PENDEKATAN METODE LEAN GUNA MENGIDENTIFIKASI WASTE (PEMBOROSAN) DENGAN MENGGUNAKAN VALUE STREAM ANALYSIS TOOLS (VALSAT) SERTA USULAN PERBAIKAN PADA PROSES PRODUKSI POT KRIM 12.5gr DI CV DHYAN DHANI PLASTIK SURABAYA Repository - UNAIR REPOSITORY

PENDEKATAN METODE LEAN GUNA MENGIDENTIFIKASI WASTE (PEMBOROSAN) DENGAN MENGGUNAKAN VALUE STREAM

  PROSES PRODUKSI POT KRIM 12.5gr DI CV DHYAN DHANI PLASTIK SURABAYA DIAJUKAN UNTUK MEMENUHI SEBAGIAN PERSYARATAN DALAM MEMPEROLEH GELAR SARJANA MANAJEMEN DEPARTEMEN MANAJEMEN PROGRAM STUDI MANAJEMEN DIAJUKAN OLEH: AYUNDA NIRMALA NIM: 040811535 FAKULTAS EKONOMI DAN BISNIS UNIVERSITAS AIRLANGGA SURABAYA 2012

KATA PENGANTAR

  Alhamdulillahirabbil’alamin. Puji syukur penulis panjatkan ke hadirat Allah SWT karena hanya berkat rahmat, hidayah dan karunia-Nya penulis berhasil menyelesaikan skripsi dengan judul Pendekatan Metode Lean Guna Mengidentifikasi Waste (Pemborosan) dengan Menggunakan Value Stream

  Analysis Tools (VALSAT) Serta Usulan Perbaikan pada Proses Produksi Pot Krim 12.5gr Di CV Dhyan Dhani Plastik Surabaya.

  Penulisan skripsi ini dilakukan untuk memenuhi sebagian persyaratan dalam memperoleh gelar Sarjana Manajemen di Universitas Airlangga.

  Untuk itu penulis mengucapkan terima kasih kepada semua pihak yang telah memberikan dukungan, kritik dan motivasi, khususnya kepada :

  1. Prof. Dr. H. Muslich Anshori, SE., M.S.c., Ak. selaku Dekan Fakultas Ekonomi dan Bisnis Universitas Airlangga Surabaya.

  2. H. Sri Gunawan, DBA. selaku Ketua Departemen Manajemen Fakultas Ekonomi dan Bisnis Universitas Airlangga Surabaya.

  3. Dra. Ec. Nuri Herachwati, M.Si., M.Sc., selaku Kaprodi S1 Manajemen Departemen Manajemen Fakultas Ekonomi dan Bisnis Universitas Airlangga Surabaya.

  4. Febriana Wujaningrum SE, MT, selaku Dosen Pembimbing yang telah banyak sekali membantu penulis, membimbing dan mengarahkan penulis.

  5. Seluruh dosen pengajar Konsentrasi Manajemen Operasi, yang telah memberikan banyak inspirasi bagi penulis. iii

  6. Ayah dan Ibuku tercinta, terima kasih atas motivasi, dan doa yang selalu diberikan.

  7. Mas dika dan adekku Eta, terima kasih buat semangatnya.

  8. Donny Prasetya, terima kasih selalu memberikan semangat dan dukungan yang begitu besar kepada penulis.

  9. Pemilik CV Dhyan Dhani Plastik, Bapak Suratno, terima kasih telah memberikan kesempatan untuk melakukan penelitian.

  10. Bapak Adi, selaku manajer operasi CV Dhyan Dhani Plastik yang telah banyak memberikan informasi dan meluangkan banyak waktunya kepada penulis.

  11. Bapak Agung dan mas Ata’, terima kasih buat semua informasinya.

  12. Temen-temen 3G, Ananti Putri Kusumastuti “bu per”, Ayu Nur Istighfarina “ngek”, Dwi Damayanti “wik”, Fakhriza Saliya Wahib “mel” , Nurfitri Indriani “bul”, Rika Rahayu “cu”, Virgiasri Puspitasari “cil”, dan Yustina Woro Handayani “gut”, Terima kasih buat doa, dukungan, support, dan kebersamaan selama ini.

  13. Dwi Hangga, Putri, Aya’, Rurid, Debrina, Nana’, Ratri, Nindita, Catra, Putra, Haykal, Sindy, Tita, terima kasih untuk kerjasamanya selama kuliah 4 tahun ini.

