LAPORAN MINGGU KE 1 KEGIATAN MAGANG KERJ
LAPORAN MINGGU KE-1 KEGIATAN MAGANG KERJA
DI KEBUN R&D SYNGENTA, KEDIRI
Oleh :
Khonsa Ummu Syahidah
135040201111126
Tanggal Magang:
18 Juli 2016 -23 Juli 2016
Dosen Pembimbing Utama:
Dr. Ir. Retno Dyah Puspitarini, MS.
Dosen Pembimbing Lapang:
Yanuar Danaatmadja SP, M.Sc.
PROGRAM STUDI AGROEKOTEKNOLOGI
MINAT HAMA DAN PENYAKIT TUMBUHAN
FAKULTAS PERTANIAN
UNIVERSITAS BRAWIJAYA
2016
DAFTAR ISI
Halaman
DAFTAR ISI ............................................................................................................ i
DAFTAR TABEL ................................................................................................... ii
DAFTAR GAMBAR ............................................................................................. iii
DAFTAR LAMPIRAN .......................................................................................... iv
LOG HARIAN JAM KERJA ..................................................................................1
RENCANA KEGIATAN MINGGU DEPAN .........................................................3
ANALISIS SALAH SATU KOMPONEN KEGIATAN ........................................4
Orientasi Lapang ................................................................................................4
Orientasi Perusahaan ..........................................................................................6
PENILAIAN UMUM KEPUASAN ........................................................................8
i
DAFTAR TABEL
Nomor
Halaman
Teks
1
Log harian jam kerja magang mingu ke-1 .................................................. 1
2
Aktivitas magang kerja mingu ke-1 ............................................................ 1
ii
DAFTAR GAMBAR
Nomor
Halaman
Teks
1
Penanaman benih jagung............................................................................. 4
2
Pengamatan lapang...................................................................................... 5
3
Struktur organisasi R&D Syngenta ............................................................. 6
4
Lay Out blok kebun tanaman jagung R&D Syngenta Kediri ..................... 7
5
Denah lokasi kebun jagung ......................................................................... 7
iii
DAFTAR LAMPIRAN
Nomor
Halaman
Teks
1
Dokumentasi Pengamatan lapang : a) penanaman benih jagung, b) update
benih, c) pengamatan lapang program DM screening ................................ 9
2
Dokumentasi Pengamatan laboratorium : a) persiapan sterilisasi, b)
persiapan agar YDC, c) persiapan cawan petri di LAFC, d) pembersihan
alat laboratorium ....................................................................................... 10
iv
LOG HARIAN JAM KERJA
Log harian jam kerja merupakan perhitungan lama kerja dalam kegiatan
magang kerja yang ditulis setiap hari dan dilaporkan setiap minggu. Log harian
jam kerja magang kerja pada minggu ke-1 (tabel 1) dapat diketahui bahwa
magang kerja dimulai pada hari senin sampai hari sabtu. Jam kerja pada setiap
harinya adalah 9 jam, kecuali untuk hari sabtu adalah 4 jam. Jadi, total jam kerja
pada minggu ke-1 adalah 49 jam.
Tabel 1. Log harian jam kerja magang kerja minggu ke-1
No
Hari
Tanggal
1.
Senin
18 Juli 2016
2.
Selasa
19 Juli 2016
3.
Rabu
20 Juli 2016
4.
Kamis
21 Juli 2016
5.
Jumat
22 Juli 2016
6.
Sabtu
23 Juli 2016
Total
Jam Kerja
9 jam
9 jam
9 jam
9 jam
9 jam
4 jam
49 jam
AKTIVITAS MAGANG KERJA
Aktivitas magang kerja merupakan kegiatan yang diikuti selama magang
kerja dan dicatat setiap hari serta dilaporkan setiap minggu. Aktivitas magang
kerja yang telah dilakukan pada minggu ke-1 (tabel 2) yakni orientasi lapang dan
perusahaan, penanaman benih jagung untuk program DM screening (Downy
mildew), pengamatan lapang untuk benih jagung DM screening yang berumur 40
hari, pengamatan laboratorium dengan mengambil sampel di lapang, pengecekan
terhadap benih jagung yang tahan terhadap serangan pathogen, dan pengecekan
benih jagung yang keluar untuk dikirimkan ke daerah tertentu yaitu program
update benih.
