SAT SUB JUMLAH Tebal Triplex t.9mm Bahan :

Lampiran 1 90 NO URAIAN PEKERJAAN KOEF SAT

H. SAT SUB JUMLAH

JUMLAH BRGTK Rp. Rp. Rp. 27 PENGECATAN KAYU 3 Kali+mani 1.0000 m 2 Bahan : Meni kayu 0.1670 Kg 7,500.00 1,252.50 Plamir tembok 0.0830 Kg 12,500.00 1,037.50 Cat kayu Merk SEIV 0.2000 Kg 22,500.00 4,500.00 Ampelas 0.4000 Lbr 2,100.00 840.00 Thinner B 0.1500 Ltr 4,000.00 600.00 Kuas 3 0.0500 bh 4,000.00 200.00 Upah Kerja : Pekerja Biasa 0.2000 Org 17,700.00 3,540.00 Tukang Cat 0.3000 Org 23,900.00 7,170.00 Kepala Tukang cat 0.0300 Org 24,400.00 732.00 Mandor 0.0100 Org 27,200.00 272.00 Alat Bantu : Steger 1.0000 Lot 50.00 50.00 JUMLAH 20,194.00 JASA PELAKSANAAN 10 2,019.40 TOTAL 22,213.40 Dibulatkan 22,200.00 28 KUSEN KAYU 1.0000 m 3 Bahan: Kayu Balok Kamper Samarinda 1.0200 m 3 2,500,000.00 2,550,000 Paku 1.2000 Kg 7,000.00 8,400 Lem Putih 0.5000 Kg 7,700.00 3,850 Upah Kerja : Pekerja terampil 6.5000 Org 19,600.00 127,400 Kepala Tukang Kayu 4.0000 Org 23,900.00 95,600 Mandor 0.6000 Org 27,200.00 16,320 JUMLAH 2,801,570.00 JASA PELAKSANAAN 10 280,157.00 TOTAL 3,081,727.00 Dibulatkan 3,081,700.00 29 DAUN PINTU PANEL 1.0000 bh Bahan: Kayu PAPAN Kamper Samarinda 0.0440 m 3 2,750,000.00 121,000.00 Paku 0.0667 Kg 6,500.00 433.55 Profil 12 12.0000 m 4,000.00 48,000.00 Lem kayu 0.1500 Kg 3,500.00 525.00 Upah Kerja : Pekerja terampil 4.0000 Org 19,600.00 78,400.00 Kepala Tukang Kayu 1.7500 Org 23,900.00 41,825.00 Mandor 0.1750 Org 27,200.00 4,760.00 JUMLAH 294,943.55 JASA PELAKSANAAN 10 29,494.36 TOTAL 324,437.91 Dibulatkan 324,400.00 Lampiran 1 91 NO URAIAN PEKERJAAN KOEF SAT H. SAT SUB JUMLAH JUMLAH BRGTK Rp. Rp. Rp. 30 DAUN PINTU LapisTEAKWOOD 1.0000 Bh Bahan : Kayu papan Kamper Samarinda 0.0343 m 3 2,750,000.00 94,325.00 Paku 0.0296 Kg 7,000.00 207.20 Teakwood 1.5000 lbr 65,000.00 97,500.00 Lem Kayu 0.1500 Kg 3,500.00 525.00 Upah Kerja : Pekerja Terampil 4.0000 Org 19,600.00 78,400.00 Tukang Kayu 1.5000 Org 23,900.00 35,850.00 Mandor 0.1000 Org 27,200.00 2,720.00 JUMLAH 309,527.20 JASA PELAKSANAAN 10 30,952.72 TOTAL 340,479.92 Dibulatkan 340,400.00 31 DAUN PINTU TEAKWOOD 1.0000 Bh DITAMBAH MELAMINTO Bahan : Kayu 410X400 Kamper Samarinda 0.0343 m 3 2,750,000.00 94,325.00 Paku 0.0296 Kg 7,000.00 207.20 Teakwood 0.6500 lbr 65,000.00 42,250.00 Melaminto 0.6500 lbr 70,000.00 45,500.00 Triplex t.4mm 0.6500 lbr 40,250.00 26,162.50 Lem Kayu 0.1500 Kg 7,700.00 1,155.00 Upah Kerja : Pekerja Terampil 4.0000 Org 19,600.00 78,400.00 Tukang Kayu 1.5000 Org 23,900.00 35,850.00 Mandor 0.1000 Org 27,200.00 2,720.00 JUMLAH 326,569.70 JASA PELAKSANAAN 10 32,656.97 TOTAL 359,226.67 Dibulatkan 359,200.00 32 SALURAN AIR DIA. 4 PVC 1.0000 m Bahan : Pipa PVC dia. 4 AW 1.0000 m 24,000.00 24,000.00 Acc. Pipa 1.0000 ls 4,000.00 4,000.00 Lem PVC 0.1500 tube 3,500.00 525.00 Upah Kerja : Pekerja Terampil 0.2000 Org 19,600.00 3,920.00 Tukang Pipa 0.1000 Org 21,800.00 2,180.00 Mandor 0.0100 Org 27,200.00 272.00 JUMLAH 34,897.00 JASA PELAKSANAAN 10 3,489.70 TOTAL 38,386.70 Dibulatkan 38,300.00 Lampiran 1 92 NO URAIAN PEKERJAAN KOEF SAT H. SAT SUB JUMLAH JUMLAH BRGTK Rp. Rp. Rp. 33 SALURAN AIR DIA. 2 12 PVC 1.0000 m Bahan : Pipa PVC dia. 2 12 AW 1.0000 m 14,375.00 14,375.00 Acc. Pipa 1.0000 ls 2,000.00 2,000.00 Lem PVC 0.0750 tube 3,500.00 262.50 Upah Kerja : Pekerja Terampil 0.1400 Org 19,600.00 2,744.00 Tukang Pipa 0.0700 Org 21,800.00 1,526.00 Mandor 0.0070 Org 27,200.00 190.40 JUMLAH 21,097.90 JASA PELAKSANAAN 10 2,109.79 TOTAL 23,207.69 Dibulatkan 23,200.00 34 SALURAN AIR DIA. 3 