”Implementation of Energy Conservation and CO
2
Emission Reduction In Industrial Sector Phase 1” Kementerian Perindustrian
6-13
PT. Energy Management Indonesia Persero 2011
1. Adiprima Suraprinta
GJ
1 -
- -
2
- -
3 Penggunaan gap former
46.200,51 4,15
4.492,08 9.246,35
0,88 529,44
93.179,52 15,00
8.628,42 5
Pemasangan closed hood dan optimasi sistem ventilasi
2.912,60 0,67
269,71 151.538,97
20,70 151.539,0
20,70 13.919,64
No Langkah Konservasi Energi
REtahun ton-CO2 eq PPEtahun
SUB TOTAL LOW COST SUB TOTAL MEDIUM COST
SUB TOTAL HIGH COST TOTAL
4 Penggunaan condebelt drying
”Implementation of Energy Conservation and CO
2
Emission Reduction In Industrial Sector Phase 1” Kementerian Perindustrian
6-14
PT. Energy Management Indonesia Persero 2011
2011 2012
2013 2014
2015 2016
2017 2018
2019 2020
1 -
2 3
Penggunaan gap former
5 Pemasangan closed hood dan optimasi sistem
ventilasi
No Langkah Konservasi Energi
TIMELINE PERKIRAAN IMPLEMENTASI SUB TOTAL LOW COST
SUB TOTAL MEDIUM COST
4 Penggunaan condebelt drying
2011 2012
2013 2014
2015 2016
2017 2018
2019 2020
Pertumbuhan produksi rata-rata 5tahun 134.950,4
141.697,9 148.782,8
156.222,0 164.033,1
172.234,7 180.846,5
189.888,8 199.383,2
209.352,4 Kebutuhan energi BAU
1.168.672,0 1.227.105,6
1.288.460,9 1.352.884,0
1.420.528,2 1.491.554,6
1.566.132,3 1.644.438,9
1.726.660,8 1.812.993,9
Produksi emisi BAU 108.219,0
113.630,0 119.311,5
125.277,1 131.540,9
138.118,0 145.023,8
152.275,0 159.888,8
167.883,2 GJ
PPE -
35.655,24 53.482,86
56.157,01 58.964,86
61.913,10 65.008,75
68.259,19 71.672,15
75.255,76 t-CO2
RE -
3.301,68 4.952,51
5.200,14 5.460,15
5.733,15 6.019,81
6.320,80 6.636,84
6.968,68 GJ
PPE -
6.991,50 11.293,96
11.858,66 12.451,59
13.074,17 13.727,88
14.414,27 15.134,99
15.891,74 t-CO2
RE -
647,41 1.045,82
1.098,11 1.153,02
1.210,67 1.271,20
1.334,76 1.401,50
1.471,57 GJ
PPE 1.177,37
4.944,93 8.653,64
9.086,32 9.540,63
10.017,66 10.518,55
11.044,48 11.596,70
12.176,53 t-CO2
RE 109,02
496,06 801,33
841,39 883,46
927,64 974,02
1.022,72 1.073,85
1.127,55 GJ
PPE 1.177,37
47.591,68 73.430,46
77.101,98 80.957,08
85.004,93 89.255,18
93.717,94 98.403,84
103.324,03 Ton CO2
RE 109,02
4.445,15 6.799,66
7.139,64 7.496,63
7.871,46 8.265,03
8.678,28 9.112,20
9.567,81
Penggunaan gap former
DESKRIPSI TIMELINE PERKIRAAN IMPLEMENTASI
ton GJ
t-CO2
Penghematan Energi Dengan Implementasi Konservasi Energi UNIT KETERANGAN
Penggunaan condebelt drying Pemasangan closed hood dan optimasi sistem ventilasi
TOTAL PENGHEMATAN ENERGI DAN REDUKSI EMISI
”Implementation of Energy Conservation and CO Kementerian Perindustrian
PT. Energy Management Indonesia Persero
2. AspecKumbong