218 3225 -Lantern Mast With Secured Battery Box (Small)
unit
3209 -Sistem Lampu Suar 6NM
unit
3216 -Solar Module 80W
unit
3222 -VRLA Absorbent Glass Mate (AGM) Battery 60AH
unit
3239 -Sistem Penangkal Petir
paket
3242 -Surge Arrester Module
paket
3234 -Power Supply & AtoN Controller Panel (Standard)
paket
3243 -Tetrahedral Alumnium Radar Reflector
unit
3245 -Fluoescent Colored Alumunium Top Mark
unit
3244 -Fluoescent Colored Alumunium Day Mark
unit
JUMLAH 882.226.942,63 PPN 10 %
88.222.694,26 JUMLAH TOTAL
970.449.636,89 Harga per- Paket
123 Biaya Langsung 123
89.522.604,00 17.725.475.592,00 123
7011 -BBM dan Pelumas Operasi
ls
198,00
360.000,00 131.400.000,00 123
7008 -Air Tawar
ls
365,00
8.367.000,00 1.656.666.000,00 123
7009 -Tunjangan Keruk
ls
198,00
2.100.000,00 766.500.000,00 123
7010 -Permakanan
ls
365,00
76.416.832,00 1.375.502.976,00 123
7006 -Pemeruman / Survey (Progress Soounding)
ls
18,00
41.296.960,00 41.296.960,00 Asumsi $1 = Rp. 9200,- 123
-Asuransi (P&I Club) ($4.489)
ls
1,00
Biaya Tidak Langsung 123
1.146.998.000,00 1.146.998.016,00 123
-Perawatan/Docking
ls
1,00
756.841.500,00 756.841.472,00 123
-Penyusutan
ls
1,00
181.769.000,00 2.181.228.000,00 123
7005 -Gaji ABK
ls/bln
12,00
41.296.960,00 330.375,69 123
-Asuransi (H&M)
ls
0,01
Biaya Usaha
ls
1,00
1.946.259.000,00 1.946.258.944,00
JUMLAH 27.728.498.335,69 PPN 10 %
2.772.849.833,57 JUMLAH TOTAL
30.501.348.169,26 Harga per- Paket
320.932,00
124 Biaya operasional pengerukan per hari 124
127.860.570,00 127.860.570,00 124
7012 -BBM dan Pelumas Operasi
hari
1,00
1.236.000,00 1.236.000,00 124
-Pemeruman / Survey (Progress Sounding)
hari
1,00
Biaya kapal per hari
hari
751.200,00 751.200,00 124
124 7016 -Air Tawar
hari
1,00
4.839.000,00 4.839.000,00 124
7018 -Insentif Keruk
hari
1,00
2.100.000,00 2.100.000,00 124
7026 -Permakanan
ls
1,00
1.008.219,18 1.008.219,18 124
-Asuransi (P & I Club)
ls
1,00
35.780.821,92 35.780.821,92 124
-Perawatan/Docking
ls
1,00
30.136.986,30 30.136.986,30 124
-Penyusutan
ls
1,00
6.585.833,33 6.585.833,33 124
7022 Gaji ABK
hari
1,00
-Asuransi (H&M)
ls
1,00
768.493,15 768.493,15
JUMLAH 211.067.123,88 dikurangi PPN yang telah dibayar
-11.623.688,18 PPN 10 %
19.944.343,57 JUMLAH TOTAL
219.387.779,27
125 Pengerukan dengan Kapal Hopper TSHD 2000 (Jarak DA ≤ 54.600,00
6 Nmil) Kap. Produksi = 4.016 m3/hari 126
Pengerukan dengan Kapal Hopper TSHD 2000 (Jarak 6 < 67.200,00 DA ≤ 12 Nmil) Kap. Produksi = 3,264 m3/hari) 127
Pengerukan dengan Kapal Hopper TSHD 2000 (Jarak 12 < 79.700,00 DA ≤ 16 Nmil) Kap. Produksi = 2,752 m3/hari 128
Pengerukan dengan Kapal Hopper TSHD 2000 (Jarak DA ≥ 113.300,00
6 Nmil) Kap. Produksi = 1,936 m3 / hari
