Analisis Faktor – Faktor Yang Mempengaruhi Waktu Penyelesaian Proyek Jaringan Transmisi Pada Perusahaan Kontraktor Rekanan PT. Pln (Persero) Unit Induk Pembangunan Jaringan Sumatera I
DAFTAR PUSTAKA
Abdullah, M.R., Rahman, I.A., Ade, Asmi,A., 2010. ”Causes of Delay in MARA
Management Procurement Construction Projects”, Faculty of Civil
Environmental Engineering Universiti Tun Hussein Onn Malaysia.
Ahmed,S.M., Azhar,S., Castillo, M., 2002.“Construction Delays in Florida: An
Emperical Study”,Final Report, Department of Construction Management,
Florida International University, Miami.
Al-Najjar, 2008. “Factor Influencing Time and Cost Overruns on Construction
Projects in the Gaza Strip”. [Thesis], The Islamic University.
Assaf,S.A., Al-Hejji, S.,2006. Causes of delay in large construction
projects.International Journal of Project Management 24. Pp. 349-357.
Bubshait & Farooq, 1999, “Team Building And Project Success”, Cost Engineering,
Vol. 41/No. 7 July 1999, 34-38.
Burke, R., 2003. Project Management : Planning and Control Techniques.
Chan, A.P., 1998, A Predictive Model For Project Success, Singapore : Mc Graw Hill.
Inc. Page 577.
Cleland, D, 1995, Project Management, Strategic, Design, and Implementation,
Singapore : Mc Graw Hill. Inc
Curtis, T. 1993, Business and Marketing For Engineers And Scientist, Singapore : Mc
Graw Hill Book Company
Dannyanti, E., 2010. Studi Kasus Twin Tower Building Optimalisasi Pelaksanaan
Proyek Dengan Metode PERT dan CPM. [Tesis], Program Pascasarjana.
Universitas Diponegoro.
Dinsmore, P.C., 1993, Hand Book of Project Management, New York : AMA
Elinwa, A.U., and Joshua. M., 2001. “Time Overrun Factors in Nigerian Construction
Industry”, Journal of Construction Engineering and Management:
September/Oktober.
Faridi, A.S. and El-Sayegh, S.M. 2006. Significant factors causing delay in the UAE
construction industry.Construction Management and Economics 24.Pp.11671176.
Ghozali, I., 2005. Aplikasi Analisis Multivariate dengan Program SPSS. Edisi 3. BPFE
Undip. Semarang.
Gilbert, D.R., Jr, Freeman, R.E., Stones, J.A.F., 1995, Management, Jilid II, Jakarta :
Prenhallindo.
Gillard and James, P., 2005. “The Competencies of Effective Project Managers : A
Conceptual Analysis”, International Journal of Management, March.
Goestiandi, E., 2000, ”Pahamilah Tim Proyek Anda”, Konstruksi, Juli-Agustus, p.25.
John P.K., 1993. General Manager, Jakarta : Erlangga.
Kaming, F.P., 2008. “Factor Influencing Craftsman Productivity In Indonesia”,
International Journal of Project Management, Vol. 15.
Keputusan Direksi PT PLN (Persero) No. 0289.K/DIR/2013 tanggal 9 April 2013
tentang “Pengadaan Tanah untuk Kepentingan Penyediaan Tenaga Listrik,
Biaya Operasional Pengadaan Tanah dan Biaya Operasional Kompensasi di
Lingkungan PT PLN (Persero)”.
Madjid, M.Z.A. 1998. “Factors of Non Excusable Delays That Influence Contractors
Performance”, Journal of Management in Engineering : May/June.
Nguyen, L.D., Stephen, O.O., and Lan, D.T.X. , 2004. “A Study on Project Success
Factors in Large Construction Projects in Vietnam”, Engineering Construction
and Architectural Management.
Notoatmojo, Soekidjo, 2003, Metodologi Penelitian. Jakarta : Rineka Cipta.
Nurfiah. 2010. Studi Dampak Pembebasan Lahan Terhadap Aspek Biaya dan Aspek
Waktu pada Proyek Pembangunan Jalan Tol Surabaya – Mojokerto [Tesis].
Surabaya : Institut Teknologi Surabaya, Program Pascasarjana.
Nurick, A.J., Thamhain, H.J., Cleland, D., Gareis, R., 1994, Strategic Project
Management, California : Mcgraw-Hill International Editions
Odeh, A.M., and Battaineh, H.T. 2002. Causes of construction delay: traditional
contracs. International Journal of Project Management 20. Pp. 67-73.
Odusami, K.T., 2002. “Perceptions of Construction Professionals Concerning
Important Skills of Effective Project Leaders”, Journal of Management in
Engineering, April.