Tabel 2. Aktivitas magang kerja
No. Hari
Tanggal
Waktu
Kegiatan
Lokasi
1. Senin 18 Juli 2016 07.00-16.00 Orientasi
lapang, Kebun jagung
orientasi
perusahaan, Syngenta,
penanaman
jagung program
1
benih Kantor
DM Syngenta
R&D
dan
(Downy
mildew) depan
Kantor
screening, pengamatan Syngenta.
tanaman jagung yang
telah berumur 40 harian
program DM (Downy
mildew)
screening,
update benih dari cool
storage.
2.
Selasa
19 Juli 2016
07.00-16.00 Pengamatan
gejala Kebun
penyakit BSR (Bacteri Syngenta
jagung
dan
Stalk Rot) di lapang, Laboratorium
serta
pengambilan Syngenta.
sampel tanaman jagung
sesuai
dengan
gejala
yang ditimbulkan oleh
penyakit
BSR.
Pembuatan
larutan
Clorox 1%, sterilisasi
alat
laboratorium
Autoclave,
di
persiapan
media agar (YDC =
Yeast Dextrose CaCo3)
dan penanaman bakteri
pada cawan petri di
LAFC.
3.
Rabu
20 Juli 2016
07.00-16.00 Pembersihan
alat Depan
Kantor
laboratorium yang telah Syngenta
digunakan, penanaman tepatnya sebelah
benih jagung program halaman Kantor
DM screening dan BSR Syngenta
Panel
Line,
update Kebun
benih dari cool storage.
2
Syngenta,
dan
jagung
tempat
penyimpanan
benih.
4.
Kamis
21 Juli 2016
07.00-16.00 Pengamatan
tanaman Kebun
Jagung
jagung di lapang pada Syngenta.
program DM screening
sebanyak 8 petak.
5.
Jumat
22 Juli 2016
07.00-16.00 Pengamatan
tanaman Kebun
Jagung
jagung di lapang pada Syngenta
program DM screening Depan
sebanyak
3
dan
Kantor
petak, Syngenta.
pengecekan
benih
jagung
tahan
yang
terhadap
serangan
pathogen beserta benih
pembandingnya sebagai
tolak
ukur
(kontrol),
penilaian
khususnya
pada penyakit bulai.
6.
Sabtu
23 Juli 2016
07.00-11.00 Pengecekan
jagung
benih Depan
yang
terhadap
Kantor
tahan Syngenta.
serangan
pathogen beserta benih
pembandingnya sebagai
tolak
ukur
(kontrol),
penilaian
khususnya
pada penyakit bulai.
RENCANA KEGIATAN MINGGU DEPAN
Rencana kegiatan minggu depan (minggu selanjutnya) dirancang melalui
konsultasi dengan pembimbing lapang untuk mendapatkan garis besar kegiatan
magang kerja yang akan dilakukan pada minggu selanjutnya. Setelah minggu
3
pertama mengikuti serangkaian kegiatan magang kerja, selanjutnya rencana
kegiatan magang kerja yang akan dilakukan pada minggu ke-2 adalah penanaman
benih screening, pengamatan lapang, pengamatan laboratorium.
ANALISIS SALAH SATU KOMPONEN KEGIATAN
Orientasi Lapang
Orientasi lapang dilakukan untuk mengetahui secara langsung kondisi
Kebun Jagung di R&D Syngenta, selain itu dalam orientasi ini juga dilakukan
diskusi dan wawancara dengan pembimbing lapang dan asisten lapang untuk
mendapatkan informasi yang lebih lengkap. Adapun informasi yang didapat dari
orientasi lapang diantaranya adalah adanya lahan untuk percobaan benih jagung
dari serangan pathogen (screening) sebanyak 60%, pemuliaan benih (breeding)
sebanyak 40%, dan untuk produksi F1 sebanyak 40%. Kegiatan pengamatan di
lapang dibimbing oleh asisten lapang dengan menghitung total tanaman jagung
perbaris, beserta tanaman yang sehat (tumbuh hijau). Kegiatan pengamatan gejala
penyakit BSR (Bacteri Stalk Rot) dibimbing secara langsung oleh dosen
pembimbing lapang. Kegiatan penanaman benih jagung program DM (Downy
Mildew) Screening dan DM (Downy Mildew) Panel Line dapat diikuti secara
langsung bersama pekerja di lapang.
Penanaman benih jagung. Kegiatan ini dilakukan untuk program
screening, khususnya terhadap serangan pathogen yang menyebabkan timbulnya
penyakit bulai. Jarak tanamnya adalah 50x10 cm dengan jumlah lubang tanam 25
lubang perbaris, masing-masing 2 benih jagung dengan varietas yang berbeda
untuk masing-masing barisnya.
