-PENGADAAN & INSTALASI PERALATAN SBNP & SUMBER TENAGA

-PENGADAAN & INSTALASI PERALATAN SBNP & SUMBER TENAGA

218 3225 -Lantern Mast With Secured Battery Box (Small)

unit

3209 -Sistem Lampu Suar 6NM

unit

3216 -Solar Module 80W

unit

3222 -VRLA Absorbent Glass Mate (AGM) Battery 60AH

unit

3239 -Sistem Penangkal Petir

paket

3242 -Surge Arrester Module

paket

3234 -Power Supply & AtoN Controller Panel (Standard)

paket

3243 -Tetrahedral Alumnium Radar Reflector

unit

3245 -Fluoescent Colored Alumunium Top Mark

unit

3244 -Fluoescent Colored Alumunium Day Mark

unit

JUMLAH 882.226.942,63 PPN 10 %

88.222.694,26 JUMLAH TOTAL

970.449.636,89 Harga per- Paket

123 Biaya Langsung 123

89.522.604,00 17.725.475.592,00 123

7011 -BBM dan Pelumas Operasi

ls

198,00

360.000,00 131.400.000,00 123

7008 -Air Tawar

ls

365,00

8.367.000,00 1.656.666.000,00 123

7009 -Tunjangan Keruk

ls

198,00

2.100.000,00 766.500.000,00 123

7010 -Permakanan

ls

365,00

76.416.832,00 1.375.502.976,00 123

7006 -Pemeruman / Survey (Progress Soounding)

ls

18,00

41.296.960,00 41.296.960,00 Asumsi $1 = Rp. 9200,- 123

-Asuransi (P&I Club) ($4.489)

ls

1,00

Biaya Tidak Langsung 123

1.146.998.000,00 1.146.998.016,00 123

-Perawatan/Docking

ls

1,00

756.841.500,00 756.841.472,00 123

-Penyusutan

ls

1,00

181.769.000,00 2.181.228.000,00 123

7005 -Gaji ABK

ls/bln

12,00

41.296.960,00 330.375,69 123

-Asuransi (H&M)

ls

0,01

Biaya Usaha

ls

1,00

1.946.259.000,00 1.946.258.944,00

JUMLAH 27.728.498.335,69 PPN 10 %

2.772.849.833,57 JUMLAH TOTAL

30.501.348.169,26 Harga per- Paket

320.932,00

124 Biaya operasional pengerukan per hari 124

127.860.570,00 127.860.570,00 124

7012 -BBM dan Pelumas Operasi

hari

1,00

1.236.000,00 1.236.000,00 124

-Pemeruman / Survey (Progress Sounding)

hari

1,00

Biaya kapal per hari

hari

751.200,00 751.200,00 124

124 7016 -Air Tawar

hari

1,00

4.839.000,00 4.839.000,00 124

7018 -Insentif Keruk

hari

1,00

2.100.000,00 2.100.000,00 124

7026 -Permakanan

ls

1,00

1.008.219,18 1.008.219,18 124

-Asuransi (P & I Club)

ls

1,00

35.780.821,92 35.780.821,92 124

-Perawatan/Docking

ls

1,00

30.136.986,30 30.136.986,30 124

-Penyusutan

ls

1,00

6.585.833,33 6.585.833,33 124

7022 Gaji ABK

hari

1,00

-Asuransi (H&M)

ls

1,00

768.493,15 768.493,15

JUMLAH 211.067.123,88 dikurangi PPN yang telah dibayar

-11.623.688,18 PPN 10 %

19.944.343,57 JUMLAH TOTAL

219.387.779,27

125 Pengerukan dengan Kapal Hopper TSHD 2000 (Jarak DA ≤ 54.600,00

6 Nmil) Kap. Produksi = 4.016 m3/hari 126

Pengerukan dengan Kapal Hopper TSHD 2000 (Jarak 6 < 67.200,00 DA ≤ 12 Nmil) Kap. Produksi = 3,264 m3/hari) 127

Pengerukan dengan Kapal Hopper TSHD 2000 (Jarak 12 < 79.700,00 DA ≤ 16 Nmil) Kap. Produksi = 2,752 m3/hari 128

