Lampiran 1 90
NO URAIAN PEKERJAAN
KOEF SAT
H. SAT SUB JUMLAH
JUMLAH BRGTK
Rp. Rp.
Rp. 27 PENGECATAN KAYU 3 Kali+mani
1.0000 m
2
Bahan :
Meni kayu 0.1670
Kg 7,500.00
1,252.50 Plamir tembok
0.0830 Kg
12,500.00 1,037.50
Cat kayu Merk SEIV 0.2000
Kg 22,500.00
4,500.00 Ampelas
0.4000 Lbr 2,100.00
840.00 Thinner B
0.1500 Ltr
4,000.00 600.00
Kuas 3 0.0500
bh 4,000.00
200.00
Upah Kerja :
Pekerja Biasa 0.2000 Org
17,700.00 3,540.00
Tukang Cat 0.3000 Org
23,900.00 7,170.00
Kepala Tukang cat 0.0300 Org
24,400.00 732.00
Mandor 0.0100 Org
27,200.00 272.00
Alat Bantu :
Steger 1.0000 Lot
50.00 50.00
JUMLAH 20,194.00
JASA PELAKSANAAN 10 2,019.40
TOTAL 22,213.40
Dibulatkan 22,200.00
28 KUSEN KAYU 1.0000
m
3
Bahan:
Kayu Balok Kamper Samarinda 1.0200 m
3
2,500,000.00 2,550,000
Paku 1.2000 Kg
7,000.00 8,400
Lem Putih 0.5000 Kg
7,700.00 3,850
Upah Kerja :
Pekerja terampil 6.5000 Org 19,600.00
127,400 Kepala Tukang Kayu
4.0000 Org 23,900.00 95,600
Mandor 0.6000 Org 27,200.00
16,320 JUMLAH
2,801,570.00 JASA PELAKSANAAN 10
280,157.00 TOTAL
3,081,727.00 Dibulatkan
3,081,700.00 29 DAUN PINTU PANEL
1.0000 bh
Bahan:
Kayu PAPAN Kamper Samarinda 0.0440 m
3
2,750,000.00 121,000.00
Paku 0.0667 Kg
6,500.00 433.55
Profil 12 12.0000 m
4,000.00 48,000.00
Lem kayu 0.1500 Kg
3,500.00 525.00
Upah Kerja :
Pekerja terampil 4.0000 Org 19,600.00
78,400.00 Kepala Tukang Kayu
1.7500 Org 23,900.00 41,825.00
Mandor 0.1750 Org 27,200.00
4,760.00 JUMLAH
294,943.55 JASA PELAKSANAAN 10
29,494.36 TOTAL
324,437.91 Dibulatkan
324,400.00
Lampiran 1 91
NO URAIAN PEKERJAAN KOEF
SAT H.
SAT SUB
JUMLAH JUMLAH
BRGTK Rp.
Rp. Rp.
30 DAUN PINTU LapisTEAKWOOD
1.0000 Bh
Bahan :
Kayu papan Kamper Samarinda 0.0343 m
3
2,750,000.00 94,325.00 Paku
0.0296 Kg 7,000.00 207.20
Teakwood 1.5000 lbr
65,000.00 97,500.00 Lem Kayu
0.1500 Kg 3,500.00 525.00
Upah Kerja :
Pekerja Terampil 4.0000 Org
19,600.00 78,400.00 Tukang Kayu
1.5000 Org 23,900.00 35,850.00
Mandor 0.1000 Org
27,200.00 2,720.00 JUMLAH
309,527.20 JASA PELAKSANAAN 10
30,952.72 TOTAL
340,479.92 Dibulatkan
340,400.00
31 DAUN PINTU TEAKWOOD
1.0000 Bh
DITAMBAH MELAMINTO
Bahan :
Kayu 410X400 Kamper Samarinda 0.0343 m
3
2,750,000.00 94,325.00 Paku
0.0296 Kg 7,000.00 207.20
Teakwood 0.6500 lbr
65,000.00 42,250.00 Melaminto
0.6500 lbr 70,000.00 45,500.00
Triplex t.4mm 0.6500 lbr
40,250.00 26,162.50 Lem Kayu
0.1500 Kg 7,700.00 1,155.00
Upah Kerja :
Pekerja Terampil 4.0000 Org
19,600.00 78,400.00 Tukang Kayu
1.5000 Org 23,900.00 35,850.00
Mandor 0.1000 Org
27,200.00 2,720.00 JUMLAH
326,569.70 JASA PELAKSANAAN 10
32,656.97 TOTAL
359,226.67 Dibulatkan
359,200.00
32 SALURAN AIR DIA. 4 PVC
1.0000 m
Bahan :
Pipa PVC dia. 4 AW 1.0000 m
24,000.00 24,000.00 Acc. Pipa
1.0000 ls 4,000.00 4,000.00
Lem PVC 0.1500 tube
3,500.00 525.00
Upah Kerja :
Pekerja Terampil 0.2000 Org
19,600.00 3,920.00 Tukang Pipa
0.1000 Org 21,800.00 2,180.00
Mandor 0.0100 Org
27,200.00 272.00 JUMLAH
34,897.00 JASA PELAKSANAAN 10
3,489.70 TOTAL
38,386.70 Dibulatkan
38,300.00
Lampiran 1 92
NO URAIAN PEKERJAAN KOEF
SAT H.
SAT SUB
JUMLAH JUMLAH
BRGTK Rp.
Rp. Rp.
