Analisa Waste Material Konstruksi Dengan Aplikasi Metode Lean Construction (Studi Kasus : Proyek Pembangunan Showroom Auto 2000)

DAFTAR PUSTAKA
Ariani, D. W. (2005). Pengendalian Kualitas Statistik Pendekatan Kuantitatif
dalam Manajemen Kualitas. Penerbit ANDI, Yogyakarta.Ervianto, Wulfram I.
2002. Manajemen Proyek Konstruksi, Edisi Pertama, Salemba Empat,
Yogyakarta.
Nasution, M. N. (2005). Manajemen Mutu Terpadu (Total Quality Management).
Ghalia Indonesia, Bogor.
Soeharto, iman (1999), Manajemen Proyek, Edisi Kedua, Jilid 1 dan Jilid 2
Womack and Jones. (1996). Lean Thinking : banish waste and create wealth in
your corporation. Michigan: Simon & Schuster.
Samadhi, T.M.A.A. (2005). Lean Production: Konsep dan Praktek, Departemen
Teknik Sipil ITB, Bandung.
Bossink, B. A. G, dan H. J. H. Brouwers. (1996). Construction Waste :
Quantification And Source Evaluation.
Gavilan, R. M., and Bernold, L. E. (1994). Source evaluation of solid waste in
Building construction. Journal of Construction Engineering and Management,
September 1994. pp.536 – 552.
Ismail. (2010). Penyebab Waste Material Pada Saat Pelaksanaan Pembangunan
Konstruksi Bangunan Gedung.

Universitas Sumatera Utara


Intan, S., et al. (2005). “Analisis dan Evaluasi Sisa Material Konstruksi : Sumber
Penyebab, Kuantitas, dan Biaya”.Civil Engineering Dimension, Vol .7, No.1, pp
36-45
Munje. (2014). Comparative Study of Last Planner System Over Traditional
Construction Processes. Rajarambapu Institute of Technology.
Rahmawati, Hayati. (2002). Analisa Sisa Material Konstruksi dan
Penanganannya Pada Proyek Gedung Pendidikan Profesi Guru Universitas Negri
Surabaya. Jurnal Teknik Sipil Institut Teknologi Sepuluh November.
Manurung, Vanbori. (2012). Analisis aplikasi Lean Construction Untuk
Mengurangi Limbah Material Pada Proyek Konstruksi Jembatan. Depok :
Departemen Teknik Sipil Fakultas Teknik Universitas Indonesia
Abduh, M., Syahrani, S., dan Roza, H.A., “Agenda Penelitian Konstruksi
Ramping” Prosiding 25 tahun Pendidikan Manajemen dan Rekayasa Konstruksi
di Indonesia, Fakultas Teknik Sipil dan Lingkungan, ITB, 2005.
Abduh, M., dan Roza, H.A. “Indonesian Contractors’ Readiness towards Lean
Construction” Proceedings of the 14th Annual Conference of International Group
for Lean Construction, Santiago, Chile, 2006a.
Abduh, M., dan Roza, H.A. “Toward Lean Construction: An Agenda for
Indonesian Contractors” Proceedings the 10th EASEC, Bangkok, Thailand, 2006.

Alwi, S., Hampson, K., Mohamed, S. (2002). “Non Value-Adding Activities: A
Comparative Study of Indonesian and Australian Construction Projects.”
Proceedings of the 10th annual conference of the IGLC, Gramado, Brazil.

Universitas Sumatera Utara

Ballard, H.G. (2000). “The Last Planner System of Production Control”. 29
Agustus 2016. www.leanconstruction.dk/media/15590/ballard2000dissertation.pdf
Heinemeirer, Dan. “Learning to See Waste”. 27 Agustus 2016.
http://www.leanconstruction.org/learning-laboratory/learning-to-see-waste.
Haggard,R. (2005).”Project

Team: Lean

Priciples

in

Construction”. 30


Agustus 2016.
www.constructioninstitute.org/scriptcontent/ac2004slides/tweedie.ppt.
Koskela, L. (2004). “Moving on Beyond Lean Thinking”. 29 Agustus 2016. Lean
Construction Journal, vol 1.pp 24 – 37, www.leanconstructionjournal.org.
Lee, S.H., Diekmann, J.E., Songer, A.D, and Brown, H. (1999). “Identifying
Waste: Aplication of Construction Process Analysis”.30 Agustus 2016.
www.ce.berkeley.edu/~tommelein/IGLC7/PDF/Lee&Diekmann&Songer&B

Universitas Sumatera Utara