Utility 2. Summary Of The Findings by Criteria 1

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 32of 77 measured. This is intended to know or adjust ripple mill tightness; if it is too close together then there will be more broken nut and broken kernel resulted, but if it is too loose there will be more whole nut. Nuts that have been broken into shell and kernel are then separated at winower LTDS; shells will be sucked, whereas kernel will pass through it. Because there are shells still carried with kernel, separation is once again performed using hydro cyclone. Samples are taken after hydro cyclone and before entering kernel silo. In the hydro shell sample is taken for broken kernel, with a standard of not higher than 1 percent. This is to know the extent of broken kernel carried with shells.

b. Utility

Power plant Electricity is produced by 1 unit of 1400 KVA steam turbine. The turbine operates at 5208 rpm. The temperature of reduction gear bearings is measured and recorded periodically. During the audit it can be seen that generated electricity has good quality with its voltage at 380 V, frequency at 50 Hz and cos phi at 0.9 – 0.93. Steam boiler There is 1 steam boiler with a capacity of 35 ton steam per hour. Steam boiler is operated at 20 kgcm 2 pressure. This still complies with steam boiler permit, which is at 21 kgcm 2 . Soot blowing is conducted periodically and recorded. During the audit, Indomarine steam boiler was frequently seen to emit soot. According to information from the organization this is due to a problem in a rotary feeder. Based on records the quality of steam boiler water is checked routinely every 3 hours. For this purpose, water boiler is sampled. Parameters measured include ph that should be at 10.5 – 11.5 standard and Conductivity at 3000. Evidence shows that boiler is operated in a safe manner. Based on boiler operator’s records the boiler combustion chamber is operated at a pressure of minus 2 up to minus 5. BPV Back pressure vessel Back pressure vessel is used to store steam from the turbine to be used for other purposes, SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 33of 77 particularly for boiling. Compliance status: Compliance 4.2 Practices maintain soil fertility at, or where possible improve soil fertility toa level that ensures optimal and sustained yield Company conducted soil analysis on 5-17 December 2012 where the results will serve as a basic guidance in preparing fertilizing recommendation for 2013. Sampling was conducted on soil located between palm trees with 0-15 cm and 15-45 cm deep. Sample for soil analysis was taken from 3 blocks, namely block C53, D58 and G35. Soil analysis result was issued by Pekan Baru Chemical and Research Laboratory of PT SARANA INTI PRATAMA on 23 April 2013. Examples of soil analysis results at block C53 are: Ph 4.5, N total 0.04, P-available 0.68ppm, K 0.08, Ca 0.20 and Mg 0.07 me100g. Company has conducted leaf analysis to determine one-year fertilizer requirement. There is a record of analysis result of leaves sent to the chemical lab. – Research Department of PT SARANA INTI PRATAMA on 27 June 2013 and completed on 15 July 2013 with Doc. No. 106423GBSMSKR-RDE-HOVI2013 totaled 125 samples. Company has fertilizing recommendation as estate reference in applying fertilizer. But, data of block A15 shows that afd OA Estate 1 has applied 4000 kg fertilizer with fertilizer type of Tap Com2 and dose 1.5 kgpkk; based on block A15 fertilizing recommendation the dose for that block should have been 1.75 kgpkk with total fertilizer of 6746.25 kg. Company has planted legume cover crop LCC with a total of 1812.69 ha in 2006; 3780.72 hain 2007; 765.28 hain 2008; 2939.59 hain 2010; 3146.93 hain 2011; 1243.79 ha in 2012; and 580.24 ha in 2013 until August. Company conducts soil fertility improvement through the application of empty fruit bunches particularly on sandy soil. In January Company applied empty fruit bunches with a total of 24.2 tons on 1.19 ha land, in February it was 72.92 tons with total area of 3.61 ha, in July it was 171.6 tons with total area of 8.58 ha. Dose of empty fruit bunch application is 40 tonha. Compliance status: Minor - NCR No.1 4.3 Practices minimize and control erosion and degradation of soils. Company has land distribution Maps that details about: SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 34of 77 1. Mineral area = 7034.99 ha 2. Peat area = 4685.72 ha 3. Sand area = 6872.71 ha Estate area has a flat topography, as indicated in the topographical map. Yet, Company has established a slope planting mechanism in Agronomy SOP GSMSOP1.11.0. Company has road maintenance plan and realization for 2013, where it performed road maintenance of 57.730 meter out of the planned 58.826 meter in January, 7.600 meter out of the planned 73.085 meter in February, 5.500 meter out of the planned 7.2848 meter in March, 65.200 out of the planned 77.700 meter in April, 75.003 out of the planned 86.600 meter in May, 109.800 meter out of the planned 137.300 meter in June, 54.350 meter out of the planned 62.700 meter in July and 40.300 meter out of the planned 63.600 meter in August. Company has built a water gate to maintain water level at 40-60 cm from the ground. There is a monitoring piezometer that is useful for knowing water level in the block; piezometer is installed in Pasar Tengah block. For estate 2 it is conducted or monitored directly by assistant RD i.e. Mr. Deni. The record includes equipment no., block, planting year, date, water level, condition of area and water level recommendation. 