Selanjutnya
SPEClFJC AGREEMENT
BETWEEN
D
TilE GOVERNMENT OF THE REPUBLIC OF INDONESIA
AND
THE GOVERNMENT OF THE KINGDOM OF BELGIUM
CONCERNING
THE PROJECT LTA-30/1 "BEDUGUL HIGH PLAINS IRRIGATION" BEING
A SUBPROJECT OF LTA- 30 "BALI REGIONAL DEVELOPMENT
PLANNING PROJECT" - PHASE II
SPECIFIC AGREEMENT
BETWEEN
THE GOVERNMENT OF THE REPUBLIC OF INDONESIA
AND
THE GOVERNMENT OF THE KINGDOM OF BELGIUM
CONCERNING
THE PROJECT LTA-30/1 "BEDUGUL HIGH PLAINS IRRIGATION" BEING
A SUBPROJECT OF LTA- 30 "BALI REGIONAL DEVELOPMENT
PLANNING PROJECT" - PHASE U
The Government of the Kingdom of Bei{,rium and t he Government of the Republic of Indo11
nesia,
Within the framework of U1e Genera] Agreement on Technical Co-operation of June 16,
1969,
Desiring to contribute jointly in the development of the High Plains of Bedugul in the Province of Bali as a vegetable growing region.
Willing to co-operate for that purpose in the irnplcwcnlalion of the project descrilicd here·
after,
Have agreed as follows :
ARTICLE 1
Objectives or the project
1.
Primary objective
The Project aints at the detailed design of an irrigation scheme, which should cover
an aJ'ea of 285 HA in the vicinity of the Lakes BRATAN and BUY AN by making use
of their water.
2.
Additional objectives
The Project should at the same time :
assess the impact of the scheme on the BUY AN and BRATAN lakes
define the appropriate kind of horticulture
provide detailed 11pecifications of the scheme and ita equipment and prep31·e
U1c
tender documents
prepare a manual for operation and maintenance of the scheme
take care of a transfer of knowledge and technical know-how to the Indonesian
co1mterparts.
3.
The Project is further described and detailed in the Terms of Reference attached to
this Specific Agreement and being an integral part of it.
ARTICLE ll
Executing Agency
l.
The Government of the Republic of Indonesia designates the Directorate of Irrigation I,
hereinafter referred to as "DI - I" of the Directorate General of Water Resources Development, the Ministry of Public Works, as i_ts Executing Agency イセウーッョゥィャ・@
for the
implementation of its contribution and operational matters of the proJect.
2.
The Government of the Kingdom of Belgiwn designates the Belgian Administration
for Development Co-operation (hereinafter referred to as "BADC") as its executing
agency,BADC is represented in Indonesia by the Development Co-operation Section of
the Belgian Embassy in jakarta. The BADC will entrust the implementation of its
contribution to experienced consultant(s).
II
ARTICLE Ill
Contribution of the Government of the Republic of Indonesia
l.
2.
In accordance with the prevailing laws and regulations, the Coverrunenl of Indonesia
shall contribute the following :
a.
Provide U1c Belgian experts with the exemptions and privilegPs mentioned in
article 7 of the General Agreement on Technical Co-operation of June 16, 1969.
b.
Grant exoneration from all duties, other levies and taxes on the technical apparatus
and equipment brought into Indonesia by the consultant and which is required to
implement the project.
c.
Give U1e required approval of the Belgian eA'J)Crts by a written notice and for the
duration of the project.
Furthermore, through the Directorate General of Water Resources Development and
the Provincial Office of Public Works in the Province of Bali, the Government of U1e
Republic of Indonesia shall :
a.
appoint a responsible project engineer who will act as an interface between the
consultant and all Indonesian services and organizations.
b.
provide accommodation for the long term and short term experts.
c.
make available furnished and equipped offices and domestic telecommunication
facilities as required for the implementation of ilie project and in accordance
with Indonesian standards.
d.
provide secretarial services as available at the pwject office.
=
e.
provide all available reports, maps, documents and technical data and other information required fo•· the propet· implementation of the project. Whenever possible,
this information will be given to the Consultant in the English language. In case
documents have to be studied which are not available in English, they will be
translated accordingly.
f.
give the consultants every reasonable assistance to enable them to perform their
study.
The implemenlalion tmd disbursement of the contribution of the Republic of Indonesia
will be limited by and subject to its normal budget appropriation.
