PERANCANGAN SHOPPING CENTER DI KAWASAN TRANSIT ORIENTED DEVELOPMENT (TOD) BELAWAN

  PERANCANGAN SHOPPING CENTER DI KAWASAN TRANSIT ORIENTED DEVELOPMENT (TOD) BELAWAN LAPORAN AKHIR SKRIPSI RTA 4231 - STUDIO PERANCANGAN ARSITEKTUR 6 SEMESTER B TAHUN AJARAN 2014 / 2015 OLEH : HANA MARIA M SIANTURI 110406069 DEPARTEMEN ARSITEKTUR FAKULTAS TEKNIK UNIVERSITAS SUMATERA UTARA MEDAN 2015

  PERANCANGAN SHOPPING CENTER DI KAWASAN TRANSIT ORIENTED DEVELOPMENT (TOD) BELAWAN LAPORAN AKHIR SKRIPSI RTA 4231 - STUDIO PERANCANGAN ARSITEKTUR 6 SEMESTER B TAHUN AJARAN 2014 / 2015 OLEH : HANA MARIA M SIANTURI 110406069 DEPARTEMEN ARSITEKTUR FAKULTAS TEKNIK UNIVERSITAS SUMATERA UTARA MEDAN 2015

PERANCANGAN SHOPPING CENTER DI KAWASAN TRANSIT ORIENTED DEVELOPMENT (TOD) BELAWAN LAPORAN AKHIR SKRIPSI

  Untuk Memperoleh Gelar Sarjana Teknik Dalam Departemen Arsitektur

  Pada Fakultas Teknik Universitas Sumatera Utara Oleh :

  HANA MARIA M SIANTURI 110406069 DEPARTEMEN ARSITEKTUR FAKULTAS TEKNIK UNIVERSITAS SUMATERA UTARA MEDAN 2015

  

PERNYATAAN

PERANCANGAN SHOPPING CENTER DI KAWASAN

TRANSIT ORIENTED DEVELOPMENT (TOD) BELAWAN

  

SKRIPSI

  Dengan ini saya menyatakan bahwa dalam skripsi ini tidak terdapat karya yang pernah diajukan untuk memperoleh gelar kesarjanaan di suatu perguruan tinggi, dan sepanjang pengetahuan saya juga tidak terdapat karya atau pendapat yan pernah ditulis atau diterbitkan oleh orang lain, kecuali secara tertulis diacu dalam naskah ini dan disebutkan dalam daftar pustaka.

  Medan, Juli 2015 (Hana Maria M Sianturi) Judul Skripsi : PERANCANGAN SHOPPING CENTER DI KAWASAN TRANSIT-ORIENTED DEVELOPMENT (TOD) BELAWAN

  Nama Mahasiswa : Hana Maria M Sianturi Nomor Pokok : 110406069 Program Studi : Arsitektur

  Menyetujui

  Dosen Pembimbing Dr. Achmad Delianur Nasution, S.T, M.T.,IAI

  NIP. 197308281999031002 Ketua Program Studi, Koordinator Skripsi, Ir. Vinky Rahman, M.T. Ir. Vinky Rahman, M.T.

  NIP. 196606221997021001 NIP. 196606221997021001 Tanggal Lulus: Juli 2015

  Tanggal Lulus : Juli 2015 Telah diuji pada Tanggal: 24 Juli 2015

  Panitia Penguji Skripsi

  Ketua Komisi Penguji : Dr. Achmad Delianur Nasution, S.T, M.T.,IAI Anggota Komisi Penguji : 1. Benny O.Y.M., S.T, M.T, Ph.D

  2. Hajar Suwantoro, ST, MT

KATA PENGANTAR

  Segala puji dan syukur saya panjatkan kepada Tuhan Yesus Kristus. Atas kemurahan dan kasih karunia-Nya lah saya dapat menyelesaikan segala keseluruhan dari proses penyusunan Laporan Tugas Akhir ini sebagai salah satu syarat untuk memperoleh gelar Sarjana Teknik Arsitektur di Departemen Arsitektur, Fakultas Teknik, Universitas Sumatera Utara.

