Selanjutnya

MEMORANDUM OF UNDERSTANDI NG
BETWEEN
THE GOVERNMENT OF THE REPUBLIC OF INDONESIA
AND
THE GOVERNMENT OF AUSTRALIA
RELATING TO
THE

INDONESIAN PREFABRICATED STEEL TRUSS BRIDGE

CONSTRUCTION PROGRAM

I
MEMORANDUM OF UNDERSTANDING RELATING TO THE
INDONESIAN PREFABRICATED STEEL TRUSS BRIDGE
CONSTRUCTION PROGRAM

GENERAL

1. THIS MEMORANDUM expresses the understandings of the Government
of the Republic of Indonesia and the Government of Australia concerning

the responsibilities and contributions respectively of the two Governments
in regard to a Prefabricated Steel Truss Bridge Construction Program
(hereinafter referred to as the Project) located in the provinces of West
Kalimantan, Central Kalimantan, East Kalimantan, North Sulawesi, Central
Sulawesi and South East Sulawesi as further described and detailed in the
Annexures I, II, Ill to this Memorandum.

I

AUTHORITIES

2. The Executing Authorities for this Project will be :
For the

Indonesian

Direktorat Jenderal Bina Marga,

Government :


Departemen Pekerjaan Umum (The Directorate General of Highways of
the Ministry of Public Works).
For the Australian Government : The Australian Development Assistance
Bureau of the Department of Foreign Affairs. The Australian Development
Assistance Bureau may nominate suitably qualified agents to undertake
any part of its functions on its behalf.
DURATION

3. This Memorandum will take effect from the date of its signature and the
Project will be deemed to have commenced from that date.
The Australian contribution to the Project and all undertakings given
herein will cease four (4) years after the date of signature of this
Memorandum or on such other date as may subsequently be agreed
between the two Governments.

PROJECT
ORGAN ISATION

4.


Responsibility for development and direction of the Project will be vested
in a Project Co-ordinating Board, whose chairman will be appointed by the
Indonesian Government.

Membership of the Board will include the

Australian Team Leader, who is to be appointed by the Australian
Government and agreed upon by the Indonesian Government. Membership
of the

Board

will

also

include
イ・ゥjセエZョャ\カ[@

or


lftt::
ャョオ・Z[ゥ\セ@

Government Ministry referred to in Clause 2 above, or nominated at the
discretion of the Indonesian Government, as well as a nominee designated
by the Australian Embassy accredited to Indonesia.
not less than twice per year.

The Board will meet

I

5.

Functions of the Project Co-ordinating Board wil l include :
(a)

co-ordinating policy for the Project;


(b)

co-ordinating operation of the project team ;

(c)

co-ordinating the disposition of the project personnel;

(d)

reviewing and reporting on progress to the two Governments; and

(e)

recommending to the two Governments changes in program, budget
and future development.

RESPONSIBILITY

6. Overall responsibility for this Project will rest with the Government of


Indonesia.

The final authority for decisions on implementation of the

agreed works program shall rest with the Directorate General of Highways
after considering consultations between the Indonesian Project Manager
and the Australian Team leader.
CONTRIBUTIONS

7. The contributions of the Indonesian and Australian Governments are
detailed in Annex I and are estimated to value Rp. 8,1 00,000,000

and

$A 18,000,000 respectively. Disbursement of the Indonesian and Australian Governments' contributions will be subject to the normal annual
Parliamentary approval of Appropriations.
EVALUATION

8. An evaluation of progress of the Project may be made at times arranged

between and mutually convenient to, the

Indonesian and

Australian

Governments. Such an evaluation would be undertaken by a joint investigation team appointed by the two Governments and independenJ of
staff involved in the Project.
PERSONNEL

9. For the purposes of this Project, the Indonesian Government will, in
accordance with existing laws and regulations, faci litate the employment
by the Australian Government or its agent of personnel as required for the
Project and established between the two Governments by :
(a)

granting exemption from income or other taxes on Project salaries
and allowances;

