Tugas Akhir Perencanaan Struktur Factory Outlet dan Resto 2 Lantai
BAB 3 Prencanaan Atap Beban P
7
Beban plafon = Luas atap degh x berat plafon
= 3,469 x 18 = 62,442 kg
Beban kuda-kuda = ½ x Btg3 + 12 + 13 + 4 x berat profil kuda kuda
= ½ x 1,875 +2,864 +3,248 +1,875 x 25 = 123,275 kg
Beban plat sambung = 30 x beban kuda-kuda
= 0,3 x 123,275 = 36,982 kg
Beban bracing = 10
x beban kuda-kuda = 0,1 x 123,275
= 12,328 kg
Beban P
8
Beban plafon = Luas atap cdhi x berat plafon
= 7,031 x 18 = 126,558 kg
Beban kuda-kuda = ½ x Btg2 + 10 + 11 +23 x berat profil kuda kuda
= ½ x 1,875 +2,165 +2,165 +1,875 x 25 = 101,000 kg
Beban plat sambung = 30 x beban kuda-kuda
= 0,3 x 101,000 = 30,300 kg
Beban bracing = 10
x beban kuda-kuda = 0,1 x 101,000
= 10,100 kg
commit to user
34
Tugas Akhir Perencanaan Struktur Factory Outlet dan Resto 2 Lantai
BAB 3 Prencanaan Atap Beban P
9
Beban plafon = Luas atap bcij x berat plafon
= 10,594 x 18 = 190,692 kg
Beban kuda-kuda = ½ x Btg1 + 9 + 2 x berat profil kuda kuda
= ½ x 1,875 +1,083 +1,875 x 25 = 60,412 kg
Beban plat sambung = 30 x beban kuda-kuda
= 0,3 x 60,412 = 18,124 kg
Beban bracing = 10
x beban kuda-kuda = 0,1 x 60,412
= 6,041 kg
Tabel 3.3 Rekapitulasi Beban Mati
Beban Beban
Atap kg
Beban gording
kg Beban
Kuda - kuda kg
Beban Bracing
kg Beban Plat
Penyambung kg
Beban Plafon
kg Jumlah
Beban kg
Input SAP
2000 kg
P
1
731,6 82,5 50,5
5,05 15,15 114,21
999,01 999 P
2
529,7 61,875 94,725 9,472 28,418
- 724,19 724 P
3
351,55 41,25 116,988 11,699 35,096
- 556,583 557 P
4
173,45 20,625 141,6 14,16
42,48 - 392,315 392
P
5
21,1 - 81,187 8,119 24,356 - 134,762 135
P
6
- - 124,437 12,444
37,331 7,596 181,808
182 P
7
- - 123,275
12,328 36,982 62,442 235,027
235 P
8
- - 101,000 10,1 30,3 126,558
267,958 268
P
9
- - 60,412 6,041 18,124
190,692 275,269
275
commit to user
35
Tugas Akhir Perencanaan Struktur Factory Outlet dan Resto 2 Lantai
BAB 3 Prencanaan Atap
1 2
3 4
5 6
9 15
7 8
10 11
12 13
14
W1 W
2 W
3 W4
W5
2 Beban Hidup
Beban hidup yang bekerja pada P
1
, P
2
, P
3,
P
4
, P
5
= 100 kg
3 Beban Angin
Perhitungan beban angin :
Gambar 3.9 Pembebanan setengah kuda-kuda utama akibat beban angin Beban angin kondisi normal, minimum = 25 kgm
2
PPIUG 1983 Koefisien angin tekan
= 0,02 α − 0,40
= 0,02 x 30 − 0,40
= 0,02
W
1
= luas atap abjk x koef. angin tekan x beban angin = 14,632 x 0,2 x 25 = 73,16 kg
W
2
= luas atap bcij x koef. angin tekan x beban angin = 10,594 x 0,2 x 25 = 52,97 kg
W
3
= luas atap cdhi x koef. angin tekan x beban angin = 7,031 x 0,2 x 25 = 35,155 kg
W
4
= luas atap degh x koef. angin tekan x beban angin = 3,469 x 0,2 x 25 = 17,345 kg
commit to user
36
Tugas Akhir Perencanaan Struktur Factory Outlet dan Resto 2 Lantai
BAB 3 Prencanaan Atap W