ARTICLE IV
Contribution of the Government of the Kingdom of Belgium
In accordance with the prevailing laws and regulations and subject to the final approval of
the proposed budget by the Belgian budgetary authorities, the Government of Belgium
shall contribute the following :
l.
Carry out the detailed study and the preparations for the implementation of the project
as specified in the TOR and take all required administrative and budgetary measures to
tlris end.
2.
Provide the services of a Belgian consultant including the wages of the experts, their
international travel to and from Denpasar, their international communication expenses
and miscellaneous expenses not covered b) the Indonesian contribution.
3.
Submit tJ1e nominations of the consultant's experts for approval to the Indonesian
Government.
4.
Provide the cost of additional surveys and investigations as demanded by the Belgian
Consultllnt to carry out their study.
5.
Provide the operating costs of the two vehicles which were provided under Phase I and
were trarlSferred to the Indonesian Authorities for safekeeping till Phase II.
6.
Provide the cost of the printing of the final report. This report should be presented to
the Indonesian Government within a period of three montllS after the approval of the
draft final report.
セ・@
ゥュセャ・ョエN。ッ@
and N、ゥウ「オイセ・ュョエ@
of the contribution of the Government. of Belgium
will be lim1ted by and subject to 1ts normal budget appropl'iation.
-
ARTICLE V
Plan of Operation
For the implementation of the project, Belgium and Indonesia shall develop a plan of operation which will constitute an operational document between BADC and Dl-1 and being an
integral of this Specific Agreement. The plan of ッセイ。エゥョ⦅@
Gセ@
he completed 。ョセ@
signed
BADC and DI-1 within 90 days from the date of this Spec1f1e Agreement, and will contam,
inter alia, the following :
?Y
a.
Detailed description of t he project.
h.
An outline of the methods and means to be used to carry out the project, including
organizational structure with operational relationship.
c.
A schedule for the implementation of the project activities, including a milestone
chart.
d.
The reporting requirements for the project.
e.
The nature, timing and responsibilities for project monitoring and evaluation and the
means l>y which they shall be made.
f.
A statement of eventual additional obligations, duties and responsibilities of Belgium
and Indonesia.
ARTICLE VI
Commu n ications
Any communication or document given, made or sent by either Government or their
designated agent pursuant to this Agreement or annexes hereto shall be in writing and shall
be deemed to have been duly given made or sent to tlte party to which it is addressed at
the time of its delivery by hand, mail, telex, cable or radiogram at its respective address,
namely:
For Indonesia
Mailing address :
The Directorate of Irrigation I
Directorate General of Water Resomces Development
Ministry of Public Works
]alan Pattimura no. 20- Kebayoran
12260 JAKARTA
INDONESIA. Telex no. 47430 DIRGASI IA.
For Belgium
Mailing address :
Head of Development Co-operation Section
Embassy of Belgium
4, Jalan Cicurug
10310 JAKARTA
INDONESIA. Telex no. 44413 BELGJ JKT. Cable address: AJ\1BABEL
JAKARTA.
ARTICLE Vll
Control and Evaluation
l.
Bolla Goverrunents may review the aims, objectives and implrmenlation of the Project
and if necessary discuss the main problems occuring during the implementation of the
project by covening a Joint Commission for this purpose.
2.
The Government of Indonesia reserves the right to request the Belgian Government to
recall any of the consultant's personal in Indonesia whose services and/or activities
are found tmSatisfactory or for reasons of misconduct, misbehaviour or illness.
3.
At any time, both Governments may supervise and/or contaol on the spot the state of
progress of the project.
4.
Where necessary and after consultation, both Govenunents may evaluate the project
or part of its implementation aspects.
ARTICLE Vm
Settlement of Dispute
Any dispute arising out of the interpretation or impleu1cntation of this Specific Agreement
shall be settled amicably by consultation or negotiation between the two Governments.
ARTICLE IX
Entry into force and validity
This Specific Agreement and the attached Terms of Reference shall enter into force on
the date ..>f signing and remain in force until the completion of the project.
Amendments to the Specific Agreement, not resulting in any increased cost to any of the
contracting parties, may be made at any time with the mutual consent of the two Governments by exchange of letters.
·-
IN WITNESS WHEREOF, the Undcrs.4,rned have signed tltis Specific Agreement.
SIGNED in JAKARTA, on JULY 30lh, 1986 in duplicate in Lhe Englisl1language.