(b)


granting exemption from import and other duties on personal and
household effects;

(c)

granting exemption from import duties on one commercial motor
vehicle per expert on condition that it either be re-exported, sold to
a person who has the same privileges, or duty paid on its assessed
value at time of sale within Indonesia, or granting exemption from
taxes and duties on the purchase in Indonesia of one locally assembled
motor vehicle per expert;

(d)

granting to Australian Project personnel all rights and entitlements
accorded to the aid personnel of any other donor country; and

I




セ@
I

(e)

expediting the issue of all documentation required for the entry of,
and performance of work by, Project personnel, including work
permits or certificates and drivers' licenses for eligible persons.

SUPPLIES

10. (a)

The Indonesian Government

will in accordance with the existing

and regular exempt from import duties and other taxes (or pay such

duties thereon) all goods supplied for the established purposes of
the Project as set out in Annex I;
(b)

The Indonesian Government will facilitate movement of Project
equipment and supplies by providing appropriate

customs

and

wharfage facilities in the port closest to the Project site and will be
responsible for the expeditious transport of such equipment and
supplies to the site; and
(c)

Project equipment and supplies provided by

Australia


shall

be

available for the unrestricted use of the Project and shall not be
withdrawn from such use without the consent of the Project Coordinating Board.

The Australian Team Leader in consultation

with the Indonesian Project Manager shall exercise administrative
control over such supplies for the duration of the Project.
LIABILITY

11. The Indonesian Government shall be responsible for dealing with any

claims which may be brought by third parties against Australia and its
experts,

agents or Australian personnel and shall hold harmless Austra-

lia and its experts, agents and personnel in case of any claims or liabilities
resulting from operations under this Memorandum. This provision shall
not relieve any person from liability for any criminal, grossly negligent
or fraudulent act.
SECURITY

12. The Indonesian Government will arrange

for any protection deemed

necessary to ensure the safety of Australian personnel, Project and personnel equipment both at the Project location, in transit and on any other
official representational activity in Indonesia. The Australian Government
will take reasonable precautions to ensure that Australian personnel have
due regard for local traditions and customs.
:

SETTLEMENT OF
DIFFERENCES

13. Any disputes arising out of the interpretation or implementation of the
Memorandum shall be settled amicably by consultation or negotiation
between the two Governments.

AMENDMENTS

14. Amendments to this Memorandum may be made at any time by an
Exchange of Letters between the tow Governments.

.I

ANNEXURES I, II and Ill to this Memorandum form an integral part of it.

SIGNED in Jakarta, in duplicate, this sixteenth day of September 1980.

FOR THE GOVERNMENT OF

FOR THE GOVERNMENT OF

THE REPUBLIC OF INDONESIA

AUSTRALIA

Signed

Signed

POERNOMOSIDI HADJISAROSA

( THOMAS K. CRITCHLEY )

Minister of Public Works

Ambassador

I

I

ANNE X

DIVISK>N OF RESPONSIBILITY

AND CONTRIBUTIONS

Australia
(a)

The Australian contribution to the Project will be approximately $18,000,000 including escalation
spread over the Australian financial year 1980-81 to 1983-84.

(b)

Within the limits of its contribution Australia will provide the following items for the purpose of
the agreed construction program :
(i)

prefabricated steel components including bearings for the bridges listed in Annex II;

(ii)

erection instructions and manuals for the prefabricated steel truss bridging system;

(iii)

The Australian Team Leader who will be based in Australia will visit the project sites up
to four times per year or in response to specific requests from the Co-ordinating Board; and

(iv)

technical support personnel as Iisted in Annex Ill to provide advice on the transport, storage,
erection and protection treatment of the steel truss bridging system.
All bridge components and manuals supplied by Australia for the Project will become the

property of the Indonesian Government on being shipped C.I.F. from Australia to the port of entry in
Indonesia closest to the respective storage sites and the Indonesian Government will provide the
Australian Embassy, Jakarta with documentary confirmation of the receipt of the equipment.
It is understood that the said prefabricated steel truss bridge components will be provided
by the Australian Government for the construction of the bridges listed in Annex II in the Provinces
of West Kalimantan, Central Kalimantan, East Kalimantan, North Sulawesi, Central Sulawesi, South East
Sulawesi, East and West Nusa Tenggara.