Gambar 1. Penanaman benih jagung
4
Pengamatan lapang. Kegiatan ini dibimbing secara langsung oleh asisten
lapang untuk mengamati gejala penyakit bulai serta menghitung total tanaman
yang hidup dan total tanaman yang tumbuh sehat (hijau). Hal ini dilakukan untuk
mengamati ketahanan tanaman terhadap penyakit bulai.
Gambar 2. Pengamatan lapang
Kultivar. Beberapa kultivar jagung yang digunakan oleh perusahaan
memiliki berbagai macam jenisnya. Standart pembanding adalah produk benih
(varietas) komersil dari pasaran dengan benih dari perusahaan sebagai tolak ukur,
salah satunya adalah anoman, p35, nk6326, nk99, lagaligo, nk6172, st5113, dan
Bisi 18. Kultivar yang digunakan memiliki program masing-masing yaitu untuk
percobaan benih jagung dari serangan pathogen (screening), pemuliaan benih
(breeding), dan untuk produksi F1.
Lahan di Kebun Utama dibagi menjadi blok-blok untuk mempermudah
pengaturan jadwal program screening, breeding maupun produksi F1. Blok-blok
tersebut adalah blok A yang terdiri dari A1, A2, blok B yang terdiri dari B1, B2,
blok C yang terdiri dari C1, C2, blok D yang terdiri dari D1, D2, blok E yang
terdiri dari E1, E2, blok F yang terdiri dari F1, F2, blok G yang terdiri dari G1,
G2, blok H yang terdiri dari H1, H2, blok I yang terdiri dari I1, I2, blok J yang
terdiri dari J1, J2, blok K yang terdiri dari K1, K2, blok L yang terdiri dari L1, L2,
blok M yang terdiri dari M1, M2, dan blok N yang terdiri dari N1, N2. Adapun
blok O, P, Q, R, S, T, U, dan V merupakan blok yang digunakan sebagai tempat
mengalirnya air untuk tanaman jagung (gambar 4). Masing-masing blok memiliki
program spesifik, menyesuaikan dengan 3 program yang ada. Sehingga total blok
kebun jagung adalah sebanyak 36 blok.
5
Orientasi Perusahaan
Orientasi perusahaan dilakukan untuk mendapatkan informasi tentang
profil dan struktur organisasi perusahaan, denah lokasi kebun, dan lay out jumlah
blok. Dari hasil orientasi perusahaan diperoleh informasi struktur organisasi R&D
Syngenta (gambar 3), Lay Out blok kebun jagung Syngenta, Kediri (gambar 4)
dan denah lokasi kebun jagung (gambar 5).
Gambar 3. Struktur organisasi R&D Syngenta
6
Gambar 4. Lay Out blok kebun tanaman jagung
LAND USAGE RECORD FARM KEDIRI
Block
Sub
Block
Panj leb
ang ar
Luas
2014
Populasi
Jan
A1
A2
B1
B2
C1
C2
D1
D2
E1
E2
F1
F2
G1
G2
H1
H2
I1
I2
J1
J2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
1
1
m
80
m
15
M2
1200
Feb
Mar
Apr
May
June
2015
July
August
Sept
Oct
Nov
Dec
Jan
Feb
Mar
70 x 20
8571
80
15
1200
8571
80
15
1200
8571
80
15
1200
8571
80
15
1200
8571
80
15
1200
8571
80
15
1200
8571
80
15
1200
8571
80
15
1200
8571
80
15
1200
8571
80
15
1200
8571
80
15
1200
8571
80
15
1200
8571
Spreader row
80
15
1200
8571
15
1200
8571
80
15
1200
8571
80
15
1200
8571
80
80
8
8
600
600
4286
4286
80
15
1200
8571
80
15
1200
8571
80
15
1200
8571
80
15
1200
8571
May
June
July
2016
August
Sept
Oct
Dm ( Monthly )
PPT - Seed Treat
Stage 6-DM
DM
Nov
Dec
Stage 3_DM
DM
1
1
Mar
Apr
May
DM
Screening
Stage 1
Stage 5_DM
F2-F3_DMR
MAXVEG -HOT PEPPER
Breeding
DM
Spreader row
CORN TRIAL F1
WO Trial Corn
Spreader row
Spreader row
DM
Spreader row
Breeding
Prodc. Stage 6
Dm Map
Spread
er row
DH-DMR_TH
DM Screening - Selfing
Spreader
row
Yield Trial Stage 2 Set 1
Spreader row
DM Screening
