PERSEDIAAN INVENTORIES
7. PERSEDIAAN 7. INVENTORIES
Persediaan terdiri dari: Inventories consist of:
Finished goods Barang dalam proses
Barang jadi
Work in process Bahan baku
Raw materials Perlengkapan suku cadang
Spare parts Bahan pembantu 11.470.203.234 7.489.545.479 Indirect materials
Total persediaan
Total inventories
Berdasarkan hasil penelaahan terhadap kondisi Based on the review of the physical condition of the fisik persediaan pada akhir tahun, manajemen
inventories at the end of the year, the Group’s Grup berpendapat bahwa persediaan telah
management is of the opinion that inventories are mencerminkan nilai realisasi netonya, sehingga
realizable at the above amounts and no provision for tidak perlu dilakukan penyisihan atas persediaan
inventory losses is necessary. tersebut.
Persediaan tersebut di atas telah diasuransikan Inventories are covered by insurance against losses terhadap risiko kerugian kebakaran, kebanjiran
from fire, flood and other risks (all-risks) with dan risiko lainnya (all-risks) pada Tokio Marine
Tokio Marine Insurance Group, PT Avrist General Insurance Group, PT Avrist General Insurance,
Insurance, PT Asuransi Tri Pakarta, PT Asuransi PT Asuransi Tri Pakarta, PT Asuransi Jasa Tania
Jasa Tania Tbk. and PT Asuransi Rama, with total Tbk. dan PT Asuransi Rama, dengan total nilai
coverage of Rp65,000,000,000 for the years 2016 pertanggungan secara keseluruhan sebesar
and 2015. The Group’s management believes that 65.000.000.000 pada tahun-tahun 2016 dan
the above insurance is adequate to cover possible 2015. Manajemen Grup berpendapat bahwa nilai
losses arising from such risks. pertanggungan tersebut cukup untuk menutup kemungkinan kerugian atas risiko tersebut.
Pada tanggal 30 September 2016 dan 31 As of September 30, 2016 and December 31, 2015, Desember 2015, persediaan milik Grup sebesar
the Group’s inventories which amounting to Rp87.531.105.651 dan Rp63.057.507.865
Rp87,531,105,651 and Rp63,057,507,865 digunakan sebagai jaminan atas utang jangka
are pledged as collateral for short-term and long- pendek dan jangka panjang (Catatan 12 dan 17).
term debts (Notes 12 and 17).
8 . BIAYA DIBAYAR DI MUKA
8. PREPAID EXPENSES
Akun ini terdiri dari:
This account consists of:
Insurance Sewa
Total biaya dibayar di muka
Total prepaid expenses
9 . ASET LANCAR LAIN-LAIN
9. OTHER CURRENT ASSETS
Akun ini terdiri dari: This account consists of:
30 September/ 31 Desember/ September, 30
Uang muka pembelian persediaan
Advances for purchase of supplies Marginal deposit Letter of Credit
Marginal Deposit Letter of Credit - . Uang muka kepada kontraktor
- Advances payment to contractors
Total aset lancar lain-lain
Total other current assets
Uang muka pembelian persediaan sebagian The advances were made mainly for the purchase of besar digunakan untuk pembelian suku cadang
spare parts for production machine. All of the mesin produksi. Seluruh uang muka tersebut
advances are settled within one year. merupakan uang muka yang akan diselesaikan dalam jangka waktu kurang dari satu tahun.
10. ASET TETAP
10. FIXED ASSETS
Mutasi aset tetap adalah sebagai berikut: The movements of this account are as follows:
Tahun yang berakhir pada tanggal 30 September 2016/Year ended September 30, 2016
Saldo Awal/
Saldo Akhir/
Beginning Penambahan/ Pengurangan/
Reklasifikasi/
Ending
Keterangan Balance Additions Deductions Reclassifications Balance Description
Biaya Perolehan Cost Pemilikan Tanah Langsung
Land Direct Ownership Bangunan dan prasarana
Buildings and infrastructures Mesin dan peralatan pabrik
Machineries and equipment Peralatan dan perabot kantor
Furniture and office equipment Kendaraan
Vehicles Perlengkapan teknik dan
Technical and
laboratory equipment
Aset dalam Penyelesaian Construction in Progress Bangunan dan prasarana
Buildings and infrastructures
Machineries and equipment Sub-total
Mesin dan peralatan 161.563.274.100