Wisatawan turis ialah setiap Excursionis ialah setiap pengunjung

Transportasi dan Komunikasi Transportation and Communication Kutai Kartanegara Dalam Angka 2010 306 Tabel 8.2.3 BANYAKNYA KENDARAAN BERMOTOR DIUJI MENURUT JENIS KENDARAAN Number of Motorized Vehicles Tested by Type Unit 2005 – 2009 Jenis Kendaraan Type of Motor Vehicles 2005 2006 2007 2008 2009 [1] [2] [3] [5] [6] [7] 1. Mobil Bus Buses - Umum Public - - 160 170 148 - Tidak Umum Non Public - - 55 67 105 -Mobil Bus Dinas - - 17 26 17 2. Mobil Barang Cargo Vehicles - Umum Public - - 59 41 33 - Tidak Umum Non Public - - 7.083 7.681 8.092 -Mobil Barang Dinas - - 121 139 172 3. Kereta Gandeng - Umum Public - - - - - - Tidak Umum Non Public - - - - - 4. Kereta Tempelan - Umum Public - - - - - - Tidak Umum Non Public - - - - - 5. Mobil Penumpang Umum MPU - - 216 220 192 JumlahTotal - - 7.711 8.344 8.759 Sumber : Dinas Perhubungan Kabupaten Kutai Kartanegara Source : Regency Office of Transportation, Kabupaten Kutai Kartanegara Transportasi dan Komunikasi Transportation and Communication Kutai Kartanegara Dalam Angka 2010 307 Tabel Table