FOR THE GOVERNMENT OF
THE REPUBUC Of INDONESIA,
FOR THE GOVERNMENT OF
THE KINGDOM OF BELGIUM,
Signed
Signed
Dr. lr. SUYONO SOSRODARSONO
j. HELLEMANS
Minister of Public Works.
Ambassador
TERM OF REFERENCE
BEDUGUL HIGH PLAIN IRRIGATION
•=============================
I.
Background Information
1.1.
Introduction
The Project location is in Buleleng Regency, Province of Bali,
Irrigate a 285 Ha high pla1n area in the vicinity of
Br·atan and
Buyan lakes by using the water from the two lakes .
The benefitted areas extends by the right and left sides of
the
main road of Denpasar- Singaraja.
The study phases consists of
a. Environmental
impact analysis
b. Detail Design
c. Operation and maintenance.
1. 2.
Justification of the project
-
There in limited high plain area in Bali for vegetable cultivation duo to the mountainous and hilly physical features of
the area .
But the water availability is also limited
although the temperature is good fur vegetable.
-
By the Tourism indus try impact it is expected that the vege table demand could be supplied by the local production
even
more to export out of Ba 1i .
-
On the hi gh plain of.Bedugul, exteds between Batan and
Buyan
lakes, the is a good area of 285 ha for vegetable cultivation
but at present has not enough water supply for it.
The area
セ Q ゥ ャ ャ@
be developed by supplying irrigation water from
Bratan and Buyan lakes .
The purposes of the study among
others
a.
Notice the impact of v1ater irnplementation on Buyan and
Bra tan 1ake.
b.
To get a clear idea on what kind of horticulture could be
cultivated according to the soil structure and marketing
、セーエZ\N@
c. . • . . . . . . . . . . . . . . . . . /2.
- 2 -
c.
d.
1.3.
Detail des i gn for horticultural irrigation development .
Provide manual for operation and maintenance and cost
estimate .
Present Situation
Vegetables cou l d be grown mostly during rainy season because in
dry season it can be grown only near the lakes by direct watering
by pails water.
1.4.
Previous Study
ITEM
NO
1.
2.
3.
Feasibi 1i ty study
Bedugul high Plains
Irrigation, 1981
Project Prooosal
Bedugul I rri gati on
Survey and Design
EXCECUTANT I CONSULTANT
ELC - ADC
Ba 1i Irrigation Project
LTA - 30
Ba 1i Irrigation Project
1.5. Government Follow Up
Governor of Bali through the local Bureau of Development Planning
with the letter No. 195/30/Bappeda dated January 21, 1985 saying
among others
a.
b.
II .
An irrigation system.shou l d be made on the use of lake water.
The use of lake water for irrigation would not bring in negative impact to the environment.
Term of Reference
2.1.
Objective of the consulting services .
1.
2.
To carry out enviromyental study on the impact of water use
for vegetab l e irrigation on Bedugul High Plain .
To make detail design of irrigation system for the vegetable.
3.
Prepare 0 & M procedure of the system
2. 2.
-···-· ··········- ! 3.
- 3 -
2.2.
Schedule of Consulting Services
2.3.
Scope of the Consulting Services
It will be noted that the services wi ll be rendered into four
Parts simultaneously.
Part I
Envi ronmenta 1 Impact study
a.
Prepare a comprehensive i nvi ronmcnta 1 for the
project area.
b.
Recommend packages of form chemica l, preferably
biodegradable, wi ch wi 11 mini mi ri 1 domage to
humans, animals and fish in the P1·oject area.
c.
Part t I
Tourism aspect Surroundings the lake.
Detailed Design
a.
Prepare detail designs and construction dravti ngs
for pump , irrigation and related structures,
including roads of new scheme
For carrying out Part II a.
(1) Review and confirm
Lilt:
dVailability of 1·1ater
in the 1akes (Brat an and Buy an) based on the
realistically estimated irrigation water
requirement, considering soil conditions and
proposed cultivation together with datailed
calculation of water sources
VS. Crop and
other purpose of water requirement.
b.
Prepare ーイッ」セ、オ・@
for operation and maintenance .
( 2) Prepare the construction methods , equi pn-ent
list according to the construction program
(3) Prepare detailed specifications and tender
documents .