Peraturan Presiden Nomor 36 Tahun 2005 tentang Pengadaan Tanah Bagi Pelaksanaan
Pembangunan untuk Kepentingan Umum
PMI, Inc., PMBOK Guide, 2004. A Guide to The Project Management Body of
Knowledge, An American National Standard.
Prihadi, S. F., 2003. Assessment Center Identifikasi, Pengukuran, dan Pengembangan
Kompetensi, Jakarta : Gramedia Pustaka Utama.
Puspitasari, D., 2007. ”Pengaruh Faktor – Faktor Sukses Tim Proyek Terhadap
Kinerja Waktu Proyek”, [Tesis], Program Pascasarjana, Teknik Sipil, Jakarta.
Universitas Indonesia.
Sekaran, 2002. Research Methods for Business: A Skill Building Approach, 2nd
Edition, New York : John Willey and Sons.
Shtub, Avraham, Bard, J.F., dan Globerson. S., 1994. Project Management :
Engineering, Technology and Implementation, New Jersey : Prentice Hall; Inc.
Stott, Kenneth., Walker, Allan., 1995, Teams, Teamwork, Team Building, Singapore
:Prentice-Hall,
Soeharto, I. 1997. Manajemen Proyek: Dari Konseptual Sampai Operasional.
Erlangga, Jakarta.
Sugiyono, DR. 2003. “Statistika Untuk Penelitian,” Penerbit CV.Alfabeta, Bandung
Suyatno, 2010. “Analisis Faktor Penyebab Keterlambatan Penyelesaian Proyek
Gedung (Aplikasi Model Regresi)”, Semarang : Universitas Diponegoro.
Syah, M.S., 2004. Manajemen Proyek, Jakarta : PT. Gramedia Pustaka Utama.
Time, Webster’s Dictionary. (Philippines : G&C Merriam Co, 1978).
Undang-undang No 02 Tahun 2012 tentang “Pengadaan Tanah Bagi Pembangunan
untuk Kepentingan Umum”.
Wei, K.S., 2010. “Causes Effects and Method og Minimizing Delays in Construction
Projects (Thesis)”, Faculty of Civil Engineering Universiti Teknologi
Malaysia, April.
Widhiawati, I.A., 2009. “Analisis Faktor-Faktor Penyebab Keterlambatan
Pelaksanaan Proyek Konstruksi,” Jurnal Teknologi Elektro Vol.8 No. 2 JuliDesember.
Yulianto, 2006. “Pengaruh kompetensi manajer proyek kontraktor terhadap kinerja
waktu penyelesaian proyek konstruksi studi kasus PT. X”, [Tesis], Program
Pascasarjana, Teknik sipil, Jakarta. Universitas Indonesia.
Abdullah, M.R., Rahman, I.A., Ade, Asmi,A., 2010. ”Causes of Delay in MARA
Management Procurement Construction Projects”, Faculty of Civil
Environmental Engineering Universiti Tun Hussein Onn Malaysia.
Ahmed,S.M., Azhar,S., Castillo, M., 2002.“Construction Delays in Florida: An
Emperical Study”,Final Report, Department of Construction Management,
Florida International University, Miami.
Al-Najjar, 2008. “Factor Influencing Time and Cost Overruns on Construction
Projects in the Gaza Strip”. [Thesis], The Islamic University.
Assaf,S.A., Al-Hejji, S.,2006. Causes of delay in large construction
projects.International Journal of Project Management 24. Pp. 349-357.
Bubshait & Farooq, 1999, “Team Building And Project Success”, Cost Engineering,
Vol. 41/No. 7 July 1999, 34-38.
Burke, R., 2003. Project Management : Planning and Control Techniques.
Chan, A.P., 1998, A Predictive Model For Project Success, Singapore : Mc Graw Hill.
Inc. Page 577.
Cleland, D, 1995, Project Management, Strategic, Design, and Implementation,
Singapore : Mc Graw Hill. Inc
Curtis, T. 1993, Business and Marketing For Engineers And Scientist, Singapore : Mc
Graw Hill Book Company
Dannyanti, E., 2010. Studi Kasus Twin Tower Building Optimalisasi Pelaksanaan
Proyek Dengan Metode PERT dan CPM. [Tesis], Program Pascasarjana.
Universitas Diponegoro.
Dinsmore, P.C., 1993, Hand Book of Project Management, New York : AMA
Elinwa, A.U., and Joshua. M., 2001. “Time Overrun Factors in Nigerian Construction
Industry”, Journal of Construction Engineering and Management:
September/Oktober.
Faridi, A.S. and El-Sayegh, S.M. 2006. Significant factors causing delay in the UAE
construction industry.Construction Management and Economics 24.Pp.11671176.
Ghozali, I., 2005. Aplikasi Analisis Multivariate dengan Program SPSS. Edisi 3. BPFE
Undip. Semarang.
Gilbert, D.R., Jr, Freeman, R.E., Stones, J.A.F., 1995, Management, Jilid II, Jakarta :
Prenhallindo.