27 August 2013 monitoring shows the level of water was 95cm from the ground and recommended to raise the level by 20-30 cm. Marginal land, like sandy soil, is managed through empty fruit bunch application and LCC planting. Compliance status: Compliance 4.4 Practices maintain the quality and availability of surface and groundwater Company has identified water sources in the estate and mill areas i.e. Sungai Kelua and Sungai Bakung, where both rivers drain to Sungai Seruyan. The protection of riparian buffer zone is implemented by the designation of 50 m to the left and right of river as a conservation area. Watershed program is incorporated into the proposed HCV management and monitoring activity, which is targeted until 2014, that is to identify and map river boundary, natural vegetation, oil palm trees, cultivated area, and open area. Those realized SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 35of 77 are the installation of signboard warning and prohibiting tree felling in watershed area. The signboard is installed at location I-50. Other protected wetlandsmarshlands where signboards have been installed are location E34 – E35. River water management program includes monitoring of river water quality, water flow rate and waste as specified in EIA document. Test parameters for river water measurement are TSS, TDS, pH, BOD, COD, DO, NH 3 , NO 2 , NO 3 , Fe, Cd, Pb, and Zn. The result of water quality measurement for semester II 2012 shows compliance with the quality standard except for pH value of BakungHulu and BakungHilir rivers that is below 6, but this corresponds with initial condition in the EIA document. For Kelua river, pH value reduction occurred due to peat land clearing activity conducted by other companies that causes drops in the river’s pH value. The latest river water quality measurement was conducted on 28 August 2013. The result is awaiting the analysis of PT Unilab testing laboratory. Water discharge measurement is planned to be conducted in the environmental monitoring of semester II. In managing PKS liquid waste, Company builds a WWTP with a capacity of 83,611.89 m 3 . There is no waste discharged into water bodies or soil because it is used for land application. Permit to utilize liquidwaste for land application has been issued by the local government of Seruyan Regency through the DecisionLetter No. 662013 dated 13 February 2013. Wastequality monitoring is carried out on a monthly basis through external laboratory of PT UnilabPerdana with sampling points at pond 5 and 5A. Testing parameters are BOD, COD, pH, oil-fat, Pb, Cu, Cd, Zn that refer to the Decree of the Minister of Environment No. 282003. The result of January – July 2013 test shows that BOD pH values comply with the quality standard. Water quality analysis of monitoring well I, II and III the well is in residential area is carried out every 3 months. Parameters measured are BOD, DO, pH, NO 3 , NH 3 , Cd, Cu, Pb, Zn, Cl and SO 4 . The recent test on 28 June 2013 shows that results of all wells comply with the quality standard except for the residential monitoring well location where the pH value is below 6. This condition has been followed up by making a new well with a cover to prevent contamination and conducting retests and the result has complied with the quality standard. The source of water for mill process comes from artificial dam that has a capacity of 96,000 m 3 . The dam has its source of water from marsh and rain water. Water consumption has SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 36of 77 been recorded on a daily basis for mill use and residential use. Data of mill’s water use in August 2013 is 7,600.00 m 3 for processing 9,426.00 tons of FFB so that the efficiency is 0.81 tonFFB. Compliance status: Compliance 4.5 Pests, diseases, weeds and invasive introduced species are effectively managed using appropriate Integrated Company has implemented IPM Program in the form of traning and census. Company has conducted spraying training SA15 RB 15 for staff, foremen and employees working as a sprayer. The training was held on Friday, 14 June 2013 at PT GBSM Training Center Building and attended by 86 participants. In addition, Company has conducted pest and plant disease training, which was executed by R D Division with 82 participants on 04 October 2012. There is SOP on OPT monitoring and control - There are Early Warning SystemEWS records by monthly periodic monitoring of OPT of pest such as termites, Oryctes beetle, rodents, ulat api, ulat kantong, Tirataba. The result is always below the economical threshold limit. - There is control facility according to SOP or work instructions hand sprayer, power sprayer, protective clothing in the form of mask, goggles, hat, boots, trousers and long sleeve dress, hand gloves - There is a warehouse for OPT control equipment and materials - There is trained pest and plant disease control teams, with training carried out internally by assistants and foremen. Level of attacts is still below economical threshold limit remain 4 . Frequent attacks are from mushroom species such as Curvularia sp, Helmintosporium and Fusarium sp. Level of attacts is still below economical threshold limit remain 5 . Company has conducted monthly pesticide toxicity monitoring, and since June 2013 it has no longer used paraquatdichlorida. Compliance status: Compliance SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 37of 77

4.6 Agrochemicals are used in a way that does not endanger health or the