  Tugas Akhir ini diproses dengan penuh duka dan suka cita yang tidak bisa dilalui tanpa dukungan, doa, semangat, dan perhatian yang tiada berhenti mengalir dari kedua orang tua, kedua saudaraku, teman-teman, dan semua orang yang terlibat dalam proses pengerjaan Tugas Akhir ini.

  Pada kesempatan ini, dengan segala kerendahan dan kedalaman hati, saya menyampaikan rasa hormat dan terimakasih sebesar-besarnya kepada Dosen Pembimbing Tugas Akhir, Bapak Achmad Delianur Nasution, S.T,M.T, yang mana atas kesediaannya untuk terus membantu, mendorong, memotivasi, pengarahan serta waktu yang terus diberikan kepada saya sehingga saya dapat menyelesaikan Studio Perancangan Arsitektur 6 ini. Tidak lupa saya ucapkan banyak terima kasih kepada para penguji bapak Hajar Suwantoro S.T, M.T dan ibu Beny O.Y Marpaung S.T, M.T. yang memberikan komentar dan kritikan dengan tujuan untuk membangun tugas akhir ini semakin baik.

   Kepada kedua orangtua saya yang begitu saya kasihi, yang selalu saya doakan dan selalu mendoakan dan mendukung saya dalam setiap kegiatan dan keperluan saya, dr. G. Sianturi dan K. Turnip. Terimakasih, Pa, Ma. I love you both.

   Untuk keluarga saya, adik-adik saya (Yuli dan Samuel), tante Elsa, Opung, yang selalu ada selalu siap membantu, bahkan di saat terdesak selalu mengupayakan apa yang saya butuhkan.

   Untuk bang Samuel yang selalu membantu sebisa mungkin dalam proses pengerjaan Tugas Akhir ini, juga selalu meluangkan waktu untuk menemani.  Untuk kedua “adik” saya : Messy dan Youna, selalu jadi penyemangat ketika rasa suntuk dan bosan datang menyerang. Sehat-sehat ya adik kakak.  Untuk teman-teman yang terkasih : Ruth, Chaterine, Risma, Try, Grace, Christi,

  Mary, Utik, Helen, Ira, yang sudah mengisi hari-hari di kampus menjadi lebih berwarna. Untuk teman-teman yang lain, Robert, BP, Joshua, Dana, terimakasih buat bantuan-bantuannya dalam mengerjakan tugas, terlebih buat Robert yang selalu sabar mengajari. Tidak lupa terimakasih untuk teman-teman stambuk 2011, kita hebat !!

   Untuk teman-teman satu grup dalam perancangan PA-6 ini, Shella, Imam, Komting dan Noni, sukses buat kita ya!

   Terakhir, untuk Laptop saya yang meskipun kemarin sempat jatuh dan casingnya rusak, tapi tidak pernah berulah sampai sekarang dan tidak pernah menyusahkan saya dalam pengerjaan tugas.

  Medan, Juli 2015 Penulis

  Hana Maria MS

  

DAFTAR ISI

  

  

  

  

  

  

  

  

  

  

  

  

  

  

  

  

  

  

  

  

  

  

  

  

  

  

  

DAFTAR GAMBAR

Gambar 2.1. Plaza Indonesia .................................................................................................... 16Gambar 2.2. Interior Plaza Indonesia ....................................................................................... 16Gambar 2.3. Plaza Semanggi .................................................................................................... 18Gambar 2.4. Gedung Balai Sarbini ........................................................................................... 18Gambar 2.5. Mall Ciputra ......................................................................................................... 19Gambar 2.6. Interior Mal Ciputra ............................................................................................. 20

  

  

  