PVC 1.0000 m Bahan : Pipa PVC dia. 3 AW 1.0000 m 20,987.50 20,987.50 Acc. Pipa 1.0000 ls 3,000.00 3,000.00 Lem PVC 0.7500 tube 3,500.00 2,625.00 Upah Kerja : Pekerja Terampil 0.1400 Org 19,600.00 2,744.00 Tukang Pipa 0.0700 Org 21,800.00 1,526.00 Mandor 0.0070 Org 27,200.00 190.40 JUMLAH 31,072.90 JASA PELAKSANAAN 10 3,107.29 TOTAL 34,180.19 Dibulatkan 34,100.00 35 SALURAN AIR BERSIH PIPA GI 1.0000 m Bahan : Pipa GI dia. 1 1.0000 m 22,050.00 22,050.00 Acc. Pipa 1.0000 ls 2,500.00 2,500.00 Selotipe 0.2500 bh 1,900.00 475.00 Upah Kerja : Pekerja Terampil 0.1200 Org 19,600.00 2,352.00 Tukang Pipa 0.0700 Org 21,800.00 1,526.00 Mandor 0.0060 Org 27,200.00 163.20 JUMLAH 29,066.20 JASA PELAKSANAAN 10 2,906.62 TOTAL 31,972.82 Dibulatkan 31,900.00 Lampiran 1 93 NO URAIAN PEKERJAAN KOEF SAT H. SAT SUB JUMLAH JUMLAH BRGTK Rp. Rp. Rp. 36 SALURAN AIR BERSIH PIPA GI 1.0000 m DIAMETER 34 Bahan : Pipa GI dia. 34 1.0000 m 15,250.00 15,250.00 Acc. Pipa 1.0000 ls 2,000.00 2,000.00 Selotipe 0.2500 bh 1,900.00 475.00 Upah Kerja : Pekerja Terampil 0.1200 Org 19,600.00 2,352.00 Tukang Pipa 0.0700 Org 21,800.00 1,526.00 Mandor 0.0060 Org 27,200.00 163.20 JUMLAH 21,766.20 JASA PELAKSANAAN 10 2,176.62 TOTAL 23,942.82 Dibulatkan 23,900.00 37 SALURAN AIR BERSIH PIPA GI DIAMETER 12 1.0000 m Bahan : Pipa GI dia. 12 1.0000 m 12,337.50 12,337.50 Acc. Pipa 1.0000 ls 1,500.00 1,500.00 Selotipe 0.2500 bh 1,900.00 475.00 Upah Kerja : Pekerja Terampil 0.1200 Org 19,600.00 2,352.00 Tukang Pipa 0.0900 Org 21,800.00 1,962.00 Mandor 0.0060 Org 27,200.00 163.20 JUMLAH 18,789.70 JASA PELAKSANAAN 10 1,878.97 TOTAL 20,668.67 Dibulatkan 20,600.00 38 BAK FIBER GLASS DAN 1.0000 Unit PAS. BATA LAPIS KERAMIK Bahan : Pasangan Bata 2.4500 m 2 42,625.10 104,431.50 Plesteran 2.9400 m 2 16,714.30 49,140.04 Pasangan Keramik 3.4300 m 2 50,417.50 172,932.03 JUMLAH 326,503.56 JASA PELAKSANAAN 10 32,650.36 TOTAL 359,153.92 Dibulatkan 359,100.00 Lampiran 1 94 NO URAIAN PEKERJAAN KOEF SAT H. SAT SUB JUMLAH JUMLAH BRGTK Rp. Rp. Rp. 39 DAUN JENDELA TANPA KACA 1.0000 Bh Bahan : Kayu 410x400 Kamper Samarinda 0.0170 m 3 2,750,000.00 46,750.00 Lem Putih FOX 0.3000 Kg 7,700.00 2,310.00 List Kayu 4.0000 m 1,950.00 7,800.00 Upah Kerja : Pekerja Terampil 0.3000 Org 17,700.00 5,310.00 Tukang Kayu Terampil 1.2000 Org 23,900.00 28,680.00 Kepala Tukang Katu 0.1200 Org 24,400.00 2,928.00 Mandor 0.0200 Org 27,200.00 544.00 JUMLAH 94,322.00 JASA PELAKSANAAN 10 9,432.20 TOTAL 103,754.20 Dibulatkan 103,300.00 40 PAS. LIST GYPSUM t.9mm 1.0000 m 2 Bahan : Gypsum t.9mm 0.3470 lLbr 36,000.00 12,492.00 Paku 4 sd 7 cm 0.2200 Kg 6,500.00 1,430.00 Upah Pasang : Pekerja SetengahTerampil 0.2800 Org 17,700.00 4,956.00 Tukang Kayu Terampil 0.4000 Org 23,900.00 9,560.00 Kepala Tukang Kayu 0.0800 Org 24,400.00 1,952.00 Mandor 0.0140 Org 27,200.00 380.80 Alat Bantu : Stoot Werk 1.0000 Lot 100.00 100.00 JUMLAH 30,870.80 JASA PELAKSANAAN 10 3,087.08 TOTAL 33,957.88 Dibulatkan 33,900.00 41 TANGGA BETON 1.0000 m 2 Uraian Pekerjaan : Pasangan Bekisting Multi 8.6000 m 2 41,173.38 354,091.07 Pembesian 218.1000 Kg 5,000.00 1,090,500.00 Beton Mutu K-225 1.0000 m 2 328,712.00 328,712.00 JUMLAH 1,773,303.07 JASA PELAKSANAAN 10 177,330.31 TOTAL 1,950,633.37 Dibulatkan 1,950,600.00 Lampiran 1 95 NO URAIAN PEKERJAAN KOEF SAT H. SAT SUB JUMLAH JUMLAH BRGT K Rp. Rp. Rp. 42 MEJA BETON 1.0000 m 2 Uraian Pekerjaan : Pasangan Bekisting Papan 5.7500 m 2 40,307.00 231,765.25 Pembesian 150.0000 Kg 5,000.00 750,000.00 Beton Mutu K-225 1.0000 m 2 328,712.00 328,712.00 