Dm Map
Apparna
Program_DM
Production Stage 2 & 3_ID
Prodc. Stage 1
DM ( Selfing )
DM SCREENING
Production Stage 3_ID
Prodc. Stage 1
DM Screening
DM
Screening
Stage 4 & 5
F3 DMR_TH
Seed Care
Seed Care
Seed Care
Seed Care
BREEDING
Breding
DM Screening - Selfing
DM
Prodc
Seed
Care
Production Stage 2_ID & DH
Produc. Stage 1
Production Stage 2 & 3_ID
Produc. Stage 4
DM ( Selfing )
Spreader row
Production Stage 3_DH
Prodc. Stage 1
DM ( Selfing )
Breeding
Yield Trial Stage 2 Set 2
Breeding
Parent Seed
Yield TrialStage 2 Set 3
Breeding
Breeding
Production Stage 5 & 6_TH
YT - Stage 2 TH Additional
DM_Map
Breeding Program
YT - Stage 1 DH Set 1 - 3
Produc. Stage 4_ID
Spreader row
2
K2
Feb
Spreader row
2
K1
Jan
Stage 2 _DM
Breeding
BREEDING
Spreader row
80
Apr
DM
DM ( Selfing )
Prodc. Stage 1
DM ( Selfing )
2
L1
1
Spreader row
Prodc. Stage 6
DM ( Selfing )
2
L2
1
80
15
1200
Spread
er row
8571
2
M1
1
80
15
1200
DM ( Selfing )
Prodc. Stage 4, 3
DM ( Selfing )
Prodc. Stage 5
8571
Apparna Spre Phatcharee
Program_D ader Program_D
M
row
M
2
M2
N1
N2
O
P
Q
R
S
T
U
V
W
X
Y
Z
1
2
1
2
1
2
80
15
1200
8571
80
15
1200
8571
Spread
er row
DM ( Selfing )
80
80
80
80
62
62
62
101
101
101
43
43
43
15
15
15
15
12
12
12
15
15
15
12
12
12
1200
1200
1200
1200
744
744
744
1515
1515
1515
516
516
516
#REF!
8571
8571
8571
8571
5314
5314
5314
10821
10821
10821
3686
3686
3686
#REF!
# REF!
# R EF !
10000
53,333
Breeding
Prodc. Stage 1
Spreader
row
Procd. Stage 1
Breeding
Prodc. Stage 1
Yield TrialStage 6
Produksi
DM Screening - Selfing
Yield Trial-Stage 1
Tomato Det Plc 4,5,6
Tomato F1 ( plc 4,5,6.1 )
Produc. Stage 2 & 3
Produc. Stage 6
Prodc. Stage 2
Prodc. Stage 4
Prodc. Stage 5
Breeding
F1 CORN TRIAL
BSR Screening
Spread
Stage 1_DM
er row
Stage 3_DM
Rice Trial & Prodc. Stage 1
Spreader row
Production Stage 4_TH & ID
Seed Care
Spread
Stage 1_DM
er row
MaxVeg
Yield Trial - Stage 2 Set 4
CP Trial ( Herbicide )
TOMAX
Gambar 5. Denah lokasi kebun jagung
7
June
July
August
Sept
Oct
Nov
Dec
PENILAIAN UMUM KEPUASAN
Penilaian umum kepuasan mahasiswa dalam menjalankan magang kerja
dilakukan untuk mengetahui sejauh mana tingkat kepuasan mahasiswa selama
mengikuti kegiatan magang kerja. Kegiatan ini dapat bermanfaat dengan
diketahuinya kendala atau hambatan yang dialami lalu kemudian diperbaiki agar
menjadi lebih baik. Penulis merasa kurang puas dengan kegiatan magang kerja
yang telah dilakukan pada minggu ke-1 karena kegiatan orientasi lapang dan
perusahaan untuk mendapat informasi masih kurang lengkap serta alat
laboratorium ada yang rusak. Hal ini dapat diperbaiki dengan melakukan diskusi
dan wawancara lagi pada minggu selanjutnya untuk melengkapi informasi tentang
jumlah tanaman jagung di setiap blok. Walaupun demikian, magang kerja pada
minggu pertama ini secara keseluruhan sudah cukup baik. Terutama, dalam
mendapatkan pengetahuan secara umum tentang budidaya dan pengendalian
penyakit tanaman jagung cukup mudah untuk diperoleh.
8
LAMPIRAN
1. Dokumentasi Pengamatan lapang
a) penanaman benih jagung
b) update benih
9
c) pengamatan lapang program DM screening
2. Dokumentasi Pengamatan laboratorium
(a)
(b)
(c)
10
(d)
Keterangan : a) persiapan sterilisasi, b) persiapan agar YDC, c) persiapan cawan
petri di LAFC, d) pembersihan alat laboratorium.