8.2.4 TARIF ANGKUTAN KAPAL PENUMPANG DAN BARANG

Transportation tariffs and goods passenger ships 2009 No Trayek Nama Kapal Tarif Ket. Penumpang BarangPerton 1 2 3 4 5 6 1 Samarinda -Tenggarong - ± Rp 25.000 Khusus penumpang Long Bagun: Rp 300.000,- 2 Samarinda - Sebulu Ingin Bersama ± Rp 25.000 ± Rp 30.000 - 3 Samarinda - Muara Kaman Berkat Illahi ± Rp 30.000 ± Rp 35.000 - 4 Samarinda - Sedulang Putra Bungsu ± Rp 35.000 ± Rp 50.000 - 5 Samarinda - Kota Bangun Telaga Putra ± Rp 40.000 ± Rp 50.000 - 6 Samarinda - Muara Wis Sinar Budi ± Rp 40.000 ± Rp 60.000 - 7 Samarinda - Muara Muntai Sumber Dinar ± Rp 50.000 ± Rp 75.000 - 8 Samarinda - Tanjung Isuy Cahaya Jempang ± Rp 70.000 ± Rp 125.000 - 9 Samarinda - Penyinggahan Putra Panca ± Rp 50.000 ± Rp 100.000 - 10 Samarinda - Muara Pahu Berkat Setia ± Rp 60.000 ± Rp 150.000 - 11 Samarinda - Damai Kurnia .F ± Rp 80.000 ± Rp 200.000 - 12 Samarinda - Melak Sama Maju ± Rp 90.000 ± Rp 200.000 - 13 Samarinda - Long Iram Noor Hasannah ± Rp 100.000 ± Rp 250.000 - 14 Samarinda - Long Hubung Kelian DC ± Rp - ± Rp - - 15 Samarinda - Long Bagun Ratah Indah ± Rp 250.000 ± Rp 350.000 - 16 Samarinda – Kb. Janggut Belayan Sejati ± Rp 100.000 ± Rp 300.000 - 17 Samarinda - Tabang Bang Ibau ± Rp 200.000 ± Rp 500.000 - 18 Samarinda - Senyiur Putra Kelinjau ± Rp 100.000 ± Rp 100.000 - 19 Samarinda - Muara Ancalong Nurmalasari ± Rp 100.000 ± Rp 150.000 - 20 Samarinda - Muara Wahau Air Bunga 2 ± Rp 200.000 ± Rp 200.000 - 21 Samarinda - Long Tesak Mutiara Prima ± Rp 250.000 ± Rp 250.000 - Sumber : Dinas Perhubungan Kabupaten Kutai Kartanegara Source : Regency Office of Transportation, Kabupaten Kutai Kartanegara Transportasi dan Komunikasi Transportation and Communication Kutai Kartanegara Dalam Angka 2010 308 Tabel Table 8.3.1 OBYEK-OBYEK WISATA DI KABUPATEN KUTAI KARTANEGARA Sightseiing Object at Kutai Kartanegara Regency 2009 Jenis Obyek Wisata Nama Obyek Wisata 1 2 1. Wisata Sejarah Museum Mulawarman Kedaton Kutai Makam Raja-Raja 2. Wisata Alam Pantai Tanah Merah Canopi Bridge di Bukit Bengkirai Danau Semayang Danau Melintang 3. Wisata Pendidikan Planetarium Jagat Raya Museum Kayu di Waduk Panji Sukarame 4. Wisata Buatan Pulau Kumala Sky Tower, Kereta Gantung, Cottages, dll. Sumber : Bappeda, Kabupaten Kutai Kartanegara Source : Bappeda , Kutai Kartanegara Regency Transportasi dan Komunikasi Transportation and Communication Kutai Kartanegara Dalam Angka 2010 309 Tabel Table 8.3.2 BANYAKNYA HOTEL DAN PENGINAPAN MENURUT BANYAKNYA KAMAR DAN TEMPAT TIDUR Number Of Accommodations, Room And Beds By Sub District 2009 KECAMATAN Sub District AKOMODASI Accommodation KAMAR Room TEMPAT TIDUR Beds [1] [2] [3] [4] 1. Samboja 6 47 54 2. Muara Jawa 7 78 120 3. Sanga-Sanga - - - 4. Loa Janan - - - 5. Loa Kulu - - - 6. Muara Muntai 2 24 26 7. Muara Wis - - - 8. Kota Bangun 5 62 80 9. Tenggarong 19 332 520 10. Sebulu 1 17 17 11. Tgr. Seberang - - - 12. Anggana - - - 13. Muara Badak 4 64 94 14. Marang Kayu 3 18 35 15. Muara Kaman 2 22 38 16. Kenohan 1 10 10 17. Kg Janggut 1 7 16 18. Tabang 3 28 22 JUMLAH Total 2009 54 709 1.032 2008 44 569 854 Sumber : Badan Pusat Statistik Kabupaten Kutai Kartanegara Source : Statistical Office , Kutai Kartanegara Regency Transportasi dan Komunikasi Transportation and Communication Kutai Kartanegara Dalam Angka 2010 310 Tabel Table 8.3.3 BANYAKNYA KUNJUNGAN