JUMLAH 1,310,477.25 JASA PELAKSANAAN 10 131,047.73 TOTAL 1,441,524.98 Dibulatkan 1,441,500.00 Lampiran 2 96 DAFTAR HARGA SATUAN MATERIAL Tahun 2002 Menurut PU Cipta Karya PROYEK : PERLUASAN GEDUNG KANTOR DINAS TENAGA KERJA DAN TRANSMIGRASI LOKASI : Jl. SOEKARNO HATTA No. 532 BANDUNG No. URAIAN SATUAN HARGA SATUAN Rp. 1 Ampelas lbr 2.000,00 2 Bata merah bh 245,00 3 Batu kali m 3 65.900,00 4 Besi Beton BJTD-24 kg 3.690,00 5 Cat besi merk SEIV kg 23.100,00 6 Cat kayu merk SEIV kg 23.100,00 7 Cat tembok SANLEX kg 5.998,00 8 Concrete Spancer bh 300,00 9 Gypsum t.9 mm DN merk JAYA lbr 28.500,00 10 Kain Perban gypsum roll 10.000,00 11 Kawat beton kg 5.914,00 12 Kayu 410 x 400 papan kamper Samarinda m 3 3.300.000,00 13 Kayu 57 x 400 Balok kamper Samarinda m 3 3.300.000,00 14 Kayu 320 x 400 papan Borneo Super m 3 1.320.000,00 15 Kayu 57 x 400 Balok Borneo m 3 1.320000,00 16 Keramik 20x20 KW 1 DN m 2 31.350,00 17 Keramik 20x25 KW 1 DN m 2 31.350,00 18 Keramik 30x30 ROMAN m 2 27.500,00 19 Kuas 2’’ bh 5.500,00 20 Kuas 3’’ bh 4.000,00 21 Lem Kayu kg 7.500,00 22 Lem putih FOX kg 8.250,00 23 Lem PVC Tube 3.500,00 24 Melaminto lbr 70.000,00 25 Meni Besi kg 8.450,00 26 Meni kayu kg 7.500,00 27 Multiplex t.12mm lbr 93.500,00 28 Multiplex t.6mm lbr 71.500,00 29 Multiplex t.9mm lbr 79.500,00 30 Nok Genteng bh 3.000,00 31 Paku kg 5.500,00 32 Paku 4 s d 7 cm kg 6.500,00 33 Paku Gypsum kg 20.000,00 34 Pasir Beton m 3 93.925,00 35 Pasir Pasang m 3 64.000,00 36 Pasir Urug m 3 38.000,00 37 Pipa GIP dia. 1’’ m’ 22.050,00 38 Pipa GIP dia. 1 2 ’’ m’ 13.337,50 39 Pipa GIP dia. 3 4 ’’ m’ 16.250,00 40 Pipa PVC dia. 2 1 2 ’’ AW m’ 16.375,00 41 Pipa PVC dia. 3’’ AW m’ 16.500,50 Lampiran 2 97 No. URAIAN SATUAN HARGA SATUAN Rp. 42 Kayu 57 x 400 Borneo Super m 3 1.325.000,00 43 Pipa PVC dia. 4’’ AW m’ 28.000,00 44 Plamir Kayu kg 11.500,00 45 Plamir Tembok kg 4.500,00 46 Profil 1 2 m’ 4.000,00 47 Roll Cat bh 10.500,00 48 Selotipe bh 1.900,00 49 Semen PC 50kg zak 27.100,00 50 Semen Gypsum kg 4.600,00 51 Semen Warna kg 4.600,00 52 Spit 2 3 mesin m 3 93.500,00 53 Teakwood lbr 82.500,00 54 Thiner B ltr 4.155,00 55 Triplex t.4mm lbr 45.350,00 56 Triplex t.6mm lbr 55.000,00 57 List kayu m’ 1.950,00 58 Armatur TL 1x36 Watt PHILIS set 35.000,00 59 Armatur TL 2x36 Watt PHILIS set 70.000,00 60 Armatur PLC 20 Watt PHILIS set 40.000,00 61 Saklar Double BRACO bh 10.500,00 62 Saklar Single BRACO bh 7.800,00 63 Saklar hotel BRACO bh 8.900,00 64 Stop kontak 200 Watt BRACO bh 8.300,00 65 Stop Kontak AC BRACO bh 22.500,00 66 Kaca Rayband 5mm ASAHI m 2 55.000,00 67 Engsel Pintu Unilon Standar ps 9.000,00 68 Engsel Jendela Unilon Standar ps 6.300,00 69 Kunci KM Bulat kwalitas biasa bh 19.000,00 70 Sloot Jendela Tunggal bh 9.300,00 71 Espangolet ps 16.000,00 72 Hak Angin Kait Jendela Biasa ps 2.750,00 73 Pas. Raeling Stainless steel tangga m’ 350.000,00 74 Closet Jongkok Standar Putih Poslin TOTO unit 135.000,00 75 Urinoir Lengkap TOTO Warna standard lengkap unit 1.035.000,00 76 Pas. Bak kontrol 40x40 bh 145.000,00 77 Saringan Talang bh 12.500,00 78 Kitchen Zink Stainless Standard Lokal selubang unit 175.000,00 79 Wastafel Lengkap TOTO bh 620.000,00 80 Kran Kitchen Zink bh 75.000,00 81 Kran Tembok ITAP Ø 1 2 bh 30.000,00 82 Penyekay Urinoir TOTO bh 200.000,00 83 Alat Bantu dan Aksesoris Listrik ls 205.000,00 84 Istalasi titik lampu Stop Kontak UpahAlat bh 75.000,00 85 Panel PP1 unit 1.100.000,00 98 DAFTAR HARGA SATUAN UPAH Tahun 2002 Menurut PU Cipta Karya PROYEK : PERLUASAN GEDUNG KANTOR DINAS TENAGA KERJA