11
DI KEBUN R&D SYNGENTA, KEDIRI
Oleh :
Khonsa Ummu Syahidah
135040201111126
Tanggal Magang:
18 Juli 2016 -23 Juli 2016
Dosen Pembimbing Utama:
Dr. Ir. Retno Dyah Puspitarini, MS.
Dosen Pembimbing Lapang:
Yanuar Danaatmadja SP, M.Sc.
PROGRAM STUDI AGROEKOTEKNOLOGI
MINAT HAMA DAN PENYAKIT TUMBUHAN
FAKULTAS PERTANIAN
UNIVERSITAS BRAWIJAYA
2016
DAFTAR ISI
Halaman
DAFTAR ISI ............................................................................................................ i
DAFTAR TABEL ................................................................................................... ii
DAFTAR GAMBAR ............................................................................................. iii
DAFTAR LAMPIRAN .......................................................................................... iv
LOG HARIAN JAM KERJA ..................................................................................1
RENCANA KEGIATAN MINGGU DEPAN .........................................................3
ANALISIS SALAH SATU KOMPONEN KEGIATAN ........................................4
Orientasi Lapang ................................................................................................4
Orientasi Perusahaan ..........................................................................................6
PENILAIAN UMUM KEPUASAN ........................................................................8
i
DAFTAR TABEL
Nomor
Halaman
Teks
1
Log harian jam kerja magang mingu ke-1 .................................................. 1
2
Aktivitas magang kerja mingu ke-1 ............................................................ 1
ii
DAFTAR GAMBAR
Nomor
Halaman
Teks
1
Penanaman benih jagung............................................................................. 4
2
Pengamatan lapang...................................................................................... 5
3
Struktur organisasi R&D Syngenta ............................................................. 6
4
Lay Out blok kebun tanaman jagung R&D Syngenta Kediri ..................... 7
5
Denah lokasi kebun jagung ......................................................................... 7
iii
DAFTAR LAMPIRAN
Nomor
Halaman
Teks
1
Dokumentasi Pengamatan lapang : a) penanaman benih jagung, b) update
benih, c) pengamatan lapang program DM screening ................................ 9
2
Dokumentasi Pengamatan laboratorium : a) persiapan sterilisasi, b)
persiapan agar YDC, c) persiapan cawan petri di LAFC, d) pembersihan
alat laboratorium ....................................................................................... 10
iv
LOG HARIAN JAM KERJA
Log harian jam kerja merupakan perhitungan lama kerja dalam kegiatan
magang kerja yang ditulis setiap hari dan dilaporkan setiap minggu. Log harian
jam kerja magang kerja pada minggu ke-1 (tabel 1) dapat diketahui bahwa
magang kerja dimulai pada hari senin sampai hari sabtu. Jam kerja pada setiap
harinya adalah 9 jam, kecuali untuk hari sabtu adalah 4 jam. Jadi, total jam kerja
pada minggu ke-1 adalah 49 jam.
Tabel 1. Log harian jam kerja magang kerja minggu ke-1
No
Hari
Tanggal
1.
Senin
18 Juli 2016
2.
Selasa
19 Juli 2016
3.
Rabu
20 Juli 2016
4.
Kamis
21 Juli 2016
5.
Jumat
22 Juli 2016
6.
Sabtu
23 Juli 2016
Total
Jam Kerja
9 jam
9 jam
9 jam
9 jam
9 jam
4 jam
49 jam
AKTIVITAS MAGANG KERJA
Aktivitas magang kerja merupakan kegiatan yang diikuti selama magang
kerja dan dicatat setiap hari serta dilaporkan setiap minggu. Aktivitas magang
kerja yang telah dilakukan pada minggu ke-1 (tabel 2) yakni orientasi lapang dan
perusahaan, penanaman benih jagung untuk program DM screening (Downy
mildew), pengamatan lapang untuk benih jagung DM screening yang berumur 40
hari, pengamatan laboratorium dengan mengambil sampel di lapang, pengecekan
terhadap benih jagung yang tahan terhadap serangan pathogen, dan pengecekan
benih jagung yang keluar untuk dikirimkan ke daerah tertentu yaitu program
update benih.
Tabel 2. Aktivitas magang kerja
No. Hari
Tanggal
Waktu
Kegiatan
Lokasi
1. Senin 18 Juli 2016 07.00-16.00 Orientasi
lapang, Kebun jagung
orientasi
perusahaan, Syngenta,
penanaman
jagung program
1
benih Kantor
DM Syngenta
R&D
dan
(Downy
mildew) depan
Kantor
screening, pengamatan Syngenta.
tanaman jagung yang
telah berumur 40 harian
program DM (Downy
mildew)
screening,
update benih dari cool
storage.