  14. Mbak marry, terima kasih banyak atas inspirasi dan pengetahuannya.

  15. Semua temen-temen manajemen 2008 khususnya mahasiswa MO 08, yang tidak bisa penulis sebutin satu-satu

  16. Windy, Via, Acied, Mukti, Darmawan, Adhit dan semua sahabat yang uda kasi’ semangat buat penulis.

  17. Hesa, Intan, Dira, mbak Icha makasi ya buat semua doanya.

  18. Teman-teman KKN BBM-44, terima kasih untuk semua pengalaman yang begitu berharga selama berada di Kota Sampang.

  19. Dan semua pihak yang tidak dapat disebutkan satu persatu.

  Surabaya, September 2012 Penulis

  ABSTRAK Lean merupakan suatu konsep untuk melakukan lebih dan lebih dengan

  sedikit kesalahan, sedikit peralatan, sedikit waktu, sedikit ruang dalam memenuhi apa yang diinginkan konsumen.

  CV Dhyan Dhani Plastik adalah sebuah perusahaan manufaktur menengah kebawah yang memproduksi plastik untuk wadah kosmetik. Dimana produk pot krim seberat 12.5gr adalah yang paling banyak diproduksi, sehingga memberikan pengaruh yang cukup besar bagi perusahaan. Penelitian ini bertujuan untuk mengidentifikasi pemborosan yang terjadi selama proses produksi. Pengurangan

  waste akan meningkatkan efisiensi produksi yang nantinya dapat memperbaiki

  kinerja perusahaan lebih baik lagi. Dan bertujuan untuk memberikan usulan perbaikan terhadap pembuatan produk pot krim 12.5gr selama proses produksi. Penelitian ini menggunakan pendekatan kualitatif dengan beberapa metode seperti observasi, wawancara dan dokumentasi.

  Pada awal penelitian, dilakukan penggambaran big picture mapping yang didapat dari analisa pemenuhan order aliran informasi dan fisik. Setelah itu dilakukan pembobotan waste dengan menyebarkan kuisioner kepada setiap kepala regu. Setelah didapat rata-rata dari perhitungan waste, maka dilakukan perhitungan VALSAT yang nantinya dapat mengidentifikasi lebih detail waste yang terjadi selama proses produksi.

  Berdasarkan hasil penelitian, maka didapatkan beberapa penyebab yang dapat menimbulkan waste antara lain seperti keterlambatan kedatangan bahan baku, permintaan produk yang berubah-ubah, umur mesin tua, human error, ataupun masalah dalam rencana produksi. Usulan perbaikan yang dapat diberikan adalah seperti membuat penjadwalan yang tepat, melakukan komunikasi dengan baik kepada supplier, melakukan monitoring secara rutin terhadap mesin, mengatur ulang jadwal mobilasasi, perbaikan dan penambahan layout kerja, dan juga menambah tenaga kerja.

  Kata Kunci : Lean manufacturing, Seven Waste, Value Stream Analysis Tools (VALSAT), Big Picture Mapping, Cause & Effect Diagram, CV Dhyan Dhani Plastik, Pot Krim 12.5gr

  vi

  ABSTRACT

  Lean is a concept to do more and more with fewer errors, less equipment, less time, less space to meet what customers want. CV Dhani Dhyan Plastics is a manufacturing company that produces plastic medium for cosmetic containers. Where products weighing 12.5gr pot cream is the most widely produced, thus providing considerable influence for the company. This study aims to identify the waste that occurs during the production process. Waste reduction will increase the production efficiency can improve the performance of the company will be better. And aims to provide the proposed improvements to the manufacture of cream 12.5gr pot during the production process. This study used a qualitative approach by several methods such as observation, interview and documentation.

  At the beginning of the study, conducted depiction big picture mapping derived from analysis of the fulfillment of the order flow of information and physical. Once that was done by distributing questionnaires waste weighting to each foreman. Having obtained the average of the waste calculation, then count

  VALSAT which can be identified more detail waste that occurs during the production process.

  Based on this research, it found several causes that can lead to waste, among others, such as late arrival of raw materials, product demand swings, the old machine age, human error or a problem in the production plan. Proposed improvements that can be provided is such as to make proper scheduling, good communication with the suppliers, conduct regular monitoring of the machine, reset mobilasasi schedule, repairs and additions to layout work, and also increase employment.

