1. INPUT DATA



















Beban Hidup
Beban Mati
Berat Sendiri
Berat Jenis
Mutu Beton
Fy
Lebar (b)

Tinggi (h)
Kehilangan Tegangan
Diameter strand
Luas Strand
UTS
Diameter Sengkang
Diameter tulangan longitudinal
Tn
Selimut Beton

= 35.15
= 10.96
=6
= 25
= 50
= 320
= 400
= 600
= 10
= 12.7

= 98.71
= 184
= 14
= 32
= 250
= 30

kN/m
kN/m
kN/m
kn/m3
mPa
mPa
mm
mm
%
mm
mm2
mm
mm

mm

2. SECTION PROPERTIES
 Luas

 W

=b*h
= 400 mm* 600 mm
= 240000 mm2
= * b * h2
= *400 mm*6002 mm
= 24000000 mm3

 Inersia =

=

* b * h3 mm
* 400 mm * 6003 mm


= 7200000000 mm4

 yt=yb =

=
= 300 mm
TUGAS 2 || 1

SBG || DEASY MONICA P 131111003

 e

=
=

 d

 dp
 Q


= 150 mm
= 0.15 m
= 0.85 * h
= 0.85 * 600 mm
= 510 mm
= 0.51 m
= yb + e
= 300 mm + 150 mm
= 450 mm
= b * f’c * e
= 400 mm *500 N/mm2 *150 mm
= 18000000 N

3. PEMBEBANAN
 Berat Sendiri

= BJ*

*


= 25*
 Qdl
 Qul
 Vu

*

= 6 kN/m
= 1.4*(Berat sendiri+Beban Mati)
= 1.4*(6 kN/m +10.96 kN/m)
= 23.74 kN/m
= (1.2*qDL) + (1.6*qLL)
= (1.2*(10.96 kN/m+6 kN/m))+(1.6*35.15 kN/m)
= 76.59 kN/m
=
=




= 382.96 kN
= *Qul*L2
= *76.59 KN/m*102 m

 MD

= 957.4 kNm
= *Qdl*L2
= *23.74 KN/m*102 m
= 296.8 kNm
TUGAS 2 || 2

SBG || DEASY MONICA P 131111003

 VD

=
=
= 118.72 kN


 Ft

= 0.5 * √

= 0.5 * √
= 3.54
=0

 Ft

=0
=0

=

52.26 =
3.010176E+14 = 6E+7 P
P =
= 5016800 N
= 5016.8 Kn


TUGAS 2 || 3

SBG || DEASY MONICA P 131111003

 Pi

=
=
= 5518.48 kN

4. STRAND

 Jumlah Strand yang dibutuhkan

=
=

 Luas (Ap)


= 37.5 buah 38 buah
= Jumlah strand yang dibutuhkan * Luas Strand
= 38 Buah * 98.71 mm2
= 3750.98 mm2
TUGAS 2 || 4

SBG || DEASY MONICA P 131111003

5. DESIGN LENTUR

Transfer

Servis
 Wp

Tekan
Tarik
= 0.6 * f’ci
= 0.25 * √
= 0.6 * 40 mPa = 0.25 *

= 24 mPa
= 1.58 mPa
= 0.45 * f’c
= 0.5 * √
= 0.6 * 50 mPa = 0.5 *

= 23 mPa
= 3.54 mPa

=
=

 R

= 66.22 kN/m
=
=



= 3311088 kN



= 22.99 mPa

=

=
=
= 34.49 mPa



=
=
= 12.37 mPa



=
= 57.48 mPa
Tegangan Saat Transfer
Fc (mPa)
=

+

-

= -22.99 mPa + 34.49 mPa - 12.37 mPa
= -0.87 mPa
-0.87 mPa < 24 mPa OK
Tegangan di serat atas yaitu -0.87 mPa lebih
kecil dari tegangan ijin pada waktu transfer
yaitu 24 mPa. STRUKTUR OK

Ft (mPa)
=

-

+

= -22.99 mPa - 34.49 mPa + 12.37 mPa
= -45 mPa
-45 mPa < 1.58 mPa OK
Tegangan di serat bawah yaitu -45 mPa
lebih kecil dari tegangan ijin pada
waktu transer yaitu 1.58 mPa.
STRUKTUR OK
TUGAS 2 || 5

SBG || DEASY MONICA P 131111003

Tegangan Saat Servis
Fc (mPa)

Ft (mPa)

=
+
= -22.99 mPa + 34.49 mPa – 57.48 mPa
= -45.98 mPa
-45.98 mPa < 23 mPa OK
Tegangan di serat atas yaitu -45.98 mPa
lebih kecil dari tegangan ijin pada waktu
servis yaitu 23 mPa. STRUKTUR OK

=
+
= -22.99 mPa - 34.49 mPa + 57.48 mPa
= 0 mPa
0 mPa < 3.54 mPa OK
Tegangan di serat atas yaitu 0 mPa lebih
kecil dari tegangan ijin pada waktu
servis yaitu 3.54 mPa. STRUKTUR
OK

