STRUKTUR BETON PRATEGANG Perencanaan Des
TUGAS 2
PERENCANAAN DESAIN BALOK
PRATEGANG
DISUSUN OLEH:
DEASY MONICA PARHASTUTI
131111003
KG-3A
PRODI KONSTRUKSI GEDUNG
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
SBG || DEASY MONICA P 131111003
1. INPUT DATA
Beban Hidup
Beban Mati
Berat Sendiri
Berat Jenis
Mutu Beton
Fy
Lebar (b)
Tinggi (h)
Kehilangan Tegangan
Diameter strand
Luas Strand
UTS
Diameter Sengkang
Diameter tulangan longitudinal
Tn
Selimut Beton
= 35.15
= 10.96
=6
= 25
= 50
= 320
= 400
= 600
= 10
= 12.7
= 98.71
= 184
= 14
= 32
= 250
= 30
kN/m
kN/m
kN/m
kn/m3
mPa
mPa
mm
mm
%
mm
mm2
mm
mm
mm
2. SECTION PROPERTIES
Luas
W
=b*h
= 400 mm* 600 mm
= 240000 mm2
= * b * h2
= *400 mm*6002 mm
= 24000000 mm3
Inersia =
=
* b * h3 mm
* 400 mm * 6003 mm
= 7200000000 mm4
yt=yb =
=
= 300 mm
TUGAS 2 || 1
SBG || DEASY MONICA P 131111003
e
=
=
d
dp
Q
= 150 mm
= 0.15 m
= 0.85 * h
= 0.85 * 600 mm
= 510 mm
= 0.51 m
= yb + e
= 300 mm + 150 mm
= 450 mm
= b * f’c * e
= 400 mm *500 N/mm2 *150 mm
= 18000000 N
3. PEMBEBANAN
Berat Sendiri
= BJ*
*
= 25*
Qdl
Qul
Vu
*
= 6 kN/m
= 1.4*(Berat sendiri+Beban Mati)
= 1.4*(6 kN/m +10.96 kN/m)
= 23.74 kN/m
= (1.2*qDL) + (1.6*qLL)
= (1.2*(10.96 kN/m+6 kN/m))+(1.6*35.15 kN/m)
= 76.59 kN/m
=
=
= 382.96 kN
= *Qul*L2
= *76.59 KN/m*102 m
MD
= 957.4 kNm
= *Qdl*L2
= *23.74 KN/m*102 m
= 296.8 kNm
TUGAS 2 || 2
SBG || DEASY MONICA P 131111003
VD
=
=
= 118.72 kN
Ft
= 0.5 * √
= 0.5 * √
= 3.54
=0
Ft
=0
=0
=
52.26 =
3.010176E+14 = 6E+7 P
P =
= 5016800 N
= 5016.8 Kn
TUGAS 2 || 3
SBG || DEASY MONICA P 131111003
Pi
=
=
= 5518.48 kN
4. STRAND
Jumlah Strand yang dibutuhkan
=
=
Luas (Ap)
= 37.5 buah 38 buah
= Jumlah strand yang dibutuhkan * Luas Strand
= 38 Buah * 98.71 mm2
= 3750.98 mm2
TUGAS 2 || 4
SBG || DEASY MONICA P 131111003
5. DESIGN LENTUR
Transfer
Servis
Wp
Tekan
Tarik
= 0.6 * f’ci
= 0.25 * √
= 0.6 * 40 mPa = 0.25 *
√
= 24 mPa
= 1.58 mPa
= 0.45 * f’c
= 0.5 * √
= 0.6 * 50 mPa = 0.5 *
√
= 23 mPa
= 3.54 mPa
=
=
R
= 66.22 kN/m
=
=
= 3311088 kN
= 22.99 mPa
=
=
=
= 34.49 mPa
=
=
= 12.37 mPa
=
= 57.48 mPa
Tegangan Saat Transfer
Fc (mPa)
=
+
-
= -22.99 mPa + 34.49 mPa - 12.37 mPa
= -0.87 mPa
-0.87 mPa < 24 mPa OK
Tegangan di serat atas yaitu -0.87 mPa lebih
kecil dari tegangan ijin pada waktu transfer
yaitu 24 mPa. STRUKTUR OK
Ft (mPa)
=
-
+
= -22.99 mPa - 34.49 mPa + 12.37 mPa
= -45 mPa
-45 mPa < 1.58 mPa OK
Tegangan di serat bawah yaitu -45 mPa
lebih kecil dari tegangan ijin pada
waktu transer yaitu 1.58 mPa.
