3. 1. General Overview Rekomendasi RSPO PT BBB final

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 13of 105 Komisi ISPO – Ministry of Agriculture Komisi Akreditasi Nasional KAN, Bogor West Java Pangkalan Bun Kalimantan, Indonesia, 2013 ; ISO 9001 : 2008 Quality Management Systems QMS AuditorLead Auditor Training Course IRCA, PT. SUCOFINDO Persero, Jakarta, Indonesia, 2013 ; Assessor Training High Conservation Value Forest – HCVF, Tropenbos International Indonesia Program, The Nature Conservancy TNC, WWF Indonesia Institut Pertanian STIPER INSTIPER Yogyakarta, Yogyakarta, Indonesia 2014. Eko Nugrahaeni Graduated from Indonesian of University UI. She has more than 10 years audit experiences in Social. She has completed the training such as training ISO 17065-2012 by Badan Standarisasi Nasional, Competency Assesor Training by Badan Nasional Sertifikasi Profesi, In-house Training ISO 17021, Nusa Bakti University by Komite Akreditasi Nasional. B.3. Assessment Methodology

B. 3. 1. General Overview

The assessment was carryingout in conformity with the SBU SICS RSPO manual and procedures for auditor and certifier. The assessment was conducted by qualified auditors and referred to RSPO standard as endorsed for the Indonesia National interpretation. Partial certification audit conducted in March to check compliance with Final RSPO Certification System for partial certification. The opening and closing meeting was conducted at the office Brahma Binabakti Estate- Jambi and then continue in Mill‟s and estate‟s offices. Stakeholders‟ meeting was conducted during main assessment. At the opening meeting, the team audit confirm to conduct the audit at : Office at Gedung The East Lt. 23, Jl. Dr Ide Anak Agung Gde Agung Kav. E. 3.2 No. 1, Jakarta Selatan, Indonesia, include:  Review the company‟s response for previous findings  Documentation review for transparencies  CSR plan and policy  Internal Audit program Management Review Meeting  Land ownership and compensation mechanism  Documentation of RSPO‟s requirement refers to P C SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 14of 105 At estate, include :  Worker interviews: OSH. Sexual, religious, racial harassment. Payment scheme, contracts. Child labor. First aid. Awareness.  Chemical stores: Storage. MSDS leaflets. Herbicide mixing areas. PPE. Ventilation. Security.  Field inspections: Fertilizingoperations. SOP‟s., Herbicide application program.Harvesting sites and efficiency. Soil maps. Land preparation. Ground cover. IPM. First aiders and boxes. Soil erosion.  HCV‟s: Identification. Management plans. Environmental Impact Assessments  Riparian zones: Width. Current and future management, monitoring system  Water management: Water courses. Water monitoring.  Road maintenance: Program and progress of road improvement.  Social amenities: Social Impact Assessments.  Workshops: Oil traps. Safe working environment. PPE.Diesel tanks. Environmental waste management.  Line sites: Interviews with householders. Inspection of water discharge points. Water improvement plans. Waste disposal.  Local communities.Contributions made. Employment opportunities. Social impacts. Complaints procedures, Transparency. At Mill include :  Mill and workshop inspections.  Documentation.  Worker interviews. SOP‟s. Safe working environment. Gen sets. Walk ways. Signs. EFB. POME treatment. Emissions. Mass balance. Diesel tanks. PPE. Fire extinguishers. First aiders and boxes. Fuel and water usage.  OSH. Training. Management structure. First aiders.  Full document review. Completion of the checklist. Review and documentation of evidence. All aspects of RSPO P C‟s applicable.  Worker interviews. OSH. Sexual, religious, racial harassment. Payment scheme, contracts, union labor  Supply Chain Certification System : Incoming FFB data input, CPOPK out goingdispatched database, marking, certified CPO PK reporting, Document Control and related procedures. Actual Audit Programme Phase I : Prelimenary Audit DateTime Functions areas Department activities include related requirements Auditors 27082014 1 st Day Location: Head Office 08.30 Opening Meeting Team 09.00 Documents Audit Checklist Audit  Union Labour, Cooperation, Social Aspect and TSS SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 15of 105 Management, SCCS dan Partial Audit  Enviromental Aspects  Best Practice Mill, SMK3, Worker welfare  Legal, High Consevation Value and Best Practice Estate RQAMR NS NM 12.00 Break 13.00 Continue documents audit All 17.00 End of day 1 28082014 Day 2 nd Audit 08.00 Closing Meeting All 10.00 End of the day 2 Number of assessor participating: 5 auditors, totally 5 person Number of days spent for the assessment on head office : 2 days Total number of person days used for the assessment on head office :10 days Phase II : Actual Certification Audit DateTime Functions areas Department activities to be audited include related requirements Auditors 08092014 1 st Day 11.05 Departure from Jakarta to Jambi Team 13.30 Departure from Jambi to Site Team 15.00 Opening Meeting  Introduction  Company Profile Presentation  Arrangements schedule auditor vs auditee All 16.30 End of the day 1 09092014 Day 2 nd Audit Location: Brahma Bina Bakti Office 08.00 Documents Audit  Social Aspect and Management  Enviromental Aspects, Best Practice Mill  Worker welfare, Union Labour, Cooperation and SMK3  Legal, High Consevation Value and Best Practice Estate TSSEN RQ NS NM 12.00 Break 13.30 Continue audit for documentation Team Arrangements location estate and stakeholders to be visited 17.00 End of the day 2 10092014 Day 3 rd Audit 08.00 Brahma Binabakti Estate  Social Meeting with stakeholders: Tokoh Adat, Kepala Desa, Tokoh Agama  Environment Afdeling D dan Afdeling H TSSEN RQ SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 16of 105  High Conservation Value Sungai Suak Putat di afdeling A Blok 5 and Best Practice Estate Pemupukan Blok B-7, Panen Blok C-6 dan Sprying Blok A-13  SMK3 Afdeling D dan Afdeling H NM NS 12.00 Break 13.00 Location: Mill  Social Meeting with stakeholders: Kontraktor, Supplier  Environment  SMK3 and Best Practice Mill TSSEN RQ NS SCCS Audit TSS Kunjungan ke patok HGU Patok BPN 51, 53, 89, dan 90 NM 17.00 End of the day 3 11092014 Day 4 th 08.00 Audit on pending agenda which have not been covered in the previous days Team 12.00 Break Team 13.30 Audit on pending agenda which have not been covered in the previous days 15.00 Reporting Team 16.30 Closing Meeting All 18.00 Departure from Site to Jambi Team 19.30 Arrived at Hotel Jambi Team 19.30 End of the day 4 12092014 Day 5 th 08.05 Departure from Jambi to Jakarta Team 09.30 Arrived at Jakarta Team 09.30 End of audit Number of assessor participating: 4 auditors + 1 technical expert, totally 5 person Number of days spent for the assessment on site: 4 days Total number of person days used for the assessment on site: 20 days SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 17of 105

B. 4. Stakeholder Consultation