6.1 Fixed Capital Invesment FCI

Tabel 6,2 Fixed Capital Invesment No Type of Capital Rp 1 Purchase equipment cost EC 12.723.854.460,146 2 instalasi 1.546.022.822,686 3 pemipaan 4.928.204.726,509 4 instrumentasi 2.275.147.067,678 5 isolasi 338.230.493,460 6 listrik 971.708.311,532 7 bangunan 2.714.904.934,597 8 tanah dan perbaikan 15.357.452.467,299 9 utilitas 15.025.411.189,554 PPC 55.880.936.473,460 10 Engineering and construction 20 11.176.187.294,692 DPC 67.057.123.768,152 11 Contractors Fee 5 3.352.856.188,408 12 Contingency 10 6.705.712.376,815 Fixed Capital Investment FCI 77.115.692.333,374

6.2 Working Capital Investment WCI

Tabel 6.3 Working Capital Investment No Type of Capital Rp 1 Persediaan bahan baku 6.443.646.528,838 2 Bahan baku dalam proses 43.555.089,589 3 Penyimpanan produksi 12.269.039.320,973 4 Biaya sebelum terjual 14.876.931.549,312 5 Persediaan uang 12.269.039.320,973 Working Capital WC 45.902.211.809,685

6.3 Total Capital Investment TCI

TCI = FCI + WCI ……………….……………………………….. 6-7 = Rp. 77.115.692.333,374 + Rp. 45.902.211.809,685 = Rp. 123.017.904.143,059 commit to user Bab VI Analisa Ekonomi 117

6.4 Manufacturing Cost MC

Tabel 6.4 Manufacturing Cost No Type of Manufacturing Cost Rp 1 Bahan baku 81.562.067.419,014 2 Gaji karyawan 3.276.000.000,000 3 Supervisi 1.608.000.000,000 4 Perawatan 5.398.098.463,336 5 Plant supplier 809.714.769,500 6 Royalties and patent 5.355.695.357,752 7 Utilitas 2.826.185.193,424 Direct Manufacturing Cost 100.835.761.203,026 8 Payroll overhead 491.400.000,000 9 Laboratorium 491.400.000,000 10 Plant overhead 1.638.000.000,000 11 Package transport 35.289.184.491,979 Indirect Manufacturing Cost 37.909.984.491,979 12 Depreciation 6.554.833.848,337 13 Pajak pendapatan 1.156.735.385,001 14 Asuransi 771.156.923,334 Fixed Manufacturing Cost 8.482.726.156,671 Manufacturing Cost 147.228.471.851,676

6.5 General Expense GE

Tabel 6.7 General Expense No Type of General Expenses Rp 1 Administrasi 2.789.800.000,000 2 Penjualan 3.570.463.571,835 3 Financial 5.701.053.913,405 4 Penelitian 3.570.463.571,835 Total General Expenses 15.631.781.057,075 commit to user Bab VI Analisa Ekonomi 118

6.6 Analisa Kelayakan

Dokumen yang terkait

PRARANCANGAN PABRIK METIL SALISILAT DARI ASAM SALISILAT DAN METANOL KAPASITAS 12000 TON/TAHUN

15 69 88

LAPORAN TUGAS PRARANCANGAN PABRIK Prarancanganpabrik Metil Salisilat Dari Metanol Dan Asam Salisilat Kapasitas 9.500 Ton/Tahun.

0 4 18

PRARANCANGAN PABRIK METIL SALISILAT DARI METANOL DAN ASAM SALISILAT Prarancangan Pabrik Metil Salisilat Dari Metanol Dan Asam Salisilat Kapasitas 20.000 Ton/Tahun.

0 3 13

PENDAHULUAN Prarancangan Pabrik Metil Salisilat Dari Metanol Dan Asam Salisilat Kapasitas 20.000 Ton/Tahun.

1 4 12

LAPORAN TUGAS PRARANCANGAN PABRIK Prarancangan Pabrik Metil Salisilat Dari Metanol Dan Asam Salisilat Kapasitas 20.000 Ton/Tahun.

0 9 16

PRARANCANGAN PABRIK METIL SALISILAT DARI ASAM SALISILAT DAN Prarancangan Pabrik Metil Salisilat Dari Asam Salisilat Dan Metanol Dengan Proses Esterifikasi Kapasitas 15.000 Ton/Tahun.

1 2 16

PRARANCANGAN PABRIK METIL SALISILAT DARI ASAM SALISILAT DAN Prarancangan Pabrik Metil Salisilat Dari Asam Salisilat Dan Metanol Dengan Proses Esterifikasi Kapasitas 15.000 Ton/Tahun.

1 3 14

LAPORAN TUGAS PRARANCANGAN PABRIK Laporan Tugas Prarancangan Pabrik Prarancangan Pabrik Metil Salisilat Dari Metanol Dan Asam Salisilat Kapasitas 9.000 Ton/Tahun.

0 3 14

1.1. Latar Belakang Laporan Tugas Prarancangan Pabrik Prarancangan Pabrik Metil Salisilat Dari Metanol Dan Asam Salisilat Kapasitas 9.000 Ton/Tahun.

0 0 10

LAPORAN TUGAS PRARANCANGAN PABRIK Laporan Tugas Prarancangan Pabrik Prarancangan Pabrik Metil Salisilat Dari Metanol Dan Asam Salisilat Kapasitas 9.000 Ton/Tahun.

1 2 15