DIV. III PEKERJAAN TANAH

1.2 Mobilisasi Ls 51,430,000.00 1.00 51,430,000.00 51,430,000.00 0.2213 1.00 51,430,000.00 0.1899 0.70 36,001,000.00 0.1330 0.30 15,429,000.00 0.0570 0.0199 0.0199 0.0199 0.0199 0.0199 0.0199 0.0199 0.0199 0.0199 0.0024 0.0285 0.0285 0.2213 - - - II. DIV. I DRAINAGE - - - - - - 2.1 Galian untuk Drainage Selokan dan Saluran Air M3 13,000.00 11,695.00 13,000.00 152,035,000.00 0.6543 5,067.76 65,880,880.00 0.2433 4,236.50 55,074,500.00 0.2034 831.26 10,806,380.00 0.0399 0.0467 0.0467 0.0467 0.0467 0.0467 0.0467 0.0468 0.0468 0.0468 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 2.2 Pasangan Batu dengan Mortar M3 270,000.00 2,179.00 270,000.00 588,330,000.00 2.5319 5,678.69 1,533,246,300.00 5.6624 5,895.19 1,591,701,300.00 5.8783 428.69 115,746,300.00 0.4275 0.1583 0.1583 0.1583 0.1583 0.1582 0.1582 0.1582 0.1582 0.1582 0.1582 0.0534 0.0534 0.0534 0.0534 0.0534 0.0534 0.0534 0.0534 2.33 Gorong Gorong dan Pipa Bertulang M1 950,000.00 58.00 950,000.00 55,100,000.00 0.2371 48.00 45,600,000.00 0.1684 - - - - - - 0.0297 0.0296 0.0296 0.0296 0.0297 dia 75 - 120 cm - - - - - 2.41 Timbunan Porous atau Bahan Penyaring M3 60,000.00 1,152.00 60,000.00 69,120,000.00 0.2975 774.19 46,451,400.00 0.1715 - - - - - - 0.0371 0.0372 0.0372 0.0372 0.0372 0.0372 2.42 Anyaman Filter Plastik M2 27,500.00 678.88 18,669,200.00 0.0689 - - - 678.88 18,669,200.00 0.0689 0.0689 2.43 Pipa Berlubang BanyakPerforated Pipe untuk Pekerjaan M1 106,250.00 - - - - - - - - - Drainase Bawah Permukaan 3.7208 - - - - - - - - - -

III. DIV. III PEKERJAAN TANAH

- - - - - - - - - - 3.11 Galian Tanah Biasa M3 12,000.00 2,261.00 12,000.00 27,132,000.00 0.1168 10,216.19 122,594,280.00 0.4528 5,455.86 65,470,320.00 0.2418 4,760.33 57,123,960.00 0.2110 0.0073 0.0073 0.0073 0.0073 0.0073 0.0073 0.0073 0.0073 0.0073 0.0073 0.0073 0.0603 0.0603 0.0603 0.0301 3.12 Galian batu M3 30,000.00 2,783.00 30,000.00 83,490,000.00 0.3593 1,358.24 40,747,200.00 0.1505 228.90 6,867,000.00 0.0254 430.50 12,915,000.00 0.0477 0.0359 0.0359 0.0359 0.0359 0.0360 0.0360 0.0238 0.0238 3.13 Galian Struktur dengan Kedalaman 0 - 2 m M3 15,000.00 - - - - - - - - - 3.14 Galian Struktur dengan Kedalaman 2 - 4 m M3 15,000.00 2,124.00 15,000.00 31,860,000.00 0.1371 1,163.81 17,457,150.00 0.0645 742.00 11,130,000.00 0.0411 421.81 6,327,150.00 0.0234 0.0137 0.0137 0.0137 0.0137 0.0137 0.0137 0.0138 0.0234 3.17 Galian Perkerasan Beraspal dengan Cold Milling Machine M3 250,000.00 35.00 250,000.00 8,750,000.00 0.0377 351.76 87,940,000.00 0.3248 - - - 351.76 87,940,000.00 0.3248 0.0047 0.0047 0.0047 0.0047 0.0047 0.0048 0.1624 0.1624 3.18 Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 175,000.00 235.00 175,000.00 41,125,000.00 0.1770 1,415.50 247,712,500.00 0.9148 1,167.17 204,254,750.00 0.7543 248.33 43,457,750.00 0.1605 0.0126 0.0126 0.0126 0.0126 0.0126 0.0126 0.0127 0.0127 0.0127 0.0127 0.0802 0.0802 3.21 Timbunan Biasa M3 65,000.00 1,040.00 65,000.00 67,600,000.00 0.2909 624.51 40,593,150.00 0.1499 2,263.80 147,147,000.00 0.5434 106.45 6,919,250.00 0.0256 0.0363 0.0363 0.0364 0.0364 0.0364 0.0364 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 3.22 Timbunan Pilihan M3 70,000.00 2,266.00 70,000.00 158,620,000.00 0.6826 8,195.89 573,712,300.00 2.1188 5,421.46 379,502,200.00 1.4015 2,977.94 208,455,800.00 0.7698 0.0683 0.0683 0.0683 0.0683 0.0683 0.0682 0.0682 0.0682 0.1283 0.1283 0.1283 0.1283 0.1283 0.1283 3.3 Penyiapan Badan Jalan M2 3,000.00 1,978.00 3,000.00 5,934,000.00 0.0255 4,241.58 12,724,740.00 0.0470 4,386.40 13,159,200.00 0.0486 225.00 675,000.00 0.0025 0.0026 0.0026 0.0026 0.0026 0.0025 0.0025 0.0025 0.0025 0.0025 1.8269 - - - - - IV. DIV. IV. PELEBARAN PERKERASAN DAN BAHU JALAN - - - - - - - - - - 4.22 Lapis Pondasi Agregate Class B M3 172,935.27 10,403.00 172,935.27 1,799,045,613.81 7.7424 8,926.40 1,543,689,394.13 5.7010 7,712.81 1,333,816,706.87 4.9259 24.00 4,150,446.48 0.0153 0.5955 0.5955 0.5956 0.5956 0.5956 0.5956 0.5956 0.5956 0.5956 0.5956 0.5955 0.0153 7.7424 - - - - - V. DIV. V. PERKERASAN BERBUTIR