Pajak Dibayar Dimuka PT Wijaya Karya (Persero) Tbk - Investor Relations: Centre
PT WIJAYA KARYA PERSERO, Tbk. PT WIJAYA KARYA PERSERO, Tbk.
DAN ENTITAS ANAK AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
Untuk periode yang berakhir tanggal 30 Juni 2015 dan 31 Desember 2014 For the period ended June 30, 2015 and December 31, 2014
Disajikan dalam ribuan Rupiah, kecuali dinyatakan lain Expressed in thousand Rupiah, unless otherwise stated
Jumlah pindahan Brought forward
Pek. Steel Structure Semen Padang Indarung Pek. Steel Structure Semen Padang Indarung
Pemb. Ktr Dinas Teknis Keuangan Pemb. Ktr Dinas Teknis Keuangan
Pek Lanj Pile Slab Martadipura 700m Pek Lanj Pile Slab Martadipura 700m
Pek. Plaza Bintaro Pek. Plaza Bintaro
Pek. Sentraland Apartemen Semarang Pek. Sentraland Apartemen Semarang
Pekerjaan Jalan Yos Sudarso Kutai Pekerjaan Jalan Yos Sudarso Kutai
Pengerukan kolam dermaga Term Teluk Lamong Pengerukan kolam dermaga Term Teluk Lamong
Pekerjaan Akses Jalan Lingkar Mas Surabaya Pekerjaan Akses Jalan Lingkar Mas Surabaya
Hotel Aston Jakarta Hotel Aston Jakarta
Pek. Hotel Harper Pek. Hotel Harper
Pemb. Dermaga Maratua MYC Pemb. Dermaga Maratua MYC
Improvement Of Drainage System of Bendung Ri Improvement Of Drainage System of Bendung River
Pek. Jembatan Baja Malinau Prambanan Pek. Jembatan Baja Malinau Prambanan
Apartemen Puncak Bukit Golf Apartemen Puncak Bukit Golf
Proyek Multipurpose Jetty Proyek Multipurpose Jetty
Pembangunan Jembatan Madusari Pembangunan Jembatan Madusari
Pemb Aprtmen Lagoon Manado Pemb Aprtmen Lagoon Manado
Civil Works of Lempuing Sec. Canal Sect 1 Civil Works of Lempuing Sec. Canal Sect 1
Pek.P-14B Rehabilitasi Saluran Induk Sawitto Pek.P-14B Rehabilitasi Saluran Induk Sawitto
PLTU Cilacap PLTU Cilacap
Apartemen Dago Suite Apartemen Dago Suite
Pek. Peaking House Indocement Pek. Peaking House Indocement
Pek. STT Telkom Pek. STT Telkom
Lainnya dibawah 3.000.000
Other under Rp 3.000.000
Jumlah Total
PINJAMAN JANGKA MENENGAH MEDIUM TERM LOAN
Jun Jun
Des Dec
Medium Term Notes
Sub Total
Current of Medium Term Notes More than 1 year Medium Term Notes
5,511,091 1,879,764
11,991,709 2,662,106
18,155,158
1,341,000,000 2,928,200
3,025,000
50,915,655 13,950,048
1,341,000,000 -
-
2014 2015
32. 32.
Akun pinjaman jangka menengah berupa penerbitan surat berharga sebagai berikut :
Account the medium-term loans in the form of the issuance of securities as follows:
Surat Hutang Jangka Menengah 1,391,000,000
591,000,000
Sub Jumlah
1,344,675,407
- 1,879,764
2,811,529 1,718,423
5,972,727
Consequences if the
construction activites fail to
be completed inpunctual time, the consequent shall be penalty
for the the delay it shall be generaly 0.1 of initial contracted value per delay day until maximum of 5 of intial contracted
value. 2,658,872
Dec
3,224,266 3,075,083
1,525,873 1,469,098
1,433,321 Des
2,179,410 8,046,728
2,573,489
1,429,561,364 1,049,416,204
5,001,442 941,078
662,898 43,754
6,283,619 1,700,308
484,776
1,391,000,000 Pinjaman Jangka Menengah Jatuh Tempo
1,240,000 3,000,000
1,142,841 985,456
4,361,472 7,259,829
5,520,797 3,292,209
- 3,228,611
- Jun
3,092,721
Konsekuensi apabila pekerjaan konstruksi tidak dapat diselesaikan tepat waktu adalah denda keterlambatan yang
umumnya sebesar 0,1 dari nilai awal kontrak perhari keterlambatan sampai maximal 5 dari nilai kontrak awal.
2,541,097 2,279,403
1,391,000,000 1,341,000,000
541,000,000 Pinjaman Jangka Menengah 1 tahun
800,000,000 800,000,000
2014 Jun
2015 927,178,686
3,276,165 1,197,689
101