2.
Selasa
19 Juli 2016
07.00-16.00 Pengamatan
gejala Kebun
penyakit BSR (Bacteri Syngenta
jagung
dan
Stalk Rot) di lapang, Laboratorium
serta
pengambilan Syngenta.
sampel tanaman jagung
sesuai
dengan
gejala
yang ditimbulkan oleh
penyakit
BSR.
Pembuatan
larutan
Clorox 1%, sterilisasi
alat
laboratorium
Autoclave,
di
persiapan
media agar (YDC =
Yeast Dextrose CaCo3)
dan penanaman bakteri
pada cawan petri di
LAFC.
3.
Rabu
20 Juli 2016
07.00-16.00 Pembersihan
alat Depan
Kantor
laboratorium yang telah Syngenta
digunakan, penanaman tepatnya sebelah
benih jagung program halaman Kantor
DM screening dan BSR Syngenta
Panel
Line,
update Kebun
benih dari cool storage.
2
Syngenta,
dan
jagung
tempat
penyimpanan
benih.
4.
Kamis
21 Juli 2016
07.00-16.00 Pengamatan
tanaman Kebun
Jagung
jagung di lapang pada Syngenta.
program DM screening
sebanyak 8 petak.
5.
Jumat
22 Juli 2016
07.00-16.00 Pengamatan
tanaman Kebun
Jagung
jagung di lapang pada Syngenta
program DM screening Depan
sebanyak
3
dan
Kantor
petak, Syngenta.
pengecekan
benih
jagung
tahan
yang
terhadap
serangan
pathogen beserta benih
pembandingnya sebagai
tolak
ukur
(kontrol),
penilaian
khususnya
pada penyakit bulai.
6.
Sabtu
23 Juli 2016
07.00-11.00 Pengecekan
jagung
benih Depan
yang
terhadap
Kantor
tahan Syngenta.
serangan
pathogen beserta benih
pembandingnya sebagai
tolak
ukur
(kontrol),
penilaian
khususnya
pada penyakit bulai.
RENCANA KEGIATAN MINGGU DEPAN
Rencana kegiatan minggu depan (minggu selanjutnya) dirancang melalui
konsultasi dengan pembimbing lapang untuk mendapatkan garis besar kegiatan
magang kerja yang akan dilakukan pada minggu selanjutnya. Setelah minggu
3
pertama mengikuti serangkaian kegiatan magang kerja, selanjutnya rencana
kegiatan magang kerja yang akan dilakukan pada minggu ke-2 adalah penanaman
benih screening, pengamatan lapang, pengamatan laboratorium.
ANALISIS SALAH SATU KOMPONEN KEGIATAN
Orientasi Lapang
Orientasi lapang dilakukan untuk mengetahui secara langsung kondisi
Kebun Jagung di R&D Syngenta, selain itu dalam orientasi ini juga dilakukan
diskusi dan wawancara dengan pembimbing lapang dan asisten lapang untuk
mendapatkan informasi yang lebih lengkap. Adapun informasi yang didapat dari
orientasi lapang diantaranya adalah adanya lahan untuk percobaan benih jagung
dari serangan pathogen (screening) sebanyak 60%, pemuliaan benih (breeding)
sebanyak 40%, dan untuk produksi F1 sebanyak 40%. Kegiatan pengamatan di
lapang dibimbing oleh asisten lapang dengan menghitung total tanaman jagung
perbaris, beserta tanaman yang sehat (tumbuh hijau). Kegiatan pengamatan gejala
penyakit BSR (Bacteri Stalk Rot) dibimbing secara langsung oleh dosen
pembimbing lapang. Kegiatan penanaman benih jagung program DM (Downy
Mildew) Screening dan DM (Downy Mildew) Panel Line dapat diikuti secara
langsung bersama pekerja di lapang.
Penanaman benih jagung. Kegiatan ini dilakukan untuk program
screening, khususnya terhadap serangan pathogen yang menyebabkan timbulnya
penyakit bulai. Jarak tanamnya adalah 50x10 cm dengan jumlah lubang tanam 25
lubang perbaris, masing-masing 2 benih jagung dengan varietas yang berbeda
untuk masing-masing barisnya.