WISATAWAN MENURUT NEGARA ASAL Number Of Tourists By Nationality 2005 - 2009 N E G A R A Nationality 2005 2006 2007 2008 2009 [1] [2] [3] [4] [5] [6] 1. Amerika 89 84 91 89 - 2. Australia 98 102 121 133 16 3. Austria 60 58 64 41 4 4. Belanda 15 17 23 30 27 5. Belgia 30 26 31 21 - 6. Canada 15 12 14 16 - 7. Denmark 20 24 30 26 - 8. Inggris 58 62 79 83 1 9. Italia 12 16 19 24 10. Jerman 58 61 67 72 34 11. Jepang 25 31 40 51 6 12. Francis 30 29 34 37 56 13. Spanyol 3 5 11 14 - 14. Swedia 1 3 8 7 - 15. Swiss 2 4 10 8 - 16. Selandia baru 37 40 54 51 - 17. Norwegia 1 - 6 7 - 18. Malaysia 2 4 22 26 9 19. Lain-Lain 5 208 214 226 453 20. Nusantara 4.516 3.879 4.616 27.991 286.960 JUMLAH Total 5.077 4.665 5.554 28.953 287.566 Sumber : Dinas Pariwisata Kabupaten Kutai Kartanegara Source : Tourism Service Office, Kutai Kartanegara Regency Transportasi dan Komunikasi Transportation and Communication Kutai Kartanegara Dalam Angka 2010 311 Tabel Table 8.3.4 BANYAKNYA PENGUNJUNG PADA MUSEUM NEGERI MULAWARMAN Number Of Tourists In Mulawarman Museum 2005 - 2009 BULAN Months 2005 2006 2007 2008 2009 [1] [2] [3] [4] [5] [6] 1. Januari 9.733 9.404 8.580 8.477 11.406 2. Pebruari 6.963 5.396 5.487 2.913 4.773 3. Maret 5.444 3.987 5.248 6.323 5.978 4. April 4.322 5.001 3.913 4.113 4.617 5. Mei 6.059 4.414 6.624 5.425 9.837 6. Juni 10.148 7.571 8.606 8.747 12.117 7. Juli 12.162 9.306 8.664 11.068 8.939 8. Agustus 2.147 5.017 4.861 5.328 3.404 9. September 3.879 3.410 3.304 1.320 20.401 10. Oktober 1.903 16.093 23.320 19.591 5.716 11. Nopember 15.203 4.741 6.630 4.875 9.198 12. Desember 4.897 5.409 5.304 6.878 7.046 JUMLAH Total 82.860 79.749 90.541 85.058 103.432 Sumber : Museum Negeri Mulawarman Kalimantan Timur Source : Mulawarman Museum, East Kalimantan Transportasi dan Komunikasi Transportation and Communication Kutai Kartanegara Dalam Angka 2010 312 Lanjutan Tabel 8.3.4 Continued Table 8.3.4 BULAN Domestik Mancanegara Jumlah Domestic Foreign Months Dewasa Anak-anak Dewasa Anak-anak Total Adult Children Adult Children [1] [2] [3] [4] [5] [6] Januari 7.855 3.539 12 - 11.406 Pebruari 3.490 1.234 49 - 4.773 Maret 4.517 1.459 2 - 5.978 April 3.478 1.122 17 - 4.617 Mei 4.592 5.235 10 - 9.837 Juni 7.317 4.791 9 - 12.117 Juli 6.283 2.650 6 - 8.939 Agustus 2.683 711 10 - 3.404 September 14.720 5.660 19 2 20.401 Oktober 4.248 1.438 30 - 5.716 Nopember 7.161 2.024 13 - 9.198 Desember 5.358 1.662 23 3 7.046 JUMLAH Total 71.702 31.525 200 5 103.432 Sumber : Museum Negeri Mulawarman Kalimantan Timur Source : Mulawarman Museum, East Kalimantan Transportasi dan Komunikasi Transportation and Communication Kutai Kartanegara Dalam Angka 2010 313 Tabel Table 8.4.1 BANYAKNYA PENERIMAAN PENJUALAN BENDA POS, GIRO DAN TABUNGAN MENURUT BULAN 000 Rp Number Of Income From Material Post Saled, Clearing And Savings By Month 2009 BULAN Months BENDA POS Post Material G I R O Clearing TABUNGAN Savings [1] [2] [3] [4] 1. Januari 266.777,6 930.040 3.187.518 2. Pebruari 223.991,5 1.489.911 2.832.603 3. Maret 241.740,5 376.743 1.772.770 4. April 297.912,5 343.939 1.958.541 5. Mei 359.930,0 508.956 2.813.253 6. Juni 437.455,0 716.575 2.379.816 7. Juli 478.165,0 610.687 4.743.871 8. Agustus 369.795,5 953.474 2.984.573 9. September 472.668,0 960.625 3.367.196 10. Oktober 660.409,0 1.201.651 3.480.009 11. Nopember 702.010,0 2.381.711 3.796.964 12. Desember 658.092,0 