Pengerukan dengan Kapal Hopper TSHD 2000 (Jarak DA ≥ 113.300,00

6 Nmil) Kap. Produksi = 1,936 m3 / hari

129 Biaya operasional pengerukan per hari 129

154.716.465,00 154.716.465,00 129

7013 -BBM dan Pelumas Operasi

hari

1,00

1.236.000,00 1.236.000,00 129

-Pemeruman / Survey (Progress Sounding)

hari

1,00

Biaya kapal per hari

hari

751.200,00 751.200,00 129

129 7016 -Air Tawar

hari

1,00

5.080.950,00 5.080.950,00 129

7019 -Insentif Keruk

hari

1,00

2.100.000,00 2.100.000,00 129

7026 -Permakanan

ls

1,00

1.046.575,34 1.046.575,34 129

-Asuransi (P & I Club)

ls

1,00

42.739.726,03 42.739.726,03 129

-Perawatan/Docking

ls

1,00

36.164.383,56 36.164.383,56 129

-Penyusutan

ls

1,00

6.615.000,00 6.615.000,00 129

7023 Gaji ABK

hari

1,00

-Asuransi (H&M)

ls

1,00

1.123.287,67 1.123.287,67

JUMLAH 251.573.587,60 dikurangi PPN yang telah dibayar

-14.065.133,18 PPN 10 %

23.750.845,44 JUMLAH TOTAL

261.259.299,87

130 Pengerukan dengan Kapal Hopper TSHD 2900 (Jarak DA ≤ 44.800,00

6 Nmil) Kap. Produksi = 5.823 m3 /hari 131

Pengerukan dengan Kapal Hopper TSHD 2900 (Jarak 6 < 55.100,00 DA ≤ 12 Nmil) Kap. Produksi = 4.773 m3 /hari 132

Pengerukan dengan Kapal Hopper TSHD 2900 (Jarak 12 < 65.400,00 DA ≤ 16 Nmil)Kap. Produksi = 3.990 m3 /hari 133

Pengerukan dengan Kapal Hopper TSHD 2900 (Jarak DA ≥ 93.000,00

6 Nmil)Kap. Produksi = 2.807 m3 /hari

134 Biaya operasional pengerukan per hari 134

180.869.510,00 180.869.510,00 134

7014 -BBM dan Pelumas Operasi

hari

1,00

1.236.000,00 1.236.000,00 134

-Pemeruman / Survey (Progress Sounding)

hari

1,00

Biaya kapal per hari

hari

751.200,00 751.200,00 134

134 7016 -Air Tawar

hari

1,00

5.564.850,00 5.564.850,00 134

7020 -Insentif Keruk

hari

1,00

2.100.000,00 2.100.000,00 134

7026 -Permakanan

ls

1,00

1.098.630,14 1.098.630,14 134

-Asuransi (P & I Club)

ls

1,00

82.191.780,82 82.191.780,82 134

-Perawatan/Docking

ls

1,00

50.410.958,90 50.410.958,90 134

-Penyusutan

ls

1,00

6.632.500,00 6.632.500,00 134

7024 Gaji ABK

hari

1,00

-Asuransi (H&M)

ls

1,00

1.536.986,30 1.536.986,30

JUMLAH 332.392.416,16 dikurangi PPN yang telah dibayar

-16.442.682,73 PPN 10 %

31.594.973,34 JUMLAH TOTAL

347.544.706,78

135 Pengerukan dengan Kapal Hopper TSHD 4000 (Jarak DA ≤ 43.200,00

6 Nmil)Kap. Produksi = 8.032 m3 /hari 136

Pengerukan dengan Kapal Hopper TSHD 4000 (Jarak 6 < 53.200,00 DA ≤ 12 Nmil)Kap. Produksi = 6.528 m3 /hari 137

Pengerukan dengan Kapal Hopper TSHD 4000 (Jarak 12 < 63.100,00 DA ≤ 16 Nmil)Kap. Produksi = 5.504 m3 /hari 138