STRUKTUR OK
TUGAS 2 || 5
SBG || DEASY MONICA P 131111003
Tegangan Saat Servis
Fc (mPa)
Ft (mPa)
=
+
= -22.99 mPa + 34.49 mPa – 57.48 mPa
= -45.98 mPa
-45.98 mPa < 23 mPa OK
Tegangan di serat atas yaitu -45.98 mPa
lebih kecil dari tegangan ijin pada waktu
servis yaitu 23 mPa. STRUKTUR OK
=
+
= -22.99 mPa - 34.49 mPa + 57.48 mPa
= 0 mPa
0 mPa < 3.54 mPa OK
Tegangan di serat atas yaitu 0 mPa lebih
kecil dari tegangan ijin pada waktu
servis yaitu 3.54 mPa. STRUKTUR
OK
6. DESIGN GESER
Design Geser Web
Cara 1
1
1
0.2
1
Vc
=[
Vc min
OK
√
=[
= 280204.89 N
= 280.20 kN
=
√
=
√
= 240416.31 N
= 240.42 kN
Vmaks =
√
=
√
= 576999.13 N
= 577.00 kN
] * bw * d
] * 400 mm * 450 mm
mm
Vc yang digunakan adalah 280.2 kN
Karena Vcmin < VC < Vmaks
240.42 kN < 280.20 kN < 577.00 kN
Cara 2
Fc =
=
= 22.99 mPa
=
= 11.5 mPa
Ft = 0.33 * √
TUGAS 2 || 6
SBG || DEASY MONICA P 131111003
V
= 0.33 * √ mPa
= 2.33 mPa
=
=
Ft
= 0.000000625 VC
=√
2.33 mPa = √
2
(2.33 mPa +
=
+
VC = 1230020.50 N
= 1230.03 kN
Vc Yang Digunakan Diantara Cara 1 Dan 2
Vc yang digunakan 280.205 kN
Karena Vc cara 1 < Vc cara 2
280.205 kN < 1230.03 kN
Menghitung Kapasitas Geser Vcw
=
rad
rad
=
= 0.060 rad
Vp = Pi Sin
= 5518.48 kN Sin
= 5.78 kN
= 5778.94 N
Vcw1 = Vc + Vp
= 280.205 kN + 5.78 kN
= 285.984 kN
Vn
=
=
= 638.27 kN
Vcw2 = [
√
]
= [
√
= 1629274.6 N
= 1629.275 kN
Vcw yang dipakai = 285.984 kN
Karena Vcw1 < Vcw2
Vs = Vn - Vcw
= 638.27 kN – 285.984 kN
= 352.28 kN
]
TUGAS 2 || 7
SBG || DEASY MONICA P 131111003
Vu = 382.96 kN
CEK Vu < 0 382.96 kN < 0
o
Butuh Tulangan Geser
Desain Tulangan Apabila Membutuhkan Tulangan Geser
sengkang
= 14 mm
Jumlah = 1 buah
AV
*
=
* 142 mm * 1 buah
= 153.86 mm2
VS
=
352.28 kN
=
S
=
S
Smax
Karena
= 218.26 mm
= 300
Vs < Av
352282.84 N < 153.86 mm2
Design Tulangan Geser Lentur
X =
=
= 2.5 m
=
=
0.3 =
Fd =
=
= 12 mPa
Fpc =
+
+
=
= 57.48 mPa
Mcs =
=
*[
√
*[
= 1167672814 Nmm
√
]
]
TUGAS 2 || 8
SBG || DEASY MONICA P 131111003
= 1167.67 kNm
Vci = [
=[
√
] + Vd + [
√
= 493.74 kN
Vcimin
=[
=[
√
]
-3
] x10 + 118.72 kN + [
]
√
= 181827.458 N
= 181.83 kN
Vci yang digunakan = 181.83
Karena
Vci min < Vci
181.83 kN < 493.74 kN
o
]
]
Desain Tulangan Apabila Membutuhkan Tulangan Geser
sengkang
= 14 mm
Jumlah = 1 buah
AV
VS
=
* 142 mm * 1 buah
= 153.86 mm2
=
352.28 kN
=
S
=
S
Smax
Karena
*
= 218.26 mm
= 300
Vs < Av
352282.84 N < 153.86 mm2
TUGAS 2 || 9
SBG || DEASY MONICA P 131111003
Vux
=
=
Vnx
= 191.48 kN
=
=
Vs
7.