DAN TRANSMIGRASI LOKASI : Jl. SOEKARNO HATTA No. 532 BANDUNG No. JENIS PEKERJAAN BANGUNAN HARGA UPAH Rp. SATUAN WAKTU 1 Pekerja 16.000,00 1 orgHr8 jam 2 Pekerja setengah teramppil 18.000,00 1 orgHr8 jam 3 Pekerja terampil 20.000,00 1 orgHr8 jam 4 Tukang Gali 18.000,00 1 orgHr8 jam 5 Tukang Batu setengah terampil 25.000,00 1 orgHr8 jam 6 Tukang Batu terampil 30.000,00 1 orgHr8 jam 7 Kepala Tukang Batu 32.500,00 1 orgHr8 jam 8 Tukang Kayu setengah terampil 25.000,00 1 orgHr8 jam 9 Tukang Kayu terampil 30.000,00 1 orgHr8 jam 10 Kepala Tukang Kayu 32.500,00 1 orgHr8 jam 11 Tukang CatPlitur setengah terampil 25.000,00 1 orgHr8 jam 12 Tukang CatPlitur terampil 30.000,00 1 orgHr8 jam 13 Kepala Tukang CatPlitur 32.500,00 1 orgHr8 jam 14 Tukang Besi Beton setengah terampil 25.000,00 1 orgHr8 jam 15 Tukang Besi Beton terampil 30.000,00 1 orgHr8 jam 16 Kepala Tukang Besi Beton 35.000,00 1 orgHr8 jam 17 Tukang Besi Profil setengah terampil 30.000,00 1 orgHr8 jam 18 Tukang Besi Profil terampil 32.500,00 1 orgHr8 jam 19 Kepala Tukang Besi Profil 35.000,00 1 orgHr8 jam 20 Mandor 30.000,00 1 orgHr8 jam 21 Tukang Pipa 32.500,00 1 orgHr8 jam Lampiran 5 99 RENCANA ANGGARAN BIAYA Tahun 2002 PU Cipta Karya Kota Bandung PROYEK :PERLUASAN GEDUNG KANTOR DINAS TENAGA KERJA DAN TRANSMIGRASI LOKASI :Jl. SOEKARNO HATTA No. 532 BANDUNG NO JENIS PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA Rp. Rp. I PEKERJAAN PERSIAPAN 1 Mobilisasi dan Demobilisasi 1 LS 4.750.000,00 SUB JUMLAH I 4.750.000,00 II PEKERJAAN STRUKTUR BETON 1 Kolom Beton K1 5050 13,98 m 3 1.990.000,00 27.820.200,00 2 Balok Beton B1 4060 14,28 m 3 2.000.000,00 28.560.000,00 3 Balok Beton B2 3060 13,20 m 3 2.000.000,00 26.400.000,00 4 Balok Beton B3 2540 7,18 m 3 2.000.000,00 14.360.000,00 5 Balok Beton B4 2030 1,61 m 3 2.000.000,00 3.220.000,00 6 Plat Lantai dak. t.12 cm 43,39 m 3 1.680.000,00 72.895.200,00 7 Kolom Praktis KP 1215 2,52 m 3 1.700.000,00 4.284.000,00 8 Listplank beton 12100 9,14 m 3 1.579.000,00 14.432.060,00 9 Tangga Beton 4,12 m 3 2.130.000,00 8.775.600,00 10 Meja Beton 0,34 m 3 1.540.000,00 523.600,00 SUB JUMLAH II 201.270.660,00 III PEKERJAAN PASANGAN DAN PLESTERAN 1 Pas. Dinding Bata 1:3 20,20 m 2 51.000,00 1.030.200,00 2 Pas. Dinding Bata 1:5 270,84 m 2 42.000,00 11.375.280,00 3 Plesteran Dinding Trasram 1:3 +acian 40,40 m 2 20.000,00 808.000,00 4 Plesteran Dinding 1:5 +acian 541,68 m 2 18.000,00 9.750.240,00 5 Plesteran Beton 1:3 179,23 m 2 20.000,00 3.584.600,00 SUB JUMLAH III 26.548.320,00 Lampiran 5 100 NO JENIS PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA Rp. Rp. IV PEKERJAAN KUSEN. PINTU JENDELA 1 Pas. Kusen kayu pitu. jendela dan bouvenlight 2,83 m 3 4.000.000,00 11.320.000,00 Kayu Samarinda 2 Daun pintu entrance P1 Double 4,00 bh 360.000,00 1.440.000,00 3 Daun pintu teakwood P2 6,00 bh 400.000,00 2.400.000,00 4 Daun pintu KM WC P3 3,00 bh 410.000,00 1.230.000,00 5 Daun jendela J2 8,00 bh 120.000,00 960.000,00 6 Daun jendela J3 4,00 bh 120.000,00 480.000,00 7 Kaca Reyban t. 5mm 51,30 m 2 55.000,00 2.821.500,00 8 Kunci pintu 11,00 bh 19.000,00 209.000,00 9 Engsel pintu 33,00 bh 9.000,00 297.000,00 10 Engsel Jendela 24,00 bh 6.300,00 151.200,00 11 Slot Jendela 12,00 bh 9.300,00 111.600,00 12 Espagnolet 6,00 bh 16.000,00 96.000,00 13 Hak Angin 24,00 bh 2.750,00 66.000,00 SUB JUMLAH IV 21.582.300,00 V PEKERJAAN LANTAI DAN DINDING 1 Pas. Keramik lantai 30x30 KW1ROMAN 300,53 m 2 53.000,00 15.928.090,00 2 Pas. Keramik tangga 30x30 KW1ROMAN 13,40 m 2 53.000,00 710.200,00 3 