Modification to the list of bridges in Annex II may be made

after consultation with the Indonesian Authorities and the Bureau .

Indonesia
(a)

The Indonesian contribution to the Project will be approximately Rp.B, 100 million spread over
the Indonesian financial years' 1980-81 to 1983·84.

(b)

The Director General of Highways will appoint an officer as Executive Project Director in Jakarta
through whom all communications with the Ministry of Public Works will be directed.

(c)

Within the limits of its contribution, Indonesia will provide :
(i)

design and construction contracts for substructure, superstructure erection and decking
work for bridges Iisted in Annex II;

(ii)

sufficient supervisory staff to ensure that the above work is carried out to an acceptable
standard;

I

(iii)

field accommodation for the technical support staff as required;

(iv)

office accommodation for technical support personnel;

(v)

accommodation of acceptable standards for technical support personnel;

(vi)

field transport for the technical support personnel;

(vii)

all handling, clearing and transportation costs at the, and from the, ports of entry to the
project sites, of imported materials, equipment, machinery, furniture and fittings and other
goods supplied to the Project by Australia;

(viii) exemption from, or reimbursement of, all duty tax paid in Indonesia by Australia in
purchasing equipment and materials for the Project;
(ix)

secure storage areas for the prefabricated steel truss bridge components with storage con·
ditions which will eliminate deterioration or damage of components during storage; and

(x)

to the Australian Embass.y, Jakarta, receipts for each consignment of prefabricated bridge
components accompanied by a list of items not received, if any.
The personnel provided by Australia shall have an advisory role but final authority for

decisions in formulating and implementing the agreed work program shall rest with the Indonesian
Government after consultation with the Australian Project Manager.
The Australian Team Leader in consultation with the Australian Ambassador in Indonesia
or his delegate shall nevertheless have final jurisdiction in respect of duties, discipline, leave and all
other administrative issues concerning Australian personnel.
It is understood that the Indonesian Government will make arrangements to design and
construct permanent substrutures for the said bridges listed in Annex II. Responsibility for the struc·
tural soundness and adequacy of the bridge substrutures will rest with the Indonesian Governments.

ANNEX

II

INDONESIAN PREFABRICATED STEEL BRIDGE
CONSTRUCTION PROGRAM
LIST OF BRIDGE REPLACEMENT PROGRAM

NAME

LINK NO'

SPAN

(m)

SUPPLY PERIOD
WEST KALIMANTAN

017
017
019

2x 60

A yuh

004
004

2 X 35

Jaar

002

Karan Mati

004

30
25

003

30

Sawan
Tempurukan Besar
Pawan

40

30

CENTRAL KALIMANTAN

Dayu

I

25

EAST KALIMANTAN

Km 30
Pondok Gang
Marwah

003
003

Saka Kana

003

Beras

003

25
20
20
20

Ranowangko
Mangga Tasi

010
010
010
010

25
30
25
30

Maruassay

010

Kanotuana

010

35

015

3x 50

NORTH SULAWESI

Malalayang
Tambala

2

X

60

CENTRAL SULAWESI

Batui
SOUTH EAST SULAWESI

Pohara

001

Amesiu

001

+
2 X 50

011
011

20
30

50

SUPPLY PERIOD 2
WEST KALIMANTAN

Pasar Betung
Kamp. Betung Ill

55

NAME

LINK NO.

