b. On sea water
- Area
- Or total
5 ha or more 1,000 units or less
3. Plan for constructing
fishery facilities in the form of fish harbors
located outside the work area of public harbors,
shall fulfil the criteria as follows.
Potential in creating impacts, such as decreasing of the quality
of water, lowering of coastal lines, social conflict, type of
disease patterns, and liquid and solid wastes.
- Quay’s length
- Or having Fish Industry
covering an area of -
Or depth of the water at the quay
300 m or more 10 ha or more
4 M LWS or more
D. Forestry
In general, the important impact is disturbances against forest ecosystem, hydrology, biological variety, pests, landscape, and social conflict potentials.
No. Activities
ScaleSize Special scientific Reasons
1. Timber Forest Products
Utilization Business UPHHK
All Harvesting of trees with certain
diameters is potential for changing the structure and
composition of upright clusters, wild animals and their habitat.
2. Plant Forest Business
UHT 5,000 ha or more
Plant forest business shall be conducted through silviculture
system of Tebang Habis Permudaan Buatan THPB
mechanically using heavy equipment.
E. Health
No. Activities
ScaleSize Special scientific Reasons
1. Construction of hospitals
A and B or those or the same level
Potential in arising an important impact in forming B3radioactive
wastes and infection of diseases.
F. Communications
No. Activities
ScaleSize Special scientific Reasons
1. Construction of railroads
25 km or more Potential in arising impact, such
as emission, traffic disturbances, noises, vibrations, visual
disturbances, ecology, and social
impact. 2.
Construction of railroad networks
HighFirst class stations
Potential in arising impact , such as emission, traffic disturbances,
transportation accessibility, noises, vibrations, visual
disturbances, ecology, social impact and security around the
said activity. And it requires an extensive area of plots.
3. Construction of subway
railroads All
Potential in arising impact, such as land subsidence, land water ,
and disturbances, such as the impact against emission, traffic,
noises, vibrations, visual disturbances, social
infrastructure network disturbances gas, electricity,
drinking water, telecommunications and social
impact surrounding the said activity.
4. Dredging of river sailing
path 500,000 m2 or more
Potential in arising important impact against hydrology and
ecology systems, which is more extensive borders than the
activity limits. This activity will also cause disturbances against
river traffic.
5. Construction of harbors
completed with one of the facilities below :
a. Piers with massive
construction - Length
- Or area 200 m or more
6,000 m2 or more -High number of moored vessels
with approximately 5,000- 10,000 DWT with minimum 4-
7 m draft so that the depth required will become-5 to – 9m
LWS
-Potential in arising important impact against hydrology
system, ecosystem, noises, and may disturb coastal processes.
b. Break watertalud
- Length 200 m or less
Potential in arising an impact against the ecosystem,
hydrology, coastal lines, and bathymetry, and disturbing
coastal processes.
c. Supporting
infrastructure for harbors terminals,
warehouses, containers, etc
5 ha or more Potential in arising impact, such
as emission, traffic disturbances, transportation accessibility,
noises, vibrations, visual disturbances, ecology, social
- Area impact, and security surrounding
the activity. And it requires an extensive area.
d. Single Point Mooring
Bay - For vessels
10,000 DWT or more
A high number of moored vessels with approximately
5,000 – 10,000 DWT and draft of with minimum 4-7 m so that
the depth required becomes –5 to –9 m LWS.
Potential in arising impact, such as disturbances to sailing paths,
change of bathymetry, ecosystem, and disturbing
coastal processes, especially upon loading of raw oil, which is
potential in causing pollution due to the spill.
6. Dredging
a. Capital dredging
- Volume 250,000 m2 or more
Potential in arising impact, such as change of bathymetry,
ecosystem, and disturbing coastal processes, including the
lowering of productivity at the areas that may arise social
impact.
b- Maintenance dredging - Volume
500,000 m2 or more Potential in arising impact, such
as change of bathymetry, ecosystem, and disturbing
coastal processes and requiring a 3-6 months period.
7. Reclamation
- Width
- Or volume
25 ha or more 5,000,000 m2 or less
Potential in arising impact, against geo-hydrology system,
hydro-oceanography, social impact, ecology, traffic, and
disturbing coastal processes.
8. Dumping activity
a. On surface
- Volume - Dumping area
250,000 m2 or more 5 ha or more
Causing change of landscape, which will have an impact on the
local ecology and hydrology.
b. On the sea All
Potential in arising impact, against sea ecosystem, stream
bathymetry, coastal stability and productivity of the sea, which
will arise social impact.
9. Construction of new
airports including the facilities
All I to V and results of study of
agreed mother plans - Including high-technology
activities, shall obeying aviation safety rules, and
relating to international conventions.
- Potential in arising impact, such as noises, vibrations,
social impact, security of the country, emission and
possibility of land and air transportation revivals.
10. Development of airports
and the facilities Classes I, II, III
based upon development plans
mother plan, structure plan, etc
- Including high-technology activities, complying with
aviation safety rules, and relating to international
conventions.
- Potential in arising impact, such as noises, vibrations,
social impact, security of the country, emission and
possibility of land and air transportation revivals
11. Extension of airports
andor the facilities -
Population migration -
Or land clearance 200 KK or more
100 ha or more - Including high-technology
activities, complying with aviation safety rules, and
related to international potential in arising impact,
such as noises, vibrations, conventions.
Costal reclamation -
Area -
Or dredging volume 25 ha or more
100,000 m3 or more Social impact, security of the
country, emission, and possibility of land air
transportation revivals.
Cutting of hills and dredging of plots volume
of 500,000 m3 or more
12. Installation of under-
surface cables All
- Potential in arising impact, such as sea ecosystem, stream
bathymetry, coastal stability and productivity of the sea.
- Preparation of construction areas may arise disturbances
against sensitive areas such as corals
- Operation of under surface cables is susceptible to traffic
of vessels casting anchors, sand mining.
G. Satellite Technology