded and realized the
assistance on 23 May 2013 as evidenced by acceptance certificate. Sampling II, no records are found on request for assistance applied by Ibu Nurhayati on 18 May 2013 i.e. application for
educational and playing equipment assistance for TK Dharma Batu Ampar. It is advised that company ensures responses to any information request as required by related SOP where
responses are to be given within 1 month at the latest. It is issued as an observation.
Records of information request and response are maintained with retention time specified by Company based on their importance.
Compliance status: Observation no.9 1.2
Management documents are publicly available except where this is prevented by commercial confidentiality or where disclosure of information would result in
negative environmental or social outcomes
Company has in place a list of information that can be accessed by relevant stakeholders. Any request for information outside the list will require Top management’s consideration and
approval. Confidential documents are documents outside the list of information to Stakeholder, such as
commercial data and data causing negative impacts that are accessible only upon management’s approval, e.g. conflict data. In general, data may be accessed asked by relevant
stakeholders as long as relevant. In addition there are data that can be given only to relevant agencies, for example production data is given to the Regency and Provincial Plantation Service.
Compliance status: Full Compliance 2
COMPLIANCE WITH APPLICABLE LAWS AND REGULATIONS 2.1
There is compliance with all applicable local, national and ratified international laws and regulations.
Company has in place evidence of its compliance with regulations related to permits, employment, and environment. Evidence of updates to new regulations is a periodic evaluation
conducted by the unit’s HO and SPO officers. The last revision is dated 01 April 2013 for
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 23of 75
permits, environment, social and employment. Company does not have a letter of release of forested areas and or letter of allocation with APL
status for the plantation area of PT Sumber Indah Perkasa. Company previously has operating permit of one 1 millfor the capacity of 30 tonhour. At the
time of preliminary audit, a nonconformity was found in which the company had two 2 Milswith a capacity of 60 tonhour each, totalled 120 tonhour. At the time of certification audit, the
company had been following it up by processing the IUP for Mills of 120 ton FFBhour capacity. The company already has a letter from the Board of Investment and Regional Integrated Permit
Service with No. 800200BID.VII.062013 dated 1 July 2013 for the management of mills with a capacity of 120 ton FFBhour.
Compliance status: Full Compliance 2.2
The right to use the land can be demonstrated, and is not legitimately contested by local communities with demonstrable rights
Company has a Decree of Governor No. C202DAHK 1989 on Land Site permit and land use totaling 9,000 Hander the name of PT Sumber Indah Permai. After that, there are site permit
changes no. C309BPHHK1990 to become 9,522.11 Ha.
Company previous name is PT Sumber Indah Permai and then changes name to become PT Sumber Indah Perkasa. Change in the company name has been notarized by a Notary Deed
dated 20 September 1990 Benny Kristianto and associate and secured in the Decree of the Minister of Justice no. C2-5826 HT.01.01.Th90.HK1990.
Companyalready has a certificate of HGU from BPN with no. 1HGUBPN93 totaling 9,522.11 Ha dated 30 January 1993.
Companyalready has a certificate of HGU that consists of : HGU issued by the Regency of North Lampung with no. 08.04.2.00037 dated 26November 1993
totaling 2,088.13 Ha and No 08.04.2.00038 dated 26 November 1993 totaling 1,899,68 Ha for the location of SMRE
All HGUswill expire in 2027. HGB for SMRM Mill no. 08.06.02.17.2.00062 totaled 58.20 Ha issued by Tulang Bawang
Regency dated 21 July 1999. Valid until 2029. Company has in place a Plantation Business License IUP no. 956Menhutbun-VII2000 dated 8
August 2000 for MILL 1 unit with a capacity of 30 ton TBShour for a total land area of 9046.63 Ha.
Company previously has operating permit of one 1 mill for the capacity of 30 tonhour. At the time of preliminary audit, nonconformity was found in which the company had two 2 mills with a
capacity of 60 tonhour each, totaled 120 tonhour. At the time of certification audit, the company had been following it up by processing the IUP for Mills of 120 ton FFBhour capacity. The
company already has a letter from the Board of Investment and Regional Integrated Permit Service with No. 800200BID.VII.062013 dated 1 July 2013 for the management of mills with a
capacity of 120 ton FFBhour.
Companyalready has IMB no. 503600XIMB1999 and no. 642540PUK-LU94 for MillSMRM.
Compliance status: Full Compliance
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 24of 75
2.3 Use of land for oil palm does not diminish the legal rights, or customary rights,
of other users, without their free, prior and informed consent. Companyis a takeover from earlier company in 1990. Company states that during the period
from 1990 until the time of the audit there was no purchasing of land. There is SOP of Land Conflict Settlement SOPSPOSMRTLH-04. So far the company and
KUD inform that there was no dispute during the period from 2010 to the present time in the area around company site. It is said in the SOP to prioritize deliberation over legal action.
At the time of audit the Location Map of PT. Sumber Indah Perkasa No. Reg: 948214PMNPVI12 with the scale of 1: 250,000 were showed. The map should have a
sufficient scale of minimum 1: 100,000 in accordance with Decree of the Ministry of Forestry No. 48menhut-II2004.
Compliance status:Observation no.4 3
COMMITMENT TO LONG-TERM ECONOMIC AND FINANCIAL VIABILITY 3.1
There is an implemented management plan that aims to achieve long-term economic and financial viability
PT SIP long term replanting program up to 2020 has been established. The replanting plan will commence in 2017 up to 2020 covering 5 estates with a total area of 23,443.87 Ha.For
plantations under the SMRE Estate, including GABA, replanting area is determined as follows:
- 2017 planting year TT 1991 is 503.03 ha;
- 2018 TT.1992 is 513.19 ha;
- 2019 TT.1993 is 1,230.45 ha; and
- 2020 TT.1994 is 834.23 ha
Companyhas financial statement that has been audited by the public accountant office of Tanubrata Sutanto Fahmi Rekan, in 2011. Tax report data for 2012 was not available yet but
there is a statement letter dated 16 April 2013 issued by the public accountant office that it is under audit completion process.
Compliance status: Full Compliance 4
USE OF APPROPRIATE BEST PRACTICES BY GROWERS AND MILLERS 4.1
Operating procedures are appropriately documented and consistently implemented and monitored
- SOP and WI related to new planting, issued 172010. - SOP on New Land Opening SOPSMARTMCARIVTA-PLB, rev.0, issued 192012. Point
2.2.6 Preparation regulates on: terracing and horseshoe shaping tapak kuda. - There is IK SMARTRMCARTA-PPA01 on Drainage
- Records of nursery maintenance are not available since there is no longer nursery activity. - SOPSMARTMCARVTA-TNM, 192012. SOP on Planting
- There is IKSMARTMCARVTA-TNM01- Lining Flat to Wavy Area and also guidance table
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 25of 75
from Plant Density in Flat Area. - In SOP and orWIthe plant density is set at 136ha.
In general, the company already has SOP on Land Preparation Technical Guidelines Palm Oil that constitutes a collection of SOP and WI related associated with new planting. issued
172010. SOP on New Land Opening SOPSMARTMCARIVTA-PLB, rev.0, issued 192012.Point 2.2.6 Preparation regulates on: terracing and horseshoe shaping tapak kuda.
Also, there is IK SMARTRMCARTA-PPA01 on Drainage system.
There are SOP on Nursery Bed SOPSMARTMCARIIITA-BBT, rev.00,192012 and IKSMARTMCARIIITA-BBT06, Seedling Acceptance and Planting. But both do not regulate
the use of certified seedlings yet at the time of audit stage I. Nevertheless, at the audit stage II the company had issued a Memorandum from VPA PSM2 D. Sivasanker No. 001MEMO-VPA
PSM 2072013 dated 1 July 2013 on the use of certified seedlings as evidence of commitment to the established SOP and WI conform.
There is Form of Oil Palm Seedling Selection FORMIIITA-BBT06-Seedling Acceptance and Planting 01 Selection.
IKSMARTMCARIIITA-BBT08-PN Selection, starting from selection at 2 months old and at transplanting, counting abnormal seedlings criteria exists, and documentingrecordingreporting
all reject seedlings. Figure 1. Types of Reject Seedlings. Recorded in the form of Pre Nursery Oil Palm Seedling Selection Sheet FORMIIITA-BBT08-Seleksi PN01, rev.00, rejection is
classified into: RL, C, TS, CM, TS, etc.
There is no data on planting plan and realization since there is no longer planting activity in all estate areas of Sungai Merah Estate SMRE and KKPA Gedung Aji Baru GABA Estate. At the
time of audit stage I there was no SOP on planting on a peat land. However, at the time of audit stage II verification was made on Work Instruction IKSMARTMCARIIITABDT06- IK on
Planting on a Peat Land Rev.00 dated 26 March 2012 for the above two2 estate areas.
Compliance status: Full Compliance 4.2
Practices maintain soil fertility at, or where possible improve soil fertility to, a level that ensures optimal and sustained yield
Sop on Maintaining Unproductive Plants SOPSMARTMCARXTA-PTB Work Instruction on Plant Census
IKSMARTMCARXTA-PTB01-Plant Census
Work Instruction on Insertion IKSMARTMCARXTA-PTB02-Insertion
Work Instruction on Measuring Plant Growth
IKSMARTMCARXTA-PTB03-Measuring Plant Growth
Work Instruction on Constructing And Installing Harvest Ladders
IKSMARTMCARXITA-PMP04-Constructing And Installing Harvest Ladders
Work Instruction on Maintaining Weeded Circle, Harvest Path, Control
Path and Collection Path IKSMARTXIITA-PTM01-Maintaining weeded circle,
harvest path, control path and collection path
Sop on Harvest Preparation SOPSMARTMCARIXTA-PMP
Work Instruction on Developing Pollinating Weevil
IKSAMRTMCARXITA-PMP01 - Developing Pollinating Weevil
Work Instruction on Castration IKSAMRTMCARXITA-PMP02- Castration
Work Instruction on Sanitation IKSAMRTMCARXITA-PMP03-Sanitation
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 26of 75
Work Instruction on Constructing And Installing Harvest Ladders
IKSAMRTMCARXITA-PMP04-Constructing And Installing Harvest Ladders
Work Instruction on Maintaining Weeded Circle, Harvest Path, Control
Path and Collection Path IKSMARTMCARXIITA-PTP01-Maintaining weeded
circle, harvest path, control path and collection path
Sop On Maintaining Productive Plants SOPSMARTMCARXIITA-PTM
Work Instruction on Tree Census IKSMARTMCARXTA-PTB01-Tree Census
Work Instruction on Maintaining Weeded Circle, Harvest Path, Control
Path and Collection Path IKSMARTMCARXIITA-PTP01- Maintaining
Weeded Circle, Harvest Path, Control Path and Collection Path
Sop on Maintaining Space Between Palm Rows
SOPSMARTMCARVIIITA-PGM Sop on Weeding
SOPSMARTMCARVIIITA-PGM Sop on Maintaining Roads, Drains and
Bridges SOP on New Land Opening
SOPSMARTMCARIVTA-PLB Sop on Pest and Disease Control
SOPSMARTMCARVIITA-HPT Work Instruction on Pruning and
Stacking of Fronds IKSMARTMCARXIITA-PTM02-Pruning and
Stacking of Fronds Sop on Fertilizing
SOPSMARTMCARIXTA-PPK Sop on Harvesting
SOPSMARTMCARXIIITA-PNN Attachment to Work Instruction on Ripe
Fruit Criteria in Mill LAMPXIIITA-PNN01- Ripe Fruit Criteria inMILL
Work Instruction on Harvest IKSMARTMCARXIIITA-PNN01-Harvest
Sop on Loading and Transporting FFB SOPSMARTMCARXIVTA-PPT
Work Instruction on Loading FFB SOPSMARTMCARXIVTA-PPT01-LoadingFFB
Work Instruction on Transporting FFB SOPSMARTMCARXIVTA-PPT02- Transporting
FFB Work Instruction on Installing Nets and
Seals SOPSMARTMCARXIVTA-PPT03-Installing nets
and seals There is no TBM maintenance because the youngest is the planting year 2000
- TM maintenance includes: 1 Tree census,
2 Maintenance of weeded circle, harvest path, control path, and collection path 3 Maintenance of space between palm rows
4 Weeding 5 Road and bridge maintenance
6 Pest and Disease Control 7 Pruning and Stacking of Fronds
Maintenance activities are recorded in: - Foreman Activity Log BKM
– daily - Work Outcome Log BHK
– wholesale. - For main estate, the content of BKM and BHK is inputted into Check roll program SAP, while
for Plasma, the BKM is summarized in the Report of Plant Maintenance.