33 SALURAN AIR DIA. 2
12
PVC
1.0000 m
Bahan :
Pipa PVC dia. 2 12 AW 1.0000 m
14,375.00 14,375.00 Acc. Pipa
1.0000 ls 2,000.00 2,000.00
Lem PVC 0.0750 tube
3,500.00 262.50
Upah Kerja :
Pekerja Terampil 0.1400 Org
19,600.00 2,744.00 Tukang Pipa
0.0700 Org 21,800.00 1,526.00
Mandor 0.0070 Org
27,200.00 190.40 JUMLAH
21,097.90 JASA PELAKSANAAN 10
2,109.79 TOTAL
23,207.69 Dibulatkan
23,200.00
34 SALURAN AIR DIA. 3 PVC
1.0000 m
Bahan :
Pipa PVC dia. 3 AW 1.0000 m
20,987.50 20,987.50 Acc. Pipa
1.0000 ls 3,000.00 3,000.00
Lem PVC 0.7500 tube
3,500.00 2,625.00
Upah Kerja :
Pekerja Terampil 0.1400 Org
19,600.00 2,744.00 Tukang Pipa
0.0700 Org 21,800.00 1,526.00
Mandor 0.0070 Org
27,200.00 190.40 JUMLAH
31,072.90 JASA PELAKSANAAN 10
3,107.29 TOTAL
34,180.19 Dibulatkan
34,100.00
35 SALURAN AIR BERSIH PIPA GI
1.0000 m
Bahan :
Pipa GI dia. 1 1.0000 m
22,050.00 22,050.00 Acc. Pipa
1.0000 ls 2,500.00 2,500.00
Selotipe 0.2500 bh
1,900.00 475.00
Upah Kerja :
Pekerja Terampil 0.1200 Org
19,600.00 2,352.00 Tukang Pipa
0.0700 Org 21,800.00 1,526.00
Mandor 0.0060 Org
27,200.00 163.20 JUMLAH
29,066.20 JASA PELAKSANAAN 10
2,906.62 TOTAL
31,972.82 Dibulatkan
31,900.00
Lampiran 1 93
NO URAIAN PEKERJAAN KOEF
SAT H.
SAT SUB
JUMLAH JUMLAH
BRGTK Rp.
Rp. Rp.
36 SALURAN AIR BERSIH PIPA GI
1.0000 m
DIAMETER 34
Bahan :
Pipa GI dia. 34 1.0000 m
15,250.00 15,250.00 Acc. Pipa
1.0000 ls 2,000.00 2,000.00
Selotipe 0.2500 bh
1,900.00 475.00
Upah Kerja :
Pekerja Terampil 0.1200 Org
19,600.00 2,352.00 Tukang Pipa
0.0700 Org 21,800.00 1,526.00
Mandor 0.0060 Org
27,200.00 163.20 JUMLAH
21,766.20 JASA PELAKSANAAN 10
2,176.62 TOTAL
23,942.82 Dibulatkan
23,900.00
37 SALURAN AIR BERSIH PIPA GI DIAMETER 12
1.0000 m
Bahan :
Pipa GI dia. 12 1.0000 m
12,337.50 12,337.50 Acc. Pipa
1.0000 ls 1,500.00 1,500.00
Selotipe 0.2500 bh
1,900.00 475.00
Upah Kerja :
Pekerja Terampil 0.1200 Org
19,600.00 2,352.00 Tukang Pipa
0.0900 Org 21,800.00 1,962.00
Mandor 0.0060 Org
27,200.00 163.20 JUMLAH
18,789.70 JASA PELAKSANAAN 10
1,878.97 TOTAL
20,668.67 Dibulatkan
20,600.00
38 BAK FIBER GLASS DAN
1.0000 Unit
PAS. BATA LAPIS KERAMIK
Bahan :
Pasangan Bata 2.4500 m
2
42,625.10 104,431.50 Plesteran
2.9400 m
2
16,714.30 49,140.04 Pasangan Keramik
3.4300 m
2
50,417.50 172,932.03 JUMLAH
326,503.56 JASA PELAKSANAAN 10
32,650.36 TOTAL
359,153.92 Dibulatkan
359,100.00
Lampiran 1 94
NO URAIAN PEKERJAAN KOEF
SAT H.
SAT SUB
JUMLAH JUMLAH
BRGTK Rp.
Rp. Rp.
39 DAUN JENDELA TANPA KACA
1.0000 Bh
Bahan :
Kayu 410x400 Kamper Samarinda 0.0170 m
3
2,750,000.00 46,750.00 Lem Putih FOX
0.3000 Kg 7,700.00 2,310.00
List Kayu 4.0000 m
1,950.00 7,800.00
Upah Kerja :
Pekerja Terampil 0.3000 Org
17,700.00 5,310.00 Tukang Kayu Terampil
1.2000 Org 23,900.00 28,680.00
Kepala Tukang Katu 0.1200 Org
24,400.00 2,928.00 Mandor
0.0200 Org 27,200.00 544.00
JUMLAH 94,322.00
JASA PELAKSANAAN 10 9,432.20
TOTAL 103,754.20
Dibulatkan 103,300.00
40 PAS. LIST GYPSUM t.9mm
1.0000 m
2
Bahan :
Gypsum t.9mm 0.3470 lLbr
36,000.00 12,492.00 Paku 4 sd 7 cm
0.2200 Kg 6,500.00 1,430.00
Upah Pasang :
Pekerja SetengahTerampil 0.2800 Org
17,700.00 4,956.00 Tukang Kayu Terampil
0.4000 Org 23,900.00 9,560.00
Kepala Tukang Kayu 0.0800 Org
24,400.00 1,952.00 Mandor
0.0140 Org 27,200.00 380.80
Alat Bantu :
Stoot Werk 1.0000 Lot
100.00 100.00 JUMLAH
30,870.80 JASA PELAKSANAAN 10
3,087.08 TOTAL
33,957.88 Dibulatkan
33,900.00
41 TANGGA BETON
1.0000 m
2
Uraian Pekerjaan :
Pasangan Bekisting Multi 8.6000 m
2
41,173.38 354,091.07 Pembesian
218.1000 Kg 5,000.00
1,090,500.00
Beton Mutu K-225 1.0000 m
2
328,712.00 328,712.00 JUMLAH
1,773,303.07 JASA PELAKSANAAN 10
177,330.31 TOTAL
1,950,633.37 Dibulatkan
1,950,600.00
Lampiran 1 95
NO URAIAN PEKERJAAN KOEF
SAT H.