  Keywords: Lean manufacturing, Seven Waste, Value Stream Analysis Tools (VALSAT), Big Picture Mapping, Cause & Effect Diagram, CV Dhyan Dhani Plastic, Pot Cream 12.5gr

  vii

  DAFTAR ISI HALAMAN JUDUL ………………………………………………………… i HALAMAN PERSETUJUAN ……………………………………………… ii KATA PENGANTAR ………………………………………………………. iii ABSTRAK …………………………………………………………………… vi DAFTAR ISI ………………………………………………………………… viii DAFTAR TABEL …………………………………………………………… xi DAFTAR GAMBAR ………………………………………………………… xii DAFTAR LAMPIRAN ……………………………………………………… xiii

  BAB I PENDAHULUAN

  1.1 Latar Belakang Masalah ………………………………………………….. 1

  1.2 Rumusan Masalah ……………………………………………………….... 4

  1.3 Tujuan Penelitian …………………………………………………………. 4

  1.4 Manfaat Penelitian ………………………………………………………... 5

  1.5 Sistematika Penulisan …………………………………………………….. 5

  BAB II TINJAUAN PUSTAKA

  2.1 Landasan Teori …………………………………………………………..... 7

  2.1.1 Konsep Lean ………………………………………………………… 7

  2.1.1.1 Prinsip Lean Thinking ……………………………………….. 7

  2.1.1.2 Metodologi Lean Thiking …………………………………..... 9

  2.1.1.3 Lean Manufacturing ………………………………………… 11

  2.1.2 Big Picture Mapping ………………………………………………... 12

  2.1.3 Konsep Waste ……………………………………………………….. 15

  2.1.3.1 Value Stream Mapping Tools ……………………………….. 19

  2.1.3.2 Value Stream Analysis Tools (VALSAT) ……..................... 25

  2.1.4 Cause and Effect Diagram ………………………………………….. 27

  2.2 Penelitian Sebelumnya ……………………………………………………. 29 viii

  ix

  4.1.5 Bahan Baku Pembuatan Pot Krim ………………………………….. 48

  Stream Analysis Tools (VALSAT) ………………………………….. 66

  4.3.3 Analisa Pemilihan Tool dengan Value

  4.3.2 Identifikasi Waste (waste workshop) ……………………………….. 65

  4.3.1 Penggambaran Big Picture Mapping ……………………………….. 65

  4.3 Pembahasan ……………………………………………………………...... 65

  4.2.3 Penggunaan Value Stream Analysis Tools (VALSAT) …………….. 59

  4.2.2 Identifikasi Waste (waste workshop) ……………………………….. 58

  4.2.1.2 Aliran Fisik Pemenuhan Order Produk Pot Krim ………….. 53

  4.2.1.1 Aliran Informasi Pemenuhan Order Produk Pot Krim ……... 51

  4.2.1 Penggambaran Big Picture Mapping ……………………………….. 51

  4.2 Deskripsi Hasil Penelitian ………………………………………………… 51

  4.1.6 Proses Produksi Pot Krim …………………………………………... 49

  4.1.4 Hasil Produksi ………………………………………………………. 47

  2.3 Research Question ………………………………………………………... 31

  4.1.3 Struktur Organisasi …………………………………………………. 44

  4.1.2 Lokasi Perusahaan ………………………………………………….. 44

  4.1.1 Sejarah Perusahaan …………………………………………………. 42

  4.1 Gambaran Umum Perusahaan …………………………………………….. 42

  BAB IV HASIL DAN PEMBAHASAN

  3.6 Tahapan Penelitian ………………………………………………………... 38

  3.5 Teknik Analisis Data …………………………………………………….... 38

  3.4 Prosedur dan Pengumpulan Data ………………………………………..... 36

  3.3 Jenis dan Sumber Data ……………………………………………………. 35

  3.2 Batasan Penelitian ………………………………………………………… 35

  3.1 Pendekatan Penelitian …………………………………………………….. 34

  BAB III METODE PENELITIAN

  2.4 Kerangka Berfikir ………………………………………………………… 33

  4.3.4 Analisa Detail Mapping …………………………………………….. 67

  4.3.4.1 Analisa Process Activity Mapping ………………………….. 68

  4.3.4.2 Analisa Supply Chain Response Matrix ……………………. 70