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 27of 75
Compliance status: Full Compliance 4.3
Practices minimize and control erosion and degradation of soils
Company has protected river border area by clearing free from oil palms with clearance space of 50 meter from river edge, and the river banks are planted with bamboo and fertifer grass to
prevent erosion. The document is SOP of PT. SIP-GALASOP34 Revision 00 dated 1 March 2012. The details of rivers location and condition is described in Criteria 5.2 HCV
Compliance status: Full Compliance 4.4
Practices maintain the quality and availability of surface and groundwater.
Revised ANDAL Document of AMDAL of Oil Palm Plantation and Oil Palm Processing into CPO, sources of water from Sungai Buaya and Sungai Merah. There are 3 drilled wells. The depth of
drilled wells are 10-15 meter
Water needs for Mill 1 ton TBS are 1.5 m
3
of water, for domestic needs are 100 m
3
day,so with mill with a capacity of 60 ton TBS per hour, the total use of river water is 2,800 m
3
day. The efficiency of water use for processing in the SMRM in 2013 from January to April is 0.705 m
3
per ton TBS. The efficiency of water use for processing in the SMRM in 2012 from Januaryto Decemberis
0.479 m
3
ton TBS, where the target of 1.5 m
3
per ton TBS has been achieved. River area has been planted with bamboo to prevent erosion.
The organization conduct a surface water quality monitoring program utilized by plantation communities through RKL and RPL activities that conduct surface water and groundwater quality
measurement periodically. The report sends to the BLH of MesujiTulang Bawang Regency, the BLH of Lampung Province, and the Ministry of Environment Jakarta every six months.
The results of surface water measurement can be found in RKL and RPL that cover Sungai Buaya, Sungai Merah mill, and 4 resident wells.
Organization has measured the quality of clean water in the resident wells with 4 resident well sampling points. The results of clean water quality measurement of resident well number 3 is
below the Environmental Quality Standard=50 for coliform biological factor, for pH the resident well number 1 and 4 are below the Environmental Quality Standard =6.5
–9. Routine measurements and reporting are carried out every 6 months based on RKL and RPL
activities to undertake measurements and reporting to the BLH of Tulang Bawang Regency, the BLH of Lampung Province, and KLH Jakarta.
Organization conducted environmental measurement during the period of Semester I of 2013 that covers surface water and groundwater. For the SMRM area it covers Tapa River. The
regulatory references are the Regulation of the Governor of South Sumatera No. 162005 Attachment I. The measurement results meet with the Environmental Quality Standard
requirements.The results will be reported to the government in accordance with RKL and RPL requirements.
.
Compliance status: Full Compliance
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 28of 75
4.5 Pests, diseases, weeds and invasive introduced species are effectively
managed using appropriate Integrated The company has the SOP on Plant Disease and Pest Control SOPSMARTMCARVIITA-
HPT, 192012 The data found for IPM program at SMRE,and KKPA GABA:
1 rat census 2012-2013, carried out quarterly, 2 UPDKS Oil Palm Leaf Eating Caterpillar, monthly since 2009-2013.
3 Maintenance of Bio controls Plants APH, 2009 – 2013, monthly, covering: Turnera
subulata, Antigonon sp. and Nephrolephis biesserata. 4 Sprayers, for GABA there are 1 group 10 personnel. There is evidence of Training
Attendee List of Restricted Pesticide Use, 18102011 for GABA. There are 64 attendees. There is SOP on Plant Disease and Pest Control SOPSMARTMCARVIITA-HPT, 192012.
Compliance status: Full Compliance 4.6
Agrochemicals are used in a way that does not endanger health or the environment. There is no prophylactic use of pesticides, except in specific
situations identified in national Best Practice guidelines. Where agrochemicals are used that are categorized as World Health Organization Type 1A or 1B, or
are listed by the Stockholm or Rotterdam Conventions, growers are actively seeking to identify alternatives, and this is documented
Handling of Pesticide Waste The registered company collected used pesticide packaging of jerry cans and plastic bottles
made of Polymex material. In Sungai Merah Estate SMRE and KKPA Gedung Aji Baru GABA Estate
The effluent from sprayer bathing activities flowing into a septic tank. Non polymex material is collected in a special warehouse after being handled in accordance with WIon Washing and
Cleaning of Pesticide Packaging’s and Fertilizer Bags, SIP-GABAIK19, No. Revision:00 approval dates 1 March 2012.Companyhas provided facilities for mixing pesticide, washing used
pesticide packaging’s, washing used Fertilizer Bags, washing pesticide apron, and bathroom for sprayer personnel.
Used pesticide packaging’s already washed are stored in a special warehouse which also contains used paint and thinner cans and picked up by Hazardous and Toxic waste collector
service company PTPrimandu Jaya. The company has obtained Hazardous and Toxic waste collector and transporter permit from the Ministry of Transportation, Directorate General of
LandTransportationfor
transporting Hazardous
Materials, No.
AJ.30950019DJPD201236005114. Pesticide hazard warning signs have been displayed in washing facilities in all areas.
Pesticide waste handling is already regulated in pesticide work instruction, WIon Washing and Cleaning of Used
Pesticide Packaging’s and Fertilizer Bags, SIP-SMREIK19, No Revision: 00 with approval date of 1 March 2012. However, it is written in the WI that the collection place is in
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 29of 75
TPS Hazardous and Toxic, whereas in implementation not in TPS Hazardous and Toxicbut in a warehouse in which there are also used paint and thinner cans. Company needs to provide
hazardous waste warning signs in the warehouse.
Companyalready has a list of agricultural and forestry pesticiderecommended by PesticideCommission of the Republic of Indonesia both synthetic and natural for weeds and
caterpillars such as, among others, synthetic herbicide Rolixon, Gromoxone, Roll up and natural insecticide Cordiceps for ulat api pest control. However, company should reduce the use of
herbicide of paraquat active substance restricted pesticide, and use herbicidesfor weeds that are powerful but safe for operators in the long run observation.
Compliance status: Observation no. 2 4.7
An occupational health and safety plan is documented, effectively communicated and implemented
Company has established and implements occupational safety and health management system to fulfill the obligation as per government regulation. Evidence of implementation found as
follows : - Has established Occupational Safety, Health and Hygiene Policy of PT. SIP
– Lampung Region, dated 292011. The policy was signed by the officials of RC, PC, and PUKSPSI. The
policy goal is continually seeking to reduce hazards leading to work accidents that result in injuries, work related diseases, goods damage, fire and explosion as well as production
process disruption and environmental pollution. Socialization of OSHPolicy is carried out in class, through training, meetings, morning calls, morning circles, as well as displayed in the
workplace.
- Company has had and established OSHAS documentation that includes OSHAS Manual, SOPProcedures, Work instructions and forms that has been implemented per 1 July 2010.
Currently, most of documentation has undergone revision once. The company has the Organizational structure and personnel in charge of OSH aspects,
i.e.OSH Officer. In order to comply with government regulatory, theCompanyhas established P2K3 team in each Unit, consists of General OSH Expert AK3U who serves as the Team
secretary and team leader which are the Unit’s Manager. All P2K3 Teams have obtained approval from local manpower agency. The approval data are as follows:
SMRM: P2K3 Team was established with SK No. 56037HIPKII.TBP2K3IV2013 dated 14102010
byTulang Bawang Manpower and Transmigration Service. The Secretary is M. Hasan Noor with appointment letter No. KEP. 986MDJPPKIII2012, dated 22032013.
SMRE : SMRE Unit, the P2K3 Team has been set up without decree from Manpower Department, but
there is a letter from an employee in the Manpower and Transmigration Service of Mesuji Regency in the name of Drs. Rozali, MH, dated 11012013. This letter explains that PT. SIP
MRE has established P2K3, and has been approved, as per 2012013. However, the document is not found in SMRE, whereas the Secretary in the name of Indra Kurniawan has received
assignment with Decree No. Kep.4118MDJPPKI2013. This issue has been raised as an observation.
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 30of 75
GABA: P2K3 Teamhas obtained approval from Social, Manpower and Transmigration Service of Tulang
Bawang Regencywith No. 56035HIPKII.TBP2K3IV2013 with Secretary Dwi asGeneral OSHExpert.
P2K3 Team has been conducting routine monthly meetings, on a regular basis. Minutes of meeting are already listing the topics, description of meetingdiscussion results, due date of
settlement follow up start, finish, and PIC. The completation status of each case complete withcompletion date, and if not yet completed then sit will be brought to the next meeting.
All work units under PT. Sumber Indah Perkasahas included its employees in the Social Security Program Jamsostek, starting from daily wage workers BHL, PKWT, and SKU. The program
varies in package according to the employee status. Those with BHL status will be included after 3 consecutive months because their status rises to Daily-SKU SKU-H. Employees with SKU-H
and PKWT status are only included for ½ packages, i.e. only JKK and JKM, whereas employees with Monthly-SKU SKU-B and SKU status up to staff get full package programs, namely: JKK,
JKM, JHT, and JPK. List of Jamsostek membership is stored and recorded on manpower data base, and already has KPJ Number. But PKWT in particular, does not have KPJ number. The
Jamsostek Insurance is not willing to give KPJ Number for reasons of non-permanent status. The company has conducted worker health examination of BHL, PKWT, and SKU. Evidence of
examination can be shown as follows:
1 There is a recapitulation of staff and employee health examination results in 2013: a. SMRM, examination date: in stages from the 2
nd
to 5
th
month of 2013, for 168 workers SKU+PKWT. b. SMRE, examination date: in stages from 2
nd
to 4
th
month of 2013. and c SMRE, examination date: in stages from 2
nd
to 4
th
month of 2013. Company has issued a Policy for medical examination, on Lampung Region Worker Health
Examination, approved by the Regional Controller and Production Controller, dated 162011, containing prior-employment, periodic, and specific examination. During preliminary audit, the
examination of cholinesterase aspect has not been conducted for workers who work closely with Hazardous and Toxic, such as: sprayers, Hazardous and Toxic waste officers, chemical
warehouse and laboratory officers. Application for this examination has just submitted. Also for personnel working in the noisy area, the audiometry measurement has not been conducted. At
the time of the audit stage 2, company has been conducting cholinesterase and audiometry examination for these personnel. Spirometry examination should also be programmed for
sprayers, Hazardous and Toxic waste, chemical warehouse and laboratory personnel.
The company also provides health care service by establishing a Clinic located in the SBYE Central Office. The clinic had received permit from the Department of Health of Tulang Bawang
with Private Health Care Service Licence No. 455503014SIT-BPDK-TBIII2004, dated 1932004 and valid until 0142007. License reapplication is currently under process in
connection with the regency expansion so that the status of the clinic becomes under the Mesuji Regency. The clinic is led by a company doctor and a paramedic, both are medical certified.
Employeeshave medication in the clinic free of charge, for both PKWT and BHL status. The service also co
vers the employee’s family. There is a Procedure for Hazard Identification, Risk Assessment and Risk Control HIRARC
No. SOPSMK3SMARTLH-02, Rev. 01. Company has conducted ISBPPR that covers the
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 31of 75
whole Estate and Mill. The ISBPPR resultsare recorded in Risk Analysis Form FP 02SMK3- SOP-02 and Risk Analysis Follow up Form FP 03SMK3-SOP-02. The reference for
preparation is the ASNZ method. Preparation of ISBPPR for Estates covers from maintenance fertilizer, spraying, space between palm rows, OPT, roads, harvesting, emplacement
maintenance, warehouse, workshop all machinery, clinic, central office, washing place for keep and Fertilizer Bags shower sprayers.