Note
Ba 1i I rri gati on Project have coordinated 11i th
Sub. Directorate of Technical Planning Directorate of
Irriqation I Bandung •
BETWEEN
D
TilE GOVERNMENT OF THE REPUBLIC OF INDONESIA
AND
THE GOVERNMENT OF THE KINGDOM OF BELGIUM
CONCERNING
THE PROJECT LTA-30/1 "BEDUGUL HIGH PLAINS IRRIGATION" BEING
A SUBPROJECT OF LTA- 30 "BALI REGIONAL DEVELOPMENT
PLANNING PROJECT" - PHASE II
SPECIFIC AGREEMENT
BETWEEN
THE GOVERNMENT OF THE REPUBLIC OF INDONESIA
AND
THE GOVERNMENT OF THE KINGDOM OF BELGIUM
CONCERNING
THE PROJECT LTA-30/1 "BEDUGUL HIGH PLAINS IRRIGATION" BEING
A SUBPROJECT OF LTA- 30 "BALI REGIONAL DEVELOPMENT
PLANNING PROJECT" - PHASE U
The Government of the Kingdom of Bei{,rium and t he Government of the Republic of Indo11
nesia,
Within the framework of U1e Genera] Agreement on Technical Co-operation of June 16,
1969,
Desiring to contribute jointly in the development of the High Plains of Bedugul in the Province of Bali as a vegetable growing region.
Willing to co-operate for that purpose in the irnplcwcnlalion of the project descrilicd here·
after,
Have agreed as follows :
ARTICLE 1
Objectives or the project
1.
Primary objective
The Project aints at the detailed design of an irrigation scheme, which should cover
an aJ'ea of 285 HA in the vicinity of the Lakes BRATAN and BUY AN by making use
of their water.
2.
Additional objectives
The Project should at the same time :
assess the impact of the scheme on the BUY AN and BRATAN lakes
define the appropriate kind of horticulture
provide detailed 11pecifications of the scheme and ita equipment and prep31·e
U1c
tender documents
prepare a manual for operation and maintenance of the scheme
take care of a transfer of knowledge and technical know-how to the Indonesian
co1mterparts.
3.
The Project is further described and detailed in the Terms of Reference attached to
this Specific Agreement and being an integral part of it.
ARTICLE ll
Executing Agency
l.
The Government of the Republic of Indonesia designates the Directorate of Irrigation I,
hereinafter referred to as "DI - I" of the Directorate General of Water Resources Development, the Ministry of Public Works, as i_ts Executing Agency イセウーッョゥィャ・@
for the
implementation of its contribution and operational matters of the proJect.
2.
The Government of the Kingdom of Belgiwn designates the Belgian Administration
for Development Co-operation (hereinafter referred to as "BADC") as its executing
agency,BADC is represented in Indonesia by the Development Co-operation Section of
the Belgian Embassy in jakarta. The BADC will entrust the implementation of its
contribution to experienced consultant(s).
II
ARTICLE Ill
Contribution of the Government of the Republic of Indonesia
l.
2.
In accordance with the prevailing laws and regulations, the Coverrunenl of Indonesia
shall contribute the following :
a.
Provide U1c Belgian experts with the exemptions and privilegPs mentioned in
article 7 of the General Agreement on Technical Co-operation of June 16, 1969.
b.
Grant exoneration from all duties, other levies and taxes on the technical apparatus
and equipment brought into Indonesia by the consultant and which is required to
implement the project.
c.
Give U1e required approval of the Belgian eA'J)Crts by a written notice and for the
duration of the project.
Furthermore, through the Directorate General of Water Resources Development and
the Provincial Office of Public Works in the Province of Bali, the Government of U1e
Republic of Indonesia shall :
a.
appoint a responsible project engineer who will act as an interface between the
consultant and all Indonesian services and organizations.
b.
provide accommodation for the long term and short term experts.
c.
make available furnished and equipped offices and domestic telecommunication
facilities as required for the implementation of ilie project and in accordance
with Indonesian standards.
d.
provide secretarial services as available at the pwject office.
=
e.
provide all available reports, maps, documents and technical data and other information required fo•· the propet· implementation of the project. Whenever possible,
this information will be given to the Consultant in the English language. In case
documents have to be studied which are not available in English, they will be
translated accordingly.
f.
give the consultants every reasonable assistance to enable them to perform their
study.
The implemenlalion tmd disbursement of the contribution of the Republic of Indonesia
will be limited by and subject to its normal budget appropriation.