2.465.982 4.348.973 JUMLAH Total 2009 5.168.946,6 12.940.294 37.666.087 2008 75.677 15.285.990 21.118.195 Sumber : PERUM Pos dan Giro Tenggarong Source : Post And Clearing Service, Tenggarong Transportasi dan Komunikasi Transportation and Communication Kutai Kartanegara Dalam Angka 2010 314 Tabel Table 8.4.2 BANYAKNYA PENGIRIMAN DAN PENERIMAAN WESEL POS MENURUT BULAN 000 Rp Number Of Maild And Received Of Money By Month 2009 BULAN Months PENGIRIMAN Mailed PENERIMAAN Received BANYAKNYA Number NILAI Value BANYAKNYA Number NILAI Value [1] [2] [3] [4] [5] 1. Januari 4.082 6.360.412 791 1.562.171 2. Pebruari 3.735 5.779.088 858 1.620.717 3. Maret 3.950 5.858.242 908 1.825.698 4. April 3.636 5.839.177 825 1.813.163 5. Mei 4.496 7.316.126 1.598 2.816.211 6. Juni 3.700 5.831.537 951 1.741.567 7. Juli 4.445 7.276.094 1.026 2.467.428 8. Agustus 3.729 6.118.483 961 1.817.709 9. September 5.903 9.061.039 1.205 2.609.111 10. Oktober 4.132 7.020.384 1.069 2.577.957 11. Nopember 4.810 7.791.925 1.175 3.920.205 12. Desember 5.865 9.448.714 1.212 3.758.715 JUMLAH Total 2009 52.483 83.701.221 12.579 28.530.652 2008 324.044 31.909.745 6.443 8.578.286 Sumber : Perum Pos dan Giro Tenggarong Source : Post And Clearing Service, Tenggarong Transportasi dan Komunikasi Transportation and Communication Kutai Kartanegara Dalam Angka 2010 315 Tabel Table 8.4.3 BANYAKNYA PENGIRIMAN SURAT MENURUT SIFAT PENGIRIMAN DAN BULAN Number Of Letter Mailed By Month And Lind Of Mailing 2009 BULAN Months BIASA Ordinary KILAT Express KILAT KHUSUS Special Express TERCA TAT Registered EKSPRES LUAR NEGERI Express Foreign JUMLAH Total [1] [2] [3] [4] [5] [6] [7] 1. Januari 1.368 1.120 1.697 - - 4.185 2. Pebruari 1.011 2.048 2.412 - - 5.471 3. Maret 1.279 2.684 1.943 - - 5.906 4. April 1.107 961 2.203 - - 4.271 5. Mei 834 1.567 1.901 - - 4.302 6. Juni 945 1.252 2.074 - - 4.271 7. Juli 3.357 1.260 2.096 - - 6.713 8. Agustus 6.483 452 1.642 - - 8.577 9. September 3.795 547 1.761 - - 6.103 10. Oktober 311 632 1.879 - - 2.822 11. Nopember 289 441 2.026 - - 2.756 12. Desember 253 340 1.808 - - 2.401 JUMLAH Total 2009 21.032 13.304 23.442 - - 57.778 2008 17.662 17.449 21.471 - - 56.582 Sumber : PERUM Pos dan Giro Tenggarong Source : Post And Clearing Service, Tenggarong Transportasi dan Komunikasi Transportation and Communication Kutai Kartanegara Dalam Angka 2010 316 Tabel Table 8.4.4 BANYAKNYA PENGIRIMAN DAN PENERIMAAN SURAT MENURUT BULAN Number Of Letter Mailed And Received Of Post Letter By Month 2009 BULAN Months DALAM NEGERI Domestic LUAR NEGERI Foreign JUMLAH Total KIRIM Mailed TERIMA Received KIRIM Mailed TERIMA Received KIRIM Mailed TERIMA Received [1] [2] [3] [4] [5] [6] [7] 1. Januari - 21.636 - - 4.185 25.821 2. Pebruari - 21.260 - - 5.471 26.731 3. Maret - 16.763 - - 5.906 22.669 4. April - 2.287 - - 4.271 6.558 5. Mei - 20.870 - - 4.302 25.172 6. Juni - 17.691 - - 4.271 21.962 7. Juli - 24.808 - - 6.713 31.521 8. Agustus - 25.257 - - 8.577 33.834 9. September - 18.064 - - 6.103 24.167 10. Oktober - 21.470 - - 2.822 24.292 11. Nopember - 16.788 - - 2.756 19.544 12. Desember - 19.268 - - 2.041 21.309 JUMLAH Total 2009 - 226.162 - - 57.418 283.580 2008 56.582 190.978 - - 56.582 190.978 Sumber : Kantor Pos Tenggarong Source : Post and Clearing Service, Tenggarong Keuangan dan Harga Harga Finance and Prices Kutai Kartanegara Dalam Angka 2010 317

