CHECK LIST PROJECT

BUSINESS PROCESS OF CHARCOAL MACHINE FABRICATION

FEED ( Front End Engineering Design ) - STAGE

CHECK LIST
OF
BUSINESS PROCESS FOR DESIGN, ENGINEERING, PROTOTYPING & PRODUCTION

N
O
1.

DESCRIPTION
PROJECT MANAGEMENT

a
b
c

2.


3.

Cost
Permit & project administrations
Schedule planning and controls


Project planning and scheduling



Project quality plan, inspection and test plan



Safety, health & environment



Project management




Construction planning



Local and global procurement capability

 Statutory submission and approval
d
Temporary Facilities
e
Mobilization
f
Progress reporting
g
Subcontractor management
h
Document management and controls

FRONT END ENGINEERING AND DESIGN (FEED)
Basic design
Level 2 – and 3 detail drawing design
Bill of Quantity & cost estimating
Facility layouts
Process design layouts
Operations and control philosophy
Project execution plans
DETAILED DESIGN
a
Process Design Engineering

b



Environmental Impact Data




Hazard & Operability Studies



P & I Diagrams ( Piping & Installation )



Process Design Calculations



Process Design Specifications



Process Flow Diagrams




Technical Feasibility Studies



Utilities Specifications



Waste Water Treatment Systems



etc

Mechanical ( Charcoal Machine & support/utilities
equipment )


Boilers, Incinerators and Flare Systems




Cranes, Hoists and Conveyor Systems



Compressors and Air Receivers/Dryers/Filters



Drum Filling Equipment



Equipment Specifications and Requisitions

PIC

c




Fire Fighting Equipment and Systems



Heat Exchangers and Columns



HVAC Systems



Marine and Truck Loading Equipment



Pumps




Sizing and Selection of Static and Rotating Equipment



etc

Piping


Equipment Layouts and Plot Plans



Pipe Spool Sheets for Shop-Fabrication



Pipe Support Design




Piping Classification and Material specification



Piping Isometric Drawings
Piping System Layouts - Products, Utilities and FireFighting
Product, Utility and Fire-Fighting Piping Design/Stress
Analysis




d

Electrical – Instrumentation, Automation and
controls



Analyzers



Building Electrical Services



Cathodic Protection Systems



Communication Systems



Control Room / Remote Instrument Enclosure Design




Earthing and Lightning protection Systems



Emergency Shutdown and Safeguarding Systems



Electrical Equipment and Material Specifications



Electrical Hazardous Area Classification
Electrical Protection Device and System Protection
Coordination
Electrical Substation and Switchroom Design





Electricity Supply Distribution and Utilization Systems



Electrical System and Equipment Layouts
Electrical
System
Design
and
Computer
Analysis/Calculation
Fire and Gas Detection & Protection Systems





Leak Detection



Lighting Systems



Metering Skids
Process and TUV certified Programmable Logic
Controllers
Security Systems (closed circuit cameras and intrusion
detectors)
Sizing and Selection of Electrical Equipment and
Material
Sizing and Selection of Instrumentation Equipment






Specification and requisition of Instrumentation
Equipment
Tank Instruments and Gauging Systems




Truck and Railcar (Un)loading Systems



Uninterruptible Power Supply and Emergency Standby
Supply Systems



e
f

Architectural
Civil & Structural Engineering ( Building )


Building Works

4.

7.

8.

9.

10
.

Design Calculations and Analysis



Design Specifications



Drainage Systems for Oily and Product Waste Water



Infrastructures



Reinforced Concrete Structures



Steel Detailing



Steel Structures for all purpose



Wide range foundations



etc

Request for Quotation & Tendering
Purchasing Orders
Expediting
Shipping, logistics, and warehousing

FABRICATION AND CONSTRUCTION SUPPORT

a
b
c
6.

Construction Specifications



PROCUREMENT

a
b
c
d
5.