Gambar 4.1. Masterplan TOD Belawan ................................................................................... 47Gambar 4.2. Groundplan Belawan Shopping Center ............................................................... 48Gambar 4.3. Denah Basement 2 ............................................................................................... 49Gambar 4.4. Denah Basement 1 ............................................................................................... 49Gambar 4.5. Denah Lantai 1 ..................................................................................................... 50Gambar 4.6. Denah Lantai 2 ..................................................................................................... 51Gambar 4.7. Denah Lantai 3 ..................................................................................................... 51Gambar 4.8. Denah Lantai 4 ..................................................................................................... 52Gambar 4.9. Denah Lantai 5-8 ................................................................................................. 52Gambar 4.10. Tampak Depan dan Tampak Belakang .............................................................. 53Gambar 4.11. Tampak Kiri dan Tampak Kanan ...................................................................... 53Gambar 4.12. Potongan A- A’ dan Potongan B-B’ ................................................................... 54Gambar 4.13. Rencana Pondasi ................................................................................................ 55Gambar 4.14. Rencana Pembalokan Lantai Basement ............................................................. 55Gambar 4.15. Rencana Pembalokan Lantai 1........................................................................... 56Gambar 4.16. Rencana Pembalokan Lantai 2 dan 3 ................................................................. 56Gambar 4.17. Rencana Pembalokan Lantai 4........................................................................... 57Gambar 4.18. Rencana Pembalokan Lantai 5-8 ....................................................................... 57Gambar 4.19. Skematik Utilitas Listrik dan Fire Alarm .......................................................... 58Gambar 4.20. Skematik Utilitas Air Bersih dan Air Kotor ...................................................... 59Gambar 4.21. Perspektif Eksterior Belawan Shopping Center ................................................ 60Gambar 4.22. Perspektif Interior Belawan Shopping Center ................................................... 61

ABSTRAK

  Manusia sebagai mahluk sosial akan selalu membutuhkan interaksi sosial dengan manusia lain dalam kehidupannya. Ruang publik mengambil alih sebagai latar bagi perkembangan kehidupan publik, baik dalam kegiatan ekonomi, sosial, hiburan, hingga politik. Berlangsungnya kehidupan publik atau interaksi sosial sangat bergantung pada keberadaan dan perkembangan ruang publik. Pengembangan kawasan baru Belawan yang akan dikembangkan menjadi kawasan berbasis TOD (Transit-Oriented Development) tentunya memiliki beberapa fungsi utama yang berhubungan dengan moda transportasi yaitu : Stasiun KA Belawan, Pelabuhan Belawan, serta Terminal Belawan. Pengembangan kawasan baru Belawan ini dianggap belum lengkap bila tidak menyertakan sebuah pusat perbelanjaan sebagai ikonnya. Dengan tipe bangunan container yang mampu menampung berbagai benda sekaligus melindungi isinya dari luar dan memiliki ciri arsitektur yang dapat menonjolkan citra dari kawasan Belawan itu sendiri disertai ketersediaan lahan parkir yang cukup, sehingga mampu melengkapi ritual belanja sebuah masyarakat konsumtif yang muncul akibat kapitalisme.

  

Kata Kunci : TOD, Transit-Oriented Development, Pengembangan Kawasan Belawan,

Belawan II, Shopping Center, Stasiun KA Belawan, Modern Architecture.

ABSTRACT

  Humans as social beings will always need social interaction with other human beings

in his life. Public space takes over as the backdrop for the development of public life, both in

economic activity, social, entertainment, to politics. Ongoing public life or social interaction

is very dependent on the existence and development of public spaces.

  

Belawan new area development that will be developed into a region-based TOD (Transit-

Oriented Development) certainly has some major functions associated with other modes of

transport, namely: railway station Belawan Belawan port, as well as Terminal Belawan.

Belawan new area development is considered incomplete if they do not include a shopping

center as its icon. With this type of container building that can accommodate a variety of

objects while protecting the contents from the outside and has a characteristic architecture

that can accentuate the image of Belawan region itself with the availability of ample parking

space, so as to complete the ritual of shopping a consumerist society that arise as a result of

capitalism.

  

Keywords : TOD, Transit-Oriented Development, Pengembangan Kawasan Belawan,

Belawan II, Shopping Center, Stasiun KA Belawan, Modern Architecture.