9.1. PENANAMAN MODAL DALAM NEGERI

PMDN DAN PENANAMAN MODAL ASING PMA Pada tahun 2009, terjadi penurunan jumlah proyek yang cukup signifikan pada penanaman modal dari dalam negeri yaitu dari 6 proyek tahun 2008 menjadi 1 proyek tahun 2009. Dari 1 proyek tersebut hanya menyerap tenaga sebesar 40 tenaga kerja Indonesia. Jumlah ini mengalami penurunan jika dibandingkan dengan tahun 2008, yang sebesar 4.918 orang . Sementara penanaman modal asing mengalami penurunan dari 32 proyek pada tahun 2008 menjadi 20 proyek pada tahun 2009. Jumlah modal yang ditanamkan juga mengalami penurunan yang cukup berarti dari US 63.366.700 menjadi US 32.850.000.

9.2. PERBANKAN

Posisi kredit bank yang telah disalurkan pada tahun 2009 terbesar adalah sektor pertanian sebesar Rp. 13,74 milyar, diikuti oleh sektor pertambangan sebesar Rp. 5,22 milyar, sektor industri Rp. 4,92 milyar dan selebihnya adalah konstruksi, lainnya, perdagangan, listrik, jasa dunia usaha, pengangkutan, dan jasa sosial. 9.3 P E G A D A I A N Selama tahun 2009 banyaknya jaminan dari penerima kredit kepada Perum Pegadaian di Kutai Kartanegara adalah 57.384 potong dengan nilai kredit sebesar Rp.115,89 milyar dengan nilai pinjaman sebesar Rp.129,57 milyar. Sedang jumlah barang yang telah dilelang sebanyak 748 potong dengan nilai pelelangan Rp.870 juta.

9.1. DOMESTIC INVESTMENTS AND FOREIGN INVESTMENTS

In 2009, the number of projects at domestic investments was 1 project, it projects decreased if it was compared with 2008 6 projects. This 1 project absorped local workers only 40 people or decreased as compared to the previous year 2008, 4.918 local workers. On the other hand, foreign investment increased from 32 projects in the year 2008 down to 20 projects in 2009. The amount of the capital investments also decreased from US 63,366,700 down to US 32,850,000.

9.2. BANKS

The outstanding bank credits which had been distributed in 2009, the biggest is agriculture sector 13.74 billion rupiahs and than used for the mining sector of 5.22 billion rupiahs, industrial sector 4.92 billion rupiahs, and the rest for construction, others, trade, electricity, business service, transportation, and social service. 9.3. PAWNING In the year 2009, number of creditor guarantee in pawnshop services in Kutai Kartanegara was 57.384 units of 115,89 billion rupiahs and the loaning off was 129,57 billion rupiahs. While the number of goods which had been auctioned was 748 units of 870 million rupiahs. Keuangan dan Harga Harga Finance and Prices Kutai Kartanegara Dalam Angka 2010 318 PENJELASAN TEKNIS 1. Data statistik perbankan ber-sumber dari Bank Indonesia. 2. Data statistik penanaman modal yang disetujui pemerintah terdiri dari Penanaman Modal Asing PMA dan Penanaman Modal Dalam Negeri PMDN bersum-ber dari Badan Koordinasi Penanaman Modal BKPM.

3. Koperasi terdiri dari Koperasi Unit Desa KUD dan non KUD

. Data mengenai koperasi bersumber dari Departemen Koperasi. KUD adalah suatu organisasi ekonomi yang berwa-tak sosial dan merupakan wa-dah bagi pengembangan berba-gai kegiatan ekonomi masya-rakat pedesaan yang diseleng-garakan oleh dan untuk masyarakat itu sendiri Inpres No.2 Tahun 1978. Non KUD adalah suatu organisasi ekonomi rakyat yang berwatak sosial, beranggotakan orang- orang atau berbadan hukum koperasi yang merupakan tata susunan ekonomi berbagai usaha bersama berdasarkan atas azas kekeluargaan.

4. Data harga yang disajikan me-liputi :

a. Harga eceran beras di beberapa kota b. Harga eceran beberapa je-nis barang c. Indeks Harga Konsumen IHK dan laju inflasi d. Indeks Harga Perdaga-ngan Besar IHPB e. Indeks Harga yang diterima dan dibayar Petani. 5. Harga eceran beras diolah dari survei mingguan Badan Pusat Statistik. Karena beragamnya kualitas beras, maka harga yang disajikan adalah harga beras kualitas sedang.