As for Mills, it has covered the entire process from transport, security, weighbridge, TBS grading, loading ramp, transfer carriage, sterilizer, tippler, thresher, press, clarifier, boilers, kernel,
engineering, effluent, workshop, warehouse, Hazardous and Toxicwarehouse, diesel fuel tank, lab, office, CPO dispatch, machine unit installation, fire engines, and vehicle traffic. ISBPPR is
reviewed annually to see the effectiveness of earlier risk control application. If deemed necessary, the additional control will be added until low L risk level is achieved. This activity is
carried out together between the operating officials and the P2K3 Secretary and Chairman.
In each Unitcompany has conducted a number of trainingrelated to safety and health OSHaspects, some of which can be reported as follows:
SMRE and GABA Units: - First aid Training, 2152013, by dr. Wiyangga, from the clinic. 6 participants 4 foreman and 2
assistant clerks, materials include simulations on how to deal with accidents. - Socialization of ISCC, ISPO, RSPO, OSH, P3K, APD, MSDS, on29052013. There were 13
participants. The presenter was OSH officer. - Socialization of procedure for handling natural disaster and fire KTD, on 16032013.
Participants were 7 security personnel. - First aid Training, combined participants of Regional level, totaling 75 participants, on
10102011. - General OSH Expert for P2K3 secretary.
- Restricted pesticide use training, on 1810.2011, participants from SMRE with a total of 67 participants, on 19102011. There was “Restricted Pesticide User Certification” from the
Department of Agriculture, Food Crops and Horticulture of Lampung Province. - Special skill training, including: welder and heavy equipment operator license.
SMRM Unit: - First aid Training, 2152013, 11 participants 4 foremen, 1 security personnel, book keeper, 2
analysts, nurses, P2K3 secretary, cashier. - Socialization of MSDS on 1452013 at SMRM to 38 workers by OSH officer.
- Special skill training, including: welder and heavy equipment operator license. Companyhas developed and established SOP related to fire prevention and mitigation, i.e.:
- SOP on Emergency Handling SOPSMK3SMARTLH-09, applicable in Estates and Mills. - Technical guidelines for dealing with emergency situation in the form of Emergency Response
Mechanism Diagram contained in form of FP 02SMK3-SOP-10, according to conditions, i.e.: 1 Fire
2 Hazardous and Toxic Spill Handling 3 Earthquake
4 Chemical Poisoning through Ingestion.
These SOPshave been effective since 1 July 2010.Socialization has been carried out to all workers by means of displaying at strategic locations, such as: Estate office, division office, Mill
office, workshop, and parking area in the form of banners or billboards.
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 32of 75
Companyhas established Emergency Response Team by appointing its personnel. The capacity to prevent and mitigate fireis sought to by providing the following training:
- SMRM Unit, some of the Dry PowderSquad members have attended training in the use of
portable extinguishers Light Fire Extinguisher, dated 20112010, but, only 2 out of the 7 squad members, i.e. Sudarso and Sugiarto.
- GABA Unit, Light Fire Extinguishertraining has been conductedas seen in the List of Attendees of Light Fire Extinguisher Training, dated 762013. But, out of the Light Fire Extinguisher Team
members, there is one not yet attending the training i.e. Sulisiyanto. - SMRE Unit, some of the Light Fire Extinguisher Team membershave attended Light Fire
Extinguisher training on 29052013 and 20112011 in Division 1 office. But out of that number of Light Fire Extinguisher Team the TTDERP Structure has not received training.
Companyhas provided fire controlmitigation facilities and infrastructures as follows: - SMRM Unit
In the Checklist of KTD Equipment dated 3 June 2013, it is recorded : 1. 35 Light Fire Extinguishersin 35 locations;
2. 4 units of pillar hydrant and 4 boxes of corresponding equipment hoses and nozzles at 4 strategic locations at St. Sterilizer, St. Boiler, St. Kernel, and St. Clarification;
3. Sandbag along with spades at 4 locations; and 4 Eye washers and showers in 5 locations lab, CaCO3 warehouse, LB-3, oil warehouse and
WTP. Companyalso has developed Evacuation Map and Map of Fire Sensitive Area provided with location points of Light Fire Extinguisher, hydrant, eye washershower, direction arrow of
evacuation route, and2 assembly points. It is suggested the company completed the information on important telephone numbers to be contacted in the case of emergency.
- SMRE and GABA Units In the Summary Report of Light Fire Extinguisher checking dated 28 May 2013, it was found :
1. 41 Light Fire Extinguishersdistributed in 41 locations in the entire estate area covering central office, fertilizer warehouse, diesel fuel warehouse, oil, spare part, LB3, division office,
mess, staff housing. 2. 1 unit of water tanks, 1 portable water pump provided with hoses and nozzlesguns.
Companyhas conducted routine inspection of Light Fire Extinguisher and hydrant and recorded the results using PMKS Patiware Light Fire Extinguisher and Hydrant Monitoring form, which
that is carried out monthly. There is evidence of implementation for December 2012 and January 2013. This activity is carried out by workshop foreman, verified by assistance workshop
and acknowledged by Mill Manager.
In dealing with emergency situation, company has established Emergency Response and Preparedness ERP as follows:
- Emergency Response and Preparedness Organizational Structure has been established for each Unit, covering SMRM, SMRE and GABA. The KTD structure was developed by
P2K3Secretary and approved by P2K3 Chairman Unit Manager. The structure is composed of Team Leader, Deputy Team Leader, General Assistant, Executive Chairman, Secretary,
Fire Extinguishing Team Dry Powder, Hydrant, Sand, Wet burlap, Hook, Evacuation Team, Security Team, Connecting team, Eliminating Team, and Health Team.
For SMRM mill area, company should have fire mitigation officers in accordance with the provisions of the Decree of the Minister of Manpower No. 186MEN1999. Based on Annex 1
and 3, a processing plant Mill is classified as vegetable oil mill with Moderate Fire Potential III. A factory with a total workforce of over 100 people should have fire mitigation officers: 1 for
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 33of 75
class A, 1 for class B, 5 for class C, and 12 for class D. At the time of the audit stage 2, the Company had carried out Fire Simulation Training, dated 05072013 from the Department of
Social, Manpower and Transmigration, Tulang Bawang, to 20 people. However, this is only a fulfillment for class D. Company is strongly encouraged to comply with these provisions and
required to program it in subsequent years. Companyhas conducted various efforts related to fire prevention and mitigation, and kept the
recorded report properly. Activities carried out in various unit areas Estates and Mills are as follows:
SMRM Unit: -
Fire simulation was conducted on 562013. -
Routine inspection of emergency response equipment such as: Light Fire Extinguisher, hydrant, and sand burlap from every two week to once a month. This activity is conducted by
TTD members, or SPO Officer, or P2K3 secretary.
SMRE and GABA Units: - Wildfire simulation was conducted on 2432012 and in mid July 2013, regional level participant
unit, 68 participants. There is scenario, evaluation, photos, and attendee list. - In GALA, simulation was conducted for potential earthquake and fire emergency situation,
dated 2562013, in the location of Central Housing, complete with scenario and evaluation but simulation for chemical spill mitigation is not yet conducted.
- Patrol activity is conducted by Security Team to monitor HCV and wildfire, recorded in the Patrol Book per 2 weeks.
- Creating fire breaks in the area bordering the community plantations and or being fire potentials, in each division
– Unit. -
Develop Division’s Fire Vulnerable Area Map. - Provide list of phone number both internal and external including for local police, local military,
hospital, fire brigade. - Routine inspection of emergency response equipment, such as: Light Fire Extinguisher,
hydrant, and sand bag from 2 weekly to monthly. This activity is conducted by ERP members, or SPO Officer, or P2K3 Secretary.
- Report fire prevention to the Department of Social, Manpower and Transmigrationevery 3 months,
Company has provided equipment related to OSH aspect, including PPEfor the workers. Below are some data that can be reported through sampling:
- SMRM Unit, there is certificate of acceptance for: 1 leather gloves 2 safety shoes-workshop for 25 people, on 922013, 3. Helmet on 1512013, 5 people, 4 Boots on 42013, for 4
people, - SMRE and GABA Units, there is a list of name of PPE recipient in Div.4, certificate of
acceptance dated 2452013, of AP Boots 7 people, sprayers: rubber gloves, AP boots, mask 12 people, harvesters: AP boots, helmet, safety glasses, sickle covers 27 people.
Company has an effort to fulfill with P3K provisions. Work sites have been provided with first aid kits, though some of them are not complete in accordance with the regulatory requirements. In
the field, every foreman such as harvest and sprayer foreman carry small first aid kits containing the required medicine. All foremen have received first aid training from company doctor. Also, in
each Unit both Estate and Mill, a number of first aid officers have been appointed based on the Letter of Decision on Appointment of First Aid Officer signed by P2K3 Chairman or Unit
Manager.
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 34of 75
Companyhas established SOP on Handling of Work Accident SOPSMK3SMARTLH-10, 172010, starting from handling accident in a worksite, handling of mass accident, reporting,
investigation and recovery. There are evidence of implementation of reporting and investigation for accident occurred, among others:
1. Work Accident Report 124 hours FP 01SMK3-SOP-10. For example, for SMRE,accident
date is 29052013, Paryanto NIK 09018, reported on 3052013. 2. Accident Investigation Report from the Assistant FP 02SMK3-SOP-10.
Other records related to accident recording are: 1 Recapitulation of Accident Report Every Month FP 03SMK3-SOP-10, and 4 Recapitulation of SR and FR Counting FP 04SMK3-
SOP-10. On Saturday 11 May 2013, an accident occurred to a plane of Fletcher type conducting air
maturing on oil palms. According to the explanation of Mr. Humala Sinaga Lampung Regional Controller, the results of investigation of accident of plane coming from Air Manuring Division
could not be obtained because of PT. Sumber Indah Perkasa SIP is just as a lessee who provides fertilizer and aircraft runway. Investigation is immediately undertaken by the National
Commission for Transportation Safety KNKT on Sunday 12 May 2013 or a day after the incident with a note that parties who want the result of the investigation are asked to contact
KNKTdirectly. Compliance status: Observation no 3 6
4.8 All staff, workers, smallholders and contractors are appropriately trained.
Companyhas established annual training programs. Training activities are based on SOP on HR Development Training SOPSPOSMARTLH-10, 172010, rev.01, covering: preparation,
implementation, and evaluation. There is Training Need Analysis set by Regional Training Center Coordinator RTCC and the results are in the form of Training Need Identification Matrix
FLEstateTRAD10, prepared by SPO Officer, and approved by Estate Manager. The Matrixes developed by SMRM, SMRE, and GABA units.
Annual training program is prepared and established by respective Unit. For 2013, it is: - SMRM and SMRE: P2K3 Training Program of PT Sumber Indah Perkasain 2013, prepared
and established by P2K3 Secretary, and P2K3 Chairman. Also, there is P2K3 Training Program for Sustainability areas covering: OSH, Environment, social, HCV, greenhouse
gas emission, sexual harassment, and PHT.
- GABA : Training Program 2013, signed by person in charge of SPO Unit and approved by Unit Head as per 05012013. Training materials include: P3K, proper, socializationtraining
of ISCC, ISPO-RSPO, PHT, harvesting, HCV, Kompes, procedures WI, PPE, Hazardous and Toxic waste control, GHG mitigation, GHG emission calculation, preventionof sexual
harassment, socialization of communication and consultation, socializationof SOP on contractor control, socializationof jamsostek to contractors.
All recordsshowing evidence of training implementation, such as: attendee list and photographs, and certificate are kept by KTU, while training records for sustainability are also kept by SPO
Officer. Each Unit records training realization. For example, in GALA as well as MSJA Units. It is recorded in Training Recapitulation form that includes information: name of training, instructor,
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 35of 75
participant, implementation time, and training location. Company is deal with trained contractor personnel. As mentioned in the above training program,
each contractorof SMRM Mill, SMRE Estate, as well as GABA Unit has been provided with related to RSPO, which includes :
- Socializationon appeal to include their workers in jamsostek, to care with environmental
sustainability, protect biodiversity, implement OSH in the form of PPE use, encouragement to comply with OSH regulations, and being in harmony with the community.