129 Biaya operasional pengerukan per hari 129
154.716.465,00 154.716.465,00 129
7013 -BBM dan Pelumas Operasi
hari
1,00
1.236.000,00 1.236.000,00 129
-Pemeruman / Survey (Progress Sounding)
hari
1,00
Biaya kapal per hari
hari
751.200,00 751.200,00 129
129 7016 -Air Tawar
hari
1,00
5.080.950,00 5.080.950,00 129
7019 -Insentif Keruk
hari
1,00
2.100.000,00 2.100.000,00 129
7026 -Permakanan
ls
1,00
1.046.575,34 1.046.575,34 129
-Asuransi (P & I Club)
ls
1,00
42.739.726,03 42.739.726,03 129
-Perawatan/Docking
ls
1,00
36.164.383,56 36.164.383,56 129
-Penyusutan
ls
1,00
6.615.000,00 6.615.000,00 129
7023 Gaji ABK
hari
1,00
-Asuransi (H&M)
ls
1,00
1.123.287,67 1.123.287,67
JUMLAH 251.573.587,60 dikurangi PPN yang telah dibayar
-14.065.133,18 PPN 10 %
23.750.845,44 JUMLAH TOTAL
261.259.299,87
130 Pengerukan dengan Kapal Hopper TSHD 2900 (Jarak DA ≤ 44.800,00
6 Nmil) Kap. Produksi = 5.823 m3 /hari 131
Pengerukan dengan Kapal Hopper TSHD 2900 (Jarak 6 < 55.100,00 DA ≤ 12 Nmil) Kap. Produksi = 4.773 m3 /hari 132
Pengerukan dengan Kapal Hopper TSHD 2900 (Jarak 12 < 65.400,00 DA ≤ 16 Nmil)Kap. Produksi = 3.990 m3 /hari 133
Pengerukan dengan Kapal Hopper TSHD 2900 (Jarak DA ≥ 93.000,00
6 Nmil)Kap. Produksi = 2.807 m3 /hari
134 Biaya operasional pengerukan per hari 134
180.869.510,00 180.869.510,00 134
7014 -BBM dan Pelumas Operasi
hari
1,00
1.236.000,00 1.236.000,00 134
-Pemeruman / Survey (Progress Sounding)
hari
1,00
Biaya kapal per hari
hari
751.200,00 751.200,00 134
134 7016 -Air Tawar
hari
1,00
5.564.850,00 5.564.850,00 134
7020 -Insentif Keruk
hari
1,00
2.100.000,00 2.100.000,00 134
7026 -Permakanan
ls
1,00
1.098.630,14 1.098.630,14 134
-Asuransi (P & I Club)
ls
1,00
82.191.780,82 82.191.780,82 134
-Perawatan/Docking
ls
1,00
50.410.958,90 50.410.958,90 134
-Penyusutan
ls
1,00
6.632.500,00 6.632.500,00 134
7024 Gaji ABK
hari
1,00
-Asuransi (H&M)
ls
1,00
1.536.986,30 1.536.986,30
JUMLAH 332.392.416,16 dikurangi PPN yang telah dibayar
-16.442.682,73 PPN 10 %
31.594.973,34 JUMLAH TOTAL
347.544.706,78
135 Pengerukan dengan Kapal Hopper TSHD 4000 (Jarak DA ≤ 43.200,00
6 Nmil)Kap. Produksi = 8.032 m3 /hari 136
Pengerukan dengan Kapal Hopper TSHD 4000 (Jarak 6 < 53.200,00 DA ≤ 12 Nmil)Kap. Produksi = 6.528 m3 /hari 137
Pengerukan dengan Kapal Hopper TSHD 4000 (Jarak 12 < 63.100,00 DA ≤ 16 Nmil)Kap. Produksi = 5.504 m3 /hari 138
Pengerukan dengan Kapal Hopper TSHD 4000 (Jarak DA ≥ 89.700,00
6 Nmil)Kap. Produksi = 3.872 m3 /hari
139 Biaya operasional pengerukan per hari 139
55.643.933,00 55.643.933,00 139
7015 -BBM dan Pelumas Operasi
hari
1,00
741.600,00 741.600,00 139
-Pemeruman / Survey (Progress Sounding)
hari
1,00
Biaya kapal per hari
