Adiprima Suraprinta Potensi Konservasi Energi dan Reduksi Emisi di Industri Kertas

”Implementation of Energy Conservation and CO 2 Emission Reduction In Industrial Sector Phase 1” Kementerian Perindustrian 6-13 PT. Energy Management Indonesia Persero 2011

1. Adiprima Suraprinta

GJ 1 - - - 2 - - 3 Penggunaan gap former 46.200,51 4,15 4.492,08 9.246,35 0,88 529,44 93.179,52 15,00 8.628,42 5 Pemasangan closed hood dan optimasi sistem ventilasi 2.912,60 0,67 269,71 151.538,97 20,70 151.539,0 20,70 13.919,64 No Langkah Konservasi Energi REtahun ton-CO2 eq PPEtahun SUB TOTAL LOW COST SUB TOTAL MEDIUM COST SUB TOTAL HIGH COST TOTAL 4 Penggunaan condebelt drying ”Implementation of Energy Conservation and CO 2 Emission Reduction In Industrial Sector Phase 1” Kementerian Perindustrian 6-14 PT. Energy Management Indonesia Persero 2011 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 1 - 2 3 Penggunaan gap former 5 Pemasangan closed hood dan optimasi sistem ventilasi No Langkah Konservasi Energi TIMELINE PERKIRAAN IMPLEMENTASI SUB TOTAL LOW COST SUB TOTAL MEDIUM COST 4 Penggunaan condebelt drying 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Pertumbuhan produksi rata-rata 5tahun 134.950,4 141.697,9 148.782,8 156.222,0 164.033,1 172.234,7 180.846,5 189.888,8 199.383,2 209.352,4 Kebutuhan energi BAU 1.168.672,0 1.227.105,6 1.288.460,9 1.352.884,0 1.420.528,2 1.491.554,6 1.566.132,3 1.644.438,9 1.726.660,8 1.812.993,9 Produksi emisi BAU 108.219,0 113.630,0 119.311,5 125.277,1 131.540,9 138.118,0 145.023,8 152.275,0 159.888,8 167.883,2 GJ PPE - 35.655,24 53.482,86 56.157,01 58.964,86 61.913,10 65.008,75 68.259,19 71.672,15 75.255,76 t-CO2 RE - 3.301,68 4.952,51 5.200,14 5.460,15 5.733,15 6.019,81 6.320,80 6.636,84 6.968,68 GJ PPE - 6.991,50 11.293,96 11.858,66 12.451,59 13.074,17 13.727,88 14.414,27 15.134,99 15.891,74 t-CO2 RE - 647,41 1.045,82 1.098,11 1.153,02 1.210,67 1.271,20 1.334,76 1.401,50 1.471,57 GJ PPE 1.177,37 4.944,93 8.653,64 9.086,32 9.540,63 10.017,66 10.518,55 11.044,48 11.596,70 12.176,53 t-CO2 RE 109,02 496,06 801,33 841,39 883,46 927,64 974,02 1.022,72 1.073,85 1.127,55 GJ PPE 1.177,37 47.591,68 73.430,46 77.101,98 80.957,08 85.004,93 89.255,18 93.717,94 98.403,84 103.324,03 Ton CO2 RE 109,02 4.445,15 6.799,66 7.139,64 7.496,63 7.871,46 8.265,03 8.678,28 9.112,20 9.567,81 Penggunaan gap former DESKRIPSI TIMELINE PERKIRAAN IMPLEMENTASI ton GJ t-CO2 Penghematan Energi Dengan Implementasi Konservasi Energi UNIT KETERANGAN Penggunaan condebelt drying Pemasangan closed hood dan optimasi sistem ventilasi TOTAL PENGHEMATAN ENERGI DAN REDUKSI EMISI ”Implementation of Energy Conservation and CO Kementerian Perindustrian PT. Energy Management Indonesia Persero

2. AspecKumbong