- Socializationon wage system and worker’s age that must not be 18 years old and minimum
wage regulations.
- Socialization on PPE: PPE mandatory, PPE benefit, encouragement to always follow OSH
regulations
—especially drivers and loading personnel.
- For TBS transport contractors, evidence of being trained is demonstrated by driving license
possession.
- Some contractors for road maintenance and housing have been selected in a strict manner
through pre-bidding process from the aspect of willingness to comply with OSH aspect, employment aspect, as well as technical aspect according to type of work to be done.
Compliance status: Full Compliance 5
ENVIRONMENTAL RESPONSIBILITY AND CONSERVATION OF NATURAL RESOURCES AND BIODIVERSITY
5.1 Aspects of estate and mill management, including replanting, that have
environmental impacts are identified, and plans to mitigate the negative impacts and promote the positive ones are made, implemented and monitored, to
demonstrate
Companyconducted impact analysis in the Revised ANDAL document ofAMDAL of Oil Palm Plantation and Oil Palm Processing into of CPO PT Sumber Indah Perkasa with an land area of
9,254 Ha and MILL with the capacity of 60 ton FFBHour No. Document is 16KOMDAL11.04IV2008 dated 14 April 2008.
In ANDAL document the scope of environmental impact analysis is oil palm plantationactivity and processing into crude palm oil CPO. The scope of environmental impact analysis is Sungai
Buaya Estate, Sungai Merah Mill and Estate, Gedung Aji Baru Plasma, Gedung Aji Lama Plasma, Mesuji Estate, Sungai Buaya Mill, and Sungai Merah Mill. In ANDAL document, the
environmental impact analysis is still scoping company current activity and condition. Environmental impact management is contained in RKL and monitoring plan is contained in
RPL. The RKL and RPL is implemented every 6 months and report every 6 months to BLH of Mesuji Regency SBYE, GABA, MSJE, SBYM, Tulang Bawang Regency SMRM, SMRE,
GALA, GABA
ANDAL Document also covers land biodiversity in the form of flora and fauna biological aspect, social cultural aspectto the population of villages around unit and division.
Compliance status: Full Compliance 5.2
The status of rare, threatened or endangered species and high conservation value habitats, if any, that exist in the estate or that could be affected by estate
or mill management, shall be identified and their conservation taken into
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 36of 75
account in management plans and operations
Companyhas had SOP on Identification and Management of HCVNo.: SOPNPSMARTIVLH 001 No. Revision 01 effective date 1 July 2010.
Company has had the revised ANDAL document of AMDAL of Oil Palm Plantation and Oil Palm Processing into CPO of PT Sumber Indah Perkasa with a total area of 9,254 Ha and Mill with a
capacity of 60 ton FFBhour that scopes environmental conditions related to flora and fauna. Information in ANDAL document prior to planting, the flora identified is commercial crops such as
meranti woodand there is no identification of fauna prior to planting. In ANDAL document there is flora and fauna identification after the land becomes oil palm plantation and oil palm mill, for flora
it is palms and bushes, for fauna it is buaya, ular sendok, tikus, landak, babi hutan, macan akar,
etc. The land’s baseline condition is a secondary forest. There is no information in ANDAL document about flora and fauna condition when it was still a secondary forest.
Companyhas performed identification of areas with high conservation value along with a team that has obtained approval from RSPO Board and the report of identification of high conservation
value area has been peer reviewed by Resin Sözer, an independent body approved to do peer review of high conservation value HCV area.
Companyhas the Final Report of Identification and Analysis of the Existence of High Conservation Value Area HCV of each unit. At the stage I and stage II, the Final Report of
Identification and Analysis of the Existence of High Conservation Value Area HCV of Sungai Merah Estate SMRE, KKPA Gedung Aji Baru GABA Estate is shown. In Sungai Merah Estate
it covers the border area of Sungai Buaya, the border area of Pidada River, Putuk River and Camp River, reptile fauna, mammals, Aves, and so on. Protection of river border is to clear it
from oil palms with a clearance space of 50 meter from the river edge, and the river banks are planted with bamboo andvertiver grass to prevent erosion. For fauna protection, companyplaces
communication boards of hunting prohibition in several areaswhere fauna occurrence is identified though through footprints macan akar and babi hutan.
HCV identification was conducted in the oil palm plantation area of SMRE unit 4°5’ - 4°17’ S and
105°26’ - 105°39’ E.The working area of PT. Sumber Indah Perkasa - SMRE is 4,046.01 Ha with planting years of 1991, 1992,1993, 1994, 1996, 2000, 2001 and 2004. GABA Unit has the
area of 5,005.25 Ha with planting years of 1995, 1996, 1997, 1998 and 1999.
Data of flora and fauna prior to planting are contained in Initial Environmental Examination of PIL Document of Oil Palm Plantation Project of PT. Sumber Indah Perkasa, Mesuji District and
Menggala District, North Lampung Regency which is prepared by PT. Mulia Consultants. Data of flora diversity consists of:
Cover Crops Base Vegetation, among others:
- Alang – alang Imperata cylindrical
- Rumput Bendera Eleucine indica - Putri Malu Mimosa invisia
- Pakis Alsophila sp - Rumput Merdeka Paspalum sp
Trees, among others: Pala Hutan Myristica sp
Beringin Hutan Ficus benyamina Karet Hevea brasiensis
Bambu Bambusa sp Pule Gudrania sp
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 37of 75
Aquatic Flora around the project location of PT. Sumber Indah Perkasa, among others: Ganggang Hijau Chlorophyta
Enceng Gondok Eichornia grassipes Palam Corypha sp
Teratai Putih Nelumbium sp Pakis Air Ceratopteris sp
Lumut Bryophyta Data of terrestrial fauna diversity in the project location of PT. Sumber Indah Perkasa prior to
plantingincludes: Aves
Manyar Ploceus manyar Tekukur Streptopelia sp
Jalak Strurnus contra Emprit Lanchura sp
Cucak Rowo Pycmonotus sp Elang Bustantur sp
Mammals Gajah Elephan sp
Kijang Cervis timorensis Babi Sus vitatus
Beruang Urus sp Reptilia
Ular Piton Phyton sp Kadal Mobvia multifaciata
Ular Sawah Phyton molurus Insect
Kupu-kupu Papilio sp Capung Gomphus sp
Kumbang Aryetes sp The following is details of Identification and Analysis of the Existence of High Conservation
Value Area HCV of Sungai Merah Estate andKKPA Gedung Aji BaruGABA Estate:
Type HCV
Hasil Identifikasi Lapangan DivisiBlok
Lokasi Temuan Area
Ha Sungai Merah Estate SMRE
1.2 There are protected animal species :
1. Elang Hitam Ictinaetus malayensis 2. Elang Tikus Elanus caeruleus
3. Cangak Abu Ardea sumatrana 4. Raja Udang Alcedo meninting
Block D20-D23; E20-E23; B26-
B29; C26-C30; D26-D30; E30
and surrounding areas
-
There are protected animal species : 1. Buaya Muara Crocodytus porosus
2. Kuntul Kerbau Bubulus ibis Pidada river
-
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 38of 75
KKPA Gedung Aji Baru GABA Estate - Plasma
1.1 ; 4.1 There is area of river border or riparian ecosystem of
Putuk River and Camp River which functions to support local protected areas, water sources and
flood control. Putuk river
17,42 Camp river
10,06
1.2 Endangeredprotected species in the list of
Government Regulation No. 71999 Protected and IUCN LC ver 3 2010, include :
1. Raja Udang Biru Alcedo coerulescens 2. Cekakak Belukar Halycon smyrnensis
3. Blekok Sawah Ardeola speciosa 4. Kuntul Kerbau Bubulcus ibis
5. Raja Udang Alcedo meninting 6. Cangak Laut Ardea purpurea
7. Cangak Merah Ardea sumatrana 8. Pekakak Emas Pelargopsis capensis
9. Cekakak Sungai Todirhamphus chloris 10. Macan Akar Felis bengalensis
Gedung Aji Baru GABA KKPA
Estate,Division 6 Peringgan and
Pidada river
-
HCVmonitoring is conducted every 2 weeks. Document used is Patrol Log Book which is summarized into HCVMonitoring Form No. Document FSMARTLH00309 every 6 months. In
addition, there are documents: Erosion Control Crop Planting Report
HCV Area Patrol Report Boundary Peg Maintenance Report
Water Level Report Socialization Invitation
HCV SocializationReport HCV Monitoring Form has specified recommendations for improvement as well as
recommendations based on routine monitoring carried out every 2 weeks, but Person in Charge PIC and a due date for the completion of recommendation should be determined to see the
progress of follow up to HCV monitoring results. Observation
Compliance status:Observation no.5 5.3
Waste is reduced, recycled, re-used and disposed of in an environmentally and socially responsible manner
Companyperforms impact analysis in the revised ANDAL document of AMDAL of Oil Palm Plantation and Oil Palm Processing into CPO of PT Sumber Indah Perkasa with a total area of
9,254 Ha and 2 MillsSMRM and SBYM with a capacity of 60 ton FFBHour.
SOP of Waste Management, SOPSPOSMARTLH-09, revision: 00 approval date: 1 July 2010, covering mill waste: solid, liquid, gas including LB3.
Plantation: expesticide packaging’s, land application, ex agrochemicals such as fertilizer bags
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 39of 75
Current practice of waste flow rate measurement is only on waste that flows out directly from the mill to Land Application recorded using flow meter every 7o’clock in the morning and at the time
when pumping is finished. Company performs ambient air and emission quality measurements mobile and non-mobile
sources. None of the measurement results exceeds the Environmental Quality Standard. Company reports the measurement results every 6 months to BLH of Tulang Bawang Regency
SMRM, BLH of Lampung Province, and Jakarta KLH, with evidence of their receipt. Liquid and Hazardous and Toxic Substance waste results are reported every 3 months.
SMRM has 8 liquid waste ponds. Internal daily measurement in SMRM covers pH, Alkalinity, and VFA parameters. In SMRM, company has external parties Health Polytechnic of Tanjung
Karang Health Department carried out the measurement of waste water, which is used for land application, and with reference to the Decree of the Minister Environment No 292003. The
result showed the BOD and COD concentrations have meet with the Environmental Quality Standard.
The organization has in place a SOP of Waste Management, SOPSPOSMARTLH-09, with revision: 00, approval date: 1 July 2010, covering plant wastes: solid, liquid, gas that includes the
utilization of empty fruit bunch, shell, and fiber wastes.
The organization has Waste Processing Work Instruction of LA and Empty Fruit Bunch EFB, SIP-SMREIK09.
The organization has in place an extended permit of liquid waste utilization for SMRM in the form of Certificate of Extension of Permit to Utilize Waste Water on Soil Land Application to PT
Sumber Indah Perkasa – Sungai Merah Mill Number: 660322III.7TBXI2012. The letter issued
from Government of Tulang Bawang Regency, Regional Environmental Agency, Menggala, Dated 23 November 2012, which is valid for 2 years.
The utilization of empty fruit bunches at SMRE in January – April 2013 was 21,763 tons with a
total land application area of 382.89 hectares. The targeted land area for empty fruit bunch EFB application for 2 years is 668 hectares. In 2012 it was 63,634 tons of EFB on 1,155.74
hectares of land, with the target of 672 hectares and 49,915 tons of EFB.
Compliance status: Full Compliance 5.4
Efficiency of energy use and use of renewable energy is maximized
Company has performed identification of GHG emission sources of estate and mill activities. Company has calculated GHG emission of the SMRM, which includes calculation of respective
GHG of estates supplying the fruit. Diesel fuel efficiency at SMRM in 2010 was 27.46, 2011 was 44.32, and 2012 was 33.94, so that on average the efficiency was 35.92. Diesel fuel
use in 2010 was 1.88 literton CPO, in 2011 was 1.51 literton CPO, in 2012 was 1.12 literton CPO.
