Baseline Early Actions Public-Private Partnerships Communications Capacity Building Design Phase 2 International Travel

43 Key Milestones and Staff Responsibilities for Major Activity Areas Program Areas Lead Partner Date for completion ICFG Supervisor CRC Backstopping Tech Support

3.1 Baseline

3.1.1 Training SM Feb MF BC, SO 3.1.2 Document analyze response SM May MF SO 3.1.3 Governance Response SM May KA SO 3.1.4 Biodiversity Threats UG May KA BC 3.1.5 Coastal Communities FON May KA BC 3.1.6 Fisheries Sector WF Aug MF KC 3.1.7 Coastal Habitats UG July MF BC 3.1.8 State of Coast Report SM Sept MF SO

3.2 Early Actions

3.2.1.1 Fisheries regulations ICFG Mar HB BC 3.2.1.2 Network meetings ICFG ongoing HB BC 3.1.3 Fish sector meetings ICFG ongoing HB BC 3.2.2.1 WERENGO support FON ongoing KA MF 3.2.2.2 Small Grants ICFG Sept MF BC 3.2.2.3 Pilot wetlands FON Sept MF BC

3.3 Public-Private Partnerships

3.3.1 Tourism ICFG July MF DR 3.3.2 Oil and Gas ICFG April MF JT

3.4 Communications

Communications development FoN August MF BC

3.5 Capacity Building

3.5.1 Technical training URI Sept MF BC 3.5.2 Gender WF July MF BC 3.5.3 Diversified Livelihoods WF Sept KA KC 3.5.4 Fisheries Department URI July KA KC

3.6 Design Phase 2

Phase 2 Design ICFG Sept MF BC, SO SM-SustainaMatrix, FON-Friends of the Nation, WF –WorldFish Center, UG-University of Ghana, URI – University of Rhode Island, MF-Mark Fenn, KA-Kofi Agbogah, HB-Harry Barnes-Dabben, BC-Brian Crawford CRC, SO-Stephen Olsen, DB-Donald Rubinof, KC-Kathy Castro, JT-Jim Tobey 44

4.5 International Travel

Schedule The following table provides tentative dates and purposes for all international travel budgeted by the Program during the implementation plan period. This travel is shown for each of the main international partners. Travel of any local partners or CRC international consultants is subsumed under the CRC-URI column. MONTH CRC-URI WorldFish Center SustainaMetrix Jan. CRC 2 to Ghana for ICFG training and research orientations Jan 25 – Feb 10 SM 1 to Ghana for ICFG training and research orientations Jan 25 – Feb 10 Feb. CRC 1 to Ghana for administrative support Feb 01-10 March -ICFG staff 1 to Washington DC USAID SUCCESS Project Learning workshop on Sustainable Livelihoods -GoG and Traditional chiefs 3 to 4 to USA on oil and gas study trip April -CRC 2 to Ghana for mid- term assessments and 2 nd ICFG training April 15-30 -URI 1 to Ghana for wetlands assessment -WF 1 to Ghana for mid- term assessments and fisheries sector study April 15-May 30 WF 1 to Ghana for ICFG for mid-term assessments and 2 nd ICFG training April 15-30 May June Ghana Participants in URI Coastal 3 and Fisheries Institutes 2 July -URI 1 to Ghana for capacity building assessment at Universities in Ghana July 15-30 -URI 1 to Ghana for trawler fleet study and Fisheries Department capacity building action plan July 15-30 WF 2 or 3 for gender study, livelihoods diversification assessment, and aquaculture feasibility study July 1-30 August -CRC 3 to Ghana for finalization of reports and Phase 2 development and Year 2 workplan and budget Aug 15-30 -University of Ghana MS students 2 to URI for Masters Program WF 1 to Ghana for finalization of reports and Phase 2 development and Year 2 workplan Aug 15- 30 SM 1 to Ghana for finalization of reports and State of the Coast Report Aug 25-Sept 10 Sept. 45

4.6 Environmental Monitoring and Compliance