6. IHK merupakan indikator inflasi, yang

dihitung setiap bulan berdasarkan perkembangan harga barang-barang dan jasa yang dikonsumsi rumah tangga. TECHNICAL NOTES 1. Banking statistics are obtained from the Bank Indonesia 2. Data on foreign and domestic investment approved by government are obtained from the “Badan Koordinasi Penanaman Modal” Investment Coordinating Board 3. Cooperatives consist of KUD Village Cooperatives Unit and Non KUD Non- Village Cooperatives Unit. The data for cooperatives are obtained from Ministery of Cooperatives. Village cooperatives unit are economic organization operated by the community, as a means to develop the economic activities of the village community, run by and for the community Presidential Instruction No. 2, 1978. Non-village CooperativesUnit are also economic organization, which gather non village member who share a common social function or role, or division of labor, or profession in society. 4. Price satitistics cover: a. Retail prices of rice in several cities b. Retail prices of several commodities c. Consumer price index and inflation rates d. Wholesale price index e. Indices of prices received and paid by farmer 5. The retail price of rice is compiled through the weekly prices survey conducted by BPS-Statistics Indonesia in several cities. Due to different qualities of rice in each city, the medium quality rice is used. 6. The consumer price index is an indicator of inflation, whereas the calculation has been based on trend of price for commodities of household consumption. Keuangan dan Harga Harga Finance and Prices Kutai Kartanegara Dalam Angka 2010 319 7. IHPB disajikan dalam bentuk in-deks umum dan juga sektoral yang meliputi : pertanian, Indus-tri, pertambangan dan pengga-lian, serta impor dan ekspor. 8. Nilai Tukar Petani NTP adalah perbandingan antara indeks harga yang diterima It dan dibayar Ib petani. 9. Metode yang digunakan dalam penghitungan Indeks Harga Konsumen IHK dan Indeks Harga Per dagangan Besar IHPB adalah : Formula Laspeyres yang telah dimodifikasi , yaitu : ∑ PnPn-1 Pn-1.Qo In = ----------------------------- X 100 ∑ Po.Qo dimana : In = Indeks bulanan Pn = Harga pada bulan ke n Pn-1 = Harga pada bulan ke n-1 Po = Harga pada tahun dasar Qo = Kuantitas pada thn dasar 7. The wholesale price index is presented in general index and group of commodities, namely agriculture, industry, mining and quarying, export, and import. 8. Farmers Term of Trade is an indicator used to determine welfare level of farmer. It measure the exchange value of products that is produced or sold by farmer compare to the product needed by farmers for process production or consumption. 9. The methods used in calculating consumer price index and wholesale price index is Modified Laspeyres Formula. The Modified Laspeyres Formula is: ∑ P n P n-1 P n-1 Q In = -------------------------- X 100 ∑ P .Q In = monthly index P n = price in month n P n-1 = price in month n-1 P = price in the basic year Q = quantity in the basic year Keuangan dan Harga Harga Finance and Prices Kutai Kartanegara Dalam Angka 2010 320 GAMBAR Figure : 9.1. PERKEMBANGAN DANA MENURUT SUMBER DANA PERBANKAN JUTA RUPIAH Fund Development of Source Funds Bank 2009 500.000 1.000.000 1.500.000 2.000.000 2.500.000 Janua ri P ebr uar i M are t A pri l M ei Juni Jul i A gus tu s S ept em ber O kt ober N opem ber GIRO SIMPANAN BERJANGKA TABUNGAN GAMBAR Figure : 9.2. PERKEMBANGAN KEGIATAN KOPERASI Development of Cooperatives Activities 2005-2009 0,000 5.000,000 10.000,000 15.000,000 20.000,000 25.000,000 2005 2006 2007 2008 2009 MODAL DANA-DANA SHU CADANGAN Keuangan dan Harga Harga Finance and Prices Kutai Kartanegara Dalam Angka 2010 321 Tabel Table 9.1.1. PERSETUJUAN PENANAMAN MODAL DALAM NEGERI