Obtain the Budget Code for the Purchase

8.4 Obtain the Budget Code for the Purchase

Check with your budget manager to: • Identify the proper budget account code to which your purchase will be

charged. • Verify that the budget account has adequate funding to cover the total

expense of the purchase (including taxes, shipping, etc.).

Page 4 of 7

PERALTA CCD

SOP09 PURCHASING DEPARTMENT

Document #:

01/04/11 STANDARD OPERATING PROCEDURE

Revised Date:

Supersedes Revised Date: 01/12/10

9. STEP 3: ENTRY IN PROMT For step-by-step procedures on how to generate a requisition in the PROMT system, refer to the

Business Process Document — Creating Requisitions in the PROMT System, listed in the REFERENCES section (available from Purchasing).

Create a requisition in PROMT by entering the following information:

• Vendor—Select the correct vendor in PROMT by confirming that the company location

listed the quote matches the company information in PROMT. • Select Buyer—Select the correct Buyer for your purchase. The current Buyer listing is

available on the Purchasing’s Website, under “Contact Information”, or you can contact the Purchasing Department (or your Business Office), to ask who the current Buyer is for your College and/or the District Administrative Center.

NOTE: If the purchase is for Measure A items, make sure you select the current Measure

A Buyer for that purchase. • Item(s)—Be specific and enter each item as a separate line item in PROMT. When POs

are issued, both Purchasing and the vendor see only the description entered in PROMT, so be sure to provide the exact specifications of what you want, such as the manufacturer make and model number, size, quantity, and any additional equipment or accessories that you require. Also include the end-user's name in the description field for the product you are requesting to buy. This will allow your college's Storekeeper to know where to deliver the product. For example "End-user: Ms. Jane Smith".

• Pricing including all taxes, shipping, etc.

Taxes—Make sure you code each line item (of your requisition), as either taxable or non- taxable. You can not enter taxable and non-taxable items on the same line item in PROMT.

Shipping—If the vendor charges for shipping, then ask the vendor if the shipping charge is taxable and enter shipping as a separate line item in the PROMT. Make sure to code shipping as either taxable or non-taxable (per the vendor’s instruction).

Note: If shipping is free, indicate this in the description field for the product you are requesting to buy, by indicating "free shipping". Do not generate a separate line item for free shipping as this causes problems in PROMT.

• Delivery—Ship To Location All items should be shipped to the District Warehouse unless special circumstances exist and arrangements have been made with the vendor and the District Buyer. Only hazardous materials (which the District cannot legally transport), live specimens, and extremely heavy items (requiring a large forklift to move) are allowed to be shipped directly to the colleges, with prior coordination with the Buyer and Warehouse Supervisor. If the item is going to be shipped directly to the campus, the Buyer must be notified and once the items have been received by the campus, the Requestor is to notify

Page 5 of 7

PERALTA CCD

SOP09 PURCHASING DEPARTMENT

Document #:

01/04/11 STANDARD OPERATING PROCEDURE

Revised Date:

Supersedes Revised Date: 01/12/10

the Warehouse Supervisor, so that the Warehouse can mark the items as received in the PROMT system.

• Budget Account Code –Enter the correct budget account code for each line item in PROMT.

Dokumen yang terkait

AN ALIS IS YU RID IS PUT USAN BE B AS DAL AM P E RKAR A TIND AK P IDA NA P E NY E RTA AN M E L AK U K A N P R AK T IK K E DO K T E RA N YA NG M E N G A K IB ATK AN M ATINYA P AS IE N ( PUT USA N N O MOR: 9 0/PID.B /2011/ PN.MD O)

0 82 16

Anal isi s L e ve l Pe r tanyaan p ad a S oal Ce r ita d alam B u k u T e k s M at e m at ik a Pe n u n jang S MK Pr ogr a m Keahl ian T e k n ologi , Kese h at an , d an Pe r tani an Kelas X T e r b itan E r lan gga B e r d asarkan T ak s on om i S OL O

2 99 16

UPAYA PENINGKATAN “ORIENTASI REALITA”PENGENALAN ORANG PADA NY. S DENGAN GANGGUAN PROSES PIKIR : WAHAM MELALUI INTERVENSI TERAPI AKTIVITAS INDIVIDU DI RUANG MELATI RSJ.DR. RADJIMAN WEDIODININGRAT LAWANG. TAHUN 2012

1 50 16

FRAKSIONASI DAN KETERSEDIAAN P PADA TANAH LATOSOL YANG DITANAMI JAGUNG AKIBAT INOKULASI JAMUR MIKORIZA ARBUSKULAR DAN BAKTERI PELARUT FOSFAT (Pseudomonas spp.)

2 31 9

HUBUN GAN AN TAR A KUA LITAS P ELAYA NA N DA N P ROMOTION MIX (BERD ASARKAN P ERSE P S I P ASIEN) DE NGAN P ROSES P ENGAM BILAN KEP UT USAN P ASIEN DA LAM P EM AN F AA TAN P ELAY AN AN RA WAT INAP DI RSD KAL IS AT

0 36 20

Hubungan Kuantitatif Struktur Aktifitas Senyawa Nitrasi Etil P -Metoksisinamat Terhadap Aktivitas Anti Tuberkulosis Melalui Pendekatan Hansch Secara Komputasi

1 34 82

Senang Belajar Ilmu Pengetahuan Alam Kelas 1 S Rositawaty Aris Muharam 2008

0 27 147

Matematika Kelas 6 Lusia Tri Astuti P Sunardi 2009

13 252 156

EFFECT OF THE USE OF STUDENT PERCEPTION COOPERATIVE LEARNING MODEL N UMBER HEAD TOGETHER LEARNING AND MOTIVATION OF CREATIVITY IN LEARNING SOCIAL STUDIES IN SMP NEGERI TUMIJAJAR TULANG BAWANG BARAT ACADEMIC YEAR 2012/2013 P ENGARUH PERSEPSI SISWA TENTANG

2 24 135

S 1 Teknik Kimia

0 11 2