Gillard and James, P., 2005. “The Competencies of Effective Project Managers : A
Conceptual Analysis”, International Journal of Management, March.
Goestiandi, E., 2000, ”Pahamilah Tim Proyek Anda”, Konstruksi, Juli-Agustus, p.25.
John P.K., 1993. General Manager, Jakarta : Erlangga.
Kaming, F.P., 2008. “Factor Influencing Craftsman Productivity In Indonesia”,
International Journal of Project Management, Vol. 15.
Keputusan Direksi PT PLN (Persero) No. 0289.K/DIR/2013 tanggal 9 April 2013
tentang “Pengadaan Tanah untuk Kepentingan Penyediaan Tenaga Listrik,
Biaya Operasional Pengadaan Tanah dan Biaya Operasional Kompensasi di
Lingkungan PT PLN (Persero)”.
Madjid, M.Z.A. 1998. “Factors of Non Excusable Delays That Influence Contractors
Performance”, Journal of Management in Engineering : May/June.
Nguyen, L.D., Stephen, O.O., and Lan, D.T.X. , 2004. “A Study on Project Success
Factors in Large Construction Projects in Vietnam”, Engineering Construction
and Architectural Management.
Notoatmojo, Soekidjo, 2003, Metodologi Penelitian. Jakarta : Rineka Cipta.
Nurfiah. 2010. Studi Dampak Pembebasan Lahan Terhadap Aspek Biaya dan Aspek
Waktu pada Proyek Pembangunan Jalan Tol Surabaya – Mojokerto [Tesis].
Surabaya : Institut Teknologi Surabaya, Program Pascasarjana.
Nurick, A.J., Thamhain, H.J., Cleland, D., Gareis, R., 1994, Strategic Project
Management, California : Mcgraw-Hill International Editions
Odeh, A.M., and Battaineh, H.T. 2002. Causes of construction delay: traditional
contracs. International Journal of Project Management 20. Pp. 67-73.
Odusami, K.T., 2002. “Perceptions of Construction Professionals Concerning
Important Skills of Effective Project Leaders”, Journal of Management in
Engineering, April.
Peraturan Presiden Nomor 36 Tahun 2005 tentang Pengadaan Tanah Bagi Pelaksanaan
Pembangunan untuk Kepentingan Umum
PMI, Inc., PMBOK Guide, 2004. A Guide to The Project Management Body of
Knowledge, An American National Standard.
Prihadi, S. F., 2003. Assessment Center Identifikasi, Pengukuran, dan Pengembangan
Kompetensi, Jakarta : Gramedia Pustaka Utama.
Puspitasari, D., 2007. ”Pengaruh Faktor – Faktor Sukses Tim Proyek Terhadap
Kinerja Waktu Proyek”, [Tesis], Program Pascasarjana, Teknik Sipil, Jakarta.
Universitas Indonesia.
Sekaran, 2002. Research Methods for Business: A Skill Building Approach, 2nd
Edition, New York : John Willey and Sons.
Shtub, Avraham, Bard, J.F., dan Globerson. S., 1994. Project Management :
Engineering, Technology and Implementation, New Jersey : Prentice Hall; Inc.
Stott, Kenneth., Walker, Allan., 1995, Teams, Teamwork, Team Building, Singapore
:Prentice-Hall,
Soeharto, I. 1997. Manajemen Proyek: Dari Konseptual Sampai Operasional.
Erlangga, Jakarta.
Sugiyono, DR. 2003. “Statistika Untuk Penelitian,” Penerbit CV.Alfabeta, Bandung
Suyatno, 2010. “Analisis Faktor Penyebab Keterlambatan Penyelesaian Proyek
Gedung (Aplikasi Model Regresi)”, Semarang : Universitas Diponegoro.
Syah, M.S., 2004. Manajemen Proyek, Jakarta : PT. Gramedia Pustaka Utama.
Time, Webster’s Dictionary. (Philippines : G&C Merriam Co, 1978).
Undang-undang No 02 Tahun 2012 tentang “Pengadaan Tanah Bagi Pembangunan
untuk Kepentingan Umum”.
Wei, K.S., 2010. “Causes Effects and Method og Minimizing Delays in Construction
Projects (Thesis)”, Faculty of Civil Engineering Universiti Teknologi
Malaysia, April.
Widhiawati, I.A., 2009. “Analisis Faktor-Faktor Penyebab Keterlambatan
Pelaksanaan Proyek Konstruksi,” Jurnal Teknologi Elektro Vol.8 No. 2 JuliDesember.
Yulianto, 2006. “Pengaruh kompetensi manajer proyek kontraktor terhadap kinerja
waktu penyelesaian proyek konstruksi studi kasus PT. X”, [Tesis], Program
Pascasarjana, Teknik sipil, Jakarta. Universitas Indonesia.