Forestry Health Communications ProdukHukum Perdagangan 17.

b. On sea water - Area - Or total 5 ha or more 1,000 units or less 3. Plan for constructing fishery facilities in the form of fish harbors located outside the work area of public harbors, shall fulfil the criteria as follows. Potential in creating impacts, such as decreasing of the quality of water, lowering of coastal lines, social conflict, type of disease patterns, and liquid and solid wastes. - Quay’s length - Or having Fish Industry covering an area of - Or depth of the water at the quay 300 m or more 10 ha or more 4 M LWS or more

D. Forestry

In general, the important impact is disturbances against forest ecosystem, hydrology, biological variety, pests, landscape, and social conflict potentials. No. Activities ScaleSize Special scientific Reasons 1. Timber Forest Products Utilization Business UPHHK All Harvesting of trees with certain diameters is potential for changing the structure and composition of upright clusters, wild animals and their habitat. 2. Plant Forest Business UHT 5,000 ha or more Plant forest business shall be conducted through silviculture system of Tebang Habis Permudaan Buatan THPB mechanically using heavy equipment.

E. Health

No. Activities ScaleSize Special scientific Reasons 1. Construction of hospitals A and B or those or the same level Potential in arising an important impact in forming B3radioactive wastes and infection of diseases.

F. Communications

No. Activities ScaleSize Special scientific Reasons 1. Construction of railroads 25 km or more Potential in arising impact, such as emission, traffic disturbances, noises, vibrations, visual disturbances, ecology, and social impact. 2. Construction of railroad networks HighFirst class stations Potential in arising impact , such as emission, traffic disturbances, transportation accessibility, noises, vibrations, visual disturbances, ecology, social impact and security around the said activity. And it requires an extensive area of plots. 3. Construction of subway railroads All Potential in arising impact, such as land subsidence, land water , and disturbances, such as the impact against emission, traffic, noises, vibrations, visual disturbances, social infrastructure network disturbances gas, electricity, drinking water, telecommunications and social impact surrounding the said activity. 4. Dredging of river sailing path 500,000 m2 or more Potential in arising important impact against hydrology and ecology systems, which is more extensive borders than the activity limits. This activity will also cause disturbances against river traffic. 5. Construction of harbors completed with one of the facilities below : a. Piers with massive construction - Length - Or area 200 m or more 6,000 m2 or more -High number of moored vessels with approximately 5,000- 10,000 DWT with minimum 4- 7 m draft so that the depth required will become-5 to – 9m LWS -Potential in arising important impact against hydrology system, ecosystem, noises, and may disturb coastal processes. b. Break watertalud - Length 200 m or less Potential in arising an impact against the ecosystem, hydrology, coastal lines, and bathymetry, and disturbing coastal processes. c. Supporting infrastructure for harbors terminals, warehouses, containers, etc 5 ha or more Potential in arising impact, such as emission, traffic disturbances, transportation accessibility, noises, vibrations, visual disturbances, ecology, social - Area impact, and security surrounding the activity. And it requires an extensive area. d. Single Point Mooring Bay - For vessels 10,000 DWT or more A high number of moored vessels with approximately 5,000 – 10,000 DWT and draft of with minimum 4-7 m so that the depth required becomes –5 to –9 m LWS. Potential in arising impact, such as disturbances to sailing paths, change of bathymetry, ecosystem, and disturbing coastal processes, especially upon loading of raw oil, which is potential in causing pollution due to the spill. 6. Dredging a. Capital dredging - Volume 250,000 m2 or more Potential in arising impact, such as change of bathymetry, ecosystem, and disturbing coastal processes, including the lowering of productivity at the areas that may arise social impact. b- Maintenance dredging - Volume 500,000 m2 or more Potential in arising impact, such as change of bathymetry, ecosystem, and disturbing coastal processes and requiring a 3-6 months period. 7. Reclamation - Width - Or volume 25 ha or more 5,000,000 m2 or less Potential in arising impact, against geo-hydrology system, hydro-oceanography, social impact, ecology, traffic, and disturbing coastal processes. 8. Dumping activity a. On surface - Volume - Dumping area 250,000 m2 or more 5 ha or more Causing change of landscape, which will have an impact on the local ecology and hydrology. b. On the sea All Potential in arising impact, against sea ecosystem, stream bathymetry, coastal stability and productivity of the sea, which will arise social impact. 9. Construction of new airports including the facilities All I to V and results of study of agreed mother plans - Including high-technology activities, shall obeying aviation safety rules, and relating to international conventions. - Potential in arising impact, such as noises, vibrations, social impact, security of the country, emission and possibility of land and air transportation revivals. 10. Development of airports and the facilities Classes I, II, III based upon development plans mother plan, structure plan, etc - Including high-technology activities, complying with aviation safety rules, and relating to international conventions. - Potential in arising impact, such as noises, vibrations, social impact, security of the country, emission and possibility of land and air transportation revivals 11. Extension of airports andor the facilities - Population migration - Or land clearance 200 KK or more 100 ha or more - Including high-technology activities, complying with aviation safety rules, and related to international potential in arising impact, such as noises, vibrations, conventions. Costal reclamation - Area - Or dredging volume 25 ha or more 100,000 m3 or more Social impact, security of the country, emission, and possibility of land air transportation revivals. Cutting of hills and dredging of plots volume of 500,000 m3 or more 12. Installation of under- surface cables All - Potential in arising impact, such as sea ecosystem, stream bathymetry, coastal stability and productivity of the sea. - Preparation of construction areas may arise disturbances against sensitive areas such as corals - Operation of under surface cables is susceptible to traffic of vessels casting anchors, sand mining.

G. Satellite Technology