Pas. Step nosing tangga 1030 20,58 m 189.583,20 3.901.622,26 4 Pas. Plint keramik lantai 146,06 m 58.200,00 8.500.692,00 5 Pas. Keramik lantai KMWC20x20 KW1ROMAN 6,12 m 2 57.000,00 348.840,00 6 Pas. Keramik dinding KMWC2025 KW1ROMAN 44,55 m 2 59.000,00 2.628.450,00 7 Pas. Partisi gypsum double+ 8,00 m 2 51.000,00 408.000,00 rangka kayu 612 + kaca 5mm - 8 Pas. Ralling stainless steel tangga 7,520 m 350.000,00 2.632.000,00 SUB JUMLAH V 35.057.894,26 VI PEKERJAAN PLAFOND 1 Pas. Rangka kayu+penutup gypsum t.9mm 331,25 m 2 51.000,00 16.893.750,00 2 Pas. List Gypsum 57 142,65 m 34.000,00 4.850.100,00 3 Pas. Talang tegak PVC Ø 4 97,20 m 44.000,00 4.276.800,00 4 Pas. Bak kontrol 40x40 12,00 bh 145.000,00 1.740.000,00 5 Saringan Talang 12,00 bh 12.500,00 150.000,00 SUB JUMLAH VI 27.910.650,00 VII PEKERJAAN FINISHING DAN PENGECATAN 1 Pengecatan Dinding 639,00 m 2 12.000,00 7.668.000,00 2 Pengecatan Plafond 352,46 m 2 12.000,00 4.229.520,00 3 Pengecatan kolom. balok beton 187,63 m 2 12.000,00 2.251.560,00 4 Pengecatan kusen 82,26 m 2 24.000,00 1.974.240,00 5 Pengecatan Daun Pintu 55,20 m 2 24.000,00 1.324.800,00 6 Pengecatan Daun Jendela 10,38 m 2 24.000,00 249.120,00 SUB JUMLAH VII 17.697.240,00 Lampiran 5 101 NO JENIS PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA Rp. Rp. VIII PEKERJAAN PLUMBING SANITAIR VIII.1 Instalasi Air Bersih 1 Pas. Instalasi Air Bersih GI Ø 34’ 38,90 m 25.000,00 972.500,00 2 Pas. Instalasi Air Bersih GI Ø 12’ 6,00 m 23.000,00 138.000,00 3 Bak Fiber glass+pas. Bata lapis keramik 3,00 bh 370.000,00 1.110.000,00 4 Closet Jongkok ex. TOTO 3,00 bh 135.000,00 405.000,00 5 Uninoir Lengkap ex. Toto 3,00 bh 935.000,00 2.805.000,00 6 Pasangan Penyekat Urinoir 2,00 bh 200.000,00 400.000,00 7 Wastafel Meja lengkap 2,00 bh 620.000,00 1.240.000,00 8 Kitchen zink lengkap 1,00 bh 175.000,00 175.000,00 9 Kran Kitchen zink Ø 12 1,00 bh 75.000,00 75.000,00 10 Kran Air Ø 12 3,00 bh 30.000,00 90.000,00 VIII.2 Instalasi Air Kotor 1 Pas. Pipa PVC Ø 4 37,90 m 44.000,00 1.667.600,00 2 Pas. Pipa PVC Ø 2 36,90 m 28.000,00 1.033.200,00 3 Floor drain Ø 4 4,00 bh 44.000,00 176.000,00 SUB JUMLAH VIII 10.287.300,00 IX PEKERJAAN INSTALASI LISTRIK 1 Panel PP1 distribusi panel 1,00 Unit 1.100.000,00 1.100.000,00 2 Instalasi titik cahaya 23,00 ttk 75.000,00 1.725.000,00 3 Instalasi titik stop kontak 14,00 ttk 75.000,00 1.050.000,00 4 Instalasi stop kontak AC 6,00 ttk 75.000,00 450.000,00 5 Armatur TL 1x36 watt 5,00 Set 35.000,00 175.000,00 6 Armatur TL 2x36 watt 10,00 Set 70.000,00 700.000,00 7 Armatur PLC 20 Watt 8,00 Set 40.000,00 320.000,00 8 Saklar Double 5,00 bh 10.500,00 52.500,00 9 Saklar Single 4,00 bh 7.800,00 31.200,00 10 Saklar hotel 1,00 bh 8.900,00 8.900,00 11 stop kontak 200 Watt 14,00 bh 8.300,00 116.200,00 12 Stop Kontak AC 6,00 bh 22.500,00 135.000,00 13 Alat bantu dan accessoris 1,00 ls 205.000,00 205.000,00 SUB JUMLAH IX 6.068.800,00 Lampiran 5 102 REKAPITULASI RENCANA ANGGARAN BIAYA Tahun 2002 PU Cipta Karya Kota Bandung PROYEK :PERLUASAN GEDUNG KANTOR DINAS TENAGA KERJA DAN TRANSMIGRASI LOKASI :Jl. SOEKARNO HATTA No. 532 BANDUNG NO URAIAN SUBJUMLAH Rp. I PEKERJAAN PERSIAPAN 4.750.000,00 II PEKERJAAN STRUKTUR BETON 201.270.660,00 III PEKERJAAN PASANGAN DAN PLESTERAN 26.548.320,00 IV PEKERJAAN KUSEN PINTU DAN JENDELA 21.582.300,00 V PEKERJAAN LANTAI DAN DINDING 35.057.894,26 VI PEKERJAAN PLAFOND 27.697.240,00 VII PEKERJAAN FINISHING DAN PENGECATAN 17.697.240,00 VIII PEKERJAAN PLUMBING DAN SANITAIR 10.287.300,00 IX PEKERJAAN INSTALASI LISTRIK 