SMRM use of palm shell and fiber as fuel substitutes in 2012 was 10,916,000 kg and 37,891,121 kg, respectively, with the total energy used ton CPO of 1,288,881 KKAL.
Company has SOP on Calculation of Green House Gas Emission at SMRM of PT- SMRMSOP02
The use of empty fruit bunches at SMRE in January – April 2013 was 21,763 ton with total
application land area of 382.89 hectares. Target area to be applied with empty bunches for 2 years is 668 hectares. In 2012 it is 63,634 ton of empty bunches 1,155.74 hectares of land, with
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 40of 75
target of 672 hectares and 49,915 ton of empty bunches. Company has SOP on GHG Emission Mitigation of PT SIP
– SMRMSOP22 No. Revision: 00, date approved: 02 January 2013, and performs calculations of GHG emission reduction from
diesel fuel efficiency, shell efficiency in the processmill where in 2012 the total GHG reduction from processing was 186.73 kg CO2ton CPO. Compared with 2011 there is a rise due to the
effect of low crop and huge crop during harvest.
The Estate GHGcalculation is as follows: SMRE = 74.81 kgCO2eqTon FFB; GABA = 87.95 KgCO2eqTon FFB.
SOP of GHGemission mitigation for PT SIP – SMRMSOP02, PT SIP.
Compliance status: Full Compliance 5.5
Use of fire for waste disposal and for preparing land for replanting is avoided except in specific situations, as identified in the ASEAN guidelines or other
regional best practice.
Companydoes not burn wastes and there are no replanting activities. Companyalready bans the use of fire for replanting. Also, Company has instructed its workers and encouraged local people
not to burn domestic garbage.
Compliance status: Full Compliance 5.6
Plans to reduce pollution and emissions, including greenhouse gases, are developed, implemented, and monitored.
Management through RKL and RPL implementation. Organization has RKL and RPL covering environmental impacts on river and drilled well water
quality, ambient air, noise, air quality. RKL and RPL are reported to the BLH of Tulang Bawang andMesuji Regency every 6 months starting from 2012, and there are receipts of RKL and RPL
document submission.
SOP of Waste Management, SOPSPOSMARTLH-09, revision: 00 date approved: 1 July 2010, covering mill wastes: solid, liquid, gas.
SOPWIis not yet available to handle stationary sources nuisance, such as noise that exceeds the Environmental Quality Standard.
At the stage 1 the results of measurement of vibration, odor, and noise did not come out due to the environmental testing laboratory’s equipment problems. Organization has followed up by
performing measurement on 20 June 2013 by the Government of South Sumatera Province, Organization controls vibration, odor, and noise nuisance through job work instructionfor
nuisance in the Mill, such as noise disturbance, the work instructionof the genset job has incorporated controls using silencer in the gensetroom and use of ear protection devices ear
plug and ear muff.
Compliance status: Full Compliance 6
RESPONSIBLECONSIDERATION OF EMPLOYEES AND OF INDIVIDUALS AND COMMUNITIES AFFECTED BY GROWERS AND MILLS
6.1 Aspects of estate and mill management that have social impacts are identified
in a participatory way, and plans to mitigate the negative impacts and promote
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 41of 75
the positive ones are made, implemented and monitored, to demonstrate continuous improvement
Companyhas conducted Social Impact Assessment internallyin 2012. Based on the results of SIA it is identified that there are 14 villages around PT SIP affected by the social impact of estate
and mill operations. SIA report says that the area of main estate is 9102.2 Ha and plasma estate is less than 15,000 Ha with total KUD member of 17,254 KK
Company has had the list of stakeholders of all units. Based on the results of SIA and input from the units, companyhas established a strategic plan
for CSR Program of 2014-2018:period 5 years. The program has included the short-term and long-term plans covering the aspects of education, health, infrastructure, sport, religion, arts,
culture and micro business. The existing program does not include specific efforts made by company to preserve the native culture of indigenous people living around the company
environment.
Based on the SIA report, Company has conducted road improvement activities in 2009-2011 for 21 villages around the company site. Educational assistance is given to areas in the location of
main estate and plasma estates. Religious assistance given in 2010 period already represents Islam and Christian religions and in 2013 it is for Hindu in the form of pura Talang Batu Village
construction.
Based on the SIA report there is negative perception because of jealousy felt by villages from not receiving social assistance Batu AmparVillage and Tri Rejomulyo Village. Company
responded by launching Cheap Oil Market Operation in 2012 in Batu Ampar Village and educational assistance in the form of building materialsfor the development of local primary
school in SDN 01 Tri Rejomulya in 2013.
Compliance status: Full Compliance 6.2
There are open and transparent methods for communication and consultation between growers andor mills, local communities and other affected or
interested parties
Companyhas had SOP on Responding to Request and Information SOPSPOSMARTLH-01. List of information is already available to be accessed by relevant stakeholders. Request for
information outside the list will require the consideration and approval from the Top management. List of stakeholders of each unit is already available consisting of
customarycommunity leaders, Muspida and village chief, company trade union, Contractors and suppliers.
Any incoming requests for information is recorded in KTU and passed to relevant Manager. All requests for information are recorded in information book. Each unit maintains information
request and response book. Routine requests are recorded in a routine information granting book and non-routine informationrequests are recorded in a separate book.
In addition, Sinar Mas Group has SOP on Communication and Consultation SMARTXIVMCAR003 where any informationrequests will be responded the longest in 5
weeks 1 month.
Compliance status: Full Compliance 6.3
There is a mutually agreed and documented system for dealing with complaints and grievances, which is implemented and accepted by all parties
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 42of 75
Company has SOP on Complaint and grievances SOPNPSMARTXIIMCAR001. Any complaint will be recorded in the log book of complaint and grievances. The source of complaints
may be internally, externally and female workers. Sampling was conducted on employee’s complaint on 10 December 2012 concerning poor quality of rice. Company passed the complaint
to KUD as the supplier of the rice. The response from KUD dated 20 December 2012 states that they will supply better quality rice. The officer informed that the employee has received better
rice so that the complaint is closed.
Compliance status: Full Compliance 6.4
Any negotiations concerning compensation for loss of legal or customary rights are dealt with through a documented system that enables indigenous
peoples, local communities and other stake holders to express their views through their own representative institutions
There is SOP on Land Conflict Settlement SOPSPOSMRTLH-04. So far the company and KUD give informationthat there is no dispute in the perio
d from 2010 until now in the company’s surrounding areas. The SOP says to give first priority to deliberation for consensus over legal
action.
Compliance status: Full Compliance 6.5
Pay and conditions for employees and for employees of contractors always meet at least legal or industry minimum standards and are sufficient to provide
decent living wages
Companymaintains SKU Detailed Payroll sample, May 2013, for SKU-H, SKU-B, as well as PKWT, while for BHL and BHB such list is contained in BHL Detailed Payroll sample, May
2013. For BHL the salary is paid twice per month, from 26
th
to 10
th
day of subsequent month, and from 11
th
to 25
th
of ongoing month, so the payroll is made twice. Company has company rules in the form: 1. Collective Labor Agreement between PT. SIP of
Tulang Bawang Regency, Lampung: BH.NO: 182PT.SIP1989 and PUK.SPPP-SPSI Trade Union of Tulang Bawang,with Registration No.: 063KPTSPCSPPP.SPSITBXII2005, for
period of 2011-2013, and 2. Company Regulations of PT. SMART Tbk, version 2013-2014. For 2013 payment system, company refers to the Decree of the Governor of Lampung No
G30III.05HK2013 concerning Stipulation on Tulang Bawang Regency Minimum Wage UMK in 2013 of Rp. 1,155,000.-, effective as per 01012013. This provision has been socialized
based on SK No. 036CEO 2HR PSM 2012013 concerning the Wage of Daily Labor BHL PT. SIP-Lampung. In consideration of the above Governor Decree then decide to adjust the wage of
daily workers BHL to become Rp. 46,200day. This decision comes into force from 01012013.
With respect to the UMK regency minimum wage provisions the workers in the field have know it precisely. This is known from the interviews with a number of BHB workers taken by sampling
of harvesting personnel. They inform that daily wages are Rp. 46.200,- working fulltime for 25 working days per month they will receive basic wages of Rp. 1.155.000,-,. On the wage payment
receipt of May 2013, under the name of NIK: 12003Abdul Majid SKU-H status and on the payment receipt of NIK: 12004 Kadek Artawan a worker of GABA Unit SKU-H status the
wages are written Rp. 1.155.000,-. The UMK provisions are imposed to the workers with BHL and PKWT status, and the first year SKU-H.
Company maintains companyrules in the form of: 1. Collective Labor Agreement PKB
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 43of 75
between PT. SIP of Tulang Bawang Regency, Lampung: BH.No: 182PT.SIP1989 and PUK.SPPP-SPSI
Trade Union
of Tulang
Bawang with
Registration No.:
063KPTSPCSPPP.SPSITBXII2005, for 2011-2013 period, and 2. Company Regulation of PT. SMART Tbk, version 2013-2014.
Company provides facilities and infrastructures to support and ensuring decent life. The following is the List of Existing Welfare Facilities in PT. Sumber Indah Perkasa, SMRM Mill, SMRE Estate,
and GABA KKPA per June 2013.
No. Jenis Bangunan
Sat Lokasi
Total SMRE
GABA SMRM
1. Perumahan staf Unit
14 -
10 24
2. Perumahan Karyawan Unit
375 -
136 511
3. Masjid Unit
4 -
1 5
4. Gereja Unit
- -
- -
5. TK Unit
- -
- 1
6. SD Unit
- -
- 1
7. Rumpin Rumah Pintar Unit
- -
- 1
8. Policlinic Unit
1 -
- 1
9. Balai Karyawan Unit
4 -
- 4
10. Balai Penitipan Anak Unit
2 -
- 2
11. Kedai ransum Koperasi Unit
2 -
2 12. Lap.Sepak Bola
Unit 2
- 1
3 13. Lap. Bulutangkis
Unit 4
- 1
5 14. Lap. Voley
Unit 4
- 2
6 15. Lap. Tennis
Unit 1
- -
1 16. Angkutan Anak Sekolah
Unit 1
- 1
1 Remarks: Facilities for GABA are all shared with SBYE because they are located close to
each other. The provisions on the rights to have housing facilities are regulated in PKB. It is also regulated in
a circu lar issued by each Unit Manager. For example, Circulars concerning SKU Workers’
Rights, issued by the Unit Manager of GABA No. Reff: 082SIP-GABA042012. It is stated that when an employee is promoted to be SKU employee either Daily SKU SKU-H or Monthly SKU
SKU-B he will be given his rights. Points 4, 7, and 8 say that they will have a housing facility without furniture, but with free water and lighting. For staff employee, housing facility will be
furnished with furniture as stipulated in Remuneration
– Housing Facility document no.doc : NOM F-01702-00 approved by MD Strategic officials, valid from 01052006. This provision
applies to employee of category HG, F, DE, to CB. Companyhas entered into a contract with contractor that requires the contractorsto comply with
applicable regulations on employment. Evidence can be seen in the contract or SPK Working Order :
1. SPK No. 001-GABASPK-LI2013 -FFB Transportation Loading between GABA Manager vs Supradi contractor, as follows:
-
Article 5 on Terms and Specification of Work, paragraph 4 the requirements to be furnished with Vehicle Holder Book, Vehicle Registration Card, Inspection Certificate, and First Aid Kit.
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 44of 75
- Article 5 paragraph 19, use of PPE for Worker.
- Article 5 paragraph 20, stressed that the contractor shall comply with the Department of
Manpower and Transmigration’s laws and regulations. -
Article 7, concerning Work Accident, where the second party Nurohim shall pay the wage of workers according to the UMK and include his workers in jamsostek program.