SAT SUB
JUMLAH JUMLAH
BRGT K
Rp. Rp.
Rp.
42 MEJA BETON
1.0000 m
2
Uraian Pekerjaan :
Pasangan Bekisting Papan 5.7500 m
2
40,307.00 231,765.25 Pembesian
150.0000 Kg 5,000.00 750,000.00
Beton Mutu K-225 1.0000 m
2
328,712.00 328,712.00 JUMLAH
1,310,477.25 JASA PELAKSANAAN 10
131,047.73 TOTAL
1,441,524.98 Dibulatkan
1,441,500.00
Lampiran 2 96
DAFTAR HARGA SATUAN MATERIAL Tahun 2002 Menurut PU Cipta Karya
PROYEK : PERLUASAN GEDUNG KANTOR DINAS TENAGA KERJA DAN
TRANSMIGRASI LOKASI
: Jl. SOEKARNO HATTA No. 532 BANDUNG
No. URAIAN SATUAN HARGA
SATUAN Rp.
1 Ampelas lbr
2.000,00 2 Bata
merah bh
245,00 3 Batu
kali m
3
65.900,00 4 Besi
Beton BJTD-24
kg 3.690,00
5 Cat besi
merk SEIV
kg 23.100,00
6 Cat kayu merk SEIV
kg 23.100,00
7 Cat tembok
SANLEX kg
5.998,00 8 Concrete
Spancer bh
300,00 9
Gypsum t.9 mm DN merk JAYA lbr
28.500,00 10 Kain
Perban gypsum
roll 10.000,00
11 Kawat beton
kg 5.914,00
12 Kayu 410 x 400 papan kamper Samarinda
m
3
3.300.000,00 13
Kayu 57 x 400 Balok kamper Samarinda m
3
3.300.000,00 14
Kayu 320 x 400 papan Borneo Super m
3
1.320.000,00 15
Kayu 57 x 400 Balok Borneo m
3
1.320000,00 16
Keramik 20x20 KW 1 DN m
2
31.350,00 17
Keramik 20x25 KW 1 DN m
2
31.350,00 18 Keramik
30x30 ROMAN
m
2
27.500,00 19 Kuas
2’’ bh
5.500,00 20 Kuas
3’’ bh
4.000,00 21 Lem
Kayu kg
7.500,00 22
Lem putih FOX kg
8.250,00 23 Lem
PVC Tube
3.500,00 24 Melaminto
lbr 70.000,00
25 Meni Besi
kg 8.450,00
26 Meni kayu
kg 7.500,00
27 Multiplex t.12mm
lbr 93.500,00
28 Multiplex t.6mm
lbr 71.500,00
29 Multiplex t.9mm
lbr 79.500,00
30 Nok Genteng
bh 3.000,00
31 Paku kg
5.500,00 32 Paku
4
s d
7 cm kg
6.500,00 33 Paku
Gypsum kg
20.000,00 34 Pasir
Beton m
3
93.925,00 35 Pasir
Pasang m
3
64.000,00 36 Pasir
Urug m
3
38.000,00 37
Pipa GIP dia. 1’’ m’
22.050,00 38
Pipa GIP dia.
1 2
’’ m’ 13.337,50
39 Pipa GIP dia.
3 4
’’ m’ 16.250,00
40 Pipa PVC dia. 2
1 2
’’ AW m’ 16.375,00
41 Pipa PVC dia. 3’’ AW
m’ 16.500,50
Lampiran 2 97
No. URAIAN SATUAN HARGA
SATUAN Rp.
42 Kayu 57 x 400 Borneo Super
m
3
1.325.000,00 43
Pipa PVC dia. 4’’ AW m’ 28.000,00
44 Plamir Kayu
kg 11.500,00
45 Plamir Tembok
kg 4.500,00
46 Profil
1 2
m’ 4.000,00 47 Roll
Cat bh
10.500,00 48 Selotipe
bh 1.900,00
49 Semen PC 50kg
zak 27.100,00
50 Semen Gypsum
kg 4.600,00
51 Semen Warna
kg 4.600,00
52
Spit
2 3
mesin
m
3
93.500,00 53
Teakwood
lbr 82.500,00 54
Thiner B
ltr 4.155,00 55 Triplex
t.4mm lbr
45.350,00 56 Triplex
t.6mm lbr
55.000,00 57 List
kayu m’
1.950,00 58
Armatur TL 1x36 Watt PHILIS set
35.000,00 59
Armatur TL 2x36 Watt PHILIS set
70.000,00 60
Armatur PLC 20 Watt PHILIS set
40.000,00 61
Saklar Double BRACO bh
10.500,00 62 Saklar
Single BRACO
bh 7.800,00 63
Saklar hotel BRACO bh 8.900,00
64 Stop kontak 200 Watt BRACO
bh 8.300,00
65 Stop Kontak AC BRACO
bh 22.500,00
66 Kaca Rayband
5mm ASAHI
m
2
55.000,00 67
Engsel Pintu Unilon Standar ps
9.000,00 68
Engsel Jendela Unilon Standar ps
6.300,00 69
Kunci KM Bulat kwalitas biasa bh
19.000,00 70 Sloot
Jendela Tunggal
bh 9.300,00
71 Espangolet ps
16.000,00 72
Hak Angin Kait Jendela Biasa ps
2.750,00 73
Pas. Raeling Stainless steel tangga m’
350.000,00 74
Closet Jongkok Standar Putih Poslin TOTO unit
135.000,00 75
Urinoir Lengkap TOTO Warna standard lengkap unit