= 319.13 kN
= Vnx – Vci
= 319.13 kN – 181.83 kN
= 137.31 kN
DESIGN TORSI
Ft
= 0.5 * √
= 0.5 * √
= 3.54 mPa
t
=3+
=3+
Tp
=
=
=
Ts
X1
Y1
S
= 78325674.22 Nmm
= 78.33 kNm
= Tn – Tp
= 250 kNm – 78.33 kNm
= 171.67 kNm
= b – (2 * Selimut beton)
= 400 mm – (2 * 30 mm)
= 340 mm
= h – (2 * Selimut beton)
= 600 mm – (2 * 30 mm)
= 540 mm
=
=
= 98.1 mm
100 mm
D14-100
TUGAS 2 || 10
SBG || DEASY MONICA P 131111003
Am =
=
= 3025,15 mm2
As1 Tulangan Longitudinal = diameter tul. Longitudinal2 *
= 32 mm *
= 804.96 mm2
Jumlah tulangan memanjang=
= 4 Buah
=
+
+
=
S
=
=
S
D14-60
=
=
+
+
D14-100
TUGAS 2 || 11
PERENCANAAN DESAIN BALOK
PRATEGANG
DISUSUN OLEH:
DEASY MONICA PARHASTUTI
131111003
KG-3A
PRODI KONSTRUKSI GEDUNG
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
SBG || DEASY MONICA P 131111003
1. INPUT DATA
Beban Hidup
Beban Mati
Berat Sendiri
Berat Jenis
Mutu Beton
Fy
Lebar (b)
Tinggi (h)
Kehilangan Tegangan
Diameter strand
Luas Strand
UTS
Diameter Sengkang
Diameter tulangan longitudinal
Tn
Selimut Beton
= 35.15
= 10.96
=6
= 25
= 50
= 320
= 400
= 600
= 10
= 12.7
= 98.71
= 184
= 14
= 32
= 250
= 30
kN/m
kN/m
kN/m
kn/m3
mPa
mPa
mm
mm
%
mm
mm2
mm
mm
mm
2. SECTION PROPERTIES
Luas
W
=b*h
= 400 mm* 600 mm
= 240000 mm2
= * b * h2
= *400 mm*6002 mm
= 24000000 mm3
Inersia =
=
* b * h3 mm
* 400 mm * 6003 mm
= 7200000000 mm4
yt=yb =
=
= 300 mm
TUGAS 2 || 1
SBG || DEASY MONICA P 131111003
e
=
=
d
dp
Q
= 150 mm
= 0.15 m
= 0.85 * h
= 0.85 * 600 mm
= 510 mm
= 0.51 m
= yb + e
= 300 mm + 150 mm
= 450 mm
= b * f’c * e
= 400 mm *500 N/mm2 *150 mm
= 18000000 N
3. PEMBEBANAN
Berat Sendiri
= BJ*
*
= 25*
Qdl
Qul
Vu
*
= 6 kN/m
= 1.4*(Berat sendiri+Beban Mati)
= 1.4*(6 kN/m +10.96 kN/m)
= 23.74 kN/m
= (1.2*qDL) + (1.6*qLL)
= (1.2*(10.96 kN/m+6 kN/m))+(1.6*35.15 kN/m)
= 76.59 kN/m
=
=
= 382.96 kN
= *Qul*L2
= *76.59 KN/m*102 m
MD
= 957.4 kNm
= *Qdl*L2
= *23.74 KN/m*102 m
= 296.8 kNm
TUGAS 2 || 2
SBG || DEASY MONICA P 131111003
VD
=
=
= 118.72 kN
Ft
= 0.5 * √
= 0.5 * √
= 3.54
=0
Ft
=0
=0
=
52.26 =