Compliance status: Full Compliance 6.6
The employer respects the right of all personnel to form and join trade unions of their choice and to bargain collectively. Where the right to freedom of
association and collective bargaining are restricted under law, the employer facilitates parallel means of independent and free association and bargaining
for all such personnel
Companyalready has a Trade Union. The policy concerning permission to establish a trade union is contained in the Circular Letter from the CEO-2 concerning Trade Union Freedom, No.
094CEO2SE122010, dated 14122010, that the freedom of association in a trade union is the worker or employee’s fundamental rights as regulated in Act No. 212000 on Trade Union or
Labor Union. The existing trade unionsare only one and covering all Unitsboth Estatesand Mills. The union
has been registered as in the Decree of Branch Board of Agricultural and Plantation Trade Union Federation of SPSI of Tulang Bawang Regency No. 026KptsPCSP.PP-SPSITBVI2007,
dated 5062007 concerning Endorsement of Work Unit Leaderships of SP.PP SPSI PT. SIP for 2007-2012 service period and has a Collective Labor Agreement PKB book with a registration
numberaccording to the Decree of the Head of Department of Manpower of Lampung Province No. KEP.188.44811III.0503I2011. The applicable PKB is that of 2011-2013 periods.
The Trade Union Leadership terms are now extended in accordance with SK No. 100KptsPCSP.PP-SPSITBVI2012 concerning Stipulation on Work Unit Executive Board of
SP.PP-
SPSI PT SIP, dated 11062012, in the third dictum: “to give a full mandate to PLT PUK SPSI PT SIP to organize the work unit meeting Musnikin November 2013. The second dictum:
to endorse executive boards of PUKSPSI PT SIP there are 6 workers being endorsed. Currently the total number of PT SIP Trade Union members, data of May 2013, is 1,102 people.
This membership is automatic in nature, when one becomes a worker of minimum SKU-H status. Currently, the member card as proof of membership is not produced yet. The names of
members are registered in the List of Trade Union Member of respective work unit. Bipartite Cooperation Body LKShas also been established in each Unit and is already
approved by local Department of Manpower. For example, the LKS Bipartite KUD Krida Sejahtera of KKPA GABA, 2013-2015 Period, No.: 560HIPKII.TBBPIV2013 dated 15042013
by Head of Department of Manpower and Transmigration of Tulang Bawang Regency. The membership is composed of 8 company representatives to 8 worker representatives.
Currently, the total number of PT SIP trade union members based on May 2013 data is 1,102 members. The membership is automatic once they become an employee with a minimum status
of SKU-H. Names of members are registered in the Trade Union Member List of each work unit.
Companyprovides facilities to smooth Trade Union activities, in the form:
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 45of 75
- A room for Trade Union office - Desks, chairs, stationery,
- File cabinet - A meeting table and chairs
- Water dispenser - Uniforms clothing for the trade union board members totaling 16 pieces.
- A freedom to use office administration facility. - Fostering the treasury by KTU relating to bookkeeping
Recordsof meeting both internal and external, as sample some can be reported as follows: - Minutes of SPSI meeting with the Management of PT SIP Lampung dated 31012013, with
subject “Discussion on workers’ aspiration and request”, attended by 17 workers at TT by PUK SPSI-Sopuan, EM Gala, and HRD Jakarta.
- Minutes of PT SIP GABA Bipartit meeting, dated 1542013, discussion on harvesting personnel wages 2013 and fines of production foreman, attended by 17 workers.
- Minutes of coordination meeting between PUK and a delegation from PT. SIP Lampung SPSI on 8012013 with the agenda: discussion on various issues, among other things, working day,
employee’s family member death, socialization on how to establish SPSI in the units, harvesting tools, hand tractor, request for copies of any circulars from the management, format
of expected payroll, bonus. The minutes are signed by the chairman and secretary.
Compliance status: Full Compliance 6.7
Children are not employed or exploited. Work by children is acceptable on family farms, under adult supervision, and when not interfering with education
programs. Children are not exposed to hazardous working conditions
Companyis very stringent in selecting the candidate employee in order to prevent underage workers, the minimum should be 18 years old. This provision is regulated in:
- PKB article 7 concerning new employee recruitment, paragraph 4, at the minimum 18 years
old. -
Government Regulation Chapter II Work Relations, Article 5, paragraph 2 that candidate worker should be the minimum 18 years old.
- Circular Letter from HR Director to all Unit Head, No. 002SE-HRDV0309, date 3132009
with subject: Minimum Age Limitation, swehubu. Act No. 13, article 68, concerning child employment prohibition, so the minimum age of employee recruitment is 18 years old.
The evidence of implementation of this policy can be seen in the following data: - In the Summary Data of GABABHL Employee, the youngest work entry age is 19 years old,
under the name of Ari Madela, born 24091993, entry into work on 01012013, for PKWT Employee , the youngest work entry age is 20 years old, under the name of Dedi Erik, born
12121991, , entry into work on 07032013
Compliance status: Full Compliance 6.8
Any form of discrimination based on race, caste, national origin, religion, disability, gender, sexual orientation, union membership, political affiliation, or
age, is prohibited
Companygives equal opportunities to everyone to work in Company.The documents: 1. HR Policy No. A-001-00, effective 192005, issued by Managing Director Strategic, point 2, states
that in principles Organizationemploys competent individualsin accordance with position
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 46of 75
requirements without discrimination by ethnic, race, and religion”. 2. Employment Recruitment Policy: Provision on Recruitment and Selection Outside Jakarta no. SDM A-006-00, dated
192005, regulates that recruitment of manpower does not define particular ethnic, sex, as well as religion as requirements. It is also mention minimum age of 18 years old.”
As evidence, worker composition in each Unit can be seen in the data as per May 2013, from data sampling as follows:
Data ofGABA Estate BHL: - Sex: Male 260, Female 114.
- Religion: Islam 378, Hindu 4, Christian 1 - Ethnic: Javanese 375, Palembang 1, Balinese 4, and Sundanese 1.
Data of GABA Estate BHB : - Sex: Male 16, Female 276
- Religion: Islam 291, Hindu 1. - Ethnic: Javanese 286, Palembang 2, Lampung 1, Bali 1, and Sundanese 2.
The location of the estates and mills is in fact within transmigration areas which are mostly inhabited by people from Muslim Javanese ethnic.
The forms of job application do not mention sex group, ethnicity, or religion for general occupation, means that any job can be performed by men or women.
Compliance status: Full Compliance 6.9
A policy to prevent sexual harassment and other forms of violence against women and to protect the reproductive rights is developed and applied
Company has established a policy related to prevention of sexual harassment in a circular letter Socialization on Harassment Sexual Issues, No. 003CEO2-SE012011, dated 10012011.
There should be socialization to all employees concerning prevention and handling of sexual harassment issues, so as to increase legal awareness and respect norms and ethics in the
plantation work units of Sinar Mas II.
Samples of evidence of the implementation of prevention of sexual harassment activities of socialization in GABA Units are as follows:
- GABA Unit, there is the Letter of Acknowledgement of Socialization on How to Deal With
Sexual Harassment held on 15032013, there are 12 participants for t he staff’s wife’s and
male workers. - GABA Unit, there is the Letter of Acknowledgement of Socialization on Sexual Harassment
carried out on 15062013, to 23 K3T representatives and 30 BHL Harvester. - In front of the GABA office there is a campaign poster s
aying “STOP.. Woman and Child Abuse”.
Nevertheless, in GABA Unit, this socializationhas been made only to 30 representative workers. There is no evidence that it is made to 276 workers personnel. This is established as minor
nonconformity. Company policy on protection of reproductive rights and documentedhas been included in:
- Government Regulation chapter IV, article 23 concerning Annual Leave, Article24 Long Rest
Period, Article 25 Maternity or Miscarriage. - Memorandum No. 001MemoVPA PSM2042011 dated 842011, concerning prohibition of
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 47of 75
pregnant and breast feeding workers to work as sprayers. - Circular Letter No. 095CEO2-SE122010, dated 14122010, concerning Menstrual Period
Permit Granting, where working is not permitted in the first and second day. Record evidence of the policy implementation of reproductive rights protection is:
- There is Sick Letter Form, in the name of Ema Ratnasari NIK 10017, remarks:dysmenorrhea H1 = Menstruation, dated 2-
3 April 2012, from a clinic’s doctor. - Sick Letter Form, in the name of Ny. Latifatul F, NIK 12008, subject on maternity leave, 35
days, dated 28122012 - 31012013, from Wiyangga Saputro. The second: dated 08112012 – 28122012 before and after giving birth.
Records of employee’s complaints and grievances have already been maintained and followed up. For example, at SMRM Unit. There is an Internal Grievance Log Book, which
contains: date, Place, Name, Contact details, Issues, Registrar, Response Date, Action, Current status, PIC, and Target Finish. Sample records are a letter of grievance in the name
of M. Tamzis, SKU-B, Workshop, residence at Blok C No. 16, 2 and Pasto Utomo, SKU-B, Office, Blok C No. 15. They are both complaining about the condition of septic tank that
overflows in their house. The grievance letter was made on 1062013, by both of them, and acknowledged by Asst MR and KTU on 10 June 2013. A follow up action has been made
accordingly.
Compliance status: Minor Non-conformity no. 1 6.10
Growers and mills deal fairly and transparently with smallholders and other local businesses.
For Mesuji Regency, there has been a letter of FFB price stipulation from local Plantation Department of Lampung Provinceon 7 May 2013 stating that on average the FFB price is Rp.
1,136.27Kg and the price company sets to the KUD Krida Sejahtera is Rp. 1,243.00 based on the planting year 10 year and higher.
For July, Lampung Province sets Rp. 1,320.61kg as the price for the crops of 10-20 years old. There is SOP for FFB Grading Guidelines and FFBGrading WI No PT SIP-SMRMIK04-1. It
contains sorting criteria and penalty provisions for FFB out-of-specification. Company has established the grading system and penalty provisions and have conformed to the provisions
stipulated by the Government. Based on the grading system, unripe and less ripe fruits and over ripe fruits will be subject to penalty 50, empty fruit bunches 100. The grading outcome and
the percent of fruit subjected to penalty are sent to the KUD in the form of hardcopy and softcopy so that
the KUD’s data is updated daily. Sampling of sorting outcome per January 2013 results in 9,446,020 Kg FFB and 13,202 kg
penalty from over ripe fruits 50 penalty and empty fruit bunches 100 penalty. The grading determination has conformed to the provisions of the regulation of the Minister of Agriculture No.
395KptsOT.140112005
The setting up of FFB purchasing price follows the prevailing provisions, and the summary of FFB price stipulation from authorized agency is available. Payment has been settled in a timely
manner both to cooperatives and contractors. Company should ensure the cooperative’s efforts to communicate pricing methods and price
cutting related to costs imposed to plasma members for maintenance and transportation. This is to ensure that all parties understand the contract agreement they entered into, and that the
contracts are fair, legal and transparent. Compliance status: Observation no. 8
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 48of 75
6.11 Growers and millers contribute to local sustainable development wherever
appropriate Company has in place a policy in the form of company memorandum to perform CSR program
throughout the company group in order to comply with Act of RI No. 402007. CSR plan in 2013 covers the aspects of education scholarships, health hospital rehabilitation, posyandu
activities, fogging, mass medication, economic empowerment FFB transportation by local contractors, purchasing local materials, infrastructure road improvement, surfacing and social
assistance for religious purpose and celebration of day of an important event.
Company has a program of prioritizing local contractors to have jobs. Jobs given include printing materials for administration purposes and rice procurement by KUD, FFB transportation,
harvesting ladder construction. Samples taken are SPK 001-GABASPK-LI2013- FFB Transport. The SPK has a validity period and terms of payment which is twice a month under the
name of Bp. Suradi, May 2013 period.
Compliance status: Full Compliance 7
RESPONSIBLE DEVELOPMENT OF NEW PLANTINGS 7.1
A comprehensive and participatory independent social and environmental impact assessment is undertaken prior to establing new plantings or
operations, or expanding existing ones, and the results incorporated into planning, management, and operations
Not Applicable 8
COMMITMENT TO CONTINUOUS IMPROVEMENT IN KEY AREAS OF ACTIVITY 8.1
Growers and millers regularly monitor and review their activities and develop and implement action plans that allow demonstrable continuous improvement
in key operations
Company has conducted evaluationregularly to ensure ‘continuous improvement’ through the
mechanism of regular management meeting and internal audit activities. SOP no. SOPSPOSMARTLH-16 lists audit internal which is conducted at least once a year. In addition,
the management conducts routine meetings both regionally and corporately.