1.035.000,00 76
Pas. Bak kontrol 40x40 bh
145.000,00 77
Saringan Talang
bh 12.500,00 78
Kitchen Zink Stainless Standard Lokal selubang
unit 175.000,00 79
Wastafel Lengkap TOTO
bh 620.000,00 80
Kran Kitchen Zink
bh 75.000,00 81
Kran Tembok ITAP Ø
1 2
bh 30.000,00
82
Penyekay Urinoir TOTO
bh 200.000,00 83
Alat Bantu dan Aksesoris Listrik ls
205.000,00 84
Istalasi titik lampu Stop Kontak UpahAlat bh
75.000,00 85 Panel
PP1 unit
1.100.000,00
98
DAFTAR HARGA SATUAN UPAH Tahun 2002 Menurut PU Cipta Karya
PROYEK : PERLUASAN GEDUNG KANTOR DINAS TENAGA KERJA DAN
TRANSMIGRASI LOKASI
: Jl. SOEKARNO HATTA No. 532 BANDUNG
No. JENIS PEKERJAAN
BANGUNAN HARGA UPAH
Rp. SATUAN WAKTU
1
Pekerja 16.000,00
1 orgHr8 jam
2
Pekerja setengah teramppil 18.000,00
1 orgHr8 jam
3
Pekerja terampil 20.000,00
1 orgHr8 jam
4
Tukang Gali 18.000,00
1 orgHr8 jam
5
Tukang Batu setengah terampil 25.000,00
1 orgHr8 jam
6
Tukang Batu terampil 30.000,00
1 orgHr8 jam
7
Kepala Tukang Batu 32.500,00
1 orgHr8 jam
8
Tukang Kayu setengah terampil 25.000,00
1 orgHr8 jam
9
Tukang Kayu terampil 30.000,00
1 orgHr8 jam
10
Kepala Tukang Kayu 32.500,00
1 orgHr8 jam
11
Tukang CatPlitur setengah terampil 25.000,00
1 orgHr8 jam
12
Tukang CatPlitur terampil 30.000,00
1 orgHr8 jam
13
Kepala Tukang CatPlitur 32.500,00
1 orgHr8 jam
14
Tukang Besi Beton setengah terampil 25.000,00
1 orgHr8 jam
15
Tukang Besi Beton terampil 30.000,00
1 orgHr8 jam
16
Kepala Tukang Besi Beton 35.000,00
1 orgHr8 jam
17
Tukang Besi Profil setengah terampil 30.000,00
1 orgHr8 jam
18
Tukang Besi Profil terampil 32.500,00
1 orgHr8 jam
19
Kepala Tukang Besi Profil 35.000,00
1 orgHr8 jam
20
Mandor 30.000,00
1 orgHr8 jam
21
Tukang Pipa 32.500,00
1 orgHr8 jam
Lampiran 5 99
RENCANA ANGGARAN BIAYA Tahun 2002 PU Cipta Karya Kota Bandung
PROYEK :PERLUASAN GEDUNG KANTOR DINAS TENAGA KERJA DAN
TRANSMIGRASI LOKASI
:Jl. SOEKARNO HATTA No. 532 BANDUNG
NO JENIS PEKERJAAN
VOLUME SAT HARGA
SATUAN JUMLAH HARGA
Rp. Rp.
I PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi 1
LS 4.750.000,00
SUB JUMLAH I 4.750.000,00
II PEKERJAAN STRUKTUR BETON
1 Kolom Beton K1 5050 13,98 m
3
1.990.000,00 27.820.200,00 2 Balok Beton B1 4060
14,28 m
3
2.000.000,00 28.560.000,00 3 Balok
Beton B2 3060 13,20 m
3
2.000.000,00 26.400.000,00 4 Balok Beton B3 2540
7,18 m
3
2.000.000,00 14.360.000,00 5 Balok Beton B4 2030
1,61 m
3
2.000.000,00 3.220.000,00 6 Plat Lantai dak. t.12 cm
43,39 m
3
1.680.000,00 72.895.200,00 7 Kolom Praktis KP 1215
2,52 m
3
1.700.000,00 4.284.000,00 8 Listplank
beton 12100
9,14 m
3
1.579.000,00 14.432.060,00 9 Tangga
Beton 4,12 m
3
2.130.000,00 8.775.600,00 10 Meja
Beton 0,34 m
3
1.540.000,00 523.600,00 SUB JUMLAH II
201.270.660,00 III PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Dinding Bata 1:3 20,20 m
2
51.000,00 1.030.200,00 2 Pas. Dinding Bata 1:5
270,84 m
2
42.000,00 11.375.280,00 3 Plesteran Dinding Trasram 1:3 +acian
40,40 m
2
20.000,00 808.000,00 4 Plesteran Dinding 1:5 +acian
541,68 m
2
18.000,00 9.750.240,00 5 Plesteran Beton 1:3
179,23 m
2
20.000,00 3.584.600,00 SUB JUMLAH III
26.548.320,00
Lampiran 5 100
NO JENIS PEKERJAAN
VOLUME SAT HARGA
SATUAN JUMLAH
HARGA Rp.
Rp.