3.010176E+14 = 6E+7 P
P =
= 5016800 N
= 5016.8 Kn
TUGAS 2 || 3
SBG || DEASY MONICA P 131111003
Pi
=
=
= 5518.48 kN
4. STRAND
Jumlah Strand yang dibutuhkan
=
=
Luas (Ap)
= 37.5 buah 38 buah
= Jumlah strand yang dibutuhkan * Luas Strand
= 38 Buah * 98.71 mm2
= 3750.98 mm2
TUGAS 2 || 4
SBG || DEASY MONICA P 131111003
5. DESIGN LENTUR
Transfer
Servis
Wp
Tekan
Tarik
= 0.6 * f’ci
= 0.25 * √
= 0.6 * 40 mPa = 0.25 *
√
= 24 mPa
= 1.58 mPa
= 0.45 * f’c
= 0.5 * √
= 0.6 * 50 mPa = 0.5 *
√
= 23 mPa
= 3.54 mPa
=
=
R
= 66.22 kN/m
=
=
= 3311088 kN
= 22.99 mPa
=
=
=
= 34.49 mPa
=
=
= 12.37 mPa
=
= 57.48 mPa
Tegangan Saat Transfer
Fc (mPa)
=
+
-
= -22.99 mPa + 34.49 mPa - 12.37 mPa
= -0.87 mPa
-0.87 mPa < 24 mPa OK
Tegangan di serat atas yaitu -0.87 mPa lebih
kecil dari tegangan ijin pada waktu transfer
yaitu 24 mPa. STRUKTUR OK
Ft (mPa)
=
-
+
= -22.99 mPa - 34.49 mPa + 12.37 mPa
= -45 mPa
-45 mPa < 1.58 mPa OK
Tegangan di serat bawah yaitu -45 mPa
lebih kecil dari tegangan ijin pada
waktu transer yaitu 1.58 mPa.
STRUKTUR OK
TUGAS 2 || 5
SBG || DEASY MONICA P 131111003
Tegangan Saat Servis
Fc (mPa)
Ft (mPa)
=
+
= -22.99 mPa + 34.49 mPa – 57.48 mPa
= -45.98 mPa
-45.98 mPa < 23 mPa OK
Tegangan di serat atas yaitu -45.98 mPa
lebih kecil dari tegangan ijin pada waktu
servis yaitu 23 mPa. STRUKTUR OK
=
+
= -22.99 mPa - 34.49 mPa + 57.48 mPa
= 0 mPa
0 mPa < 3.54 mPa OK
Tegangan di serat atas yaitu 0 mPa lebih
kecil dari tegangan ijin pada waktu
servis yaitu 3.54 mPa. STRUKTUR
OK
6. DESIGN GESER
Design Geser Web
Cara 1
1
1
0.2
1
Vc
=[
Vc min
OK
√
=[
= 280204.89 N
= 280.20 kN
=
√
=
√
= 240416.31 N
= 240.42 kN
Vmaks =
√
=
√
= 576999.13 N
= 577.00 kN
] * bw * d
] * 400 mm * 450 mm
mm
Vc yang digunakan adalah 280.2 kN
Karena Vcmin < VC < Vmaks
240.42 kN < 280.20 kN < 577.00 kN
Cara 2
Fc =
=
= 22.99 mPa
=
= 11.5 mPa
Ft = 0.33 * √
TUGAS 2 || 6
SBG || DEASY MONICA P 131111003
V
= 0.33 * √ mPa
= 2.33 mPa
=
=
Ft
= 0.000000625 VC
=√
2.33 mPa = √
2
(2.33 mPa +
=
+
VC = 1230020.50 N
= 1230.03 kN
