”Implementation of Energy Conservation and CO Kementerian Perindustrian
PT. Energy Management Indonesia Persero
2. AspecKumbong
1 Pemanasan awal udara pembakaran
2 Blowdown heat recovery
3 Penambahan sistem supplementary firing
di kogenerasi
SUB TOTAL HIGH COST
Sub Total Medium Cost
Sub Total High Cost
Total
Sub Total Low Cost
No Langkah Konservasi Energi
CO
2
Emission Reduction In Industrial Sector Phase 1”
Gambar 6.9 Konsumsi Energi dan Emisi CO
2
GJ 35.822,8
0,80 4.062,61
12.314.933.000 35.822,8
0,8 4.062,6
12.314.933.000,0 24.628,1
0,55 2.050,64
23.830.101 156.00
24.628,1 0,6
2.050,6 23.830.101,0
156.009
ry firing 195.234,0
4,36 22.141,21
721.387.590 39.984.0
195.234,0 4,36
22.141,21 721.387.590
39.984.0 158.634,9
5,71 28.254,45
13.060.150.691 40.140.0
158.634,9 5,71
28.254,5 13.060.150.691 40.140.0
REtahun Penghematan
Biaya per Tahun Rp
Perkiraan Investas
6-15
2011
0,00 Low Cost
0,0 156.009.000
0,64 Medium Cost
156.009.000,0 39.984.000.000
2,48 High Cost
39.984.000.000 40.140.009.000
40.140.009.000 Simple
Payback Thn Periode
Kelompok Investasi
Perkiraan Biaya Investasi Rp
”Implementation of Energy Conservation and CO
2
Emission Reduction In Industrial Sector Phase 1” Kementerian Perindustrian
6-16
PT. Energy Management Indonesia Persero 2011
2011 2012
2013 2014
2015 2016
2017 2018
2019 2020
Pertumbuhan Produksi rata-rata 5tahun 391.485
411.059 431.612
453.193 475.853
499.645 524.628
550.859 578.402
607.322 Kebutuhan Energi BAU 12,01 GJTon 2010
4.701.737 4.936.823
5.183.665 5.442.848
5.714.990 6.000.740
6.300.777 6.615.816
6.946.606 7.293.937
Produksi Emisi BAU by energy consume 533.217
559.878 587.872
617.266 648.129
680.535 714.562
750.290 787.805
827.195
Penghematan Energi dgn Implementasi KE
GJ Penghematan Energi
0,0 43.543
45.720 48.006
50.406 52.927
55.573 58.351
Ton CO2 Reduksi Emisi
0,0 2.434
2.556 2.684
2.818 2.959
3.107 3.262
GJ Penghematan Energi
0,0 0,0
0,0 0,0
0,0 34.654,3
36.387,0 38.206,3
40.116,7 Ton CO2
Reduksi Emisi 0,0
0,0 0,0
0,0 0,0
1.937,2 2.034,0
2.135,7 2.242,5
GJ Penghematan Energi
0,0 0,0
0,0 0,0
0,0 0,0
302.872,0 318.015,6
Ton CO2 Reduksi Emisi
0,0 0,0
0,0 0,0
0,0 0,0
16.930,5 17.777,1
GJ Penghematan Energi
0,0 43.543
45.720 48.006
85.060 89.314
396.651 416.484
Ton CO2 Reduksi Emisi
0,0 2.434
2.556 2.684
4.755 4.993
22.173 23.281
DESKRIPSI UNITKETERANGAN
TIMELINE PERKIRAAN IMPLEMENTASI
Penambahan sistem supplementary firing di kogenerasi
TOTAL PENGHEMATAN ENERGI DAN REDUKSI EMISI
Ton GJ
Ton CO2 Pemanasan awal udara pembakaran
Blowdown heat recovery
2011 2012
2013 2014
2015 2016
2017 2018
2019 2020
1 Pemanasan awal udara pembakaran
2 Blowdown heat recovery
3 Penambahan sistem supplementary firing
di kogenerasi Sub Total Medium Cost
TIMELINE PERKIRAAN IMPLEMENTASI
Sub Total Low Cost
No Langkah Konservasi Energi
”Implementation of Energy Conservation and CO Kementerian Perindustrian
PT. Energy Management Indonesia Persero
3. BekasiTeguh