IV PEKERJAAN KUSEN. PINTU JENDELA
1 Pas. Kusen kayu pitu. jendela dan bouvenlight 2,83 m
3
4.000.000,00 11.320.000,00 Kayu Samarinda
2 Daun pintu entrance P1 Double 4,00 bh 360.000,00 1.440.000,00
3 Daun pintu teakwood P2 6,00 bh 400.000,00 2.400.000,00
4 Daun pintu KM WC P3 3,00 bh 410.000,00 1.230.000,00
5 Daun jendela J2 8,00 bh 120.000,00 960.000,00
6 Daun jendela J3 4,00 bh 120.000,00 480.000,00
7 Kaca Reyban t. 5mm 51,30 m
2
55.000,00 2.821.500,00 8 Kunci pintu
11,00 bh 19.000,00 209.000,00 9 Engsel pintu
33,00 bh 9.000,00 297.000,00 10 Engsel Jendela
24,00 bh 6.300,00 151.200,00 11 Slot Jendela
12,00 bh 9.300,00 111.600,00 12 Espagnolet
6,00 bh 16.000,00 96.000,00 13 Hak Angin
24,00 bh 2.750,00 66.000,00
SUB JUMLAH IV 21.582.300,00
V PEKERJAAN LANTAI DAN DINDING
1 Pas. Keramik lantai 30x30 KW1ROMAN 300,53
m
2
53.000,00 15.928.090,00 2 Pas. Keramik tangga 30x30 KW1ROMAN
13,40 m
2
53.000,00 710.200,00 3 Pas. Step nosing tangga 1030
20,58 m 189.583,20 3.901.622,26
4 Pas. Plint keramik lantai 146,06
m 58.200,00 8.500.692,00 5 Pas. Keramik lantai KMWC20x20 KW1ROMAN 6,12
m
2
57.000,00 348.840,00 6 Pas. Keramik dinding KMWC2025 KW1ROMAN 44,55
m
2
59.000,00 2.628.450,00 7 Pas. Partisi gypsum double+
8,00 m
2
51.000,00 408.000,00 rangka kayu 612 + kaca 5mm
- 8 Pas. Ralling stainless steel tangga
7,520 m 350.000,00 2.632.000,00
SUB JUMLAH V 35.057.894,26
VI PEKERJAAN PLAFOND
1 Pas. Rangka kayu+penutup gypsum t.9mm 331,25 m
2
51.000,00 16.893.750,00 2 Pas. List Gypsum 57
142,65 m 34.000,00 4.850.100,00 3 Pas. Talang tegak PVC Ø 4
97,20 m 44.000,00 4.276.800,00 4 Pas. Bak kontrol 40x40
12,00 bh 145.000,00 1.740.000,00 5 Saringan Talang
12,00 bh 12.500,00 150.000,00
SUB JUMLAH VI 27.910.650,00
VII PEKERJAAN FINISHING DAN PENGECATAN
1 Pengecatan Dinding 639,00 m
2
12.000,00 7.668.000,00 2 Pengecatan Plafond
352,46 m
2
12.000,00 4.229.520,00 3 Pengecatan kolom. balok beton
187,63 m
2
12.000,00 2.251.560,00 4 Pengecatan kusen
82,26 m
2
24.000,00 1.974.240,00 5 Pengecatan Daun Pintu
55,20 m
2
24.000,00 1.324.800,00 6 Pengecatan Daun Jendela
10,38 m
2
24.000,00 249.120,00 SUB JUMLAH VII
17.697.240,00
Lampiran 5 101
NO JENIS PEKERJAAN
VOLUME SAT HARGA SATUAN JUMLAH HARGA
Rp. Rp.
VIII PEKERJAAN PLUMBING SANITAIR VIII.1 Instalasi Air Bersih
1 Pas. Instalasi Air Bersih GI Ø 34’ 38,90 m
25.000,00 972.500,00
2 Pas. Instalasi Air Bersih GI Ø 12’ 6,00 m
23.000,00 138.000,00
3 Bak Fiber glass+pas. Bata lapis keramik 3,00 bh
370.000,00 1.110.000,00
4 Closet Jongkok ex. TOTO 3,00 bh
135.000,00 405.000,00
5 Uninoir Lengkap ex. Toto 3,00 bh
935.000,00 2.805.000,00
6 Pasangan Penyekat Urinoir 2,00 bh
200.000,00 400.000,00
7 Wastafel Meja lengkap 2,00 bh
620.000,00 1.240.000,00
8 Kitchen zink lengkap 1,00 bh
175.000,00 175.000,00
9 Kran Kitchen zink Ø 12 1,00 bh
75.000,00 75.000,00
10 Kran Air Ø 12 3,00 bh
30.000,00 90.000,00
VIII.2 Instalasi Air Kotor
1 Pas. Pipa PVC Ø 4 37,90 m
44.000,00 1.667.600,00
2 Pas. Pipa PVC Ø 2 36,90 m
28.000,00 1.033.200,00
3 Floor drain Ø 4 4,00 bh
44.000,00 176.000,00
SUB JUMLAH VIII 10.287.300,00
IX PEKERJAAN INSTALASI
LISTRIK
1 Panel PP1 distribusi panel 1,00 Unit 1.100.000,00
1.100.000,00 2 Instalasi titik cahaya
23,00 ttk 75.000,00 1.725.000,00
3 Instalasi titik stop kontak 14,00 ttk 75.000,00
1.050.000,00 4 Instalasi stop kontak AC
6,00 ttk 75.000,00 450.000,00
5 Armatur TL 1x36 watt 5,00 Set 35.000,00
175.000,00 6 Armatur TL 2x36 watt
10,00 Set 70.000,00 700.000,00
7 Armatur PLC 20 Watt 8,00 Set 40.000,00
320.000,00 8 Saklar Double
5,00 bh 10.500,00 52.500,00
9 Saklar Single 4,00 bh 7.800,00
31.200,00 10 Saklar hotel
1,00 bh 8.900,00 8.900,00
11 stop kontak 200 Watt 14,00 bh 8.300,00
116.200,00 12 Stop Kontak AC
6,00 bh 22.500,00 135.000,00
13 Alat bantu dan accessoris 1,00 ls
205.000,00 205.000,00
SUB JUMLAH IX 6.068.800,00
Lampiran 5 102
REKAPITULASI RENCANA ANGGARAN BIAYA Tahun 2002 PU Cipta Karya Kota Bandung
PROYEK :PERLUASAN GEDUNG KANTOR DINAS TENAGA KERJA DAN
TRANSMIGRASI LOKASI
:Jl. SOEKARNO HATTA No. 532 BANDUNG
NO URAIAN SUBJUMLAH
Rp.