SPAN (m)

CENTRAL KALIMANTAN

Tabuk I

005

Buntok

005

Raut

005

25
35
25

002
002
002
002
002
002

30
20
25
30
25
25

EAST KALIMANTAN

Pekasan
Kuaru
Rangan
Sakurau
Pasiangan
Selulu
NORTH SULAWESI

Pontanga

003

Talaga

004

40
40
25
50+55

Bionga
Bone

005
025

Lolak

003

35

Tou

026

25

003

3x 35

017
017

2 X 45
60

005
005
005

45
50
30

006
006
006
006
006

25
35
25
20
25
35
30
25
25

CENTRAL SULAWESI

Taipa
SUPPLY PERIOD 3
WEST KALIMANTAN

Solak
Melisum
EAST KALIMANTAN

Jembayan
Loa Haur
Bongkok
NORTH SULAWESI

Malalahu
Alo
Biluanga
Tore· E
Lebo to
Marah
Bubode
Batulo Malu II
Maelang

007
007
007
007

NAME

LINK NO.

SPAN (m)

CENTRAL SULAWESI

Natindok
Sinorang

015
015

3 X 45

2

X

20 + 40

SOUTH EAST SULAWESI

Aduna IV
Laeya II

004
004
004

20
2 X 35

Auma

004

30

lnalobu

45

SUPPLY PER 100 4
WEST KALIMANTAN

Pemuar
Pinoh

006
006

2 X 40
3 X 60

CENTRAL KALIMANTAN

Laren I
Biang II

004

25

004

30

Singan I

004

25

Muru

007

Muru

001

25
2S

Nangka

001
001

35

EAST KALIMANTAN

Setin
Kendilu

30

001
001

2x 50

Sangkob

007

Pondang

007

2x 40 +
2x 50
2x 40

Biontong II

007
007

Bosui

35

NORTH SULAWESI

Jambu Sarang

35
20

SOUTH EAST SULAWESI

Rahabaugga
Ondonuhu

001
001

55
35 +40

SUPPLY PERIOD 5
WEST KALIMANTAN

Kuala Satong I

017

Kuala Satong II

017

so
so

NAME

LINK NO.

SPAN (m)

EAST KALIMANTAN

30

Batakan Kecil

006
006

Aji Raden

006

30

Batakan Besar

20

NORTH SULAWESI

Labiakiki
Dulupi
Lapuang
Mentiki I and II
Kakawang
Mananggu
Bumbulan
Marisa I
Tangkobu
Marisa

001
001
029
030
030
001
001
001
001
001

25
25
25
30
25
20
30
40
2 X 60
25

008
009

3x 50
3x 40

005
006
006
005

25
20
35
30

019
019

2 X 45
2 X 45

005
005
005

45
25
25

CENTRAL SULAWESI

Towera
Bainaa
SOUTH EAST SULAWESI

Labalamo Ponanua
Tula
Kaongke-Ongkea
Lonbiki
SUPPLY PER 100 6
WEST KALIMANTAN

Rantau Panjung
Padu
CENTRAL KALIMANTAN

K. Jihi
Labanen
Halawen

NAME

LINK NO.

SPAN (m)

EAST KALIMANTAN

Koman

001

Serakit

001

Selirung
Langun

001
001
001
001
001
001

30
25
25
30
25
25
20
25

007
007
007
007
007
007
007

25
40
35
25
30
30
50

009

2 X 40

Langun

II

Langun

Ill

Meliri

I

Meliri

II

NORTH SULAWESI

Imana
Keakar
Tuntung
!mana
Ane Gile
Wuwut
Somuo I

CENTRAL SULAWESI
Tinombo

ANNEX

INDONESIAN PREFABRICATED STEEL BRIDGE
CONSTRUCTION PROGRAM
TECHNICAL SUPPORT PERSONNEL

AUSTRALIAN

+

Project Manager/Co-ordinator



Project Engineer

*

Project Technician

+

To be based in Australia (from the Bureau's Agent)

*

Project based advisers (from bridge supplier)

INDONESIAN

+

Project Manager/Co-ordinator plus staff



Project Engineer plus sufficient supervisory staff

+

Based in Jakarta



Based in each of eight provinces to be supplied.

Ill