Tugas Akhir
Perencanaan Struktur Bangunan Sekolahan 2 Lantai
BAB 7 Portal Tabel 7.2. Rekapitulasi Hitungan Pembebanan Balok Memanjang
BALOK INDUK PEMBEBANAN
BEBAN MATI kgm’
Jumlah berat
sendiri+ber at plat
lantai+berat dinding
BEBAN HIDUP kgm’
BEBAN BERFAKTOR
Balok As
bentang plat lantai
berat dinding
beban No.
Leq jumlah
beban No.
berat sendiri
Leq jumlah
1 A-B 411.0
1.18 485 273.6 918.0
1677
200.0 1.18 236 2389.5
B-C 411.0 1.25 514 273.6 918.0
1705
200.0 1.25 250 2446.4
C-D 411.0 1.28 526 273.6 918.0
1718
200.0 1.28 256 2470.8
D-E 411.0 1.22 501 273.6 918.0
1693
200.0 1.22 244 2422.0
E-F 411.0 1.22
501 273.6 918.0
1693
200.0 1.22 244 2422.0
F-G 411.0 1.28 526 273.6 918.0
1718
200.0 1.28 256 2470.8
G-H 411.0 1.18 485 273.6 918.0
1677
200.0 1.18 236 2389.5
H-I 411.0 0.00
411 273.6 918.0
1603
200.0 0.00 200 2243.1
2
A-B 411.0 2.36 970 273.6 918.0
2162
200.0 2.36 472 3349.1
B-C 411.0 2.36 970 273.6 918.0
2162
200.0 2.36 472 3349.1
C-D 411.0 2.56
1052 273.6 918.0
2244
200.0 2.56 512 3511.7
D-E 411.0 2.44
1003 273.6 918.0
2194
200.0 2.44 488 3414.1
E-F 411.0 2.44
1003 273.6 918.0
2194
200.0 2.44 488 3414.1
F-G 411.0 2.56
1052 273.6 918.0
2244
200.0 2.56 512 3511.7
G-H 411.0 2.36 970 273.6 918.0
2162
200.0 2.36 472 3349.1
H-I 411.0 1.18
485 273.6 918.0
1677
200.0 1.18 236 2389.5
3
A-B 411.0 2.36 970 273.6 918.0
2162
200.0 2.36 472 3349.1
B-C 411.0 2.36 970 273.6 918.0
2162
200.0 2.36 472 3349.1
C-D 411.0 2.56
1052 273.6 918.0
2244
200.0 2.56 512 3511.7
D-E 411.0 2.44
1003 273.6 918.0
2194
200.0 2.44 488 3414.1
E-F 411.0 2.44
1003 273.6 918.0
2194
200.0 2.44 488 3414.1
F-G 411.0 2.56
1052 273.6 918.0
2244
200.0 2.56 512 3511.7
G-H 411.0 2.36 970 273.6 918.0
2162
200.0 2.36 472 3349.1
H-I 411.0 2.36
970 273.6 918.0
2162
200.0 2.36 472 3349.1
4 A-B 411.0
1.18 485 273.6 918.0
1677
200.0 1.18 236 2389.5
B-C 411.0 1.18 485 273.6 918.0
1677
200.0 1.18 236 2389.5
C-D 411.0 1.28 526 273.6 918.0
1718
200.0 1.28 256 2470.8
D-E 411.0 1.22 501 273.6 918.0
1693
200.0 1.22 244 2422.0
E-F 411.0 1.22
501 273.6 918.0
1693
200.0 1.22 244 2422.0
F-G 411.0 1.28 526 273.6 918.0
1718
200.0 1.28 256 2470.8
G-H 411.0 1.18 485 273.6 918.0
1677
200.0 1.18 236 2389.5
H-I 411.0 1.18
485 273.6 918.0
1677
200.0 1.18 236 2389.5
commit to user
143
Tugas Akhir
Perencanaan Struktur Bangunan Sekolahan 2 Lantai
BAB 7 Portal 7.2.2. Perhitungan Pembebanan Balok Melintang