I PEKERJAAN PERSIAPAN
4.750.000,00 II
PEKERJAAN STRUKTUR BETON 201.270.660,00
III PEKERJAAN PASANGAN
DAN PLESTERAN 26.548.320,00
IV PEKERJAAN KUSEN PINTU DAN JENDELA 21.582.300,00
V PEKERJAAN LANTAI DAN DINDING
35.057.894,26 VI PEKERJAAN PLAFOND
27.697.240,00 VII PEKERJAAN FINISHING DAN PENGECATAN
17.697.240,00 VIII PEKERJAAN PLUMBING DAN SANITAIR
10.287.300,00 IX PEKERJAAN INSTALASI LISTRIK
6.068.800,00 SUB JUMLAH
350.959.754,26 PPN 10
35.095.975,43 TOTAL KESELURUHAN
386.055.729,69 DIBULATKAN
386.055.000,00 Terbilang : Tiga Ratus Delapan Puluh Enam
Lima Puluh Lima Ribu Rupiah
Lampiran 6 103
ANALISA HARGA SATUAN PEKERJAAN Tahun 2002 PU Cipta Karya Kota Bandung
PROYEK :PERLUASAN GEDUNG KANTOR DINAS TENAGA KERJA DAN TRANSMIGRASI
LOKASI :Jl. SOEKARNO HATTA No. 532 BANDUNG
KOEF H. SAT
SUB JUMLAH
JUMLAH NO URAIAN
PEKERJAAN BRGTK
SAT Rp. Rp. Rp.
1 BETON MUTU
K-225 1,0000 m
3
Bahan :
Semen PC 50Kg 6,7200 Zak
27.100,00 182.112,00 Split 23 mesin
0,8100 m
3
93.500,00 75.735,00 Pasir beton
0,4500 m
3
93.925,00 42.266,25
Upah Kerja :
Pekerja setengah terampil 1,5000 Org
18.000,00 27.000,00 Tukang Batu terampil
0,5000 Org 30.000,00 15.000,00
Kepala Tukang Batu 0,0500 Org
32.500,00 1.625,00 Mandor
0,0100 Org 30.000,00 300,00
Alat Bantu 1,0000 Ls
5.000,00 5.000,00 JUMLAH
349.038,25 JASA PELAKSANAAN 10
34.903,83 TOTAL
383.942,08 Dibulatkan
380.000,00
2 BEKISTING DENGAN PAPAN
1,0000 m
2
Asumsi :
1. Papan borneo 2x pakai dihitung 75 2. Kayu borneo 2x pakai dihitung 50
Bahan:
Papan 320x400 Borneo 0,0230 m
3
1.320.000,00 18.975,00 Kayu 57x400 Borneo
0,0140 m
3
1.320.000,00 6.125,00 Paku 4sd 7 cm
0,4000 Kg 6.500,00 2.600,00
Upah Pasang:
Pekerja setengah terampil 0,1200 Org
18.000,00 2.160,00 Tukang kayu
0,1500 Org 30.000,00 4.500,00
Kepala Tukang Kayu 0,1500 Org
32.500,00 4.875,00 Mandor
0,0050 Org 30.000,00 150,00
Upah untuk bongkar Bekisting :
Pekerja terampil 0,1200 Org
20.000,00 2.400,00
Alat Bantu 1,0000 ls
750,00 750,00 JUMLAH
42.535,00 JASA PELAKSANAAN 10
4.253,50 TOTAL
46.788,50 EFESIENSI 30
14.036,55 Dibulatkan
60.825,05
Lampiran 6 104
NO URAIAN PEKERJAAN KOEF
SAT H.
SAT SUB
JUMLAH JUMLAH
BRGTK Rp.
Rp. Rp.
3 BEKISTING DGN MULTIPLEX t 9mm 1,0000 m
2
Bahan:
Multiplex 9mm 0,3472 lbr 79.500,00 19.321,68
Kayu 57x400 Borneo 0,0175 m
3
1.320.000,00 6.930,00 Paku 4 sd 7cm
0,3800 kg 6.500,00 2.470,00
Upah Pasang :
Pekerja setengah terampil 0,1200 Org 18.000,00 2.160,00
Tukang Kayu 0,1500 Org 30.000,00 4.500,00
Kepala Tukang Kayu 0,1500 Org 32.500,00 4.875,00
Mandor 0,0500 Org 30.000,00 1.500 ,00
Upah bongkar :
Pekerja terampil 0,1200 Org 20.000,00 2.400,00
Alat Bantu 1,0000 ls 250,00 250,00
JUMLAH 44.406,68
JASA PELAKSANAAN 10 4.440,67
TOTAL 48.847,35
EFESIENSI 20 9.769,47
Dibulatkan 58.616,82
4 PEMBESIAN
1,0000 Kg
Bahan :
Besi Beton BJTD-24 1,0200 Kg 3.690,00 3.763,80
Kawat Beton 0,0100 Kg 5.914,00 59,14
Concrete spancer 2,0000 Bh 300,00 600,00
Upah kerja :
Pekerja setengah terampil 0,0015 Org 18.000,00 27,00
Tukang besi terampil 0,0150 Org 30.000,00 450,00
Kepala tukang besi 0,0100 Org 35.000,00 350,00
Mandor 0,0050 Org 30.000,00 150,00
Alat bantu 1,0000 ls 150,00 150,00
JUMLAH 5.549,94
JASA PELAKSANAAN 10 554,99
TOTAL 6.104,93
Dibulatkan 6.000,00
5 KOLOM BETON 5050
Uraian pekerjaan :
Pasang bekisting multi 8,0000 m
2
44.406,63 355.253,04 Pembesian
200,0000 kg 5.549,94 1.109.988,00
beton mutu K-225 1,0000 m
3
349.038,25 349.038,25 JUMLAH
1.814.279,29 JASA PELAKSANAAN 10
181.427,93 TOTAL
1.995.707,22 Dibulatkan
1.990.000,00
Lampiran 6 105
NO URAIAN PEKERJAAN KOEF
SAT H.
SAT SUB
JUMLAH JUMLAH BRGTK
Rp. Rp.
Rp.
