Copyright © 2006 Open Geospatial Consortium, Inc. All Rights Reserved.
Copyright © 2006 Open Geospatial Consortium, Inc. All Rights Reserved.
Page 10 of 131
i. Preface
Suggested additions, changes, and comments on this draft are welcome and encouraged. Such suggestions may be submitted by email message or by making suggested changes
in an edited copy of this document.
The changes made in this document version, relative to the previous version, are tracked by Microsoft
®
Word, and can be viewed if desired. If you choose to submit suggested changes by editing this document, please first accept all the current changes,
and then make your suggested changes with change tracking on.
ii. Document terms and definitions
This document uses the specification terms defined in Subclause 5.3 of [OGC 05-008], which is based on the ISOIEC Directives, Part 2: Rules for the structure and
drafting of International Standards. In particular, the word “shall” not “must” is the verb form used to indicate a requirement to be strictly followed to conform to this
specification.
iii. Document contributors contact points.
All questions regarding this document should be directed to the editor or the contributors:
Name Organization
Graham Vowles Ordnance Survey
®
John R. Herring Oracle
®
Corporation Cecil Goodwin
Tele Atlas N.V. Mark V. Scardina
Oracle Corporation Andreas Matheus
University of the German Armed Forces, Munich Cristian Opincaru
University of the German Armed Forces, Munich Wayne Debeugny
Technical Editor, Ordnance Survey
iv. Revision history
Date Release
Editor Primary clauses
modified Description
Copyright © 2006 Open Geospatial Consortium, Inc. All Rights Reserved.
Copyright © 2006 Open Geospatial Consortium, Inc. All Rights Reserved.
Page 11 of 131
Date Release
Editor Primary clauses
modified Description
1 September 2005
0.0.1 Graham Vowles
Initial glossary, roles and scenario definition.
17 October 2005
0.0.2 John R. Herring
Preface, Forward,
1 Scope 2 Conformance
3 References 4 Definitions
first few Filling in gaps in boilerplate for
specifics of GeoDRM, subject to WG working group review. Some format
changes were made in 3 and 4 first few definitions to get nearer ISO
rules.
26 October 2005
0.0.3 Cecil Goodwin
4 Definitions Refined definitions
28 October 2005
0.0.4 John R. Herring
3, 4, 5 Filling in gaps in boilerplate and
formats for specifics of GeoDRM, subject to WG review. Some format
changes were made in 3 and 4 to get nearer ISO rules. Exteriorizing
external definition changing a quote to a reference.
22 November 2005
0.0.5 Mark V. Scardina
4. Definitions, comments
29 November 2005
0.0.6 John R. Herring
Reorganize and clean-up
12 December 2005
0.0.7 John R. Herring
Reorganize and new rights
section Rights model based on 6 Dec. 05
telecom, and up for discussion for 13 Dec. 05
20 December 2005
0.0.8 John R. Herring
Clause 1, 3, 4 Clause 6
Clause 9 Answered Marks comment and added
more information model detail. More work on definitions.
22 December 2005
0.0.9 John R. Herring
Clause 6.4, 9.4.2
Trust and Process-derived rights proposal
27 December 2005
0.0.10 John R. Herring
9.1 Deleted old comments, clean up of
some formatting issues, Expanded 9.1 5 January
2006 0.0.11
John R. Herring 4, Annex B
Fixed some definitions sources, fixed use of principal. Added Model annex.
11 January 2006
0.0.12 Andreas Matheus,
Cristian Opincaru Introduction, 3,
9 Comments, Minor changes
20 January 2006
0.0.13 Graham Vowles Enterprise
Viewpoint Add edits from Munich workshop
25 January 2006
0.0.14 John R. Herring
Various Add edits from Munich workshop
26 January 2006
0.0.15 Andreas Matheus
Motivation, 6.1 Add Motivation and GeoDRM Roadmap
26 January 2006
0.0.16 John R. Herring
9, Annex B and some other
minor edits Information viewpoint text added and
general editorial clean-up. Annex B still and the Information
Model Clause 9 have been harmonized. Annex B is not
informative.
31 January 2006
0.0.17 Graham Vowles
1-6 Editorial, 7 and 8 Updated
Added a description of how the GeoDRM RM relates to other
documents. Editorial changes and update of Enterprise Viewpoint.
Added Joe Cardinale edits to Section 8 Computational Viewpoint.
3 February 2006
0.0.18 Graham Vowles
Annex C Added scenarios from GeoDRM
Game 27 February.
06 06-004r2 Wayne Debeugny
All over Grammar and style corrections.
Copyright © 2006 Open Geospatial Consortium, Inc. All Rights Reserved.
Copyright © 2006 Open Geospatial Consortium, Inc. All Rights Reserved.
Page 12 of 131
v. Changes to the OGC Abstract Specification