  4.3.4.3 Analisa Demand Amplification Mapping …………………… 72

  4.3.5 Analisa Pemborosan (waste) ……………………………………….. 76

  4.3.5.1 Produksi Berlebih …………………………………………... 76

  4.3.5.2 Menunggu …………………………………………………... 77

  4.3.5.3 Gerakan Berlebih ……………………………………………. 79

  4.3.5.4 Proses yang tidak Sesuai ……………………………………. 80

  4.3.5.5 Cacat ………………………………………………………… 81

  4.3.5.6 Persediaan Berlebih …………………………………………. 83

  4.3.5.7 Transport Berlebih …………………………………………... 84

  4.3.6 Usulan Perbaikan ……………………………………………………. 86

BAB V KESIMPULAN DAN SARAN

  5.1 Kesimpulan …………………………………………………………… 91

  5.2 Saran ………………………………………………………………….. 92

DAFTAR PUSTAKA LAMPIRAN

  x

  DAFTAR TABEL

Tabel 2.1 The Seven Stream Mapping Tools …………………………………. 20Tabel 2.2 Matriks Seleksi untuk value stream analyisis tools ………………... 26Tabel 4.1 Hasil Produksi ……………………………………………………… 47Tabel 4.2 Bahan Baku Pembuatan Pot Krim …………………………………. 49Tabel 4.3 Hasil Pembobotan seven waste …………………………………….. 58Tabel 4.4 Hasil Pembobotan VALSAT ………………………………………. 59Tabel 4.5 Day Physical Stocks ………………………………………………... 62Tabel 4.6 Presentase Jumlah Aktivitas untuk tiap tipe aktivitas ………………. 68

  xi

  DAFTAR GAMBAR

Dokumen yang terkait

USULAN PERBAIKAN PROSES PRODUKSI DENGAN MENGGUNAKAN PENDEKATAN LEAN PRODUCTION (Study Kasus Pada PT ABADI BARINDO AUTOTECH)

0 61 2

PERENCANAAN PERBAIKAN PROSES PRODUKSI DENGAN LEAN PRODUCTION UNTUK MEMINIMASI WASTE (Study Kasus PR. Jaya Pratama. Malang)

0 6 2

PENGURANGAN WASTE PADA PROSES PRODUKSI PUPUK PHONSKA DENGAN PENDEKATAN LEAN SIX SIGMA (Studi Kasus: PT. Petrokimia Gresik)

3 19 2

IMPLEMENTASI LEAN MANUFACTURING MENGGUNAKAN METODE VALUE STREAM ANALYSIS TOOLS UNTUK MENINGKATKAN EFISIENSI WAKTU PRODUKSI EDAMAME (STUDY KASUS PT. MITRATANI DUA TUJUH JEMBER)

46 148 129

WASTE TRANSPORTATION DENGAN PENDEKATAN LEAN MANUFACTURING DI

2 4 8

PENERAPAN METODE 5S UNTUK MEMINIMASI WASTE MOTION PADA PROSES PRODUKSI TUTUP BOTOL OLI AHM BIRU DI AREA MACHINING DAN FINISHING DI CV WK MENGGUNAKAN PENDEKATAN LEAN MANUFACTURING PROPOSAL OF IMPROVEMENT WITH 5S METHOD TO MINIMIZING WASTE MOTION AT AHM BLU

0 0 8

RANCANGAN USULAN PERBAIKAN UNTUK MINIMASI WASTE MOTION PADA PROSES PRODUKSI GITAR AKUSTIK JENIS BOLT-ON DENGAN PENDEKATAN LEAN MANUFACTURING DI PT GENTA TRIKARYA IMPROVEMENT PLAN TO MINIMIZE MOTION WASTE ON PRODUCTION PROCESS OF BOLT-ON TYPE GUITARS USING

0 1 8

USULAN RANCANGAN PERBAIKAN PROSES PRODUKSI DOOR FS ROOT A320 UNTUK MEMINIMASI WASTE WAITING PADA WORKSTATION CMM INSPECTION DI PT.DIRGANTARA INDONESIA DENGAN PENDEKATAN LEAN MANUFACTURING PRODUCTION PROCESS IMPROVEMENT OF DOOR FS ROOT A320 TO MINIMIZE WAS

1 3 8

USULAN PERBAIKAN PROSES PENCETAKAN MOTIF PADA KAIN GREY UNTUK MEMINIMASI WASTE TRANSPORTATION DI PT KHARISMA PRINTEX DENGAN PENDEKATAN LEAN MANUFACTURING IMPROVEMENT PROPOSAL OF MOTIFS PRINTING PROCESSING AT PT KHARISMA PRINTEX FOR MINIMIZING WASTE TRANSP

0 0 9

PERANCANGAN USULAN PERBAIKAN UNTUK MEMINIMASI WASTE MOTION PADA PROSES PRODUKSI MODUL SURYA 260WP PT XYZ DENGAN PENDEKATAN LEAN MANUFACTURING IMPROVEMENT TO MINIMIZING WASTE MOTION IN PRODUCTION PROCESS OF SOLAR MODULE 260WP AT PT XYZ WITH LEAN MANUFACTUR

0 1 8