Rp Domestic Investment Rp 2003 - 2009 Tahun Year Jumlah Proyek Projects Modal Capital Rp Tenaga Kerja Labours Indonesia Indonesian Asing Foreign 1 2 3 4 5 2003 5 436.530.000.000 170 - 2004 5 1.509.606.000.000 5.114 20 2005 1 682.200.000.000 185 2006 7 14.688.781.380.000 16.795 7 2007 2 3.934.088.000 2.033 - 2008 6 825.949.222.524 4.918 2 2009 1 14.500.000.000 40 - Sumber : BPMD Kabupaten Kutai Kartanegara. Source : BPMD, Kutai Kartanegara Regency. Keuangan dan Harga Harga Finance and Prices Kutai Kartanegara Dalam Angka 2010 322 Tabel Table 9.1.2. PROYEK PENANAMAN MODAL DALAM NEGERI YANG DISETUJUI MENURUT SEKTOR EKONOMI Approved Domestic Investment Project by Economic Sector 2009 No. Sektor Ekonomi Jumlah Proyek Rencana Investasi Economic Sector Number of Projects Plant of Investment Rp 1 2 3 4 1. Perkebunan Kelapa Sawit - - 2. Pertambangan Umum 1 14.500.000 3. Perdagangan Ekspor - - JumlahTotal 1 14.500.000 Sumber : BPMD Kabupaten Kutai Kartanegara. Source : BPMD, Kutai Kartanegara Regency. Keuangan dan Harga Harga Finance and Prices Kutai Kartanegara Dalam Angka 2010 323 Tabel Table 9.1.3. PENANAMAN MODAL ASING Foreign Investment 2003 - 2009 Tahun Year Jumlah Proyek Projects Modal Capital US Tenaga Kerja Labours Indonesia Indonesian Asing Foreign 1 2 3 4 5 2003 1 2.384.000 591 - 2004 5 114.735.900 501 32 2005 13 259.444.000 4.944 33 2006 16 915.473.520 6.351 25 2007 15 598.540.676 2.809 20 2008 32 63.366.700 1.985 63 2009 20 32.850.000 918 39 Sumber : BPMD Kabupaten Kutai Kartanegara. Source : BPMD, Kutai Kartanegara Regency. Keuangan dan Harga Harga Finance and Prices Kutai Kartanegara Dalam Angka 2010 324 Tabel Table 9.1.4. PROYEK PENANAMAN MODAL ASING YANG DISETUJUI MENURUT SEKTOR EKONOMI Approved Foreign Investment Project by Economic Sector 2009 No. Sektor Ekonomi Jumlah Proyek Rencana Investasi Economic Sector Number of Projects Plant of Investment Rp 1 2 3 4 1. Perkebunan Kelapa Sawit - - 2. Pertambangan Umum 20 32.850 3. Perdagangan Ekspor - - JumlahTotal 20 32.850 Sumber : BPMD Kabupaten Kutai Kartanegara. Source : BPMD, Kutai Kartanegara Regency. Keuangan dan Harga Harga Finance and Prices Kutai Kartanegara Dalam Angka 2010 325 Tabel Table 9.2.1 DAFTAR NAMA-NAMA BANK DI KABUPATEN KUTAI KARTANEGARA List of Bank Name in Kutai Kartanegara Regency 2009 No Nama Bank [1] [2] 1. Bank Pembangunan Daerah BPD 2. Bank Nasional Indonesia BNI 46 3. Bank Rakyat Indonesi BRI 4. Bank Mandiri 5. Bank Syariah Mandiri 6. Bank Perserikatan 7. Bank Danamon 8. Bank CIMB Niaga 9. Bank Perkreditan Rakyat BPR 10. Bank Central Asia BCA 11. Bank Mega Sumber : Bappeda, Kabupaten Kutai Kartanegara Source : Bappeda, Kutai Kartanegara Regency Keuangan dan Harga Harga Finance and Prices Kutai Kartanegara Dalam Angka 2010 326 Tabel Table 9.2.2 TOTAL ACTIVA BANK UMUM DAN BPR JUTA RUPIAH Total Assets Of General And Public Cridited Banks Million of Rp 2009 B U L A N Month BANK UMUM dan BANK PERKREDITAN General And Public Cridited Banks JUMLAH Total [1] [2] [3] 1. Januari 2.695.132 2.695.132 2. Pebruari 2.474.768 2.474.768 3. Maret 2.750.743 2.750.743 4. April 3.012.399 3.012.399 5. Mei 2.883.177 2.883.177 6. Juni 3.056.105 3.056.105 7. Juli 2.782.629 2.782.629 8. Agustus 2.711.642 2.711.642 9. September 2.889.972 2.889.972 10. Oktober 2.790.416 2.790.416 11. Nopember 2.212.837 2.212.837 12. Desember 2.707.348 2.707.348 Desember December 2009 2.707.348 2.707.348 2008 2.695.132 2.718.284 Sumber : Bank Indonesia, Samarinda Source : Bank of Indonesia, Samarinda Keuangan dan Harga Harga Finance and Prices Kutai Kartanegara Dalam Angka 2010 327 Tabel Table 9.2.3 POSISI KREDIT BANK MENURUT SEKTOR EKONOMI JUTA RUPIAH Credits Bank Position by Economic Sector Million of Rp 2009 SEKTOR EKONOMI Economic Sectors PERIODE