hari
139 7017 -Air Tawar
393.600,00 393.600,00 139
hari
1,00
4.803.750,00 4.803.750,00 139
7021 -Insentif Keruk
hari
1,00
2.040.000,00 2.040.000,00 139
7027 -Permakanan
ls
1,00
1.098.630,14 1.098.630,14 139
-Asuransi (P & I Club) Clamshel
ls
1,00
112.328,77 224.657,53 139
-Asuransi (P & I Club) Barge (2SB)
ls
2,00
6.849.315,07 6.849.315,07 139
-Perawatan/Docking Clamshel
ls
1,00
4.109.589,04 8.219.178,08 139
-Perawatan/Docking Barge (2SB)
ls
2,00
3.452.054,79 3.452.054,79 139
-Penyusutan Clamshel
ls
1,00
1.808.219,18 3.616.438,36 139
-Penyusutan Barge (2SB)
ls
2,00
5.950.000,00 5.950.000,00 139
7025 Gaji ABK
hari
1,00
246.575,34 246.575,34 139
-Asuransi (H&M) Clamshel
ls
1,00
-Asuransi (H&M) Barge (2SB)
ls
2,00
164.383,56 328.767,12
JUMLAH 93.608.499,44 dikurangi PPN yang telah dibayar
-5.058.539,36 PPN 10 %
8.854.996,01 JUMLAH TOTAL
97.404.956,09 140
Pengerukan dengan Kapal Clamshell 5,5 M3 & 2 SB 500 54.100,00 (750 PK) (Jarak DA ≤ 6 Nmil)Kap. Produksi = 1.800 m3 /hari
141 Pengerukan dengan Kapal Clamshell 5,5 M3 & 2 SB 500 70.700,00 (750 PK) (Jarak 6 < DA ≤ 12 Nmil)Kap. Produksi = 1.376 m3 /hari
142 Pengerukan dengan Kapal Clamshell 5,5 M3 & 2 SB 500 82.800,00 (750 PK) (Jarak 12 < DA ≤ 16 Nmil)Kap. Produksi = 1.176 m3 /hari
143 Pengerukan dengan Kapal Clamshell 5,5 M3 & 2 SB 500 113.700,00 (750 PK) (Jarak DA ≥ 6 Nmil)Kap. Produksi = 856 m3 /hari
144 Biaya operasional mobilisasi dan demobilisasi per hari (8 knot x 24 jam = 192 mil/hari)
122.614.107,00 122.614.107,00 144
144 7028 -BBM dan Pelumas Operasi
hari
1,00
Biaya kapal per hari
hari
666.000,00 666.000,00 144
144 7032 -Air Tawar
hari
1,00
4.839.000,00 4.839.000,00 144
7018 -Insentif Keruk
hari
1,00
2.100.000,00 2.100.000,00 144
7026 -Permakanan
ls
1,00
1.008.219,18 1.008.219,18 144
-Asuransi (P & I Club)
ls
1,00
19.679.452,05 19.679.452,05 144
-Perawatan/Docking
ls
1,00
30.136.986,30 30.136.986,30 144
-Penyusutan
ls
1,00
6.585.833,33 6.585.833,33 144
7022 Gaji ABK
hari
1,00
768.493,15 768.493,15 144
-Asuransi (H&M)
ls
1,00
Biaya Berlayar per hari dengan kecepatan rata-rata 8 knot sehingga jarak yang di tempuh per hari adalah 192 mil
JUMLAH 188.398.091,02 dikurangi PPN yang telah dibayar
-11.146.737,00 PPN 10 %
17.725.135,40 JUMLAH TOTAL
194.976.489,42
Biaya Mobilisasi Kapal Type TSHD 2000 per hari 1.015.500,00
145 Biaya operasional mobilisasi dan demobilisasi per hari (8 knot x 24 jam = 192 mil/hari)
146.151.347,00 146.151.347,00 145
145 7029 -BBM dan Pelumas Operasi
hari
1,00
Biaya kapal per hari
hari
666.000,00 666.000,00 145
145 7032 -Air Tawar
hari
1,00
5.080.950,00 5.080.950,00 145
7019 -Insentif Keruk
hari
1,00
2.100.000,00 2.100.000,00 145
7026 -Permakanan