6
KOLOM BETON 4060
Uraian pekerjaan :
Pasang bekisting multi 5,6576 m
2
44.406,63 251.234,95 Pembesian
225,0000 kg 5.549,94 1.248.736,50
Beton mutu K-225 1,0000 m
3
349.038,25 349.038,25 JUMLAH
1.849.009,70 JASA PELAKSANAAN 10
184.900.97 TOTAL
2.033.910,67 Dibulatkan
2.000.000,00
7 KOLOM BETON 3060
Uraian pekerjaan :
Pasang bekisting multi 7,0056 m
2
44.406,63 311.095,09 Pembesian
210,000 kg 5.549,94 1.165.487,40
Beton mutu K-225 1,0000 m
3
349.038,25 349.038,25 JUMLAH
1.825.620,74 JASA PELAKSANAAN 10
182.562,07 TOTAL
2.008.182,81 Dibulatkan
2.000.000,00
8 KOLOM BETON 2540
Uraian pekerjaan :
Pasang bekisting multi 8,1000 m
2
44.406,63 359.693,70 Pembesian
210,0000 kg 5.549,94 1.165.487,40
Beton mutu K-225 1,0000 m
3
349.038,25 349.038,25 JUMLAH
1.874.219,35 JASA PELAKSANAAN 10
187.421,94 TOTAL
2.061.641,29 Dibulatkan
2.000.000,00
9 KOLOM BETON 2030
Uraian pekerjaan :
Pasang bekisting multi 9,3296 m
2
44.406,63 414.296,10 Pembesian
200,0000 kg 5.549,94 1.109.988,00
Beton mutu K-225 1,0000 m
3
349.038,25 349.038,25 JUMLAH
1.873.322,35 JASA PELAKSANAAN 10
187.332,23 TOTAL
2.060.654,58 Dibulatkan
2.000.000,00
10 KOLOM PRAKTIS 1215
Uraian pekerjaan :
Pasang bekisting Papan 14,5000 m
2
42.535,00 616.757,50 Pembesian
120,0000 kg 5.549,94 665.992,80
Beton mutu K-175 1,0000 m
3
326.299,50 326.299,50 JUMLAH
1.609.049,80 JASA PELAKSANAAN 10
160.904,98 Dibulatkan
1.769.954,78
Lampiran 6 106
NO URAIAN PEKERJAAN KOEF
SAT H.
SAT SUB
JUMLAH JUMLAH
BRGTK Rp.
Rp. Rp.
11 BETON MUTU K-175
1,0000 m
3
Bahan :
Semen PC 50kg 5,5000 Zak
27.100,00 149.050,00 Split 23 mesin
0,8300 m
3
93.500,00 77.605,00
Pasir beton 0,5400 m
3
93.925,00 50.719,50
Upah kerja :
Pekerja setengah terampil 1,5000 Org
18.000,00 27.000,00 Tukang batu terampil
0,5000 Org 30.000,00 15.000,00
Kepala tukang batu 0,0500 Org
32.500,00 1.625,00 Mandor
0,0100 Org 30.000,00 300,00
Alat bantu 1,0000 ls
5.000,00 5.000,00 JUMLAH
326.299,50 JASA PELAKSANAAN 10
32.629,95 TOTAL
358.929,45 Dibulatkan
350.000,00
12 BALOK BETON 1330
Uraian pekerjaan :
Pasang bekisting multi 13,5000 m
2
44.406,63 599.489,51 Pembesian
125,0000 kg 5.549,94 693.742,50
beton mutu K-225 1,0000 m
3
349.038,25 349.038,25 JUMLAH
1.642.270,26 JASA PELAKSANAAN 10
164.227,03 TOTAL
1.806.497,28 Dibulatkan
1.800.000,00
13 PLAT LANTAI T. 12cm
Uraian pekerjaan :
Pasang bekisting multi 8,3000 m
2
41.173,38 341.739,05 Stoot bekisting
8,3000 m
2
48.611,15 403.472,55 Pembesian
100,0000 kg 4.609,55 460.955,00
beton mutu K-225 1,0000 m
3
328.712,00 328.712,00 JUMLAH
1.534.878,60 JASA PELAKSANAAN 10
153.487,86 TOTAL
1.688.366,46 Dibulatkan
1.680.000,00
Lampiran 6 107
NO URAIAN PEKERJAAN KOEF
SAT H.
SAT SUB
JUMLAH JUMLAH
BRGTK Rp.
Rp. Rp.
14
PAS. STOOT WERK UNIT. COR Lt
1,0000 m
2
Asumsi :
1. Papan stoot 2x pakai dihitung 75 2. Kayu stoot 2x pakai dihitung 50
Bahan:
Papan 320x400 Borneo 0,0150 m
3
1.320.000,00 12.375,00 Kayu 57x400 Borneo
0,0525 m
3
1.320.000,00 22.968,75 Paku 4sd 7 cm
0,5000 kg 6.500,00 3.250,00
Upah Pasang:
Pekerja setengah terampil 0,1500 Org
18.000,00 2.700,00 Tukang kayu
0,2000 Org 30.000,00 6.000,00
Kepala Tukang Kayu 0,1000 Org
32.500,00 3.250,00 Mandor
0,0170 Org 30.000,00 510,00
JUMLAH 51.053,75
JASA PELAKSANAAN 10 5.105,38
TOTAL 56.159,13
EFESIENSI 30 16.847,74
Dibulatkan 73.006,86
15 BETON LISTPLANK 1290
1,0000 m
2
Uraian pekerjaan :
Pasang bekisting multi 12,6000 m
2
44.406,63 559.523,54 Pembesian
125,0000 kg 5.549,94 693.742,50
Beton mutu K-225 1,0000 m
3
349.038,25 349.038,25 JUMLAH
1.602.304,29 JASA PELAKSANAAN 10
160.230,43 TOTAL
1.762.534,72 Dibulatkan
1.760.000,00
16 PAS. BATA MERAH 1Pc:3Ps
1,000 m
2
Bahan :
Bata Merah
70
,
0000
Bh 245,00 17.150,00 Semen PC 50kg
0,4200 Zak 27.100,00 11.382,00
Pasir pasang 0,0540 m
3
64.000,00 3.456,00
Upah kerja :
Pekerja setengah terampil 0,4290 Org 18.000,00 7.722,00
Tukang batu terampil 0,2140 Org 30.000,00 6.420,00
Kepala tukang batu 0,0210 Org 32.500,00 682,50
Mandor 0,0110 Org 30.000,00 330,00
Alat bantu 1,0000 ls 75,00 75,00
JUMLAH 47.217,50
JASA PELAKSANAAN 10 4.721,75
TOTAL 51.939,25
Dibulatkan 51.000,00
Lampiran 6 108
NO URAIAN PEKERJAAN KOEF
SAT H.