6.068.800,00 SUB JUMLAH 350.959.754,26 PPN 10 35.095.975,43 TOTAL KESELURUHAN 386.055.729,69 DIBULATKAN 386.055.000,00 Terbilang : Tiga Ratus Delapan Puluh Enam Lima Puluh Lima Ribu Rupiah Lampiran 6 103 ANALISA HARGA SATUAN PEKERJAAN Tahun 2002 PU Cipta Karya Kota Bandung PROYEK :PERLUASAN GEDUNG KANTOR DINAS TENAGA KERJA DAN TRANSMIGRASI LOKASI :Jl. SOEKARNO HATTA No. 532 BANDUNG KOEF H. SAT SUB JUMLAH JUMLAH NO URAIAN PEKERJAAN BRGTK SAT Rp. Rp. Rp. 1 BETON MUTU K-225 1,0000 m 3 Bahan : Semen PC 50Kg 6,7200 Zak 27.100,00 182.112,00 Split 23 mesin 0,8100 m 3 93.500,00 75.735,00 Pasir beton 0,4500 m 3 93.925,00 42.266,25 Upah Kerja : Pekerja setengah terampil 1,5000 Org 18.000,00 27.000,00 Tukang Batu terampil 0,5000 Org 30.000,00 15.000,00 Kepala Tukang Batu 0,0500 Org 32.500,00 1.625,00 Mandor 0,0100 Org 30.000,00 300,00 Alat Bantu 1,0000 Ls 5.000,00 5.000,00 JUMLAH 349.038,25 JASA PELAKSANAAN 10 34.903,83 TOTAL 383.942,08 Dibulatkan 380.000,00 2 BEKISTING DENGAN PAPAN 1,0000 m 2 Asumsi : 1. Papan borneo 2x pakai dihitung 75 2. Kayu borneo 2x pakai dihitung 50 Bahan: Papan 320x400 Borneo 0,0230 m 3 1.320.000,00 18.975,00 Kayu 57x400 Borneo 0,0140 m 3 1.320.000,00 6.125,00 Paku 4sd 7 cm 0,4000 Kg 6.500,00 2.600,00 Upah Pasang: Pekerja setengah terampil 0,1200 Org 18.000,00 2.160,00 Tukang kayu 0,1500 Org 30.000,00 4.500,00 Kepala Tukang Kayu 0,1500 Org 32.500,00 4.875,00 Mandor 0,0050 Org 30.000,00 150,00 Upah untuk bongkar Bekisting : Pekerja terampil 0,1200 Org 20.000,00 2.400,00 Alat Bantu 1,0000 ls 750,00 750,00 JUMLAH 42.535,00 JASA PELAKSANAAN 10 4.253,50 TOTAL 46.788,50 EFESIENSI 30 14.036,55 Dibulatkan 60.825,05 Lampiran 6 104 NO URAIAN PEKERJAAN KOEF SAT H. SAT SUB JUMLAH JUMLAH BRGTK Rp. Rp. Rp. 3 BEKISTING DGN MULTIPLEX t 9mm 1,0000 m 2 Bahan: Multiplex 9mm 0,3472 lbr 79.500,00 19.321,68 Kayu 57x400 Borneo 0,0175 m 3 1.320.000,00 6.930,00 Paku 4 sd 7cm 0,3800 kg 6.500,00 2.470,00 Upah Pasang : Pekerja setengah terampil 0,1200 Org 18.000,00 2.160,00 Tukang Kayu 0,1500 Org 30.000,00 4.500,00 Kepala Tukang Kayu 0,1500 Org 32.500,00 4.875,00 Mandor 0,0500 Org 30.000,00 1.500 ,00 Upah bongkar : Pekerja terampil 0,1200 Org 20.000,00 2.400,00 Alat Bantu 1,0000 ls 250,00 250,00 JUMLAH 44.406,68 JASA PELAKSANAAN 10 4.440,67 TOTAL 48.847,35 EFESIENSI 20 9.769,47 Dibulatkan 58.616,82 4 PEMBESIAN 1,0000 Kg Bahan : Besi Beton BJTD-24 1,0200 Kg 3.690,00 3.763,80 Kawat Beton 0,0100 Kg 5.914,00 59,14 Concrete spancer 2,0000 Bh 300,00 600,00 Upah kerja : Pekerja setengah terampil 0,0015 Org 18.000,00 27,00 Tukang besi terampil 0,0150 Org 30.000,00 450,00 Kepala tukang besi 0,0100 Org 35.000,00 350,00 Mandor 0,0050 Org 30.000,00 150,00 Alat bantu 1,0000 ls 150,00 150,00 JUMLAH 5.549,94 JASA PELAKSANAAN 10 554,99 TOTAL 6.104,93 Dibulatkan 6.000,00 5 KOLOM BETON 5050 Uraian pekerjaan : Pasang bekisting multi 8,0000 m 2 44.406,63 355.253,04 Pembesian 200,0000 kg 5.549,94 1.109.988,00 beton mutu K-225 1,0000 m 3 349.038,25 349.038,25 JUMLAH 1.814.279,29 JASA PELAKSANAAN 10 181.427,93 TOTAL 1.995.707,22 Dibulatkan 1.990.000,00 Lampiran 6 105 NO URAIAN PEKERJAAN KOEF SAT H. SAT SUB JUMLAH JUMLAH BRGTK Rp. Rp. Rp. 6 KOLOM BETON 4060 Uraian pekerjaan : Pasang bekisting multi 5,6576 m 2 44.406,63 251.234,95 Pembesian 225,0000 kg 5.549,94 1.248.736,50 Beton mutu K-225 1,0000 m 3 349.038,25 349.038,25 JUMLAH 1.849.009,70 JASA PELAKSANAAN 10 184.900.97 TOTAL 2.033.910,67 Dibulatkan 2.000.000,00 7 KOLOM BETON 3060 Uraian pekerjaan : Pasang bekisting multi 7,0056 m 2 44.406,63 