ARTICLE IV
Contribution of the Government of the Kingdom of Belgium
In accordance with the prevailing laws and regulations and subject to the final approval of
the proposed budget by the Belgian budgetary authorities, the Government of Belgium
shall contribute the following :
l.
Carry out the detailed study and the preparations for the implementation of the project
as specified in the TOR and take all required administrative and budgetary measures to
tlris end.
2.
Provide the services of a Belgian consultant including the wages of the experts, their
international travel to and from Denpasar, their international communication expenses
and miscellaneous expenses not covered b) the Indonesian contribution.
3.
Submit tJ1e nominations of the consultant's experts for approval to the Indonesian
Government.
4.
Provide the cost of additional surveys and investigations as demanded by the Belgian
Consultllnt to carry out their study.
5.
Provide the operating costs of the two vehicles which were provided under Phase I and
were trarlSferred to the Indonesian Authorities for safekeeping till Phase II.
6.
Provide the cost of the printing of the final report. This report should be presented to
the Indonesian Government within a period of three montllS after the approval of the
draft final report.
セ・@
ゥュセャ・ョエN。ッ@
and N、ゥウ「オイセ・ュョエ@
of the contribution of the Government. of Belgium
will be lim1ted by and subject to 1ts normal budget appropl'iation.
-
ARTICLE V
Plan of Operation
For the implementation of the project, Belgium and Indonesia shall develop a plan of operation which will constitute an operational document between BADC and Dl-1 and being an
integral of this Specific Agreement. The plan of ッセイ。エゥョ⦅@
Gセ@
he completed 。ョセ@
signed
BADC and DI-1 within 90 days from the date of this Spec1f1e Agreement, and will contam,
inter alia, the following :
?Y
a.
Detailed description of t he project.
h.
An outline of the methods and means to be used to carry out the project, including
organizational structure with operational relationship.
c.
A schedule for the implementation of the project activities, including a milestone
chart.
d.
The reporting requirements for the project.
e.
The nature, timing and responsibilities for project monitoring and evaluation and the
means l>y which they shall be made.
f.
A statement of eventual additional obligations, duties and responsibilities of Belgium
and Indonesia.
ARTICLE VI
Commu n ications
Any communication or document given, made or sent by either Government or their
designated agent pursuant to this Agreement or annexes hereto shall be in writing and shall
be deemed to have been duly given made or sent to tlte party to which it is addressed at
the time of its delivery by hand, mail, telex, cable or radiogram at its respective address,
namely:
For Indonesia
Mailing address :
The Directorate of Irrigation I
Directorate General of Water Resomces Development
Ministry of Public Works
]alan Pattimura no. 20- Kebayoran
12260 JAKARTA
INDONESIA. Telex no. 47430 DIRGASI IA.
For Belgium
Mailing address :
Head of Development Co-operation Section
Embassy of Belgium
4, Jalan Cicurug
10310 JAKARTA
INDONESIA. Telex no. 44413 BELGJ JKT. Cable address: AJ\1BABEL
JAKARTA.
ARTICLE Vll
Control and Evaluation
l.
Bolla Goverrunents may review the aims, objectives and implrmenlation of the Project
and if necessary discuss the main problems occuring during the implementation of the
project by covening a Joint Commission for this purpose.
2.
The Government of Indonesia reserves the right to request the Belgian Government to
recall any of the consultant's personal in Indonesia whose services and/or activities
are found tmSatisfactory or for reasons of misconduct, misbehaviour or illness.
3.
At any time, both Governments may supervise and/or contaol on the spot the state of
progress of the project.
4.
Where necessary and after consultation, both Govenunents may evaluate the project
or part of its implementation aspects.
ARTICLE Vm
Settlement of Dispute
Any dispute arising out of the interpretation or impleu1cntation of this Specific Agreement
shall be settled amicably by consultation or negotiation between the two Governments.
ARTICLE IX
Entry into force and validity
This Specific Agreement and the attached Terms of Reference shall enter into force on
the date ..>f signing and remain in force until the completion of the project.
Amendments to the Specific Agreement, not resulting in any increased cost to any of the
contracting parties, may be made at any time with the mutual consent of the two Governments by exchange of letters.
·-
IN WITNESS WHEREOF, the Undcrs.4,rned have signed tltis Specific Agreement.
SIGNED in JAKARTA, on JULY 30lh, 1986 in duplicate in Lhe Englisl1language.