Pengerukan dengan Kapal Hopper TSHD 4000 (Jarak DA ≥ 89.700,00

6 Nmil)Kap. Produksi = 3.872 m3 /hari

139 Biaya operasional pengerukan per hari 139

55.643.933,00 55.643.933,00 139

7015 -BBM dan Pelumas Operasi

hari

1,00

741.600,00 741.600,00 139

-Pemeruman / Survey (Progress Sounding)

hari

1,00

Biaya kapal per hari

hari

139 7017 -Air Tawar

393.600,00 393.600,00 139

hari

1,00

4.803.750,00 4.803.750,00 139

7021 -Insentif Keruk

hari

1,00

2.040.000,00 2.040.000,00 139

7027 -Permakanan

ls

1,00

1.098.630,14 1.098.630,14 139

-Asuransi (P & I Club) Clamshel

ls

1,00

112.328,77 224.657,53 139

-Asuransi (P & I Club) Barge (2SB)

ls

2,00

6.849.315,07 6.849.315,07 139

-Perawatan/Docking Clamshel

ls

1,00

4.109.589,04 8.219.178,08 139

-Perawatan/Docking Barge (2SB)

ls

2,00

3.452.054,79 3.452.054,79 139

-Penyusutan Clamshel

ls

1,00

1.808.219,18 3.616.438,36 139

-Penyusutan Barge (2SB)

ls

2,00

5.950.000,00 5.950.000,00 139

7025 Gaji ABK

hari

1,00

246.575,34 246.575,34 139

-Asuransi (H&M) Clamshel

ls

1,00

-Asuransi (H&M) Barge (2SB)

ls

2,00

164.383,56 328.767,12

JUMLAH 93.608.499,44 dikurangi PPN yang telah dibayar

-5.058.539,36 PPN 10 %

8.854.996,01 JUMLAH TOTAL

97.404.956,09 140

Pengerukan dengan Kapal Clamshell 5,5 M3 & 2 SB 500 54.100,00 (750 PK) (Jarak DA ≤ 6 Nmil)Kap. Produksi = 1.800 m3 /hari

141 Pengerukan dengan Kapal Clamshell 5,5 M3 & 2 SB 500 70.700,00 (750 PK) (Jarak 6 < DA ≤ 12 Nmil)Kap. Produksi = 1.376 m3 /hari

142 Pengerukan dengan Kapal Clamshell 5,5 M3 & 2 SB 500 82.800,00 (750 PK) (Jarak 12 < DA ≤ 16 Nmil)Kap. Produksi = 1.176 m3 /hari

143 Pengerukan dengan Kapal Clamshell 5,5 M3 & 2 SB 500 113.700,00 (750 PK) (Jarak DA ≥ 6 Nmil)Kap. Produksi = 856 m3 /hari

144 Biaya operasional mobilisasi dan demobilisasi per hari (8 knot x 24 jam = 192 mil/hari)

122.614.107,00 122.614.107,00 144

144 7028 -BBM dan Pelumas Operasi

hari

1,00

Biaya kapal per hari

hari

666.000,00 666.000,00 144

144 7032 -Air Tawar

hari

1,00

4.839.000,00 4.839.000,00 144

7018 -Insentif Keruk

hari

1,00

2.100.000,00 2.100.000,00 144

7026 -Permakanan

ls

1,00

1.008.219,18 1.008.219,18 144

-Asuransi (P & I Club)

ls

1,00

19.679.452,05 19.679.452,05 144

-Perawatan/Docking

ls

1,00

30.136.986,30 30.136.986,30 144

-Penyusutan

ls

1,00

6.585.833,33 6.585.833,33 144

7022 Gaji ABK

hari

1,00

768.493,15 768.493,15 144

-Asuransi (H&M)

ls

1,00

Biaya Berlayar per hari dengan kecepatan rata-rata 8 knot sehingga jarak yang di tempuh per hari adalah 192 mil

JUMLAH 188.398.091,02 dikurangi PPN yang telah dibayar

-11.146.737,00 PPN 10 %

17.725.135,40 JUMLAH TOTAL

194.976.489,42

Biaya Mobilisasi Kapal Type TSHD 2000 per hari 1.015.500,00

145 Biaya operasional mobilisasi dan demobilisasi per hari (8 knot x 24 jam = 192 mil/hari)

146.151.347,00 146.151.347,00 145

145 7029 -BBM dan Pelumas Operasi

hari

1,00

Biaya kapal per hari

hari

666.000,00 666.000,00 145

145 7032 -Air Tawar

hari

1,00

5.080.950,00 5.080.950,00 145

7019 -Insentif Keruk

hari

1,00

2.100.000,00 2.100.000,00 145

7026 -Permakanan

ls

1,00

1.046.575,34 1.046.575,34 145

-Asuransi (P & I Club)

