Analisis Mitigasi Risiko pada Supply Chain Pembuatan Sterilizier

IV-59

DAFTAR PUSTAKA

Bames, Ralph M. 1980. Motion and Time Study and Work Measurement. New
York: John Wiley & Sons Inc.
Ginting, Rosnani. 2008. Sistem Produksi. Graha Ilmu, Yogyakarta.
Hakim N, Arman. 1999. Perencanaan dan Pengendalian Produksi. Guna Widya,
Surabaya.
Modrak, Vladimir, dkk. 2010. Flow Shop Scheduling Algorithm to Minimize
Completion Time for n-Jobs m-Machine Problem. Technical University of
Košice. Slovakia.
Pinedo, Michael L. 2011. Scheduling, Theory, Algorithms, and System. Edisi
keempat. New York, USA.
Sinulingga, Sukaria. 2011. Metodologi Penelitian. USU Press, Medan.
Sutalaksana, Iftikar Z. 1979. Teknik Tata Cara Kerja. Bandung: Jurusan Teknik
Industri Institut Teknologi Bandung.
Werner, Frank. 2011. Genetic Algorithms for Shop Scheduling Problems:
A Survey. Otto-von-Guericke-Universität. Germany.

Universitas Sumatera Utara