311.095,09 Pembesian 210,000 kg 5.549,94 1.165.487,40 Beton mutu K-225 1,0000 m 3 349.038,25 349.038,25 JUMLAH 1.825.620,74 JASA PELAKSANAAN 10 182.562,07 TOTAL 2.008.182,81 Dibulatkan 2.000.000,00 8 KOLOM BETON 2540 Uraian pekerjaan : Pasang bekisting multi 8,1000 m 2 44.406,63 359.693,70 Pembesian 210,0000 kg 5.549,94 1.165.487,40 Beton mutu K-225 1,0000 m 3 349.038,25 349.038,25 JUMLAH 1.874.219,35 JASA PELAKSANAAN 10 187.421,94 TOTAL 2.061.641,29 Dibulatkan 2.000.000,00 9 KOLOM BETON 2030 Uraian pekerjaan : Pasang bekisting multi 9,3296 m 2 44.406,63 414.296,10 Pembesian 200,0000 kg 5.549,94 1.109.988,00 Beton mutu K-225 1,0000 m 3 349.038,25 349.038,25 JUMLAH 1.873.322,35 JASA PELAKSANAAN 10 187.332,23 TOTAL 2.060.654,58 Dibulatkan 2.000.000,00 10 KOLOM PRAKTIS 1215 Uraian pekerjaan : Pasang bekisting Papan 14,5000 m 2 42.535,00 616.757,50 Pembesian 120,0000 kg 5.549,94 665.992,80 Beton mutu K-175 1,0000 m 3 326.299,50 326.299,50 JUMLAH 1.609.049,80 JASA PELAKSANAAN 10 160.904,98 Dibulatkan 1.769.954,78 Lampiran 6 106 NO URAIAN PEKERJAAN KOEF SAT H. SAT SUB JUMLAH JUMLAH BRGTK Rp. Rp. Rp. 11 BETON MUTU K-175 1,0000 m 3 Bahan : Semen PC 50kg 5,5000 Zak 27.100,00 149.050,00 Split 23 mesin 0,8300 m 3 93.500,00 77.605,00 Pasir beton 0,5400 m 3 93.925,00 50.719,50 Upah kerja : Pekerja setengah terampil 1,5000 Org 18.000,00 27.000,00 Tukang batu terampil 0,5000 Org 30.000,00 15.000,00 Kepala tukang batu 0,0500 Org 32.500,00 1.625,00 Mandor 0,0100 Org 30.000,00 300,00 Alat bantu 1,0000 ls 5.000,00 5.000,00 JUMLAH 326.299,50 JASA PELAKSANAAN 10 32.629,95 TOTAL 358.929,45 Dibulatkan 350.000,00 12 BALOK BETON 1330 Uraian pekerjaan : Pasang bekisting multi 13,5000 m 2 44.406,63 599.489,51 Pembesian 125,0000 kg 5.549,94 693.742,50 beton mutu K-225 1,0000 m 3 349.038,25 349.038,25 JUMLAH 1.642.270,26 JASA PELAKSANAAN 10 164.227,03 TOTAL 1.806.497,28 Dibulatkan 1.800.000,00 13 PLAT LANTAI T. 12cm Uraian pekerjaan : Pasang bekisting multi 8,3000 m 2 41.173,38 341.739,05 Stoot bekisting 8,3000 m 2 48.611,15 403.472,55 Pembesian 100,0000 kg 4.609,55 460.955,00 beton mutu K-225 1,0000 m 3 328.712,00 328.712,00 JUMLAH 1.534.878,60 JASA PELAKSANAAN 10 153.487,86 TOTAL 1.688.366,46 Dibulatkan 1.680.000,00 Lampiran 6 107 NO URAIAN PEKERJAAN KOEF SAT H. SAT SUB JUMLAH JUMLAH BRGTK Rp. Rp. Rp. 14 PAS. STOOT WERK UNIT. COR Lt 1,0000 m 2 Asumsi : 1. Papan stoot 2x pakai dihitung 75 2. Kayu stoot 2x pakai dihitung 50 Bahan: Papan 320x400 Borneo 0,0150 m 3 1.320.000,00 12.375,00 Kayu 57x400 Borneo 0,0525 m 3 1.320.000,00 22.968,75 Paku 4sd 7 cm 0,5000 kg 6.500,00 3.250,00 Upah Pasang: Pekerja setengah terampil 0,1500 Org 18.000,00 2.700,00 Tukang kayu 0,2000 Org 30.000,00 6.000,00 Kepala Tukang Kayu 0,1000 Org 32.500,00 3.250,00 Mandor 0,0170 Org 30.000,00 510,00 JUMLAH 51.053,75 JASA PELAKSANAAN 10 5.105,38 TOTAL 56.159,13 EFESIENSI 30 16.847,74 Dibulatkan 73.006,86 15 BETON LISTPLANK 1290 1,0000 m 2 Uraian pekerjaan : Pasang bekisting multi 12,6000 m 2 44.406,63 559.523,54 Pembesian 125,0000 kg 5.549,94 693.742,50 Beton mutu K-225 1,0000 m 3 349.038,25 349.038,25 JUMLAH 1.602.304,29 JASA PELAKSANAAN 10 160.230,43 TOTAL 1.762.534,72 Dibulatkan 1.760.000,00 16 PAS. BATA MERAH 1Pc:3Ps 1,000 m 2 Bahan : Bata Merah 70 , 0000 Bh 245,00 17.150,00 Semen PC 50kg 0,4200 Zak 27.100,00 11.382,00 Pasir pasang 0,0540 m 3 64.000,00 3.456,00 Upah kerja : Pekerja setengah terampil 0,4290 Org 18.000,00 7.722,00 Tukang batu terampil 0,2140 Org 30.000,00 6.420,00 Kepala tukang batu 0,0210 