Company has conducted internal audit with different objects, such as called Mill Audit Advisory which is performed twice a year. For ISPORSPO, Internal Audit is scheduled at least once a
year. ISPORSPO internal audit was carried out by personnel who have had Internal Auditor training, i.e. Maman Surahman, Baby F Nurainy and Hendra Setiawan on 19-26 March 2013.
There were 13 findings and all have been closed.
Company has developed CSR program for respective units and for the communities in the neighborhood of plasma and main estates. Some of the short-term programs have been
implemented for the period of 2013.
Company should develop a specific method to evaluate the effectiveness of CSR programs done as input to future program improvement.
Compliance status: Observation no. 7
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 50of 75
D.2. Statement by the Certifier Body on Behalf of PT. Sucofindo SBU-SICS
We, the undersigned declare that the information and conclusions included in this report have been prepared in accordance with rule and standard of RSPO, PC, and that the certification
decision has been based upon this information. Verified and Reviewed by:
Name Nuzwardy Sjahwil
Position SLA LA Auditor
Signature
Date December, 16
th
2013 Approval:
Name Triyan Aidilfitri
Position HSE Audit and Certification Department Head
Signature
Date December, 16
th
2013
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 51of 75
List of Abbreviation
AMDAL Analisa Mengenai Dampak Lingkungan Environment Impact Study
Report ANDAL
Analisa Dampak Lingkungan Environment Impact Analysis Report BOD
Biological Oxygen Demand BPN
Badan Pertanahan Nasional National Land Agency COD
Chemical Oxygen Demand CPO
Crude Palm Oil CSR
Corporate Social Responsibility DOE
Department of Environment EFB
Empty Fruit Bunch EIA
Environment Impact Assessment FFA
Free Fatty Acids FFB
Fresh Fruit Bunch FSMS
Food Safety Management System GMP
Good Manufacturing Practice GABA
Gedung Aji Baru Estate GALA
Gedung Aji Lama Estate GPS
Global Positioning System Ha
Hectares HACCP
Hazard Analysis and Critical Control Point HCV
High Conservation Value HCVF
High Conservation Value Forest HGU
Hak Guna Usaha Land Use Title HSE
Health Safety Environment IEMA
Institute of Environmental Management and Assessment IPB
Institut Pertanian Bogor IRCA
International Register of Certified Auditor JAMSOSTEK Jaminan Sosial Tenaga Kerja Labor Social Insurance
K3 Keselamatan dan Kesehatan Kerja Occupational Safety and Health
KAN Komite Akreditasi Nasional The Indonesian Accreditation
Committee KKPA
Kredit Kepada Koperasi Primer KLH
Kementerian Lingkungan Hidup Ministry of Environment KTU
Kepala Tata Usaha Administration Head LCC
Legume Cover Crop LSM
Lembaga Swadaya Masyarakat NGOs MOU
Memorandum of Understanding MSDS
Material Safety Data Sheet MSJA
Mesuji Estate NA
Not Applicable NC
Non Conformity NCR
Non Conformity Register OER
Oil Extraction Rate OSH
Occupational Safety and Health
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 52of 75
OSHAS Occupational Safety and Health Assessment Scheme
PC Principle and Criteria
PHT Pengendalian Hama Terpadu Integrated Pest ManagementIPM
PK Palm Kernel
PKO Palm Kernel Oil
POM Palm Oil Mill
POME Palm Oil Mill Effluent
PPE Personal Protective Equipment
RSPO Roundtable on Sustainable Palm Oil
RSPO NI Roundtable on Sustainable Palm Oil National Interpretation
RKL-RPL Rencana Kelola Lingkungan dan Rencana Pemantauan Lingkungan
Environment Management Plan – Environment Monitoring Plan
SA8000 Social Accountability 8000
SIA Social Impact Assessment
SIO Surat Izin Operator
SOP Standard Operating Procedure
SIP Sumber Indah Perkasa
SBYM Sungai Buaya Mill
SBYE Sungai Buaya Estate
SMK3 Sistem Manajemen
– Keselamatan dan Kesehatan Kerja Management System of Occupational Safety and Health
SMRM Sungai Merah Mill
SMRE Sungai Merah Estate
TTD Tim Tanggap Darurat Emergency Response and Preparedness
UKL Upaya Pengelolaan Lingkungan Environmental Management
Efforts UPL
Upaya Pemantauan Lingkungan Environmental Monitoring Efforts WWTP
Waste Water Treatment Plant WHO
World Health Organization
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 53of 75
ATTACHMENT-1 MAP
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 54of 75
1.1. Overlay Map of Sungai Merah Estate SMRE and KKPA Gedung Aji Baru GABA Estate
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 55of 75
1.2. Map of Rivers
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 56of 75
1.3. Map of HCV Gedung Aji Baru Estate
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 57of 75
1.4. Map of Topography
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 58of 75
1.5. Map of Planting Year Sungai Merah Estate SMRE
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 59of 75
1.6. Map of Planting Year Gedung Aji Baru GABA Estate
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 60of 75
ATTACHMENT-2 NCR
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 61of 75
Non Conformity Observation Report Organization
No. Audit
No.
Standard. Audit Date :
14-06-2013 TSS, RQ, WS, AMR,
RSPO 00003 1
1 RSPO Preliminary ATL Auditor :
RSPO 00004 Organization Rep. :
No .
Category Clause Std
Auditor Description
Root Cause Investigation
Corrective Action Evidence
Audit Team
Review 1
2 3
4 5
6 7
8 9
1 Major
2.1 1
TSS The company has a
letter of permit of the release of forested
areas and or a letter of designation with the
APL status for the plantation area of PT
Sumber Indah Perkasa. The company does not
have permitsIUP for Mill with a capacity of 120
tons of TBShour. So far the company only has a
letter of recommendation from
the Provincial Forestry Service for the
management of mills with a capacity of 120
tons TBShour. 1. Letter of the
Regional Forestry Office of Lampung
Province No. 1052KANWIL-6TGH-
13490 is undocumented in the
estate office so that at the time of pre audit it
could not be shown to the auditor.2. The IUP
does not specify a mill with a capacity of 120
tonshour, but with respect to production
capacity, there has been an approval from
the State Minister of Investment Head of
BKPM.1. Letter of the Regional Forestry
Corrective Action 1: Document the letter of
the Regional Forestry Office of Lampung
Province No. 1052KANWIL-6TGH-
13490 at the estate office.Evidence 1:Letter
of the Regional Forestry Office of Lampung
Province No. 1052KANWIL-6TGH-
13490 has been available.Corrective
Action 2:Confirmation to the relevant agencies
relating to IUP.Evidence 2:The company has had
SPUP that is valid as IUP, while for production
capacity there has been Closed
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 62of 75
Office of Lampung Province No.
1052KANWIL-6TGH- 13490 is
undocumented in the estate office so that at
the time of pre audit it could not be shown to
the auditor.2. The IUP does not specify a mill
with a capacity of 120 tonshour, but with
respect to production capacity, there has
been an approval from the State Minister of
Investment Head of BKPM.
an approval from the State Minister of
Investment Head of BKPM No
46IIPMDN1998 dated 01 July 1998 concerning
Letter of approval for expanding domestic
capital investment stating that the production
capacity becomes 120 Tons of FFB per hour.
This was confirmed by the letter of the Head of
Capital Investment Coordinating Board and
Integrated Permit Service of Lampung Province No
800200BID. VII.062013 dated 01
July 2013 that the Business Permit of PT
SIP issued by BKPM Agency for capital
investment is equal to the estate business license
IUP issued by sectoral technical agency due to
the authority granted by the Minister of
Agriculture.
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 63of 75
2 Major
4.6 ; 5.3
1 RQ
At GABA, waste water comes from bathing
activity of sprayer personnel flows into
the septic tanks, but at SBYE it flows to public
ditches. This is potentially to
contaminate water that will poison flora, fauna,
and human. Waste water come
from bathing activity of sprayer personnel at
the SBYE does not enter into the septic
tanks or a catchment and still flows into
public ditches. Corrective Action :
To repair the bathrooms sewer so that used
water from the sprayer bathing activities will not
go to public ditches. Evidence:
Used water from the sprayer personnel
bathing activities has been directed to the
septic tanks Photo documentation is
available. Closed
3 Major
5.6 1
RQ The measurement
results for vibration, odor, and noise are not
obtained because there is a problem with the
environmental testing laboratorys equipment.
Vibration and odor tests have been carried
out but the results are not obtained yet.
Corrective Action:Perform vibration
and odor tests in collaboration with an
accredited laboratory.Evidence:The
results of vibration and odor tests have been
available. Closed
4 Major
5.4 1
RQ The company does not
have a record of land use trajectory from
secondary forest into palm land.
The company does not have a record of land
use a minimum 2 years before the land is
Document of land use trajectory cannot be
shown because the prior status of land is
APL Corrective Action:
Document of land use plan prior to the
plantation opening will be searched for.
Evidence: The document is
available in the form of Closed
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 64of 75
cleared for plantation business.
The company does not have a record of land
use trajectory from secondary forest into
palm land. The company does not
have a record of land use a minimum 2 years
before the land is cleared for plantation
business. land satellite image
1988 – 1989.
5 Major
4.1 1
WS The SOP on Seed
Nursery SOPSMARTMCARII
ITA-BBT, rev.00, 192012 and
IKSMARTMCARIIIT A-BBT06 on Seedling
Acceptance and Planting does not yet
explicitly regulate the obligation to use a
certified seed. SOP does not include
sentences requiring the use of certified seeds.
Corrective Action: Develop a mechanism
that requires the use of certified seeds.
Evidence: The mechanism to use
certified seeds has been available in the form of
SE from VPA PSM2. Closed
6 Major
4.1 1
WS There is no SOPWork
Instruction that explicitly and in details
regulates planting on peat land
SOP of planting on peat land is unable to
be shown because the company has
committed not to make a new planting in peat
land area. Corrective Action:
Develop a SOP that regulates planting in
peat land replanting area.
Evidence: There has been a SOP
regulating on planting in Closed
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 65of 75
peat land replanting area.
7 Major
4.7 1
WS The company, for
SBYM and SMRM Mills, currently does
not have fire mitigation officers as regulated in
Kepmenaker No. 186MEN1999.
Fire warden training is not already conducted
at SBYM and SMRM units.
Corrective Action : Deliver fire mitigation
training to fire warden in collaboration with
relevant agencies.Evidence :Fire
warden training has been conducted by
Local Manpower and Transmigration Service
Disaster Mitigation Body of Tulang Bawang
Regency on 5 July 2013 Closed
8 Major
4.7 1
WS There are some
officers of fire fighter squad in the
Emergency Response Team Structure without
evidenced of fire mitigation training.
They are: SBYE, 1 people, SMRM 5 out of
7 people, and SMRE 5 out of 8 people.
At the implementation of fire mitigation
training, some of the emergency response
teams members were not present so that not
all the people have fire mitigation training.
Corrective Action: Conduct training in
using Apar for fire fighter squad that has
registered in the structure of emergency
response team. Evidence:
Officers of fire fighter squad registered in the
emergency response team have received fire
mitigation training. Closed
9 Major
4.7 1
WS Simulation on dealing
with fire emergency situation has not been
carried out in SBYE and GABA units.
Fire simulation has not conducted in each
work unit of estate and mill, because to date
fire simulation is Corrective Action:
Conduct fire emergency response simulation.
Evidence:
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 66of 75
carried out jointly Estate and Mill at
SBYE. Documentation of the
simulation implementation has
been available.
10 Major
4.7 1
WS Data of worker health
showed that there is no examination of
cholinesterase aspect on workers touching
B3, such as: sprayers and chemical
warehouse officers. Periodic health
examination has been conducted routinely,
but the examination of Cholinesterase has not
been conducted yet on the sprayer personnel
and chemical warehouse officers.