SAT SUB
JUMLAH JUMLAH
BRGTK Rp.
Rp. Rp.
17
PAS. BATA MERAH 1PC:5PS
1,0000 m
2
Bahan :
Bata Merah 70,0000 Bh 245,00 17.150,00
Semen PC 50kg 0,2074 Zak 27.100,00 5.620,54
Pasir pasang 0,0580 m
3
64.000,00 3.712,00
Upah kerja :
Pekerja setengah terampil 0,3218 Org 18.000,00 5.792,40
Tukang batu terampil 0,1805 Org 30.000,00 5.415,00
Kepala tukang batu 0,0158 Org 32.500,00 513,50
Mandor 0,0083 Org 30.000,00 249,00
Alat bantu 1,0000 ls 130,00 130,00
JUMLAH 38.582,44
JASA PELAKSANAAN 10 3.858,24
TOTAL 42.440,68
Dibulatkan 42.000,00
18
PLESTERAN 1PC ; 3PS ACIAN
1,0000 m
2
Bahan:
Semen PC 50 kg 0,1630 Zak 27.100,00 4.417,30
Pasir Pasang 0,0190 m
3
64.000,00 1.216,00
Upah Kerja :
Pekerja setengah terampil 0,2860 Org 18.000,00 5.148,00
Tukang batu terampil 0,2140 Org 30.000,00 6.420,00
Kepala Tukang Kayu 0,0210 Org 32.500,00 682,50
Mandor 0,0200 Org 30.000.00 600,00
Alat Bantu 1,0000 ls 50,00 50,00
JUMLAH 18.533,80
JASA PELAKSANAAN 10 1.853,38
TOTAL 20.387,18
Dibulatkan 20.000,00
19 PLESTERAN 1PC ; 3PS ACIAN
1,0000 m
3
Bahan:
Semen PC 50 kg 0,1050 Zak 27.100,00 2.845,50
Pasir Pasang 0,0190 m
3
64.000,00 1.216,00
Upah Kerja :
Pekerja setengah terampil 0,2860 Org 18.000,00 5.148,00
Tukang batu terampil 0,2140 Org 30.000,00 6.420,00
Kepala Tukang Kayu 0,0210 Org 32.500,00 682,50
Mandor 0,0200 Org 30.000,00 600,00
Alat Bantu 1,0000 ls 50,00 50,00
JUMLAH 16.962,00
JASA PELAKSANAAN 10 1.696,20
TOTAL 18.658,20
Lampiran 6 109
NO URAIAN PEKERJAAN KOEF
SAT H.
SAT SUB
JUMLAH JUMLAH
BRGTK Rp.
Rp. Rp.
20 LANTAI KERAMIK 3030
1,0000 m
2
Bahan :
Keramik 3030 ROMAN 1,0500 m
2
27.500,00 28.875,00 Semen PC 50 kg
0,1600 Zak 27.100,00 4.336,00
Pasir pasang 0,0300 m
3
64.000,00 1.920,00 Semen warna
0,0130 kg 4.500,00 58,50
Upah Kerja : -
Pekerja terampil 0,3400 Org 18.000,00 6.120,00
Tukang Batu terampil 0,1700 Org 30.000,00 5.100,00
Kepala Tukang batu 0,0340 Org 32.500,00 1.105,00
Mandor 0,0170 Org 30.000,00 510,00
Alat bantu 1,0000 ls
450,00 450,00 JUMLAH
48.474,50 JASA PELAKSANAAN 10
4.847,45 TOTAL
53.321,95 Dibulatkan
53.000,00
21 LANTAI KERAMIK 2020
1,0000 m
2
Bahan :
Keramik 2020 KW1 DN 1,0500 m
2
31.350,00 32.917,50 semen PC 50 kg
0,1600 Zak 27.100,00 4.336,00
Pasir pasang 0,0300 m
3
64.000,00 1.920,00 Semen warna
0,0130 kg 4.500,00 58,50
Upah Kerja :
Pekerja terampil 0,3400 Org 18.000,00 6.120,00
Tukang Batu terampil 0,1700 Org 30.000,00 5.100,00
Kepala Tukang batu 0,0340 Org 32.500,00 1.105,00
Mandor 0,0170 Org 30.000,00 510,00
Alat bantu 1,0000 ls
500,00 500,00 JUMLAH
52.567,00 JASA PELAKSANAAN 10
5.256,70 TOTAL
57.823,70 Dibulatkan
57.000,00
22 LANTAI KERAMIK 2025
1,0000 m
2
Bahan :
Keramik 2025 KW1 DN 1,0500 m
2
31.350,00 32.917,50 semen PC 50 kg
0,1600 Zak 27.100,00 4.336,00
Pasir pasang 0,0300 m
3
64.000,00 1.920,00 Semen warna
0,0130 kg 4.500,00 58,50
Upah Kerja :
Pekerja terampil 0,1875 Org 18.000,00 3.375,00
Tukang Batu terampil 0,2750 Org 30.000,00 8.250,00
Kepala Tukang batu 0,0750 Org 32.500,00 2.437,50
Mandor 0,0188 Org 30.000,00 564,00
Alat bantu 1,0000 ls
500,00 500,00 JUMLAH
54.358,50
Lampiran 6 110
JASA PELAKSANAAN 10 5.435,85
TOTAL 59.794,35
Dibulatkan 59.000,00
NO URAIAN PEKERJAAN
KOEF SAT H. SAT
SUB JUMLAH
JUMLAH BRGTK
Rp. Rp.
Rp.
23 PLAFOND TRIPLEX 4mm
1,0000 m
2
Asumsi : 1. Bahan Rangka Kayu Borneo Super
2. Tebal Triplex t.4mm Bahan :