PERIOD 2008 2009 Desember Januari Februari Maret April Mei [1] [2] [3] [4] [5] [6] [7] 1. Pertanian Agriculture 908.923 919.764 959.434 982.108 1.175.943 1.276.948 2. Pertambangan Mining 412.004 304.875 404.366 642.216 455.467 427.663 3. Perindustrian Industry 298.134 617.135 621.307 607.945 473.132 286.305 4. Perdagangan Trade 233.663 224.008 261.356 273.479 276.947 280.906 5. Listrik, Gas Air Electrycity, Gas, and Water 163.555 164.949 163.347 165.949 163.492 164.035 6. Konstruksi Construction 376.753 345.649 346.191 362.666 356.242 365.673 7. Pengangkutan Transportation 16.024 16.092 16.073 15.166 13.915 13.185 8. Jasa Dunia Usaha Business Service 241.817 239.875 201.081 193.460 173.560 166.547 9. Jasa Sosial Masyarakat Social Service 1.396 1.345 1.253 1.142 1.904 1.971 10. Lainnya Others 260.256 263.809 259.001 272.070 280.509 298.641 Total Total 2.912.525 3.097.501 3.233.410 3.516.201 3.371.111 3.281.874 Sumber : Bank Indonesia, Samarinda Source : Bank of Indonesia, Samarinda Keuangan dan Harga Harga Finance and Prices Kutai Kartanegara Dalam Angka 2010 328 Lanjutan Tabel 9.2.3 Continued Table 9.2.3 SEKTOR EKONOMI Economic Sectors PERIODE PERIOD 2009 Juni Juli Agustus September Oktober Nopember [1] [2] [3] [4] [5] [6] [7] 1. Pertanian Agriculture 1.311.499 1.252.287 1.257.083 1.355.145 1.610.333 1.639.036 2. Pertambangan Mining 586.762 460.399 488.755 463.620 486.643 496.528 3. Perindustrian Industry 355.619 295.510 293.556 311.321 528.629 531.523 4. Perdagangan Trade 297.084 325.605 332.175 321.659 326.403 326.419 5. Listrik, Gas Air Electrycity, Gas, and Water 163.219 216.086 205.725 203.927 202.081 200.205 6. Konstruksi Construction 378.611 330.577 345.534 359.702 385.960 397.195 7. Pengangkutan Transportation 12.582 11.930 12.032 11.314 10.732 11.972 8. Jasa Dunia Usaha Business Service 161.382 163.537 172.545 188.572 173.119 161.382 9. Jasa Sosial Masyarakat Social Service 2.479 2.390 2.802 3.521 3.500 5.868 10. Lainnya Others 297.091 321.508 330.645 342.077 359.881 384.153 Total Total 3.571.466 3.377.674 3.431.844 3.544.831 4.102.734 4.166.017 Sumber : Bank Indonesia, Samarinda Source : Bank of Indonesia, Samarinda Keuangan dan Harga Harga Finance and Prices Kutai Kartanegara Dalam Angka 2010 329 Tabel Table 9.2.4 POSISI SIMPANAN MASYARAKAT PADA BANK UMUM DAN BPR JUTA RUPIAH Outstanding of Private Deposit of Commercial and Rural Bank Million of Rp 2009 B U L A N GIRO Demand Deposit SIMPANAN BERJANGKA Time Deposit TABUNGAN Saving Deposit JUMLAH TOTAL Month Nominal Rekening Account Satuan Number Nominal Rekening Account Satuan Number Nominal Rekening Account Satuan Number Nominal Rekening Account Satuan Number [1] [2] [3] [4] [5] [6] [7] [8] [9] 1. Januari 1.534.680 2.487 336.031 1.851 1.022.494 267.211 2.893.205 271.549 2. Pebruari 1.481.986 2.489 337.737 1.910 977.555 139.878 2.797.278 144.277 3. Maret 1.815.025 2.457 338.954 1.918 976.522 136.699 3.130.502 141.074 4. April 2.066.575 2.460 341.400 1.917 952.726 138.326 3.360.701 142.703 5. Mei 1.926.266 2.427 332.908 1.844 904.538 135.975 3.163.711 140.246 6. Juni 1.920.284 2.485 527.235 1.853 947.467 137.994 3.394.987 142.332 7. Juli 1.216.405 2.488 934.362 1.865 933.379 140.547 3.084.147 144.900 8. Agustus 1.144.579 2.799 915.349 1.856 946.160 143.185 3.006.088 147.840 9. September 1.844.643 3.272 706.376 1.849 985.519 145.767 3.536.538 150.888 10. Oktober 975.398 2.638 1.104.904 1.877 1.003.204 148.350 3.083.506 152.865 11. Nopember 766.905 2.667 709.431 1.887 1.012.164 150.312 2.488.500 154.866 12. Desember Desember December 2009 2008 1.681.443 2.989 299.884 1.765 1.029.207 130.517 3.010.534 135.271 Sumber : Bank Indonesia, Samarinda Source : Bank of Indonesia, Samarinda Keterangan : Data belum tersedia oleh Bank Indonesia