Gambar 1. Penanaman benih jagung
4
Pengamatan lapang. Kegiatan ini dibimbing secara langsung oleh asisten
lapang untuk mengamati gejala penyakit bulai serta menghitung total tanaman
yang hidup dan total tanaman yang tumbuh sehat (hijau). Hal ini dilakukan untuk
mengamati ketahanan tanaman terhadap penyakit bulai.
Gambar 2. Pengamatan lapang
Kultivar. Beberapa kultivar jagung yang digunakan oleh perusahaan
memiliki berbagai macam jenisnya. Standart pembanding adalah produk benih
(varietas) komersil dari pasaran dengan benih dari perusahaan sebagai tolak ukur,
salah satunya adalah anoman, p35, nk6326, nk99, lagaligo, nk6172, st5113, dan
Bisi 18. Kultivar yang digunakan memiliki program masing-masing yaitu untuk
percobaan benih jagung dari serangan pathogen (screening), pemuliaan benih
(breeding), dan untuk produksi F1.
Lahan di Kebun Utama dibagi menjadi blok-blok untuk mempermudah
pengaturan jadwal program screening, breeding maupun produksi F1. Blok-blok
tersebut adalah blok A yang terdiri dari A1, A2, blok B yang terdiri dari B1, B2,
blok C yang terdiri dari C1, C2, blok D yang terdiri dari D1, D2, blok E yang
terdiri dari E1, E2, blok F yang terdiri dari F1, F2, blok G yang terdiri dari G1,
G2, blok H yang terdiri dari H1, H2, blok I yang terdiri dari I1, I2, blok J yang
terdiri dari J1, J2, blok K yang terdiri dari K1, K2, blok L yang terdiri dari L1, L2,
blok M yang terdiri dari M1, M2, dan blok N yang terdiri dari N1, N2. Adapun
blok O, P, Q, R, S, T, U, dan V merupakan blok yang digunakan sebagai tempat
mengalirnya air untuk tanaman jagung (gambar 4). Masing-masing blok memiliki
program spesifik, menyesuaikan dengan 3 program yang ada. Sehingga total blok
kebun jagung adalah sebanyak 36 blok.
5
Orientasi Perusahaan
Orientasi perusahaan dilakukan untuk mendapatkan informasi tentang
profil dan struktur organisasi perusahaan, denah lokasi kebun, dan lay out jumlah
blok. Dari hasil orientasi perusahaan diperoleh informasi struktur organisasi R&D
Syngenta (gambar 3), Lay Out blok kebun jagung Syngenta, Kediri (gambar 4)
dan denah lokasi kebun jagung (gambar 5).
Gambar 3. Struktur organisasi R&D Syngenta
6
Gambar 4. Lay Out blok kebun tanaman jagung
LAND USAGE RECORD FARM KEDIRI
Block
Sub
Block
Panj leb
ang ar
Luas
2014
Populasi
Jan
A1
A2
B1
B2
C1
C2
D1
D2
E1
E2
F1
F2
G1
G2
H1
H2
I1
I2
J1
J2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
1
1
m
80
m
15
M2
1200
Feb
Mar
Apr
May
June
2015
July
August
Sept
Oct
Nov
Dec
Jan
Feb
Mar
70 x 20
8571
80
15
1200
8571
80
15
1200
8571
80
15
1200
8571
80
15
1200
8571
80
15
1200
8571
80
15
1200
8571
80
15
1200
8571
80
15
1200
8571
80
15
1200
8571
80
15
1200
8571
80
15
1200
8571
80
15
1200
8571
Spreader row
80
15
1200
8571
15
1200
8571
80
15
1200
8571
80
15
1200
8571
80
80
8
8
600
600
4286
4286
80
15
1200
8571
80
15
1200
8571
80
15
1200
8571
80
15
1200
8571
May
June
July
2016
August
Sept
Oct
Dm ( Monthly )
PPT - Seed Treat
Stage 6-DM
DM
Nov
Dec
Stage 3_DM
DM
1
1
Mar
Apr
May
DM
Screening
Stage 1
Stage 5_DM
F2-F3_DMR
MAXVEG -HOT PEPPER
Breeding
DM
Spreader row
CORN TRIAL F1
WO Trial Corn
Spreader row
Spreader row
DM
Spreader row
Breeding
Prodc. Stage 6
Dm Map
Spread
er row
DH-DMR_TH
DM Screening - Selfing
Spreader
row
Yield Trial Stage 2 Set 1
Spreader row
DM Screening