FOR THE GOVERNMENT OF
THE REPUBUC Of INDONESIA,
FOR THE GOVERNMENT OF
THE KINGDOM OF BELGIUM,
Signed
Signed
Dr. lr. SUYONO SOSRODARSONO
j. HELLEMANS
Minister of Public Works.
Ambassador
TERM OF REFERENCE
BEDUGUL HIGH PLAIN IRRIGATION
•=============================
I.
Background Information
1.1.
Introduction
The Project location is in Buleleng Regency, Province of Bali,
Irrigate a 285 Ha high pla1n area in the vicinity of
Br·atan and
Buyan lakes by using the water from the two lakes .
The benefitted areas extends by the right and left sides of
the
main road of Denpasar- Singaraja.
The study phases consists of
a. Environmental
impact analysis
b. Detail Design
c. Operation and maintenance.
1. 2.
Justification of the project
-
There in limited high plain area in Bali for vegetable cultivation duo to the mountainous and hilly physical features of
the area .
But the water availability is also limited
although the temperature is good fur vegetable.
-
By the Tourism indus try impact it is expected that the vege table demand could be supplied by the local production
even
more to export out of Ba 1i .
-
On the hi gh plain of.Bedugul, exteds between Batan and
Buyan
lakes, the is a good area of 285 ha for vegetable cultivation
but at present has not enough water supply for it.
The area
セ Q ゥ ャ ャ@
be developed by supplying irrigation water from
Bratan and Buyan lakes .
The purposes of the study among
others
a.
Notice the impact of v1ater irnplementation on Buyan and
Bra tan 1ake.
b.
To get a clear idea on what kind of horticulture could be
cultivated according to the soil structure and marketing
、セーエZ\N@
c. . • . . . . . . . . . . . . . . . . . /2.
- 2 -
c.
d.
1.3.
Detail des i gn for horticultural irrigation development .
Provide manual for operation and maintenance and cost
estimate .
Present Situation
Vegetables cou l d be grown mostly during rainy season because in
dry season it can be grown only near the lakes by direct watering
by pails water.
1.4.
Previous Study
ITEM
NO
1.
2.
3.
Feasibi 1i ty study
Bedugul high Plains
Irrigation, 1981
Project Prooosal
Bedugul I rri gati on
Survey and Design
EXCECUTANT I CONSULTANT
ELC - ADC
Ba 1i Irrigation Project
LTA - 30
Ba 1i Irrigation Project
1.5. Government Follow Up
Governor of Bali through the local Bureau of Development Planning
with the letter No. 195/30/Bappeda dated January 21, 1985 saying
among others
a.
b.
II .
An irrigation system.shou l d be made on the use of lake water.
The use of lake water for irrigation would not bring in negative impact to the environment.
Term of Reference
2.1.
Objective of the consulting services .
1.
2.
To carry out enviromyental study on the impact of water use
for vegetab l e irrigation on Bedugul High Plain .
To make detail design of irrigation system for the vegetable.
3.
Prepare 0 & M procedure of the system
2. 2.
-···-· ··········- ! 3.
- 3 -
2.2.
Schedule of Consulting Services
2.3.
Scope of the Consulting Services
It will be noted that the services wi ll be rendered into four
Parts simultaneously.
Part I
Envi ronmenta 1 Impact study
a.
Prepare a comprehensive i nvi ronmcnta 1 for the
project area.
b.
Recommend packages of form chemica l, preferably
biodegradable, wi ch wi 11 mini mi ri 1 domage to
humans, animals and fish in the P1·oject area.
c.
Part t I
Tourism aspect Surroundings the lake.
Detailed Design
a.
Prepare detail designs and construction dravti ngs
for pump , irrigation and related structures,
including roads of new scheme
For carrying out Part II a.
(1) Review and confirm
Lilt:
dVailability of 1·1ater
in the 1akes (Brat an and Buy an) based on the
realistically estimated irrigation water
requirement, considering soil conditions and
proposed cultivation together with datailed
calculation of water sources
VS. Crop and
other purpose of water requirement.
b.
Prepare ーイッ」セ、オ・@
for operation and maintenance .
( 2) Prepare the construction methods , equi pn-ent
list according to the construction program
(3) Prepare detailed specifications and tender
documents .
Note
Ba 1i I rri gati on Project have coordinated 11i th
Sub. Directorate of Technical Planning Directorate of
Irriqation I Bandung •