Vc Yang Digunakan Diantara Cara 1 Dan 2
Vc yang digunakan 280.205 kN
Karena Vc cara 1 < Vc cara 2
280.205 kN < 1230.03 kN
Menghitung Kapasitas Geser Vcw
=
rad
rad
=
= 0.060 rad
Vp = Pi Sin
= 5518.48 kN Sin
= 5.78 kN
= 5778.94 N
Vcw1 = Vc + Vp
= 280.205 kN + 5.78 kN
= 285.984 kN
Vn
=
=
= 638.27 kN
Vcw2 = [
√
]
= [
√
= 1629274.6 N
= 1629.275 kN
Vcw yang dipakai = 285.984 kN
Karena Vcw1 < Vcw2
Vs = Vn - Vcw
= 638.27 kN – 285.984 kN
= 352.28 kN
]
TUGAS 2 || 7
SBG || DEASY MONICA P 131111003
Vu = 382.96 kN
CEK Vu < 0 382.96 kN < 0
o
Butuh Tulangan Geser
Desain Tulangan Apabila Membutuhkan Tulangan Geser
sengkang
= 14 mm
Jumlah = 1 buah
AV
*
=
* 142 mm * 1 buah
= 153.86 mm2
VS
=
352.28 kN
=
S
=
S
Smax
Karena
= 218.26 mm
= 300
Vs < Av
352282.84 N < 153.86 mm2
Design Tulangan Geser Lentur
X =
=
= 2.5 m
=
=
0.3 =
Fd =
=
= 12 mPa
Fpc =
+
+
=
= 57.48 mPa
Mcs =
=
*[
√
*[
= 1167672814 Nmm
√
]
]
TUGAS 2 || 8
SBG || DEASY MONICA P 131111003
= 1167.67 kNm
Vci = [
=[
√
] + Vd + [
√
= 493.74 kN
Vcimin
=[
=[
√
]
-3
] x10 + 118.72 kN + [
]
√
= 181827.458 N
= 181.83 kN
Vci yang digunakan = 181.83
Karena
Vci min < Vci
181.83 kN < 493.74 kN
o
]
]
Desain Tulangan Apabila Membutuhkan Tulangan Geser
sengkang
= 14 mm
Jumlah = 1 buah
AV
VS
=
* 142 mm * 1 buah
= 153.86 mm2
=
352.28 kN
=
S
=
S
Smax
Karena
*
= 218.26 mm
= 300
Vs < Av
352282.84 N < 153.86 mm2
TUGAS 2 || 9
SBG || DEASY MONICA P 131111003
Vux
=
=
Vnx
= 191.48 kN
=
=
Vs
7.
= 319.13 kN
= Vnx – Vci
= 319.13 kN – 181.83 kN
= 137.31 kN
DESIGN TORSI
Ft
= 0.5 * √
= 0.5 * √
= 3.54 mPa
t
=3+
=3+
Tp
=
=
=
Ts
X1
Y1
S
= 78325674.22 Nmm
= 78.33 kNm
= Tn – Tp
= 250 kNm – 78.33 kNm
= 171.67 kNm
= b – (2 * Selimut beton)
= 400 mm – (2 * 30 mm)
= 340 mm
= h – (2 * Selimut beton)
= 600 mm – (2 * 30 mm)
= 540 mm
=
=
= 98.1 mm
100 mm
D14-100
TUGAS 2 || 10
SBG || DEASY MONICA P 131111003
Am =
=
= 3025,15 mm2
As1 Tulangan Longitudinal = diameter tul. Longitudinal2 *
= 32 mm *
= 804.96 mm2
Jumlah tulangan memanjang=
= 4 Buah
=
+
+
=
S
=
=
S
D14-60
=
=
+
+
D14-100
TUGAS 2 || 11