Dm Map
Apparna
Program_DM
Production Stage 2 & 3_ID
Prodc. Stage 1
DM ( Selfing )
DM SCREENING
Production Stage 3_ID
Prodc. Stage 1
DM Screening
DM
Screening
Stage 4 & 5
F3 DMR_TH
Seed Care
Seed Care
Seed Care
Seed Care
BREEDING
Breding
DM Screening - Selfing
DM
Prodc
Seed
Care
Production Stage 2_ID & DH
Produc. Stage 1
Production Stage 2 & 3_ID
Produc. Stage 4
DM ( Selfing )
Spreader row
Production Stage 3_DH
Prodc. Stage 1
DM ( Selfing )
Breeding
Yield Trial Stage 2 Set 2
Breeding
Parent Seed
Yield TrialStage 2 Set 3
Breeding
Breeding
Production Stage 5 & 6_TH
YT - Stage 2 TH Additional
DM_Map
Breeding Program
YT - Stage 1 DH Set 1 - 3
Produc. Stage 4_ID
Spreader row
2
K2
Feb
Spreader row
2
K1
Jan
Stage 2 _DM
Breeding
BREEDING
Spreader row
80
Apr
DM
DM ( Selfing )
Prodc. Stage 1
DM ( Selfing )
2
L1
1
Spreader row
Prodc. Stage 6
DM ( Selfing )
2
L2
1
80
15
1200
Spread
er row
8571
2
M1
1
80
15
1200
DM ( Selfing )
Prodc. Stage 4, 3
DM ( Selfing )
Prodc. Stage 5
8571
Apparna Spre Phatcharee
Program_D ader Program_D
M
row
M
2
M2
N1
N2
O
P
Q
R
S
T
U
V
W
X
Y
Z
1
2
1
2
1
2
80
15
1200
8571
80
15
1200
8571
Spread
er row
DM ( Selfing )
80
80
80
80
62
62
62
101
101
101
43
43
43
15
15
15
15
12
12
12
15
15
15
12
12
12
1200
1200
1200
1200
744
744
744
1515
1515
1515
516
516
516
#REF!
8571
8571
8571
8571
5314
5314
5314
10821
10821
10821
3686
3686
3686
#REF!
# REF!
# R EF !
10000
53,333
Breeding
Prodc. Stage 1
Spreader
row
Procd. Stage 1
Breeding
Prodc. Stage 1
Yield TrialStage 6
Produksi
DM Screening - Selfing
Yield Trial-Stage 1
Tomato Det Plc 4,5,6
Tomato F1 ( plc 4,5,6.1 )
Produc. Stage 2 & 3
Produc. Stage 6
Prodc. Stage 2
Prodc. Stage 4
Prodc. Stage 5
Breeding
F1 CORN TRIAL
BSR Screening
Spread
Stage 1_DM
er row
Stage 3_DM
Rice Trial & Prodc. Stage 1
Spreader row
Production Stage 4_TH & ID
Seed Care
Spread
Stage 1_DM
er row
MaxVeg
Yield Trial - Stage 2 Set 4
CP Trial ( Herbicide )
TOMAX
Gambar 5. Denah lokasi kebun jagung
7
June
July
August
Sept
Oct
Nov
Dec
PENILAIAN UMUM KEPUASAN
Penilaian umum kepuasan mahasiswa dalam menjalankan magang kerja
dilakukan untuk mengetahui sejauh mana tingkat kepuasan mahasiswa selama
mengikuti kegiatan magang kerja. Kegiatan ini dapat bermanfaat dengan
diketahuinya kendala atau hambatan yang dialami lalu kemudian diperbaiki agar
menjadi lebih baik. Penulis merasa kurang puas dengan kegiatan magang kerja
yang telah dilakukan pada minggu ke-1 karena kegiatan orientasi lapang dan
perusahaan untuk mendapat informasi masih kurang lengkap serta alat
laboratorium ada yang rusak. Hal ini dapat diperbaiki dengan melakukan diskusi
dan wawancara lagi pada minggu selanjutnya untuk melengkapi informasi tentang
jumlah tanaman jagung di setiap blok. Walaupun demikian, magang kerja pada
minggu pertama ini secara keseluruhan sudah cukup baik. Terutama, dalam
mendapatkan pengetahuan secara umum tentang budidaya dan pengendalian
penyakit tanaman jagung cukup mudah untuk diperoleh.
8
LAMPIRAN
1. Dokumentasi Pengamatan lapang
a) penanaman benih jagung
b) update benih
9
c) pengamatan lapang program DM screening
2. Dokumentasi Pengamatan laboratorium
(a)
(b)
(c)
10
(d)
Keterangan : a) persiapan sterilisasi, b) persiapan agar YDC, c) persiapan cawan
petri di LAFC, d) pembersihan alat laboratorium.
11