Constructability reviews
Field engineering and audits
Subcontractor supervision

OPERATIONS SUPPORT

a
Operational Manual Document
b
Maintenance manual Document
c
Training operation & Maintenance
d
Testing, Commissioning & start-up
c
Start up assistance
d
Troubleshooting
AS BUILT DRAWING
a
Process Design Engineering
b
Mechanical ( Charcoal Machine & support/utilities
equipment )
c
Piping
d
Electrical – Instrumentation, Automation and
controls
e
Architectural
F
Civil & Structural Engineering ( Building )
1st PROJECT HAND OVER
a
Trial Run & Commissioning
b
Project Quality Assurance & Audit
c
Record of Project capabilities
d
Troubleshooting
INITIAL MASS PRODUCTON & ASSISTANCE
a
Trial Run & commissioning
b
Machine Quality Assurance & Audit
c
Record of Machine eficiency & performance
d
Troubleshooting
FINAL PROJECT HAND OVER

Dokumen yang terkait

PERHITUNGAN RENCANA ANGGARAN BIAYA PADA GEDUNG PERPUSTAKAAN UNIVERSITAS MUHAMMADIYAH PONOROGO MENGGUNAKAN PROGRAM MICROSOFT PROJECT 2003

2 39 1

PERENCANAAN ANGGARAN BIAYA, WAKTU DAN SUMBER DAYA MANUSIA PADA PROYEK PEMBANGUNAN GEDUNG REKTORAT UNIVERSITAS MUHAMMADIYAH PONOROGO DENGAN MENGGUNAKAN MS – PROJECT 2003

2 43 1

PERHITUNGAN RENCANA ANGGARAN BIAYA PADA GEDUNG KULIAH BERSAMA UNIVERSITAS MUHAMMADIYAH PONOROGO MENGGUNAKAN PROGRAM MICROSOFT PROJECT 2003

1 38 2

RENCANA ANGGARAN BIAYA DENGAN MENGGUNAKAN PROGRAM MICROSOFT PROJECT 2003 PADA GEDUNG LABORATORIUM UNIVERSITAS MUHAMMADIYAH PONOROGO

0 11 1

PENERAPAN MODEL PEMBELAJARAN MISSOURI MATHEMATICS PROJECT (MMP) PADA MATERI BANGUN RUANG SISI DATAR KELAS VIII SMP DIPONEGORO33

1 17 25

MASTER PARTS LIST

0 12 7

KREATIVITAS SISWA DALAM PEMBELAJARAN BIOLOGI PADA MATERI DAUR ULANG LIMBAH MENGGUNAKAN MODEL PROJECT BASED LEARNING (PjBL) (Siswa Kelas X SMA Negeri 1 Gunung Alip Semester Genap Tahun Pelajaran 2014/2015)

1 11 59

STUDI PERBANDINGAN HASIL BELAJAR EKONOMI DENGAN MENGGUNAKAN MODEL PEMBELAJARAN PROJECT BASED LEARNING DAN DISCOVERY LEARNING DENGAN MEMPERHATIKAN KEMAMPUAN BERPIKIR KRITIS SISWA KELAS X SMA NEGERI 1 SIDOMULYO TAHUN AJARAN 2014/2015

0 5 89

PENERAPAN MODEL COOPERATIVE LEARNING TIPE PAIR CHECK UNTUK MENINGKATKAN AKTIVITAS DAN HASIL BELAJAR PADA PEMBELAJARAN IPS SISWA KELAS IV SD NEGERI 5 METRO SELATAN

0 9 68

STUDI PERBANDINGAN HASIL BELAJAR IPS TERPADU SISWA DENGAN MENGGUNAKAN MODEL PEMBELAJARAN PROBLEM BASED LEARNING DAN PROJECT BASED LEARNING DENGAN MEMPERHATIKAN MOTIVASI BELAJAR SISWA KELAS VIII SMP NEGERI 2 METRO TAHUN AJARAN 2014/2015

0 6 87