6. DESIGN GESER
Design Geser Web
Cara 1



1
1
0.2

1

 Vc

=[

 Vc min

OK


=[

= 280204.89 N
= 280.20 kN
=


=

= 240416.31 N
= 240.42 kN
 Vmaks =

=

= 576999.13 N
= 577.00 kN

] * bw * d

] * 400 mm * 450 mm

mm

Vc yang digunakan adalah 280.2 kN
Karena Vcmin < VC < Vmaks
240.42 kN < 280.20 kN < 577.00 kN
Cara 2
 Fc =

=


= 22.99 mPa

=
= 11.5 mPa
 Ft = 0.33 * √

TUGAS 2 || 6

SBG || DEASY MONICA P 131111003



V

= 0.33 * √ mPa
= 2.33 mPa

=
=

 Ft

= 0.000000625 VC
=√

2.33 mPa = √
2
(2.33 mPa +
=
+
VC = 1230020.50 N
= 1230.03 kN
Vc Yang Digunakan Diantara Cara 1 Dan 2
Vc yang digunakan 280.205 kN
Karena Vc cara 1 < Vc cara 2
280.205 kN < 1230.03 kN
 Menghitung Kapasitas Geser Vcw


=

rad
rad

=

= 0.060 rad
 Vp = Pi Sin
= 5518.48 kN Sin
= 5.78 kN
= 5778.94 N
 Vcw1 = Vc + Vp
= 280.205 kN + 5.78 kN
= 285.984 kN
 Vn

=
=
= 638.27 kN

 Vcw2 = [



]

= [

= 1629274.6 N
= 1629.275 kN
 Vcw yang dipakai = 285.984 kN
Karena Vcw1 < Vcw2
 Vs = Vn - Vcw
= 638.27 kN – 285.984 kN
= 352.28 kN

]

TUGAS 2 || 7

SBG || DEASY MONICA P 131111003

 Vu = 382.96 kN
 CEK Vu < 0 382.96 kN < 0
o

Butuh Tulangan Geser

Desain Tulangan Apabila Membutuhkan Tulangan Geser
 sengkang
= 14 mm
 Jumlah = 1 buah

 AV

*

=

* 142 mm * 1 buah

= 153.86 mm2

 VS

=

352.28 kN

=

S

=

S
 Smax
Karena

= 218.26 mm
= 300
Vs < Av
352282.84 N < 153.86 mm2

 Design Tulangan Geser Lentur
 X =
=



= 2.5 m
=
=
0.3 =

 Fd =
=
= 12 mPa

 Fpc =

+
+

=
= 57.48 mPa

 Mcs =
=

*[



*[

= 1167672814 Nmm



]

]
TUGAS 2 || 8

SBG || DEASY MONICA P 131111003

= 1167.67 kNm

 Vci = [
=[



] + Vd + [



= 493.74 kN

 Vcimin

=[

=[



]

-3

] x10 + 118.72 kN + [

]



= 181827.458 N
= 181.83 kN
 Vci yang digunakan = 181.83
Karena
Vci min < Vci
181.83 kN < 493.74 kN
o

]

]

Desain Tulangan Apabila Membutuhkan Tulangan Geser
 sengkang
= 14 mm
 Jumlah = 1 buah

 AV
 VS

=

* 142 mm * 1 buah

= 153.86 mm2
=

352.28 kN

=

S

=

S
 Smax
Karena

*

= 218.26 mm
= 300
Vs < Av
352282.84 N < 153.86 mm2

TUGAS 2 || 9

SBG || DEASY MONICA P 131111003

 Vux

=
=

 Vnx

= 191.48 kN
=
=

 Vs

7.

= 319.13 kN
= Vnx – Vci
= 319.13 kN – 181.83 kN
= 137.31 kN

DESIGN TORSI
 Ft



= 0.5 * √

= 0.5 * √
= 3.54 mPa
t

=3+
=3+

 Tp

=
=
=

 Ts
 X1
 Y1
 S

= 78325674.22 Nmm
= 78.33 kNm
= Tn – Tp
= 250 kNm – 78.33 kNm
= 171.67 kNm
= b – (2 * Selimut beton)
= 400 mm – (2 * 30 mm)
= 340 mm
= h – (2 * Selimut beton)
= 600 mm – (2 * 30 mm)
= 540 mm
=
=
= 98.1 mm

100 mm

D14-100
TUGAS 2 || 10

SBG || DEASY MONICA P 131111003

 Am =
=
= 3025,15 mm2

 As1 Tulangan Longitudinal = diameter tul. Longitudinal2 *

= 32 mm *
= 804.96 mm2

 Jumlah tulangan memanjang=

= 4 Buah



=

+
+

=
S


=
=
S

D14-60

=

=

+
+
D14-100

TUGAS 2 || 11