ls
1,00
1.046.575,34 1.046.575,34 145
-Asuransi (P & I Club)
ls
1,00
23.506.849,32 23.506.849,32 145
-Perawatan/Docking
ls
1,00
36.164.383,56 36.164.383,56 145
-Penyusutan
ls
1,00
6.615.000,00 6.615.000,00 145
7023 Gaji ABK
hari
1,00
1.123.287,67 1.123.287,67 145
-Asuransi (H&M)
ls
1,00
Biaya Berlayar per hari dengan kecepatan rata-rata 8 knot sehingga jarak yang di tempuh per hari adalah 192 mil
JUMLAH 222.454.392,89 dikurangi PPN yang telah dibayar
-13.286.486,09 PPN 10 %
20.916.790,68 JUMLAH TOTAL
230.084.697,48
Biaya Mobilisasi Kapal Type TSHD 2900 per hari 1.198.300,00
146 Biaya operasional mobilisasi dan demobilisasi per hari (8 knot x 24 jam = 192 mil/hari)
167.483.396,00 167.483.396,00 146
146 7030 -BBM dan Pelumas Operasi
hari
1,00
Biaya kapal per hari
hari
666.000,00 666.000,00 146
146 7032 -Air Tawar
hari
1,00
5.564.850,00 5.564.850,00 146
7020 -Insentif Keruk
hari
1,00
2.100.000,00 2.100.000,00 146
7026 -Permakanan
ls
1,00
1.098.630,14 1.098.630,14 146
-Asuransi (P & I Club)
ls
1,00
45.205.479,45 45.205.479,45 146
-Perawatan/Docking
ls
1,00
50.410.958,90 50.410.958,90 146
-Penyusutan
ls
1,00
6.632.500,00 6.632.500,00 146
7024 Gaji ABK
hari
1,00
1.536.986,30 1.536.986,30 146
-Asuransi (H&M)
ls
1,00
Biaya Berlayar per hari dengan kecepatan rata-rata 8 knot sehingga jarak yang di tempuh per hari adalah 192 mil
JUMLAH 280.698.800,79 dikurangi PPN yang telah dibayar
-15.225.763,27 PPN 10 %
26.547.303,75 JUMLAH TOTAL
292.020.341,27
Biaya Mobilisasi Kapal Type TSHD 4000 per hari 1.520.900,00
147 Biaya operasional pengerukan per hari 147
55.643.933,00 55.643.933,00 147
7015 -BBM dan Pelumas Operasi
hari
1,00
741.600,00 741.600,00 147
-Pemeruman / Survey (Progress Sounding)
hari
1,00
Biaya kapal per hari
hari
147 7017 -Air Tawar
393.600,00 393.600,00 147
hari
1,00
4.803.750,00 4.803.750,00 147
7021 -Insentif Keruk
hari
1,00
2.040.000,00 2.040.000,00 147
7027 -Permakanan
ls
1,00
1.098.630,14 1.098.630,14 147
-Asuransi (P & I Club) Clamshel
ls
1,00
112.328,77 224.657,53 147
-Asuransi (P & I Club) Barge (2SB)
ls
2,00
6.849.315,07 6.849.315,07 147
-Perawatan/Docking Clamshel
ls
1,00
4.109.589,04 8.219.178,08 147
-Perawatan/Docking Barge (2SB)
ls
2,00
3.452.054,79 3.452.054,79 147
-Penyusutan Clamshel
ls
1,00
1.808.219,18 3.616.438,36 147
-Penyusutan Barge (2SB)
ls
2,00
5.950.000,00 5.950.000,00 147
7025 Gaji ABK
hari
1,00
246.575,34 246.575,34 147
-Asuransi (H&M) Clamshel
ls
1,00
-Asuransi (H&M) Barge (2SB)
ls
2,00
164.383,56 328.767,12
JUMLAH 93.608.499,44 dikurangi PPN yang telah dibayar
-5.058.539,36 PPN 10 %
8.854.996,01 JUMLAH TOTAL
97.404.956,09
Biaya Mobilisasi Kapal Type TSHD 4000 per hari 1.352.800,00