Analisis Perbaikan Penjadwalan Produksi Kertas Untuk Meminimumkan Keterlambatan Produksi Di Pabrik Pt. Pusaka Prima Mandiri Jl. Brigjen Zein Hamid Km 6,9 Deli Tua

DAFTAR PUSTAKA

Baker,Kenneth R, 1984”Introduction ToSequencing and Scheduling” Jonn Wiley &
Sound New York.
Barnes,Ralp M.1980,”Motion and Time Study Deasurement of work” John Wiley &
Sound New York.
Biegel,Jonh E.1978,”Production Control A Qwantitive Approach”Prentice Hall Of
India Private Limited, New Delhi
Elsayed and Boucher, Thomas O, 1994,”Analisys and Control Production System
Prestice” Hall International, Inc.
Herjato,eddy,1999.”ManajemenProduksidanOperasi”
Indonesia, Jakarta.

PT.

GramediaWidiasarana

Kusuma, Hendra,2002, “PerencanaandanPengendalianProduksi” PenerbitAndi,
Yogyakarta.
Nasution, H.
Arman,1999.

GunaWidya, Jakarta.

“PerencanaandanPengendalianProduksi”

PT.

Sutalaksana.Z.Iftikar,1999,”Teknik Tata Cara Kerja” JurusanTeknikIndustri, Institut
Teknologi Bandung.
Adrese Kusiato, Computation Intelligence in Design and Manufacturing, John
Wihey&Sams, United States of America. 2000.
Cross,Nigel., Engineering Design Methos, England, John Wiley & Sons, Second
Edition,1994.
David D. Bedworth& James F. Bailey, Integrated Production and Control Systems,
Jonhn Willey &Sams. Singapore.1987.
Baroto, Teguh., Perencanaandan Pengendalian Produksi, Jakarta Ghalia Indon
esia,2002.
James Riggs, Production System,”Planning Analysis and Control” Jhon Willey
&Sams, United States of America, 1976.
J.Supranto. Statistik” TeoridanAplikasi”, EdisiKedua, PenerbitErlangga, Jakata 1991.


Universitas Sumatera Utara