Corrective Action: Conduct Cholinesterase
examination for chemical warehouse
officers and sprayer personnel.
Evidence: Chemical warehouse
officers and sprayer personnel have their
cholinesterase examined The test
results from Prodia Laboratory have been
available. Closed
11 Major
4.7 1
WS During a visit to Mill
area, some workers were found not using
PPE, sampling: 1 at SMRM, in the area of
St. Sterilizer, and Nut- Kernel, not using
earplugmuff. 2. No apron was available for
workers in boiler area. Noise test value at St.
Sterilizer and Nut Kernel is 84 - 85 dBA.
. Corrective Action: Risk
analysis has been reviewed based on
suggestion from the Auditor by providing ear
plugmuff in ST Sterilizer and Nut
Kernel.Evidence :Minutes of ear plug
ear muff supply acceptance have been
available. Closed
12 Minor
6.9.1 1
WS There is no evidence
that sexual Sexual harassment
socialization in MSJA Corrective Action:
Document the evidence Not
Closed
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 67of 75
harassmentsocializatio n has been conducted
in MSJA unit. In addition from the
evidence of socialization records
available is still extremely small in
number. has been conducted to
the staffs wives and some female workers
but the documentation is kept in the MSJA
SPO secretariat so that it was unable to be
shown during document checking by
auditor in the Lampung Regional office.
of sexual harassment socialization.
Evidence: Evidence of sexual
harassment socialization is available
and documented. This
NCR will be
seen in certifica
tion audit
13 Observas i
6.1 1
TSS It would be better that
CSR plans developed are capable of ensuring
welfareskill improvement. The
method of need identification are
employed as a basis to determine priorities of
the CSR program in villages outside the
company area. It is suggested the
company establishes a short- and long-term
plan and a method of evaluation to ensure
that the CSR program is effective and
successful as an indicator of
improvement. The short-term CSR
plan has been available in the form of
Annual CSR Program. The Five Year CSR
Strategic Plan of 2014
– 2018 periods along with the performance
indicator for evaluating CSR activities are
under preparation process.
Corrective Action: Finalize 5 year CSR
strategic plans. Evidence:
The draft CSR strategic plan of 2014
– 2018 period along with
performance indicator for evaluating CSR
activities have been available.
Closed
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 68of 75
Non Conformity Observation Report
Organization No.
Audit Standard.
Audit Date :
19-07-2013 TSS, RQ, GGU, YSF, WS,
RSPO 00003 No. 02
1 RSPO Certification ATL Auditor :
RSPO 00004 Organization Rep. :
No. Category
Clause Std
Auditor Description
Root Cause Investigation
Corrective Action Evidence
Audit Team
Review 1
2 3
4 5
6 7
8 9
1 Minor 6.9
1 WS The implementation of
sexual harassment socialization to employees is
limited compared to the number of workers. Data
showed : -In GABA Unit, the number
of workers has been socialized to 30 workers. For
BHL and PKWT personnel are30 out of 276 workers
only 10.9 . Sexual harassment
socialization has been conducted to the workers,
but the documentation was cannot be showed at
the time of audit. To completed the
documentation of sexual harassment socialization.
Evidence : Documentation of sexual
harassment socialization is available at SPO
secretariat. Closed
2 Observasi 4.6
1 YSF Company has used
herbicide registered in Pesticide Commission of the
Republic of Indonesia but the use of restricted
pesticide should be reduced gradually and substituted by
a more environmentally friendly herbicide and safer
to field operators. The company still apply
restricted pesticide i.e. paraquat.
The management has issued memo to reduce
the paraquat No. 002MEMO-VPA
PSM2042011. The restricted pesticide will be
monitored yearly to see the trend of paraquat
reduced. Evidence :
Graphic of Closed
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 69of 75
restrictedpesticide use year 2011-2013 showed
the reduce of paraquat used.
3 Observasi 4.7
1 YSF Company has undertaken
workers health examination covering cholinesterase and
audiometry but for those working with risks of
chemical exposure should be added with spirometry
examination to ensure their lung health.
The workers with exposure to chemical
material hazard were not checked for spirometry.
To conduct identification the workers with risks of
chemical exposure and gradually will conduct
spirometry checking. Evidence :
1. List of worker who
needs to be checked for spirometry.
2. Medical check program for spirometry.
Closed
4 Observasi 2.3
1 TSSGG U
Organization has made a map but the map should
have a sufficient scale, at least 1: 100.000 in
accordance with Decree of the Ministry of Forestry No.
48menhut-II2004. The company has the
different scale for all maps.
Map will be adjusted to be scale 1 : 100.000
Evidence : Map with the scale
1:100.000 Closed
5 Observasi 5.2
1 TSSGG U
Organization has performed monitoring and contained in
HCV Monitoring Report, but it should establish Person in
Charge PIC and due date of the recommendation
specified in the HCV monitoring report to see the
follow up and progress of such recommendation.
There is no column for PIC and Action Plan at
Form HCV Monitoring. Completed the form with
edit PIC and Action Plan. Column.
Evidence : Revision of Form HCV
Monitoring. Closed
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 70of 75
6 Observasi 4.7
1 WS Company already complete
with the provisions of Decree of the Ministry of Manpower
No. 1861999 related to the number of fire mitigation
personnel in mill area. But it only trained 20 personnel for
both mills it should be 12 personnel for each mill. It
should ensure to gradually conduct training to cover the
remainder in class D, C, B and A.
The simulation of fire fighting has conducted
but the number of the fire fighter was not meet with
the government regulation Kepmenaker
No. 186 Tahun 1999. To fulfill the number of fire
fighter to meet with the Kepmenaker No. 186
Tahun 1999. Evidence :
Documentation of fire fighter training.
Closed
7 Observasi 8.1
1 TSS Companyshould develop a
specific method to evaluate the effectiveness of CSR
program done as input to future program
improvement. Yearly CSR Program has
been setup for each unit, but not yet covered the
culture program. For the strategic planning year
2014-2018 has addressed the vision and
mission to develop and maintain the culture of
local people. The company will re-
identification the existing indigenous people. If there
is then the company will setup the CSR to develop
and maintain the culture of indigenous people.
Evidence : Revise CSR Program.
Closed
8 Observasi 6.10
1 TSS Company should ensure
cooperative’s efforts to socialize aspects that
become a factor in price cutting related to costs
imposed to plasma members for maintenance and
transportation costs. Proof that all parties understand
the contract agreement they entered to, and that the
contracts are fair, legal and transparent.
The company has conducted the
socialization to the cooperation staff and
coordinator staff, regarding the factor in
price cutting related to costs imposed to plasma
members for maintenance and
transportation costs. But the socialization was not
sufficient some of the members were found well
The company will conduct monthly meeting and to
socialized the factor in price cutting related to
costs imposed to plasma members for maintenance
and transportation costs. Evidence :
The documentation of meeting schedule between
company and cooperation is available.
Closed
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 71of 75
not understand for the subject.
9 Observasi 1.1
1 TSS It is advised that company
ensures responses to any information request as
required by related SOP where responses are to be
given within 1 month at the latest.
Sampling II, no records are found on request for
assistance applied by Ibu Nurhayati on 18 May 2013
i.e. application for educational and playing
equipment assistance for TK Dharma Batu Ampar.
Obs
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 72of 75
APPENDIX PT. SUMBER INDAH PERKASA
– SUNGAI MERAH MILL RSPO SUPPLY CHAIN CHECKLIST
– MASS BALANCE MODUL
PT. Sumber Indah Perkasa – Sungai Merah Mill SMRM is implemented the supply chain
system procedures as required in RSPO certification. The company has set the supply chain system categorized as Mass Balance scheme.
A. Documented Procedures
1.1 Complete and up to date procedures covering the implementation of all the elements in these requirements.
RecordsEvidence: There is procedure SOP Identifikasi dan kemampuan-telusuran SOP
Identification and Traceability PT SIP ‐SMRMSOP01
The name of the person having overall responsibility for and authority over the implementation of these requirements and compliance with all applicable
requirements. This person shall be able to demonstrate awareness of the facilities procedures for the implementation of this standard.
RecordsEvidence: Management Representative related to RSPO-SCCS implementation
Traceability Officer related to RSPO ‐SCCS implementation
SMRM: Decree No. 010PC ‐SMRMIII2013
Document Controller – SPO Officer related to RSPO‐SCCS implementation
SMRM: Decree No. 005FM ‐ SMRMIII2013
1.2 The facility shall have documented procedures for receiving and processing certified and non-certified FFBs.
RecordsEvidence:
SOP Identifikasi dan kemampuan-telusuran SOP Identification and Traceability PT SIP
‐SMRMSOP01
Surat Pengantar Buah Fruit Delivery Letter SMRE GABA with ‘’Mass Balance’’ mark SMRM: Form Rekap Penerimaan TBS Per Unit FFB
Receiving Resume Form each Unit CPO Production Report
SMRM = 55,362.691 tonYear with average OER : 21.51 Recapitulation data of FFB certified receivedprocess CPO production from
January to December 2012 PK Production Report
SMRM = 13,802.922 tonYear with average KER : 5.37 Recapitulation data of FFB certified receivedprocess PK production from
January to December 2012 CPO Dispatch Report
SMRM = 54,631.570 tonYear Addition of Initial Stock, Carry over Last Year
PK Dispatch Report SMRM = 13,466.250 tonYear
B. Purchasing and goods in
SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES
Sucofindo ICS FRM 3.04
Issue 04 Rev. 6 73of 75
2.1 The facility shall verify and the document the volumes of certified and non-certified FFBs received.
RecordsEvidence:
There is procedure SOP Identifikasi dan kemampuan-telusuran SOP Identification and Traceability PT SIP
‐SMRMSOP01
There is a database system called Weightbridge Computerized Program
which has been designed to separate certified and non-certified incoming FFB from own estate, Scheme small holders and independent small holders with the
specific code in database. 2.2 The facility shall inform the CB immediately if there is a projected overproduction.
RecordsEvidence:
SOP Identifikasi dan kemampuan-telusuran SOP Identification and Traceability PT SIP
‐SMRMSOP01 Inform related RSPO certification body and RSPO IT System.
Re-analyze production data and mass balance report. Calibrated and recheck for the bridge and supporting equipments.
To define the projection of certified product considering the error rate contamination for maximum 5 from the total projection data.
C. Record keeping 3.1 The facility shall maintain accurate, complete, up-to-date and accessible records and
reports covering all aspects of these requirements. RecordsEvidence:
Surat Pengantar Buah Fruit Delivery Letter SBYE with “Mass Balance” mark Form rekap Penerimaan TBS per Unit FFB Receiving Resume from each
Unit CPO Production Report daily, three-monthly, and annual
All documents and records have been in controlled according to SOP Pengendalian Dokumen dan Rekaman SOP Document Control and Record Control
SOP Pengendalian Dokumen SOP Document Control PT. SIP-SMRMSOP18 Rev.00, dated 02012012
SOP Pengendalian Catatan, dated 02012012 PT. SIP-SMRMSOP12 Rev.00, dated 02012012
3.2 Retention times for all records and reports shall be at least five 5 years. RecordsEvidence:
Retention times of all records have been determined in SOP Pengendalian Dokumen dan Rekaman SOP Document Control and Record Control
Retention time for all records and reports of PT. Sumber Indah Perkasa is 10 years
3.3 The facility shall record and balance all receipts of RSPO certified FFB and deliveries of RSPO certified CPO, PKO and palm kernel meal on a three-monthly basis.
RecordsEvidence: The company has the monthly, three-monthly, and annual report which contain
record and balance all receipts of RSPO certified FFB and deliveries of RSPO certified CPO and PK.
SBYM Mass Balance Monthly Report, SBYM Mass Balance Three-Monthly Report, and SBYM Mass Balance Annual Report
All volumes of palm oil and palm kernel oil that are delivered are deducted from the material accounting system according to conversion ratios stated by RSPO.