ls

1,00

23.506.849,32 23.506.849,32 145

-Perawatan/Docking

ls

1,00

36.164.383,56 36.164.383,56 145

-Penyusutan

ls

1,00

6.615.000,00 6.615.000,00 145

7023 Gaji ABK

hari

1,00

1.123.287,67 1.123.287,67 145

-Asuransi (H&M)

ls

1,00

Biaya Berlayar per hari dengan kecepatan rata-rata 8 knot sehingga jarak yang di tempuh per hari adalah 192 mil

JUMLAH 222.454.392,89 dikurangi PPN yang telah dibayar

-13.286.486,09 PPN 10 %

20.916.790,68 JUMLAH TOTAL

230.084.697,48

Biaya Mobilisasi Kapal Type TSHD 2900 per hari 1.198.300,00

146 Biaya operasional mobilisasi dan demobilisasi per hari (8 knot x 24 jam = 192 mil/hari)

167.483.396,00 167.483.396,00 146

146 7030 -BBM dan Pelumas Operasi

hari

1,00

Biaya kapal per hari

hari

666.000,00 666.000,00 146

146 7032 -Air Tawar

hari

1,00

5.564.850,00 5.564.850,00 146

7020 -Insentif Keruk

hari

1,00

2.100.000,00 2.100.000,00 146

7026 -Permakanan

ls

1,00

1.098.630,14 1.098.630,14 146

-Asuransi (P & I Club)

ls

1,00

45.205.479,45 45.205.479,45 146

-Perawatan/Docking

ls

1,00

50.410.958,90 50.410.958,90 146

-Penyusutan

ls

1,00

6.632.500,00 6.632.500,00 146

7024 Gaji ABK

hari

1,00

1.536.986,30 1.536.986,30 146

-Asuransi (H&M)

ls

1,00

Biaya Berlayar per hari dengan kecepatan rata-rata 8 knot sehingga jarak yang di tempuh per hari adalah 192 mil

JUMLAH 280.698.800,79 dikurangi PPN yang telah dibayar

-15.225.763,27 PPN 10 %

26.547.303,75 JUMLAH TOTAL

292.020.341,27

Biaya Mobilisasi Kapal Type TSHD 4000 per hari 1.520.900,00

147 Biaya operasional pengerukan per hari 147

55.643.933,00 55.643.933,00 147

7015 -BBM dan Pelumas Operasi

hari

1,00

741.600,00 741.600,00 147

-Pemeruman / Survey (Progress Sounding)

hari

1,00

Biaya kapal per hari

hari

147 7017 -Air Tawar

393.600,00 393.600,00 147

hari

1,00

4.803.750,00 4.803.750,00 147

7021 -Insentif Keruk

hari

1,00

2.040.000,00 2.040.000,00 147

7027 -Permakanan

ls

1,00

1.098.630,14 1.098.630,14 147

-Asuransi (P & I Club) Clamshel

ls

1,00

112.328,77 224.657,53 147

-Asuransi (P & I Club) Barge (2SB)

ls

2,00

6.849.315,07 6.849.315,07 147

-Perawatan/Docking Clamshel

ls

1,00

4.109.589,04 8.219.178,08 147

-Perawatan/Docking Barge (2SB)

ls

2,00

3.452.054,79 3.452.054,79 147

-Penyusutan Clamshel

ls

1,00

1.808.219,18 3.616.438,36 147

-Penyusutan Barge (2SB)

ls

2,00

5.950.000,00 5.950.000,00 147

7025 Gaji ABK

hari

1,00

246.575,34 246.575,34 147

-Asuransi (H&M) Clamshel

ls

1,00

-Asuransi (H&M) Barge (2SB)

ls

2,00

164.383,56 328.767,12

JUMLAH 93.608.499,44 dikurangi PPN yang telah dibayar

-5.058.539,36 PPN 10 %

8.854.996,01 JUMLAH TOTAL

97.404.956,09

Biaya Mobilisasi Kapal Type TSHD 4000 per hari 1.352.800,00