PERENCANAAN LINE BALANCING GUNA MENINGKATKAN EFISIENSI SISTEM DENGAN MENGGUNAKAN METODE REGION APPROACH (Studi kasus di Departemen Produksi pada PT Karya Utama, Pare Kediri)

PERENCANAAN LINE BALANCING GUNA MENINGKATKAN EFISIENSI
SISTEM DENGAN MENGGUNAKAN METODE REGION APPROACH (Studi
kasus di Departemen Produksi pada PT Karya Utama, Pare Kediri)
Oleh: RINI SETYANINGSIH ( 09540044 )
Industrial Engineering
Dibuat: 2010-10-04 , dengan 8 file(s).

Keywords: Line Balancing, Stasiun Kerja, Balance Delay, Efisiensi Sistem,Output Produksi,
Metode Region Approach (RA).
ABSTRAKSI

PT Karya Utama yang terletak didaerah Kediri merupakan perusahaan yang memproduksi
beberapa macam bentuk paving dan perusahaan sering mengalami kendala dalam proses
produksinya, sehingga waktu lembur dalam perusahaan terlalu banyak dikarenakan perencanaan
produksi yang dibuat kurang efektif.
Dengan kondisi perusahaan seperti inilah, masalah keseimbangan lintasan perlu diperhatikan
kembali agar output yang dihasilkan sesui dengan yang diharapkan. Pengaturan lintasan produksi
untuk produk ini bertujuan untuk lebih meningkatkan efisiensi kerja sehingga output yang
dihasilkan dapat ditingkatkan.
Dalam perencanaan line balancing ini, metode yang digunakan adalah Region Approach (RA).
Dari perencanaan tersebut didapatkan jumlah Stasiun Kerja : 3, Balance Delay : 5,71 %,

Efisiensi Sistem : 94,29%, Output Produksi : 1300 buah/hari, Keuntungan meningkat : Rp
10.099.470,Dari hasil perencanaan line balancing ini didapatkan hasil yang semakin meningkat efisiensi
sistem, serta output yang dihasilkan semakin meningkat.

ABSTRACT

PT Karya Utama that was located in the Kediri area where the company which producing some
kinds of paving and the company often experienced the hindrance in the process of his
production, so that in company too much course of overtime time because of production
planning that made less effective.
With the condition for the company that like this, the problem of the balance of the tracks must
be paid again attention to so that output that was produced in accordance with that was hoped
for. The tracks regulation produce for this product had a purpose to more increased efficiency
work so as output could be increased.
In planning line balancing this, the method that was used Region Approach (RA). From this
planning was obtained the number of work station : 3, Balance Delay : 5,71%, System Efficiency
: 94,29%, Output the Production : 1300/day, the profit : Rp 10.099.470,-

From the result of Planning Line Balancing was obtained by result that increasingly system
efficiency, as well as output that was produced increasingly increased.

Keywords : Line Balancing, Work Station, Balance Delay, System Efficiency, Output the
Production, Region Approach Method (RA).