Org 32.500,00 682,50 Mandor 0,0110 Org 30.000,00 330,00 Alat bantu 1,0000 ls 75,00 75,00 JUMLAH 47.217,50 JASA PELAKSANAAN 10 4.721,75 TOTAL 51.939,25 Dibulatkan 51.000,00 Lampiran 6 108 NO URAIAN PEKERJAAN KOEF SAT H. SAT SUB JUMLAH JUMLAH BRGTK Rp. Rp. Rp. 17 PAS. BATA MERAH 1PC:5PS 1,0000 m 2 Bahan : Bata Merah 70,0000 Bh 245,00 17.150,00 Semen PC 50kg 0,2074 Zak 27.100,00 5.620,54 Pasir pasang 0,0580 m 3 64.000,00 3.712,00 Upah kerja : Pekerja setengah terampil 0,3218 Org 18.000,00 5.792,40 Tukang batu terampil 0,1805 Org 30.000,00 5.415,00 Kepala tukang batu 0,0158 Org 32.500,00 513,50 Mandor 0,0083 Org 30.000,00 249,00 Alat bantu 1,0000 ls 130,00 130,00 JUMLAH 38.582,44 JASA PELAKSANAAN 10 3.858,24 TOTAL 42.440,68 Dibulatkan 42.000,00 18 PLESTERAN 1PC ; 3PS ACIAN 1,0000 m 2 Bahan: Semen PC 50 kg 0,1630 Zak 27.100,00 4.417,30 Pasir Pasang 0,0190 m 3 64.000,00 1.216,00 Upah Kerja : Pekerja setengah terampil 0,2860 Org 18.000,00 5.148,00 Tukang batu terampil 0,2140 Org 30.000,00 6.420,00 Kepala Tukang Kayu 0,0210 Org 32.500,00 682,50 Mandor 0,0200 Org 30.000.00 600,00 Alat Bantu 1,0000 ls 50,00 50,00 JUMLAH 18.533,80 JASA PELAKSANAAN 10 1.853,38 TOTAL 20.387,18 Dibulatkan 20.000,00 19 PLESTERAN 1PC ; 3PS ACIAN 1,0000 m 3 Bahan: Semen PC 50 kg 0,1050 Zak 27.100,00 2.845,50 Pasir Pasang 0,0190 m 3 64.000,00 1.216,00 Upah Kerja : Pekerja setengah terampil 0,2860 Org 18.000,00 5.148,00 Tukang batu terampil 0,2140 Org 30.000,00 6.420,00 Kepala Tukang Kayu 0,0210 Org 32.500,00 682,50 Mandor 0,0200 Org 30.000,00 600,00 Alat Bantu 1,0000 ls 50,00 50,00 JUMLAH 16.962,00 JASA PELAKSANAAN 10 1.696,20 TOTAL 18.658,20 Lampiran 6 109 NO URAIAN PEKERJAAN KOEF SAT H. SAT SUB JUMLAH JUMLAH BRGTK Rp. Rp. Rp. 20 LANTAI KERAMIK 3030 1,0000 m 2 Bahan : Keramik 3030 ROMAN 1,0500 m 2 27.500,00 28.875,00 Semen PC 50 kg 0,1600 Zak 27.100,00 4.336,00 Pasir pasang 0,0300 m 3 64.000,00 1.920,00 Semen warna 0,0130 kg 4.500,00 58,50 Upah Kerja : - Pekerja terampil 0,3400 Org 18.000,00 6.120,00 Tukang Batu terampil 0,1700 Org 30.000,00 5.100,00 Kepala Tukang batu 0,0340 Org 32.500,00 1.105,00 Mandor 0,0170 Org 30.000,00 510,00 Alat bantu 1,0000 ls 450,00 450,00 JUMLAH 48.474,50 JASA PELAKSANAAN 10 4.847,45 TOTAL 53.321,95 Dibulatkan 53.000,00 21 LANTAI KERAMIK 2020 1,0000 m 2 Bahan : Keramik 2020 KW1 DN 1,0500 m 2 31.350,00 32.917,50 semen PC 50 kg 0,1600 Zak 27.100,00 4.336,00 Pasir pasang 0,0300 m 3 64.000,00 1.920,00 Semen warna 0,0130 kg 4.500,00 58,50 Upah Kerja : Pekerja terampil 0,3400 Org 18.000,00 6.120,00 Tukang Batu terampil 0,1700 Org 30.000,00 5.100,00 Kepala Tukang batu 0,0340 Org 32.500,00 1.105,00 Mandor 0,0170 Org 30.000,00 510,00 Alat bantu 1,0000 ls 500,00 500,00 JUMLAH 52.567,00 JASA PELAKSANAAN 10 5.256,70 TOTAL 57.823,70 Dibulatkan 57.000,00 22 LANTAI KERAMIK 2025 1,0000 m 2 Bahan : Keramik 2025 KW1 DN 1,0500 m 2 31.350,00 32.917,50 semen PC 50 kg 0,1600 Zak 27.100,00 4.336,00 Pasir pasang 0,0300 m 3 64.000,00 1.920,00 Semen warna 0,0130 kg 4.500,00 58,50 Upah Kerja : Pekerja terampil 0,1875 Org 18.000,00 3.375,00 Tukang Batu terampil 0,2750 Org 30.000,00 8.250,00 Kepala Tukang batu 0,0750 Org 32.500,00 2.437,50 Mandor 0,0188 Org 30.000,00 564,00 Alat bantu 1,0000 ls 500,00 500,00 JUMLAH 54.358,50 Lampiran 6 110 JASA PELAKSANAAN 10 5.435,85 TOTAL 59.794,35 Dibulatkan 59.000,00 NO URAIAN PEKERJAAN KOEF SAT H. SAT SUB JUMLAH JUMLAH BRGTK Rp. Rp. Rp. 23 PLAFOND TRIPLEX 4mm 1,0000 m 2 Asumsi : 1. Bahan Rangka Kayu Borneo Super

2. Tebal Triplex t.4mm Bahan :