Kegiatan Usaha Perusahaan. Struktur Organisasi Perusahaan Financial Accounting Dept

14 4. PT. Madhani Telatah Nusantara Senoni 2003 – 2005. Coal Getting, Coal Cleaning and Removal Overburden, Road Maintenance, Coal Transportation. 5. PT. Pamapersada Nusantara Job Site Kideco 2003 – sekarang. Land Clearing Grubbing, Ripping Dozing, Road Maintenance, Compacting, Workshop Support Tire Handling. 6. PT. Pamapersada Nusantara Job Site Asam 2 2004 – 2006. Overburden and Coral Hauler Access Road, Land Clearing, Work Preparation, Removal Overburden, Coal Transportation. 7. PT. Multi Harapan Utama Tenggarong 2005 – sekarang. Mining Contractor. 8. PT. Arkananta Apta Pratista Senoni 2004 – 2005. Coal Getting, Work Preparation, Road Maintenance, Coal Transportation. 9. PT. Sapta Indra Sejati SIS Site Adaro 2004 – sekarang. Land Clearing, Work Preparation, Road Maintenance, Coal Transportation. 10. PT. Kideco Jaya Agung Batukajang 2006 – sekarang Earthworks, Setting Pond, Civil Environment 11. PT. Tunas Muda Jaya Batusopang 2008 – sekarang. Mining Contractor. 12. PT. Istaka Karya 2002 – 2003. Double Track Railways, Toll Road Cikampek – West Java

4.5 Kegiatan Usaha Perusahaan.

Kegiatan usaha yang dilakukan oleh PT. Rante Mutiara Insani dapat dibagi menjadi 3 kegiatan utama, yaitu :  Pertambangan Batubara Coal Mining : 1. Pembangunan di sektor pertambangan Development of mining front  Pembukaan Lahan Land Clearing  Penghapusan lapisan tanah atas Top Soil Removal 15  Pembangunan akses jalan menuju tambang Construction of access in pit road  Bench and slope finishing 2. Pengupasan lapisan penutup tanah Removal and Stripping of Overburden  Penyimpanan Stock pilling  Pengangkutan Loading  Pengangkutan ke daerah pembuangan limbah Hauling to designated waste disposal area 3. Pengelolaan Pembuangan Limbah Disposal Management  Penyebaran Spreading  Pemadatan Compacting  Pembuatan saluran pemerataan DrainageLeveling 4. Penggalian batubara siap jual atau penyimpanan Extraction of Salable Coal or Deposit  Pembersihan permukaan Surface cleaning  Pengangkutan Loading  Pengangkutan ke pabrik pengolahan batubara Hauling to coal preparation plant 5. Stockpiling and Loading into The Barge Drainage of Mining Front  Pembuatan Selokan Saluran Construction of perimeter ditch  Sistem Drainase Drainage system  Instalasi Bak Penampung dan Pompa Sump and pump installation  Sistem pengeringan Dewatering system 6. Pemeliharaan Jalan pengangkutan Haulroad Maintenance  Sistem Drainase Drainage system  Grading  Pemadatan Compacting  Penekanan debu Dust suppression 16  Proyek Konstruksi Construction : 7. Kontraktor Umum General Contractor  Persiapan Lahan Land preparation  Pengupasan Tanah Stripping  Pemotongan dan Pengisian Cutting and filling  Pengangkutan dan pemadatan Hauling and compacting  Konstruksi jalan Road construction  Pengaturan konstruksi Setting pond construction  Persewaan Alat-Alat Berat Rent: 8. Persewaan Alat Berat  Penyewaan alat-alat berat beserta operatornya.

4.6 Struktur Organisasi Perusahaan Financial Accounting Dept

Keterangan : : Garis Perintah Koordinasi Langsung Sumber : Human Resource and Legal Department Cashier Tax Supervisor Accounting Staff Administration Site Support Payroll Supervisor General Manager Of Financial and Accounting Manager Of Financial and Accounting Accounting Assistant Manager Financial Assistant Manager Accounting Staff Financial Staff Financial Supervisor Accounting Supervisor 17

4.7 Job Description bagian Financial and Accounting